Updated Agency Specifications.docx

DOCX document 16 KB Posted

Attached to
AFC Statewide Tower Repairs - 183107
Solicitation number
SRC0000021251
Issued by
Alabama

About this file

The document is a set of bid specifications for the Alabama Forestry Commission (AFC) requesting bids for tower maintenance and repairs statewide. The bid shall include labor and travel to and from the 157 tower sites with tower-mounted equipment. Services requested include tower maintenance/repair, tensioning of guyed wire, anchor inspection, removal/installation of antenna, feedline, connector, mounting hardware, grounding components, lighting systems, and associated component repair/installation. The bid is for a multiple vendor award contract.

The bid specifications outline the labor rates required for work during regular business hours, after hours, weekends, and holidays. The AFC will provide certain materials such as antennas, connectors, and feedline. Bidder requirements include a 90-day warranty on all repairs, parts, labor, and travel charges, unless caused by an act of nature.

View the file

Other files

File Type Posted
Agency Email Correspondences regarding References.pdf PDF
RFB Standard Boilerplate udated 08.31.2023.pdf PDF
Tower Sites with GPS Locations.xls XLS spreadsheet
Specific Terms and Conditions.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALABAMA FORESTRY COMMISSION

BID SPECIFICATIONS FOR STATEWIDE TOWER REPAIRS

Alabama Forestry Commission (AFC) is requesting bids for tower maintenance and repairs statewide.

This bid shall include labor, and travel to and from the site. This bid shall be a multiple vendor award. AFC has a total of 157 tower sites with tower mounted equipment. Services for sites should include tower maintenance/repair, tensioning of guyed wire, anchor inspection, removal/installation of antenna, feedline, connector, mounting hardware, grounding components, lighting systems, and associated component repair/installation.

Tower Location Spreadsheet attached:

Scope of Work:

1. Tower Labor for installation/repair of tower mounted equipment on towers and travel rate for job completion:

· Labor per hour Monday-Friday 8AM-5PM

· Labor per hour after hours, weekends, and Holidays

2. Climb or Non-Climb Labor to accomplish the following:

· TIA (Tower Inspection Analysis).

· Guyed wire tension/repair.

· Guyed wire repair and anchor repair/inspection.

Materials provided by the AFC Communication Division:

· DB-420-B 450-470 11.3 dB UHF Omni Dipole•Snap in or Bolt on Coax Hanger
· DB-224-A 150-160MHz VHF Omni Dipole•7/8 Coax Grounding Kits
· IS-B50LN-C2- MA Polyphasers•Reel Stands for Coax Reel

· RF CELLFLEX LCF78-50JA Feedline

· RFS Male Connectors (NF-LCF78-D01K)

· Vapor Wrap / Waterproofing

Bidder Requirements:

· All repairs, parts, labor, and travel charge must have a 90-day warranty unless caused be an act of nature.

File details come from the government source that posted it. Updated .