Specific Terms and Conditions.docx

DOCX document 52 KB Posted

Attached to
AFC Statewide Tower Repairs - 183107
Solicitation number
SRC0000021251
Issued by
Alabama

About this file

The document outlines the Specific Terms and Conditions for a state-level contract opportunity in Alabama. The contract is being issued by the State of Alabama and seeks to establish a 12-month contract, with options to extend for up to five additional 12-month periods, for tower maintenance and repairs on a statewide basis. The contract will be awarded to up to three responsible bidders that meet all specifications. Bidders must provide unit pricing and a supplier part number, or indicate "N/A" if a part number is not applicable. The contract period may be extended upon written approval of both the state and the vendor, with any price increases capped at 5% and requiring justifiable proof in writing.

The pricing terms stipulate that the bid is F.O.B. destination, and any freight charges must be included in the bid prices. Vendors may be required to provide documentation of being an authorized manufacturer's representative for the products listed, and failure to do so may result in rejection of the bid. Suppliers are encouraged to refer to the "Alabama Buys Supplier Support" training materials to assist with the electronic submission process.

View the file

Other files

File Type Posted
Agency Email Correspondences regarding References.pdf PDF
RFB Standard Boilerplate udated 08.31.2023.pdf PDF
Tower Sites with GPS Locations.xls XLS spreadsheet
Updated Agency Specifications.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specific Terms and Conditions

Pricing submission instructions:

Suppliers are required to enter a unit price and a supplier part number. If the part number is not applicable, you may enter “N/A” in this field. On the supplier portal page, click the link titled “Alabama Buys Supplier Support” to access training Quick Reference Guides to assist in the electronic submission process.

Award:

Award shall be made to multiple bidders by accepting up to three (3) responsible bidders that meet all specifications. In the event of a tie for the third awarded bidder meeting all specifications, the State shall award to both bidders.

Freight:

Bid is F.O.B. destination. Any freight charges must be included in the bid prices.

Contract period:

Establish a 12-month contract with an option to extend for a second, third, fourth, and fifth 12-month period with the same pricing, terms and conditions. The second, third, fourth, or fifth 12-month period, if agreed by both parties, would begin the day after the first, second, third, or fourth 12-month period expires. Any successive extension must have written approval of both the state and vendor no later than 30 days prior to expiration of the previous 12-month period.

Materials, Supplies or Equipment:

All materials, supplies or equipment being bid and delivered to the State shall be new, unused, of recent manufacture, first class in every respect, and suitable for their intended purpose.

Quality of Materials and Labor:

Materials used that are not otherwise specified shall be the kind and quality consistent with the trade practice for such work and shall comply with all local codes. All labor shall be well experienced in this type of work and it shall be completed in a professional manner.

Requested information:

Any additional information requested from a vendor must be furnished within five (5) days from receipt of request.

Price Increase:

At the renewal of each contract period, up to a 5% price increase may be allowed, if agreed upon by both the contract vendor and the State of Alabama. The request for a price increase must have justifiable proof in writing and be submitted to the State of Alabama sixty (60) days prior to renewal date. Justifiable proof may be copies of materials, fuel, or labor costs increase over the current year of the contract. Any price increase allowed will be based on a percentage difference of the current contract price in effect and must not exceed 5%. Any price resulting from an agreed upon increase, must be firm for the next 12-month period of the contract.

Vendor Qualification:

If requested, vendor must provide documentation of being an authorized manufacturer's representative for the products listed. Failure to provide this information may result in rejection of bid.