UNICOR Elevators Scope of Work Document.pdf

PDF 116 KB Posted

Attached to
UNICOR Elevator Modernization Project
Solicitation number
ISO220-26
Issued by

About this file

This is a Scope of Work document for the UNICOR Elevator Modernization project at the UNICOR Central Office located at 400 First St. NW, Washington, DC.

The contractor shall modernize four elevator systems: three passenger traction elevators and one service traction elevator. Modernization includes replacement of major components such as gearless and geared AC machines, VVVF drives, controllers, isolation transformers, governors, safeties, oil buffers, roller guides, car and hoistway doors, door operators, cab interiors, car operating panels, emergency communication systems, and flooring. The scope additionally encompasses removal and disposal of asbestos-containing materials and lead-based paint; repair of concrete and masonry cracks and spalls; creation of new exterior door openings and metal stairs on the roof with roof patching; metal fabrications and pit ladders; fireproofing patching; firestopping of penetrations; installation of new metal doors and frames; interior finishes and signage; fire sprinkler system alterations; new elevator sump pumps; new VRF HVAC systems for equipment rooms; electrical and lighting alterations; fire alarm and communications systems alterations; and replacement of chain-link partitions and gates. The contractor is responsible for all supervision, labor, supplies, materials, licenses, permits, testing, inspections, machinery, tools, equipment, and services necessary for completion. The contractor must verify all quantities and field measurements prior to beginning work, as provided information is for illustrative guidance only. All work must comply with OSHA requirements, ASME A17.1, International Building codes, and applicable laws and regulations, with the contractor bearing full responsibility for safety.

View the file

Other files

File Type Posted
AMND 02.pdf PDF
AMND 01.pdf PDF
ISO220-26.pdf PDF
ACH Vendor Enrollment Form 2022.pdf PDF
FORM SF-24 BID BOND.pdf PDF
UNICOR ElevatorsTechnical Specifications rev 5-27-26.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE (2).pdf PDF
FORMSF-25A PAYMENT BOND.pdf PDF
FORM SF-25 PERFORMANCE BOND.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNICOR Elevator Modernization UNICOR Central Office 400 First St. NW, Washington, DC

Scope of Work

The Contractor shall furnish all supervision, labor, supplies/materials, licenses, permits, testing, inspections, machinery, tools, equipment, and services, including utility and transportation services required to perform and complete all work in accordance with the attached Drawings and Specifications titled “UNICOR ELEVATOR MODERNIZATION”.

The scope of work involves, but is not limited to:

a) The modernization of three passenger traction elevator systems, including replacement of existing components and equipment with new as specified. New components include, but are not limited to: overhead gearless AC machines, VVVF drives, controllers, isolation transformers, governors, safeties, oil buffers, roller guides, car and hoistway doors, car door sills, door operators, cab interiors, car operating panels, emergency communication systems, car and hall fixtures, car interiors, and flooring.

b) The modernization of one service traction elevator system, including replacement of existing components and equipment with new as specified. New components include, but are not limited to: basement geared AC machine, VVVF drive, controller, isolation transformer, governor, safeties, roller guides, car doors and sills, door operators, cab shell, cab interior, car operating panel, emergency communication systems, car and hall fixtures, car interior, and flooring.

c) Removal and disposal of asbestos-containing materials and equipment.

d) Removal and disposal of lead-based paint materials.

e) Repair of cracks and spalls in concrete and masonry and miscellaneous concrete work.

f) Providing a new exterior door opening in an exterior masonry wall.

g) Providing a new exterior metal stair and landing on the existing roof and patching roof.

h) Metal fabrications and pit ladders.

i) Patching of fireproofing.

j) Firestopping of penetrations.

k) Providing new metal doors and frames.

l) Interior finishes and signage.

m) Fire sprinkler system alterations.

n) Providing new elevator sump pumps.

o) Providing new VRF HVAC systems for equipment rooms.

p) Electrical and lighting alterations.

q) Fire alarm and communications systems alterations.

r) Replacement of a chain-link partition and gate with new.

The Contractor shall be responsible for field verification for all quantities and field measurements. Any quantities, measurements, illustrations, drawings, or documents provided in the contract documents are for illustrative guidance only and are required to be verified by the Contractor prior to beginning work.

The Contractor shall be responsible for safety. All work shall be conducted in strict compliance with safety regulations and guidelines including OSHA requirements, and any applicable laws, codes and regulations.

The work shall comply with all referenced codes and standards including ASME A17.1 and the International Building codes.