TX FW TECH MULTI(1) Plans Reduced.pdf
PDF 46 MB Posted
- Attached to
- TX FW TECH MULTI (1), Various Routes & Parking
- Solicitation number
- 6982AF24B000012
About this file
This document appears to be a solicitation for the TX FW TECH MULTI (1) project, which involves the reconstruction, chip seal maintenance, and surface drainage improvements to approximately 16.4 miles of existing roadways and parking areas within the Texas Chenier Plain Wildlife Refuge Complex. The project is being advertised on a full and open competition basis, with an estimated price range between $5,000,000 and $10,000,000. The Federal Highway Administration (FHWA) is conducting a pre-bid meeting on August 28, 2024 to provide a project overview and site visit, although attendance is not mandatory to bid. The solicitation specifies that the work will be contained within the existing roadway and parking lot footprints with no additional widening. Key objectives include prolonging the pavement life and improving surface drainage. The solicitation includes the project details, pre-bid meeting information, and pricing disclosure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CURTIS R SCOTT Digitally signed by CURTIS R SCOTT Date: 2024.08.22 08:38:52 -06'00'
PHILIP R. HAHN
109192
07/30/2024HDR ENGINEERING, INC.
TEXAS REGISTERED
FIRM F-754
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024 HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
07/30/2024
HDR ENGINEERING, INC.
File details come from the government source that posted it. Updated .