This document is a solicitation for the TX FW TECH MULTI (1), Various Routes & Parking project in the Texas Chenier Plain Wildlife Refuge Complex. The project involves reconstruction, chip seal maintenance, and drainage improvements to approximately 16.4 miles of existing roadways and parking areas that were damaged by Hurricane Harvey in 2017. The work will be performed within the existing boundaries of the wildlife refuge complex. The estimated price range for the project is between $5,000,000 and $10,000,000. A pre-bid meeting is scheduled for August 28, 2024, but attendance is not mandatory to bid on the project. This is a full and open competition solicited by the Department of Transportation Federal Highway Administration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHILIP R. HAHN

109192

07/30/2024

HDR ENGINEERING, INC.

TEXAS REGISTERED

FIRM F-754

AMENDMENT A001

9/09/2024 Added new sheet1

A001 9/09/2024

-T14A

AMENDMENT A001

9/09/2024

Updated Sheets:

A2, A8, A10, A17, B1, B2, B3, B4, B8, B11, B13, B15, B17, C3, C5, C8, C9, C20, C21, C22, C23, C24, D1, D5 Added Sheet:

T14A

PHILIP R. HAHN

109192

09/11/2024

HDR ENGINEERING, INC.

TEXAS REGISTERED FIRM

F-754

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

9/09/2024 Moved Route 010 Parking Area 2 at 84+28.93 to 85+36.24, LT;

to 132+45.00 to 132+75.00, RT

A001 9/09/2024

PHILIP R. HAHN

109192

09/11/2024

HDR ENGINEERING, INC.

TEXAS REGISTERED FIRM F-754

07/30/2024

HDR ENGINEERING, INC.

9/09/2024 Added Fill material callout and note.

A001 9/09/2024

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

9/09/2024 Added Separation-stabilization Geotextile callout and note, added Roadway Aggregate, and increase width of Concrete Pavement.

A001 9/09/2024

1 1

HDR ENGINEERING, INC.

TEXAS REGISTERED FIRM

F-754

G INCG INC

PHILIP R. HAHN

09/11/2024

07/30/2024

HDR ENGINEERING, INC.

A001 9/09/2024

718 52 770

AMENDMENT A001

9/09/2024 Increased Roadway Aggregate1

PHILIP R. HAHN

109192

09/11/2024

HDR ENGINEERING, INC.

965 55

AMENDMENT A001

9/09/2024 Increased Concrete Pavement and Sign System1

40 401

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

8 8

9/09/2024 Increased Pavement Marking1

A001 9/09/2024

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

46441 156

9/09/2024AMENDMENT A001

9/09/2024 Increased Roadway Aggregate1

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

132+45 TO 132+75 RT

A001 9/09/2024

AMENDMENT A001

9/09/2024 Moved Route 010 Parking Area 2 at 84+28.93 to 85+36.24, LT;

to 132+45.00 to 132+75.00, RT

PHILIP R. HAHN

109192

09/11/2024

07/30/2024HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

A001 9/09/2024

AMENDMENT A001

9/09/2024 Increased Concrete Pavement and Roadway Aggregate1

1 1

87+25 to 88+45 17 TON 120' L x 4' W x 6" D Roadway aggregate for temporary diversion during construction of half the width of minor concrete pavement

PHILIP R. HAHN

109192

09/11/2024

HDR ENGINEERING, INC.

07/30/2024HDR ENGINEERING, INC.

219+80 LT R7-8 Reserved Parking 12 x 18 1 same post R7-8p Van Accessible (plaque) 18 x 9

AMENDMENT A001

9/09/2024 Added 1 Sign System1

A001 9/09/2024

40 1

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

AMENDMENT A001

9/09/2024 Added 1 Accessibility Symbol1

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

10062+00 TO 64+00 and Aggregate Parking1

AMENDMENT A001

9/09/2024 Added aggregate parking1

A001 9/09/2024

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

07/30/2024HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024HDR ENGINEERING, INC.

AMENDMENT A001

9/09/2024 Moved Route 010 Parking Area 2 at 84+28.93 to 85+36.24, LT;

to 133+00.00 to 133+70.00, RT

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

9/06/2024

AMENDMENT A001

9/09/2024 Moved Route 010 Parking Area 2 at 84+28.93 to 85+36.24, LT;

to 132+45.00 to 132+75.00, RT

PHILIP R. HAHN

109192

09/11/2024

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

AMENDMENT A001

9/09/2024 Added Note 4.1

PHILIP R. HAHN

109192

09/11/2024

HDR ENGINEERING, INC.

9/09/2024 Added aggregate parking, updated slope stake and limits of construction lines.1

A001 9/09/2024

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024HDR ENGINEERING, INC.

9/09/2024 Added Parking Area Striping callout.1

A001 9/09/2024

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

9/09/2024 Added Parking Area Striping callout.1

A001 9/09/2024

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

AMENDMENT A001

9/09/2024 Added ADA Symbol, Sign System, and Parking Area Striping callouts.1

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

Install Parking Area Striping See Special 634-A 1

A001 9/09/2024

AMENDMENT A001

9/09/2024 Added Parking Area Striping callout.1

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

AMENDMENT A001

9/09/2024 Added Parking Area Striping callout.1

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

AMENDMENT A001

9/09/2024 Moved Route 010 Parking Area 2 at 84+28.93 to 85+36.24, LT;

to 133+00.00 to 133+65.00, RT

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

9/09/2024 Added Fill line.1

A001 9/09/2024

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024HDR ENGINEERING, INC.

07/30/2024HDR ENGINEERING, INC.

07/30/2024HDR ENGINEERING, INC.

07/30/2024HDR ENGINEERING, INC.

07/30/2024HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024 HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024HDR ENGINEERING, INC.

07/30/2024HDR ENGINEERING, INC.

07/30/2024HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

9/09/2024 Added new sheet.1

A001 9/09/2024

PHILIP R. HAHN

109192

09/09/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

07/30/2024

HDR ENGINEERING, INC.

File details come from the government source that posted it. Updated .