This document contains Questions and Answers related to a federal contract opportunity for the TX FW TECH MULTI (1) project, which involves the reconstruction and maintenance of approximately 16.4 miles of existing roadways and parking areas within the Texas Chenier Plain Wildlife Refuge Complex.

The key details include:

  • The project aims to repair damages from Hurricane Harvey in 2017, including reconstruction of asphalt, chip seal maintenance, and surface drainage improvements.
  • A pre-bid meeting is scheduled for August 28, 2024, where the Federal Highway Administration will provide an overview and site visit. Attendance is not mandatory to bid.
  • The estimated price range for the contract is between $5,000,000 and $10,000,000.
  • The contract includes questions and answers on topics such as the provision of a field office, project end date if an option is awarded, and the potential for time extensions due to material/equipment lead times.

View the file

Other files for this federal contract opportunity

Other files attached to TX FW TECH MULTI (1), Various Routes & Parking, newest first.
File Type Posted
Bid Opening Summary.pdf PDF
QA_Responses 9.24.24.pdf PDF
SF30.pdf PDF
A001 - 6982AF24B000012 2 of 2.pdf PDF
A001 - 6982AF24B000012 1 of 2.pdf PDF
TX FW TECH MULTI(1) Plans Reduced.pdf PDF
TX FW TECH MULTI(1) Final Pavement Report.pdf PDF
TX FW TECH MULTI(1) Final Drainage Design Memo.pdf PDF
IFB - 6982AF24B000012 - TX FW MULTI(1).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for

TX FW TECH MULTI(1) Various Routes & Parking

September 12, 2024

Questions Answers

On the bid items it has a Government furnished office trailer-

A0700 63701-0000 FIELD OFFICE (GOVERNMENT

FURNISHED)

In the SCR’s, we interpret it that the contractor must furnish the office trailer. Section 637.01 and 637.02 state to provide facilities and services.

It is understood that the contractor is to provide the services. Is the contractor to provide the facility or will the Government provide the facility?

See amendment A002

September 19, 2024

Questions Answers

2 What are the implications for the project end date if Option X is awarded?

Refer to SCR 108.01

3 If NTP is not issued by 11/4/24 how will those delays be added back into the project with no work allowed during the month of

April?

See FAR 52.211-10 Alternate 1

4 Does the 48” RCP need to be ARCH or will circular RCP be accepted?

A 5’Wx3’H box culvert may be considered. Submit a value engineering proposal after award.

5 Will FHWA accept 5x3 box culvert in place of the 48”ARCH

RCP?

A 5’Wx3’H box culvert may be considered. Submit a value engineering proposal after award.

6 Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?

See SCR 153.02(a)(1) Qualifications. No SSHO is required.

7 Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?

Time extensions may be considered under FAR Clause 52.249-10

8 Are soil boring reports available? If not, it will be assumed that excavation will be clear of rocks and obstructions.

See Pavement Report and Special Contract Requirement Section 204.

9 Is there a sign schedule available? If not, what sizes should be assumed for the signage package?

See Permanent Sign Summary and MUTCD

10 Confirm Texas DOT mixes are sufficient for asphalt and concrete. See Special Contract Requirement Section 403

11 Will an extension be issued to allow contractors time for review of new plans/updated specs in order to send proposals via mail?

No time extensions are being considered at this moment.