PRESERVE CARVER MUSEUM
TUIN 231534
TUSKEGEE, ALABAMA
DESIGN SERVICE FOR DESIGN DEVELOPMENT (DD) AND
CONSTRUCTION DOCUMENTS (CD), SUPPLEMENTAL SERVICES AND
ARCHITECTURAL/ENGINEERING (A/E) CONSTRUCTION PHASE SERVICES
TUSKEGEE INSTITUTE NATIONAL HISTORIC SITE
PMIS NO. 231534 PRESERVE CARVER MUSEUM
PMIS NO. 318984 REPAIR CARVER ROOF TRUSSES
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
May 6th, 2022
Signed on 05/05/2022 using a Digital Signature.
Signed on 05/05/2022 using a Digital Signature.
DocuSign Envelope ID: 134A1C0E-FD39-4872-B913-27A2A37EE04D
TUIN 231534 00 01 10 - 1
TABLE OF CONTENTS
SECTION 00 01 10 - TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 00 - Cover
00 01 10 - Table of Contents
SPECIFICATIONS
DIVISION 01 -- GENERAL REQUIREMENTS
01 10 00 – Summary of Work
01 22 00 - Unit Prices
01 26 01 – Contract Modification Procedures
01 27 00 – Definition of Contract Line Items
01 31 00 – Project Management and Coordination
01 32 16 – Construction Schedule
01 32 33 – Photo Documentation
01 33 23 – Submittal Procedures
01 35 13.22 – Archeological Protection
01 35 23 – Safety Requirements
01 35 91 – Historic Preservation Treatment Procedures
01 40 00 – Quality Requirements
01 42 00 – Reference Standards
01 50 00 – Temporary Facilities and Controls
01 57 19.11 – Indoor Air Quality Management
01 57 19.12 – Noise and Acoustics Management
01 57 23 – Temporary Storm Water Pollution Prevention
01 67 00 – Product Requirements
01 73 40 – Execution
01 74 19 – Construction Waste Management and Disposal
01 77 00 – Closeout Procedures
01 78 10 - Special Project Warranty on Roofs and Walls
01 78 23 – Operation and Maintenance Data
01 79 00 – Demonstration and Training
01 81 13 – Sustainable Design Requirements
DIVISION 02 -- EXISTING CONDITIONS
02 15 00 – Bracing and Shoring
02 41 00 – Demolition
02 42 50 – Selective Demolition in Historic Structures
02 83 00 – Lead Paint Remediation
02 85 00 – Mold Remediation
DIVISION 03 -- CONCRETE
03 05 16 - Underslab Vapor Barrier
03 20 00 – Concrete Reinforcing
TUIN 231534 00 01 10 - 2
03 30 00 – Cast in Place Concrete
DIVISION 04 -- MASONRY
04 01 20 – Masonry Cleaning
04 09 20 – Masonry Repair and Re-Pointing
DIVISION 05 -- METALS
05 52 13 - Pipe and Tube Railings
DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
06 10 53 - Miscellaneous Rough Carpentry
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
07 10 00 - Waterproofing
07 21 26 - Blown Insulation
07 46 23 - Wood Siding
07 53 23 - EPDM Thermoset Single-Ply Roofing - Carlisle
07 61 00 - Sheet Metal Roofing
07 84 00 - Firestopping
07 92 00 - Joint Sealants
DIVISION 08 -- OPENINGS
08 01 20 – Wood, Sash, Frame and Door Restoration
08 71 00 – Door Hardware
08 83 00 – Mirrors
DIVISION 09 -- FINISHES
09 05 61 - Preparation of Concrete to Receive Adhesively Installed Flooring
09 21 16 - Gypsum Board Assemblies
09 23 00 - Gypsum Plastering
09 30 00 - Tiling
09 60 10 - Flooring Transitions
09 65 00 - Resilient Flooring
09 68 13 - Tile Carpeting
09 91 00 - Painting
09 96 00 - High-Performance Coatings
09 97 23 - Concrete and Masonry Coatings
DIVISION 10 -- SPECIALTIES
10 21 13 - Toilet Compartments
10 28 00 - Toilet, Bath, and Laundry Accessories
10 44 00 - Fire Extinguishers, Cabinets, and Accessories
DIVISION 11 -- NOT USED
DIVISION 12 -- FURNISHINGS
12 36 00 - Countertops and Window Stools
DIVISION 13 -- NOT USED
DIVISION 14 -- NOT USED
DIVISION 21 -- FIRE SUPPRESSION
21 00 10 – Fire Suppression General
TUIN 231534 00 01 10 - 3
21 00 90 – Fire Suppression Performance Verification
21 30 00 – Fire Suppression Systems
DIVISION 22 -- PLUMBING
22 00 10 – Plumbing General
22 00 90 – Plumbing Performance Verification
22 25 00 – Plumbing Insultation
22 42 00 – Plumbing Fixtures
22 43 00 – Drainage Systems
22 44 00 – Water Systems
22 45 00 – Fuel Gas Systems
DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 00 10 – HVAC General
23 00 95 – Testing, Adjusting and Balancing
23 10 00 – Piping, Valves and Accessories
23 25 00 – HVAC Insultation
23 60 00 – Equipment
23 70 00 – Air Distribution
23 80 00 – Automatic Temperature Controls
DIVISION 25 -- NOT USED
DIVISION 26 -- ELECTRICAL
26 00 10 – Electrical General
26 00 90 – Electrical Performance Verification
26 05 19 – Building Wire and Cable – 600 Volt
26 05 26 – Grounding
26 05 29 – Supporting Devices
26 05 33 – Raceways
26 05 73.13- Short Circuit Studies
26 05 73.16- Coordination Studies
26 05 73.19—Arc-Flash Hazard Analysis
26 09 23 – Lighting Control Devices
26 09 43 – Relay-Based Lighting Control
26 13 00 – Boxes
26 14 80 – Connections to Motors and Equipment
26 24 16 – Panelboards
26 27 26 – Wiring Devices
26 28 16 – Circuit and Motor Disconnects
26 47 50 – Overcurrent Protective Devices
26 47 60 – Individual Circuit Breakers
26 51 00 – Luminaries
26 52 13 -- Emergency and Exit Lighting
26 56 19 – LED Exterior Lighting
DIVISION 27 -- NOT USED
TUIN 231534 00 01 10 - 4
DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY
28 30 10 – Fire Detection and Alarm General
28 30 90 – Fire Detection and Alarm Performance Verification
28 31 00 – Fire Alarm System
DIVISION 31 -- EARTHWORK
31 10 00 – Site Clearing
31 13 10 – Tree and Plant Protection and Removal
31 13 17 – Tree Pruning
31 22 00 – Grading
31 23 17 – Excavating and Backfilling for Structures
31 23 33 – Trenching and Backfilling
31 43 13 – Concrete Pressure Grouting
31 66 15 – Helical Piles
DIVISION 32 -- EXTERIOR IMPROVEMENTS
32 92 00 – Staging, Handling and Installation of Trees and Plants
32 92 19 – Seeding
32 92 23 – Sodding
32 93 00 – Selection of Trees and Shrubs
DIVISION 33 -- UTILITIES
33 40 00 – Storm Drainage Utilities
DIVISION 34 -- NOT USED
DIVISION 40 -- NOT USED
DIVISION 46 -- NOT USED
APPENDICES
Appendix A
Historic Mortar Analysis dated October 4th, 2021
Appendix B
NPS Accessibility Scoping Form for ABAAS Facilities
Appendix C
Statement of Structural Tests and Special Inspections
Appendix D
Regulated Materials Survey dated November 15th, 2021
Appendix E
Geotechnical Report dated February 5th, 2021
END OF SECTION
TUIN - 231534 01 11 00 - 1
051121 SUMMARY OF WORK
SECTION 01 11 00 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes the following:
1. Work Covered by Contract Documents
2. Contractor Use of Site
3. Public Use of Site
4. Occupancy Requirements for Buildings
5. Conduct of Operations
6. Work Restrictions
7. Special Construction Requirements
8. Soils Investigation Report
9. Additional Reports
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: Tuskegee Institute National Historic Site, George Washington Carver Museum, Tuskegee, Alabama. Project Located in the George Washington Carver Museum on Tuskegee
Institute’s Campus.
B. The Work consists of:
1. Selective demolition and rehabilitation of the site, interior, and exterior of the George
Washington Carver Museum building including upgrades to life safety, accessibility, masonry, structure, and systems.
C. Project will be constructed under a single prime contract.
1.3 CONTRACTOR USE OF SITE
A. General: Contractor shall have full use of the site for construction operations during the construction period. Contractor's use of the site is limited only by the Government's right to perform work or to retain other contractors on portions of Project.
B. Storage of Materials and Staging: Confine storage of materials to climate-controlled trailers for sensitive materials and securely protected parking areas fenced and located in parking lot adjacent to Booker T. Washington Home on W. Montgomery Road. Coordinate location and size of storage and staging areas within parking area indicated with Contracting Officer. Entrance to
Tuskegee Campus is restricted to Payton Drive. See G3.1. Staging to be located in parking lot adjacent to Booker T. Washington Home on W. Montgomery Road. See G3.1. Small scale temporary staging directly adjacent to the building is indicated on the drawing G3.0.
C. Parking: Confine parking to up to 15 spaces on Tuskegee campus parking.
TUIN - 231534 01 11 00 - 2
D. Stockpiling: Confine stockpiling to storage areas defined in item 1.3B.
E. Preservation of Natural Features:
1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
2. Provide temporary barriers to protect existing trees and plants and root zones.
3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with
Contracting Officer (CO) and remove agreed-on roots and branches that interfere with construction.
4. Do not fasten ropes, cables, or guys to existing trees.
5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
F. Driveways and Entrances: Keep driveways, walkways, and entrances serving immediately surrounding premises clear and available to University employees and students, Government employees, and emergency vehicles at all times. Do not use for parking or storage of materials.
1. Schedule deliveries to minimize use of driveways and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
G. Construction Camp: Establishment of a camp within park will not be permitted.
H. Hauling Restrictions: Comply with legal load restrictions in hauling of materials. Load restrictions on park roads are identical to state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.
I. Bridge Restrictions: Identify jurisdictions, load restrictions, permit requirements, time and calendar restrictions as outlined.
1.4 PUBLIC USE OF SITE
A. The building and immediate grounds will be closed to the public during construction.
Construction activity will be taking place on an active University campus, coordinate activities with Park. Park will coordinate with University Campus.
1.5 CONDUCT OF OPERATIONS
A. Contractor shall conduct his operations in conformance with rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by Park Superintendent.
B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed unless stated in the Work Restrictions below or without prior consent from the Contracting Officer. Submit requests 3 business days in advance of the work to the Contracting Officer for approval. Work
TUIN - 231534 01 11 00 - 3
involving impact to the project schedule and requiring additional access on Saturdays, Federal holidays, or at night must submit requests 5 business days in advance of the work.
C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
1.6 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:30 a.m. to 4 p.m., Monday through Friday, except when otherwise indicated.
1. Weekend Hours: Sunday work will not be permitted. Saturday work is permitted only with prior approval.
2. Early Morning Hours: By request and prior approval.
B. Existing Utilities
1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.
2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify Contracting Officer not less than five business days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Contracting Officer’s written permission.
3. Hours and length of Utility Shutdowns: Shutdowns to be for the minimal possible amount of time. If shutdown affects surrounding buildings a 2-hour limitation will be required.
D. Non-smoking Building/Tobacco Use/Vaping: Smoking is not permitted.
1.7 SPECIAL CONSTRUCTION REQUIREMENTS
A. Project Website: A project website administered by NPS will be used for purposes of managing communication and documents during construction stage.
1. See Section 01 31 00 "Project Management and Coordination" for requirements on using
Project Website.
1.8 SOILS INVESTIGATION REPORT
A. The report: Report of Subsurface Exploration and Geotechnical Engineering Evaluation, George
Washington Carver Museum Rehabilitation, Tuskegee, Alabama, prepared by Geo Hydro is an appendix with this package.
TUIN - 231534 01 11 00 - 4
B. In case of conflict between report and drawings or specifications, the drawings and specifications govern.
1.9 ADDITIONAL REPORTS
A. The report Hazardous Materials, In Progress prepared by Intertek. is an appendix with this package.
B. In case of conflict between report and drawings or specifications, drawings and specifications govern.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 11 00
TUIN 231534 01 22 00 - 1
UNIT PRICES
SECTION 01 22 00 - UNIT PRICES
PART 1 GENERAL
1.1 SECTION INCLUDES
A. List of unit prices, for use in preparing Bids.
B. Measurement and payment criteria applicable to Work performed under a unit price payment method.
1.2 COSTS INCLUDED
A. Unit Prices included on the Bid Form shall include full compensation for all required labor, products, tools, equipment, plant, transportation, services and incidentals; erection, application or installation of an item of the Work; overhead and profit.
1.3 UNIT QUANTITIES SPECIFIED
A. Quantities indicated in the Bid Form are for bidding and contract purposes only. Quantities and measurements of actual Work will determine the payment amount.
1.4 MEASUREMENT OF QUANTITIES
A. Measurement methods delineated in the individual specification sections complement the criteria of this section. In the event of conflict, the requirements of the individual specification section govern.
B. Take all measurements and compute quantities. Measurements and quantities will be verified by Owner.
C. Assist by providing necessary equipment, workers, and survey personnel as required.
D. Perform surveys required to determine quantities, including control surveys to establish measurement reference lines. Notify Architect prior to starting work.
E. Contractor's Engineer Responsibilities: Sign surveyor's field notes or keep duplicate field notes, calculate and certify quantities for payment purposes.
1.5 PAYMENT
A. Payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities of Work that is incorporated in or made necessary by the Work and accepted by the Architect, multiplied by the unit price.
B. Payment will not be made for any of the following:
1. Products wasted or disposed of in a manner that is not acceptable.
2. Products determined as unacceptable before or after placement.
3. Products not completely unloaded from the transporting vehicle.
4. Products placed beyond the lines and levels of the required Work.
5. Products remaining on hand after completion of the Work.
6. Loading, hauling, and disposing of rejected Products.
1.6 SCHEDULE OF UNIT PRICES
A. Moisture-Resistant Sealer-Surfacer.
1. Section 09 0561 - Preparation of Concrete to Receive Adhesively Installed Flooring.
2. Measurement: Plan quantity, work in place.
3. Payment: Per square foot.
4. Include the following quantity in the Base Bid: 0 SF.
B. Standard Flooring Adhesive for Resilient Flooring.
1. Section 09 6500 - Resilient Flooring.
TUIN 231534 01 22 00 - 2
UNIT PRICES
2. Section 09 0561 - Preparation of Concrete to Receive Adhesively Installed Flooring.
3. Measurement: Plan quantity, work in place.
4. Payment: Per square foot.
5. Include the following quantity in the Base Bid: 100% of the area to receive resilient flooring.
C. Moisture-Resistant Flooring Adhesive for Resilient Flooring.
1. Section 09 6500 - Resilient Flooring.
2. Section 09 0561 - Preparation of Concrete to Receive Adhesively Installed Flooring.
3. Measurement: Plan quantity, work in place.
4. Payment: Per square foot.
5. Include the following quantity in the Base Bid: 0 SF.
D. Standard Flooring Adhesive for Carpet.
1. Section 09 6800 - Carpet.
2. Section 09 0561 - Preparation of Concrete to Receive Adhesively Installed Flooring.
3. Measurement: Plan quantity, work in place.
4. Payment: Per square foot.
5. Include the following quantity in the Base Bid: 100% of the area to receive carpet.
E. Moisture-Resistant Flooring Adhesive for Carpet.
1. Section 09 6800 - Carpet.
2. Section 09 0561 - Preparation of Concrete to Receive Adhesively Installed Flooring.
3. Measurement: Plan quantity, work in place.
4. Payment: Per square foot.
5. Include the following quantity in the Base Bid: 0 SF.
F. Gypsum Plastering
1. Section 09 2300 - Gypsum Plastering
2. Measurement: Plan quantity, work in place.
3. Payment: Per square foot.
4. Include the following quantity in the Base Bid: 0 SF.
G. Concrete Repair
1. Section 03 3000 - Cast-in-Place Concrete
2. Measurement: Plan quantity, work in place.
3. Payment: Per square foot.
4. Include the following quantity in the Base Bid: 0 SF.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
TUIN - 231534 01 26 01 - 1
012721 CONTRACT MODIFICATION PROCEDURES
SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section consists of administrative and procedural requirements for contract modifications.
1.2 DEFINITIONS AND ALLOWANCES
A. Home Office Overhead: Costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):
1. Rent
2. Utilities
3. Furnishings
4. Office equipment
5. Executive and management staff not exclusively assigned to the project
6. Support, accounting, and administrative staff
7. Preparation of cost proposals, estimating, and schedule analyses connected with
Modifications
8. Estimating and preconstruction services
9. Mortgage costs
10. Real estate and corporate taxes
11. Automobile maintenance and travel costs for home office personnel
12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.
13. Depreciation of equipment and other assets
14. Home office supplies (paper, staples, etc.)
15. Legal services
16. Accounting and data processing
17. Professional fees/registration
B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with preparation of modifications will not be allowed. Costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:
1. Project Manager (PM), Assistant Project Manager
2. Superintendent, Assistant Superintendent
3. Quality Control, Safety Officer, Environmental Manager, etc.
4. Engineers
5. Travel, lodging, and per diem (as established by Federal Travel Regulations)
6. Scheduling
TUIN - 231534 01 26 01 - 2
7. Field Office Trailers and associated temporary utilities
8. Field office supplies
a. Mailing and couriers
b. Reproduction costs
c. Storage
d. Phones
e. Computers
f. Copiers
9. Personal vehicles i.e. Superintendent Pickup trucks
C. General Requirements: Costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate.
The following items, if applicable, are considered allowable costs for calculating General Requirements:
1. Hoisting
2. Material handling
3. Temporary fencing
4. Port-a-lets
5. Trash removal, dumpsters
6. Barricades
7. Small tools
8. Safety supplies
9. Scaffolding
10. Daily cleaning
11. Traffic control
12. Temporary signage
13. Temporary heating and power
D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on project site. Modification costs for salaried workers are only allowed within the structure of a 40-hour week and no overtime or holiday pay will be allowed.
1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:
a. Base Rate: The hourly rate paid directly to the worker
b. Labor Burden: Employer payments of all applicable burdens; includes insurance and taxes the business must pay on behalf of the worker to government entities and educational forums, such as:
1) Social Security
2) Medicare
3) Workers Compensation – Policy and company calculation to be made available.
4) Federal Unemployment Tax Act (FUTA) - Cap Rate and percentage to be proportionally allocated over one year.
5) State Unemployment Tax Act (SUTA) - Cap Rate and percentage to be proportionally allocated over one year.
TUIN - 231534 01 26 01 - 3
6) Union agreement costs - Other costs required under an enforceable collective bargaining agreement.
c. Fringe Benefits: Various non-wage compensations provided to employees such as:
1) Health Care Insurance Premiums
2) Cell Phone
3) Clothing
4) 401K and Pensions
5) Vehicle allowances
6) Gas allowance
7) Life insurance premiums
8) Disability insurance
9) Other Fringe Benefits required under an enforceable collective bargaining agreement
E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.
F. General Liability Insurance: An insurance policy that protects Contractor from claims resulting from bodily injury or property damage to a third party. Include as a separate line item within all modification proposals and provide a current insurance quote upon request.
G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees the Contractor will pay the labor and material costs incurred. Banks and Insurance companies charge a premium for individual project based on a sliding scale related to the size of the project.
Include as a separate line item in modification proposals and provide current company bonding rates upon request.
H. Builder’s Risk Insurance: Covers the contractor’s loss due to fire, high winds, or other natural forces. Not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.
1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS
A. General:
1. Proposal be received in the format and within the time frame specified in the Request for Proposal (RFP) letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.
2. Proposal shall be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed they are included in the hourly rate shown, or contractor is not requesting reimbursement. Contractor may utilize the government provided Contractor Estimate Form, or their own form, provided that it contains the same information and level of detail as the Government’s form.
TUIN - 231534 01 26 01 - 4
3. Requests for extensions of contract time as a result of change must be justified with a Time Impact Analysis (TIA). Refer to Section 01 32 16 "Construction Schedule", for time impact analysis requirements. TIA and associated costs shall be received with the proposal by the date shown within the Request for Proposal letter. Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving right for additional time and no time extension will be allowed.
4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer (CO) upon request.
5. Contractor shall review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.
6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.
B. Labor:
1. Contractor shall estimate cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing hours required for each craft directly engaged in modification work. Any work proposed requiring overtime work or premium pay shall be itemized separately. Rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, Federal Insurance Contributions Act (FICA), FUTA, and other direct costs resulting from Federal, State or local laws.
2. Itemize labor costs for equipment operators separate from equipment costs.
3. Labor cost for foremen shall only be costs for related work required for the modification.
C. Materials:
1. Estimated cost for materials shall include quotes from multiple sources. Material prices shall include applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.
2. No markup shall be applied to any material provided by NPS.
D. Equipment:
1. Equipment used for the project must be appropriately sized for work being performed.
2. Do not include costs for "miscellaneous tools and equipment", in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 shall be broken out separately.
3. Regardless of ownership, rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:
a. United States (U.S.) Army Corps of Engineers, Ownership and Operating Expense Schedule (use latest edition and applicable region)
b. Construction Blue Book
c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.
TUIN - 231534 01 26 01 - 5
4. Estimated equipment rates shall include operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires and tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per Federal Acquisition Regulation (FAR) 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.
5. Estimate full rate for equipment only for duration that equipment will be utilized to accomplish work of the modification.
6. Standby unit rates used in accordance with paragraph 1.3, D, 2, above. If the U.S. Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then 1/2 of equipment costs minus any operating costs, major repair and overhaul will be accepted.
7. If equipment is in standby mode due solely to a documented NPS delay, established standby rate shall apply from the first day of the delay.
8. Equipment not used and on job site for up to five consecutive days may be classified at standby rates, provided the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work.
Equipment still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.
9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.
10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.
E. Establishment and Application of Overhead and Profit Percentages:
1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.
Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:
Overhead………………10% Profit………………7.80%
2. Total aggregate limit of markup (OH&P) for Contractor and Subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.
3. If Contractors form a partnership, partnership may only receive home office overhead and profit in same amount as an individual Contractor (refer to paragraph 1.3,E,1 above). It is the responsibility of the partners to decide on division of revenue.
4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, overhead and profit mark-ups are required on net increases and deducted on net decreases.
5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.
TUIN - 231534 01 26 01 - 6
PART 2 - PRODUCTS
PART 3 - EXECUTION
END OF SECTION 012601
TUIN 231534 01 27 00 - 1
012721 DEFINITION OF CONTRACT LINE ITEMS
SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Section explains in general, what is and is not included in a contract line item, and limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of work, include costs in a related item.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS
A. Contract Line Item Number 1 Base Bid, Selective Rehabilitation of Carver Museum
1. This item consists of Selective demolition and rehabilitation of the site, interior, and exterior of the George Washington Carver Museum building including upgrades to life safety, accessibility, masonry, structure, and systems.
2. Measurement for payment will be for work in place.
3. Payment will be made at the contract lump sum price.
B. Contract Line Item Number 2 Base Bid, Truss Repair Support
1. This item consists of repair of finishes and substrates, and the reinstallation of Exhibits following the truss repair work in Bid Option 5.
2. Measurement for payment will be for work in place.
3. Payment will be made at the contract lump sum price.
C. Contract Line Item Number 3 Base Bid, Packing, Transport, Storage, and Re-installation of
Museum Collections
1. This item consists of the packing, transport, storage, and re-installation of the museum collections.
2. Measurement for payment will be for work in place.
3. Payment will be made at the contract lump sum price.
D. Option A: Bid Option 1 Lower Level Restrooms Total Upgrade
1. Contract Line Item Number 0004:
a. This item consists of the removal of restroom ceramic tile flooring and base, toilet partitions, restroom lighting, restroom mechanical diffusers, select restroom plumbing fixtures, and the existing galvanized piping in the building and the replacement of the removed items with new.
TUIN 231534 01 27 00 - 2
012721 DEFINITION OF CONTRACT LINE ITEMS
b. Measurement for payment: Work in place.
c. Payment will be made at the contract lump sum price.
E. Option B: Bid Option 2 Fire Alarm System Replacement
1. Contract Line Item Number 0005:
a. This item consists of the removal of existing fire alarm system and related architectural work and the replacement of the removed items with new.
b. Measurement for payment: Work in place.
c. Payment will be made at the contract lump sum price.
F. Option C: Bid Option 3 Upper Level Light Fixture Replacement
1. Contract Line Item Number 0006
a. This item consists of the removal upper level luminaires, including track lighting and the replacement of the removed items with new.
b. Measurement for payment: Work in place.
c. Payment will be made at the contract lump sum price.
G. Option D: Bid Option 4 Upper Level Finishes Upgrade
1. Contract Line Item Number 0007:
a. This item consists of the removal existing floor finishes and trim, the replacement of the removed items with new, and the painting of the ceiling and walls.
b. Measurement for payment: Work in place.
c. Payment will be made at the contract lump sum price.
H. Option E: Bid Option 5 Roof Truss Repair
1. Contract Line Item Number 0008:
a. This item consists of shoring of existing trusses, removal of select portions of the ceiling, repairing roof trusses, installing new insulation, and repairing ceiling and flooring as needed.
b. Measurement for payment: Work in place.
c. Payment will be made at the contract lump sum price.
END OF SECTION 01 27 00
TUIN 231534 01 31 00 - 1
012721 PROJECT MANAGEMENT AND COORDINATION
SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Definitions
2. Construction Coordination
3. Submittals
4. Coordination Drawings
5. Requests for Information (RFIs)
6. Project Meetings
7. Environmental Coordination
8. Permits
B. Related Requirements:
1. Section 01 32 16 "Construction Schedule" for preparing and submitting Contractor’s construction schedule.
2. Section 01 73 40 "Execution" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
3. Section 01 77 00 "Closeout Procedures" for coordinating closeout of the Contract.
1.2 DEFINITIONS
A. Agency with Jurisdiction
B. Construction Permits – Contractor Provided
C. Government Furnished Permits
1.3 CONSTRUCTION COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.
3. Make provisions to accommodate items scheduled for later installation.
TUIN 231534 01 31 00 - 2
4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of components, including mechanical and electrical.
5. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to:
1. Preparation of Contractor's Construction Schedule
2. Preparation of the Schedule of Values
3. Installation and removal of temporary facilities and controls
4. Delivery and processing of submittals
5. Progress meetings
6. Permit requirements
7. Pre-installation conferences
8. Project closeout activities
1.4 SUBMITTALS
A. Coordination Drawings: Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.
1. Content: Project-specific information, drawn accurately to scale. Do not base Coordination
Drawings on reproductions of Contract Documents or standard printed data. Include following information, as applicable:
a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.
b. Indicate dimensions shown on Contract Drawings and make specific note of dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to Contracting Officer (CO) for resolution of such conflicts.
c. Indicate space requirements for routine maintenance and anticipated replacement of components during the life of the installation.
d. Show location and size of access doors required for access to concealed dampers, valves, and controls.
e. Indicate required installation sequences.
2. Sheet Size: At least 8-1/2 by 11 inches (215 by 280 millimeters) but no larger than 30 by
40 inches (750 by 1000 millimeters).
3. Number of Copies: Submit two (2) opaque copies of each submittal. Contracting Officer will return one (1).
TUIN 231534 01 31 00 - 3
4. Refer to individual Sections for Coordination Drawing requirements for Work in those
Section
B. Coordination Drawing Organization: Organize coordination drawings as follows:
1. Floor Plans and Reflected Ceiling Plans: Show architectural, structural, mechanical, plumbing, fire-protection, fire-alarm, and electrical elements. Show locations of visible ceiling-mounted devices relative to acoustical ceiling grid. Supplement plan drawings with section drawings where required to adequately represent the Work.
2. Plenum Space: Indicate sub-framing for support of ceiling and wall systems, mechanical and electrical equipment, and related Work. Locate components within ceiling plenum to accommodate layout of light fixtures indicated on Drawings. Indicate areas of conflict between light fixtures and other components.
3. Mechanical Rooms: Provide coordination drawings for mechanical rooms showing plans and elevations of mechanical, plumbing, fire-protection, fire-alarm, and electrical equipment.
4. Structural Penetrations: Indicate penetrations and openings required for all disciplines.
5. Slab Edge and Embedded Items: Indicate slab edge locations and sizes and locations of embedded items for metal fabrications, sleeves, anchor bolts, bearing plates, angles, door floor closers, slab depressions for floor finishes, curbs and housekeeping pads, and similar items.
6. Mechanical and Plumbing Work:
a. Sizes and bottom elevations of ductwork, piping, and conduit runs, including insulation, bracing, flanges, and support systems.
b. Dimensions of major components, such as dampers, valves, diffusers, access doors, cleanouts and electrical distribution equipment.
c. Fire-rated enclosures around ductwork.
7. Electrical Work:
a. Runs of vertical and horizontal conduit 1-1/4 inches (32 millimeters) in diameter and larger.
b. Light fixture, exit light, emergency battery pack, smoke detector, and other fire-alarm locations.
c. Panel board, switch board, switchgear, transformer, busway, generator, and motor control center locations.
d. Location of pull boxes and junction boxes, dimensioned from column center lines.
8. Fire-Protection System:
a. Locations of standpipes, mains piping, branch lines, pipe drops, and sprinkler heads.
9. Review: Contracting Officer will review coordination drawings to confirm Work is being coordinated; details of coordination are Contractor's responsibility. If Contracting Officer determines coordination drawings are not prepared in scope or detail, or are otherwise deficient, Contracting Officer will inform Contractor, who shall make changes and resubmit.
10. Coordination Drawing Prints: Prepare coordination drawing prints according to requirements in Section 01 33 23 "Submittal Procedures."
TUIN 231534 01 31 00 - 4
C. Coordination Digital Data Files: Prepare coordination digital data files according to:
1. File Preparation Format: Same digital data software program, version, and operating system as original Drawings.
2. File Submittal Format: Submit or post coordination drawing files using Portable Document
Format (PDF) file format.
3. Contracting Officer will furnish Contractor one set of digital data files (AutoCad.dwg) of
Drawings for use in preparing coordination digital data files.
a. Contracting Officer makes no representations as to accuracy or completeness of digital data files as they relate to Drawings.
b. Digital Data Software Program: Drawings are available in AutoCad.dwg.
D. Division 1 documents: The following items shall be submitted a minimum of one week prior to
Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for Pre-
Construction Conference.
1. Letter designating Project Superintendent
2. Construction Schedule
3. A Comprehensive Schedule of Values
4. Accident Prevention Plan
5. A List of Subcontractors for this project
6. Written statements from Subcontractors certifying compliance with applicable labor standard clauses.
7. Certificates of Insurance or SF1413 for Contactor and all Subcontractors
8. Waste Management Plan
9. Quality Control Plan
10. Temporary Storm Water Pollution Prevention Plan (SWPP or UPPP)
11. Indoor Air Quality (IAQ) Management Plan
12. Historic Preservation Treatment Plan (HPTP)
13. List of Required Construction Permits. Include the following information for each permit:
a. Name of Permit
b. Agency(ies) with Jurisdiction issuing the permit
c. Information required from Government to complete permit application
E. Provide items listed to Contracting Officer before Pre-Construction Conference. If all documents have not been received one week prior to scheduled Pre-Construction Conference date, conference may be cancelled, Notice to Proceed may not be issued, and Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.
1.5 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of
Contract Documents, Contractor shall prepare and submit an RFI utilizing form created on
NPS/DSC management software website.
1. Contracting Officer will not respond to RFIs submitted by other entities controlled by
Contractor.
TUIN 231534 01 31 00 - 5
2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.
B. Content of RFI: Include detailed, legible description of item needing information or interpretation and the following:
1. RFI number, numbered sequentially
2. Date
3. RFI subject
4. Specification Section number and title and related paragraphs, as appropriate.
5. Drawing number and detail references, as appropriate.
6. Field dimensions and conditions, as appropriate.
7. Contractor's suggested resolution: If Contractor's suggested resolution impacts Contract
Time or Contract Sum, Contractor shall state impact in RFI.
8. Contractor's signature
9. Requested date for response
10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop
Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.
C. RFI Form: Complete RFI Form on NPS/DSC Project Website as follows:
1. Enter general information at the top of the form.
2. Under the "Action" section at the bottom of the form, select "Question" then select "CMR" in drop-down of "Send to" box.
3. Enter details of question and attach related documents.
4. Select "Submit Form" at bottom of page.
D. Contracting Officer’s Action: Contracting Officer will review each RFI, determine action required, and respond. Contracting Officer will determine critical nature of each RFI and issue response accordingly.
1. The following are not considered to be RFIs and will receive no action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for approval of Contractor's means and methods.
d. Requests for coordination information already indicated in Contract Documents.
e. Requests for adjustments in Contract Time or Contract Sum.
f. Requests for interpretation of Architect's actions on submittals.
g. Incomplete RFIs or inaccurately prepared RFIs.
2. Contracting Officer's action may include a request for additional information; time for response will date from time of receipt of additional information.
3. Contracting Officer's action on RFIs may result in need for a change to Contract Time or
Contract Sum. All contract changes will be processed following terms and conditions of contract.
TUIN 231534 01 31 00 - 6
1.6 PROJECT MEETINGS
A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor. Meeting agenda will include the following as a minimum:
1. Roles & Responsibilities / Lines of Authority
2. Park rules and regulations
3. Jobsite Safety
4. Resolution of comments on required Division 1 documents
5. Coordination of Subcontractors
6. Labor law application
7. Modifications
8. Payments to Contractor
9. Payroll reports
10. Contract time
11. Liquidated damages
12. Contractor Performance Evaluation
13. Display of Hotline posters
14. Notice to proceed
15. Correspondence procedures
16. NPS/DSC Project website
17. Acceptance/rejection of work
18. Progress meetings
19. Submittal procedures
20. NPS Final Accessibility Inspection
21. Environmental requirements
22. Permit requirements
23. As-constructed drawings/operation and maintenance (O&M) manuals.
24. Saturday, Sunday, holiday and night work.
25. Reference materials
26. Value engineering
27. Schedule of Values
B. Progress Meetings: Contracting Officer will schedule weekly meetings with Contractor.
1. Attendees: In addition to Government Representatives, each Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented. Participants at meeting shall be familiar with Project and authorized to conclude matters relating to the
Work.
2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Meeting agenda will include:
a. Approval of minutes of previous meetings
b. Submittal status
c. Review of off-site fabrication and delivery schedules.
d. Requests for information (RFI) and other issues.
e. Modifications
f. Work in progress and projected.
TUIN 231534 01 31 00 - 7
1) Status of required inspections (Special Inspections, Accessibility, etc.)
g. Inspections of work in progress and projected (Special inspections, Accessibility, etc.)
h. Construction Schedule update (provide updated Critical Path Method (CPM)).
i. Status of Project Record Drawings and O&M manuals.
j. Other business relating to work.
k. Permit requirements
C. Preinstallation Conferences: Conduct at Project site before each construction activity that requires coordination with other construction.
1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend meeting. Advise Contracting
Officer of scheduled meeting dates.
2. Agenda: Review progress of other construction activities and preparations for particular activity under consideration, including requirements for:
a. Contract Documents
b. Options
c. Related RFIs
d. Related Change Orders
e. Purchases
f. Deliveries
g. Submittals
h. Review of mockups
i. Possible conflicts
j. Compatibility requirements
k. Time schedules
l. Weather limitations
m. Manufacturer's written instructions
n. Warranty requirements
o. Compatibility of materials
p. Acceptability of substrates
q. Temporary facilities and controls
r. Space and access limitations
s. Regulations of agency(ies) with jurisdiction
t. Testing and inspecting requirements
u. Installation procedures
v. Coordination with other work
w. Required performance results
x. Protection of adjacent work
y. Protection of construction and personnel
3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.
4. Reporting: Distribute minutes of meeting to each party present and to other parties requiring information.
5. Do not proceed with installation if conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of Work and reconvene conference at earliest feasible date.
TUIN 231534 01 31 00 - 8
1.7 ENVIRONMENTAL COORDINATION
A. Contractor’s Environmental Manager: Designate on-site party responsible for overseeing
Contractor’s conformance to environmental goals for project and implementing procedures for environmental protection. CEM can also serve other Contracting functions.
1. Qualifications: Minimum 3 years Construction experience on projects of similar size and scope; with environmental procedures…