View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Planning Guidelines and Design Standards for Checked Baggage Inspection Systems

Version 8.0 December 30, 2022

File 2600.3

Planning Guidelines and Design Standards for Checked Baggage Inspection Systems

Version 8.0 Date: December 30, 2022

This document was approved on March 8, 2023 by:

- Brad Anderson, Program Manager, Electronic Baggage Screening Program, TSA, APM

- Craig Mosford, Capability Manager, Checked Baggage, TSA, RCA

GENERAL INFORMATION

Planning Guidelines and Design Standards Version 8.0 for Checked Baggage Inspection Systems i December 30, 2022

FRONT MATTER

VERSION HISTORY

Version Date Modifications

1.0 October 10, 2007 First published version

2.0 January 31, 2009 Update based on recommended follow -on studies and comments on Version 1.0

3.0 November 27, 2009 Update based on recommended follow -on studies and comments on Version 2.0

4.0 July 15, 2011 Update based on recommended follow -on studies and comments on Version 3.0

4.1 September 15, 2011 Update based on recommended follow -on studies and comments on Version 4.0

4.2 May 2, 2014 Update based on recommended follow -on studies and comments on Version 4.1

5.0 July 9, 2015 Update based on need for clear differentiation betw een requirements and best practices, follow -on studies and comments on Version 4.2

6.0 September 29, 2017 Update based on recommended follow -on studies and comments on Version 5.0

7.0 August 21, 2020 Update based on recommended follow -on studies and comments on Version 6.0

8.0 December 30, 2022 Update based on recommended follow -on studies and comments on Version 7.0 for Checked Baggage Inspection Systems ii December 30, 2022

DISCLAIMER

The Planning Guidelines and Design Standards (PGDS) for Checked Baggage Inspection Systems (CBISs) is being distributed under the sponsorship of the Transportation Security Administration (TSA) of the U.S. Department of Homeland Security (DHS) in the interest of information exchange. The U.S. Government assumes no liability for the contents or use of this document.

The purpose of the document is to present TSA’s requirements and documented best practices for implementing a high-performance and cost-effective CBIS. This document captures TSA’s requirements for a CBIS project from the beginning stages of design through commissioning of the system. Best practices are meant to highlight practices that have proven successful during implementation and that TSA recommends for the Project Sponsor’s consideration during the design and construction of a CBIS.

COMPLIANCE LANGUAGE DEFINITIONS

When used in the PGDS, the terms Requirement, Best Practice/Guidance, and Support statements shall be defined as follows:

Requirement – a statement of required, mandatory practice. All requirement statements are presented in underlined text. The verb “shall” is used.

The verbs “should” and “will” are not used in requirement statements.

Best Practice and Guidance – a statement of recommended, but not mandatory, practice. These statements are generated from lessons learned. These statements are geared to inform the reader of known effective practices that have proven successful during implementation. Best practice and guidance statements can be identified within the document by the use of the verb “should”. The verbs “shall” and “will” are not used in best practice or guidance statements.

Support – an informational statement that does not convey any degree of mandate, recommendation, authorization, prohibition, or enforceable condition. The verbs “shall” and “should” are not used in Support statements. The verb “will” can sometimes be used in support statements when referencing things that are the government’s responsibility.

PGDS APPLICABILITY

CURRENT VERSION

Designs for new CBISs shall comply with the requirements set forth in this version of the PGDS. See for other project types and their PGDS compliance.

Chapter 4

All CBIS will be tested to requirements as established in the Commissioning and Evaluation Testing appendix of the latest version of the PGDS in effect at the time of testing. This will allow TSA to obtain the best set of test data to evaluate CBIS performance and to recommend fixes or for Checked Baggage Inspection Systems iii December 30, 2022 improvements to the system. For Operational Analysis Reports and CBIS that are being upgraded or changed, TSA reserves the right to evaluate the CBIS against the most current published PGDS version.

PRIOR VERSIONS

Any project sponsor that has received formal confirmation from TSA of the receipt of the complete 30% Detailed Design Package for a CBIS project prior to the publication date of this version of the PGDS shall continue to be governed by the PGDS version in effect at the time of such confirmation. Projects that have passed the 30% Detailed Design phase—including those systems currently under construction or in operation— with TSA approval shall be held to the design standards specified by that approval (either under the previous PGDS versions or prior standards in place before the publication of Version 1.0 of the PGDS).

DELAYED OPENING OF CBIS

TSA reserves the right to require a project sponsor to resubmit the 30% Detailed Design Package under the requirements of the latest PGDS if the CBIS has not passed the Integrated Site Acceptance Test (ISAT), according to the PGDS version in effect at the time of the original 30% Detailed Design Package submittal, within two years of TSA approval of the original 30% Detailed Design Package.

INDUSTRY COLLABORATION AND COMMENTS

TSA has been collaborating with an Industry Working Group (IWG) that represents airlines, Baggage Handling System (BHS) designers, manufacturers, and consultants to finalize recommended changes to PGDS Version 7.0.

The PGDS is updated regularly to ensure that its guidance and standards reflect the current technology and operating environment. The IWG will continue to meet with TSA to maintain the collaboration and consider potential changes for incorporation into the next version of PGDS.

The public and industry are invited to submit comments to TSA’s rom the date of PGDS publication.

Comments, as well as TSA proposed changes, will be shared with the IWG prior to each meeting and will be reviewed and discussed during the sessions. Any additional comments provided through the IWG will also be considered during these sessions.

PGDS mailbox at pgds@tsa.dhs.gov f

The TSA values all comments and input from industry stakeholders, but only those comments and input determined to enhance and improve the PGDS will be incorporated in the next release of the PGDS. An example of the standard form for comments is provided in Appendix A, Section A.11.

The comment form can be found at the using the search term “PGDS”. SAM.gov website https://www.sam.gov mailto:pgds@tsa.dhs.gov

CONTENTS

for Checked Baggage Inspection Systems iv December 30, 2022

MAIN DOCUMENT

VERSION HISTORY ........................................................................................................................................................................... I

DISCLAIMER.................................................................................................................................................................................... II

COMPLIANCE LANGUAGE DEFINITIONS........................................................................................................................................... II

PGDS APPLICABILITY ...................................................................................................................................................................... II Current Version ............................................................................................................................................................................... ii Prior Versions ................................................................................................................................................................................ iii Delayed Opening of CBIS ................................................................................................................................................................ iii

INDUSTRY COLLABORATION AND COMMENTS ............................................................................................................................... III

CONTENTS ..................................................................................................................................................................................... IV Main Document .............................................................................................................................................................................. iv Appendices................................................................................................................................................................................... xv Tables .........................................................................................................................................................................................xvi

Figures ........................................................................................................................................................................................xvi

ACRONYMS AND ABBREVIATIONS................................................................................................................................................. XX

ACKNOWLEDGEMENTS ............................................................................................................................................................... XXII

SECTION I : CBIS CONCEPTS

CHAPTER 1 : INTRODUCTION......................................................................................................................................................... 1-1

1.1 Purpose ............................................................................................................................................................................. 1-2

1.2 Background ........................................................................................................................................................................ 1-4

1.3 Organization ....................................................................................................................................................................... 1-5

1.4 Key Changes from PGDS v7 to PGDS v8 ............................................................................................................................... 1-6 for Checked Baggage Inspection Systems v December 30, 2022

CHAPTER 2 : CHECKED BAGGAGE SCREENING PROCESS............................................................................................................. 2-1

2.1 Screening Process Overview................................................................................................................................................. 2-2

2.2 Level 1 – EDS..................................................................................................................................................................... 2-3

2.3 Level 2 – On-Screen Resolution ............................................................................................................................................ 2-3

2.4 Level 3 – Checked Baggage Resolution Area .......................................................................................................................... 2-3

CHAPTER 3 : CBIS TYPES AND EQUIPMENT ................................................................................................................................... 3-1

3.1 CBIS Overview ................................................................................................................................................................... 3-2

3.2 CBIS Using Type I EDS Units................................................................................................................................................ 3-3

3.2.1 In-Line CBIS .......................................................................................................................................................... 3-3

3.2.2 EDS Multiplexed Network ........................................................................................................................................ 3-7

3.3 CBIS Using Type II EDS Units ............................................................................................................................................... 3-8

3.3.1 Mini In-Line CBIS.................................................................................................................................................... 3-8

3.3.2 Stand-Alone EDS ................................................................................................................................................. 3-11

3.4 CBIS Using ETD Units ....................................................................................................................................................... 3-17

3.4.1 Primary Screening ................................................................................................................................................ 3-17

3.4.2 Alarm Resolution .................................................................................................................................................. 3-21

3.5 Other Baggage Conveying Systems ..................................................................................................................................... 3-21

3.5.1 Individual Carrier Systems ..................................................................................................................................... 3-21

3.5.2 Mobile Inspection Tables ....................................................................................................................................... 3-22

3.6 Advanced Tracking Technology ........................................................................................................................................... 3-22

3.6.1 Automatic Image Reconciliation System ................................................................................................................... 3-22

3.6.2 Reconstructive Tracking ........................................................................................................................................ 3-23

SECTION II: CBIS PROJECTS

CHAPTER 4 : PROJECT PLANNING AND INITIATION........................................................................................................................ 4-1

4.1 CBIS Project Types ............................................................................................................................................................. 4-2

4.1.1 New CBIS Projects ................................................................................................................................................. 4-2

4.1.2 Recapitalization ...................................................................................................................................................... 4-2 for Checked Baggage Inspection Systems vi December 30, 2022

4.1.3 Optimization........................................................................................................................................................... 4-2

4.1.4 PGDS Upgrades..................................................................................................................................................... 4-3

4.1.5 Expansion ............................................................................................................................................................. 4-3

4.2 Stakeholder Roles and Responsibilities .................................................................................................................................. 4-3

4.2.1 Project Stakeholders ............................................................................................................................................... 4-3

4.2.2 Integrated Local Design Team .................................................................................................................................. 4-4

4.2.3 Project Sponsor...................................................................................................................................................... 4-5

4.2.4 TSA Headquarters .................................................................................................................................................. 4-5

4.3 Project Phases.................................................................................................................................................................... 4-6

4.4 Design-Build Projects ........................................................................................................................................................... 4-8

4.5 Design Review Process........................................................................................................................................................ 4-8

4.6 General Submittals Requirements.......................................................................................................................................... 4-9

4.6.1 Supporting Data ................................................................................................................................................... 4-10

4.6.2 Requests for Variance ........................................................................................................................................... 4-10

4.6.3 Submittals Formatting ........................................................................................................................................... 4-10

4.6.4 Electronic File Naming Convention .......................................................................................................................... 4-11

4.6.5 Design Review Comment Form .............................................................................................................................. 4-11

4.6.6 Submittals Checklist.............................................................................................................................................. 4-12

4.7 TSA Funding .................................................................................................................................................................... 4-12

4.7.1 Funding Application .............................................................................................................................................. 4-12

4.7.2 Use of TSA-Approved Equipment............................................................................................................................ 4-12

4.7.3 Invoicing and Earned Value Management................................................................................................................. 4-13

CHAPTER 5 : PRE-DESIGN PHASE.................................................................................................................................................. 5-1

5.1 Pre-Design Phase Overview ................................................................................................................................................. 5-2

5.2 Project Sponsor and ILDT Pre-Design Phase Responsibilities .................................................................................................... 5-4

5.3 Pre-Design Phase Deliverables ............................................................................................................................................. 5-5

5.4 TSA Pre-Design Phase Responsibilities.................................................................................................................................. 5-6

5.5 Baggage Screening Demand Determination ............................................................................................................................ 5-6

5.5.1 Categorize the Airport into Screening Zones ............................................................................................................... 5-7

5.5.2 Determine Current Checked Baggage Demand ........................................................................................................... 5-9

5.5.3 Project Future Baggage Demand ............................................................................................................................ 5-19 for Checked Baggage Inspection Systems vii December 30, 2022

5.6 Baggage Screening Equipment Requirements Determination................................................................................................... 5-21

5.6.1 Screening Equipment Parameters and Assumptions .................................................................................................. 5-22

5.6.2 EDS Equipment Requirements ............................................................................................................................... 5-23

5.6.3 EDS Equipment Redundancy ................................................................................................................................. 5-26

5.6.4 OSR Station Requirements .................................................................................................................................... 5-27

5.6.5 Baggage Inspection Station Requirements ............................................................................................................... 5-27

5.6.6 ETD Machine Requirements................................................................................................................................... 5-31

5.6.7 Accommodating Traffic Growth after the Design Year................................................................................................. 5-32

5.7 Alternatives Development and Evaluation ............................................................................................................................. 5-34

5.7.1 Alternatives Development ...................................................................................................................................... 5-34

5.7.2 Alternatives Evaluation and Selection ...................................................................................................................... 5-38

5.8 Alternatives Analysis Report................................................................................................................................................ 5-41

CHAPTER 6 : SCHEMATIC DESIGN PHASE...................................................................................................................................... 6-1

6.1 Schematic Design Phase Overview ........................................................................................................................................ 6-2

6.2 Project Sponsor and ILDT Schematic Design Phase Responsibilities .......................................................................................... 6-4

6.3 Schematic Design Phase Deliverables.................................................................................................................................... 6-5

6.4 TSA Schematic Design Phase Responsibilities ........................................................................................................................ 6-5

6.5 Basis of Design Report......................................................................................................................................................... 6-6

6.5.1 Project Requirements .............................................................................................................................................. 6-6

6.5.2 Description of Operations......................................................................................................................................... 6-7

6.5.3 Flow-Based Modeling .............................................................................................................................................. 6-7

6.5.4 EDS to be Decommissioned ..................................................................................................................................... 6-8

6.6 Other Design Package Documents......................................................................................................................................... 6-8

6.6.1 Schematic Drawings ............................................................................................................................................... 6-8

6.6.2 Project Schedule .................................................................................................................................................. 6-12

6.6.3 Phasing Plan ....................................................................................................................................................... 6-13

6.6.4 Screening Equipment Installation Guideline References ............................................................................................. 6-14

6.6.5 Conveyor Manifest ................................................................................................................................................ 6-14

6.6.6 Specifications....................................................................................................................................................... 6-14

6.6.7 Bid Documents..................................................................................................................................................... 6-15

6.6.8 Stakeholder Notification ......................................................................................................................................... 6-15 for Checked Baggage Inspection Systems viii December 30, 2022

CHAPTER 7 : DETAILED DESIGN PHASE......................................................................................................................................... 7-1

7.1 Detailed Design Phase Overview ........................................................................................................................................... 7-2

7.2 30% Design ........................................................................................................................................................................ 7-2

7.2.1 Project Sponsor and ILDT 30% Design Responsibilities................................................................................................ 7-4

7.2.2 30% Design Deliverables ......................................................................................................................................... 7-5

7.2.3 TSA 30% Design Responsibilities ............................................................................................................................. 7-6

7.2.4 Dynamic Modeling .................................................................................................................................................. 7-6

7.3 70% Design ........................................................................................................................................................................ 7-8

7.3.1 Project Sponsor and ILDT 70% Design Responsibilities.............................................................................................. 7-10

7.3.2 70% Design Deliverables ....................................................................................................................................... 7-11

7.3.3 TSA 70% Design Responsibilities ........................................................................................................................... 7-12

7.3.4 Configuration Management .................................................................................................................................... 7-12

7.4 100% Design .................................................................................................................................................................... 7-14

7.4.1 Project Sponsor and ILDT 100% Design Responsibilities ............................................................................................ 7-15

7.4.2 100% Design Deliverables ..................................................................................................................................... 7-16

7.4.3 TSA 100% Design Responsibilities .......................................................................................................................... 7-17

7.5 Contingency Planning ........................................................................................................................................................ 7-17

7.5.1 Contingency Planning Requirements ....................................................................................................................... 7-17

7.5.2 Contingency Planning Considerations ...................................................................................................................... 7-18

7.5.3 Design Recommendations to Facilitate Contingency Planning ..................................................................................... 7-19

7.5.4 Alternative TSA Screening Measures....................................................................................................................... 7-21

7.5.5 Failure Types and Mitigation Measures .................................................................................................................... 7-21

7.5.6 Evaluation of Contingency Alternatives .................................................................................................................... 7-23

CHAPTER 8 : CONSTRUCTION PHASE ............................................................................................................................................ 8-1

8.1 Construction Phase Overview ............................................................................................................................................... 8-2

8.2 Project Sponsor and ILDT Construction Phase Responsibilities .................................................................................................. 8-2

8.3 Construction Phase Deliverables ........................................................................................................................................... 8-3

8.4 TSA Construction Phase Responsibilities ................................................................................................................................ 8-3

8.5 Meetings ............................................................................................................................................................................ 8-4

8.6 Construction Schedule ......................................................................................................................................................... 8-4

8.7 System Change Implementation and Test Data........................................................................................................................ 8-5 for Checked Baggage Inspection Systems ix December 30, 2022

8.7.1 CBIS Change Requests........................................................................................................................................... 8-5

8.7.2 Change Request Log .............................................................................................................................................. 8-6

8.7.3 TSA Approval......................................................................................................................................................... 8-6

8.7.4 Testing Procedures ................................................................................................................................................. 8-7

8.7.5 Test Results........................................................................................................................................................... 8-7

8.8 Training ............................................................................................................................................................................. 8-7

8.8.1 Training Deliverables............................................................................................................................................... 8-7

8.8.2 CBIS Use and Logistics Training ............................................................................................................................... 8-7

8.8.3 TSA Training.......................................................................................................................................................... 8-8

CHAPTER 9 : TESTING AND COMMISSIONING PHASE ..................................................................................................................... 9-1

9.1 Testing and Commissioning Phase Overview .......................................................................................................................... 9-2

9.2 Pre-Commissioning Requirements ......................................................................................................................................... 9-2

9.3 Testing and Commissioning Phase Deliverables ...................................................................................................................... 9-6

9.4 TSA Testing and Commissioning Phase Responsibilities ........................................................................................................... 9-6

9.4.1 Integrated Site Acceptance Testing ........................................................................................................................... 9-7

9.4.2 Operational Run-in & Closeout ............................................................................................................................... 9-10

9.5 EDS Recapitalization Baseline ISAT Testing ......................................................................................................................... 9-10

CHAPTER 10 : PROJECT CLOSEOUT PHASE ................................................................................................................................ 10-1

10.1 Project Closeout Phase Overview ........................................................................................................................................ 10-2

10.2 Project Closeout Phase Deliverables .................................................................................................................................... 10-2

10.3 Control Configuration Architecture Documentation.................................................................................................................. 10-3

10.3.1 Closeout Submittal Format ..................................................................................................................................... 10-3

10.3.2 Control System Architecture Drawing....................................................................................................................... 10-4

10.3.3 PLC Code and Associated Configuration Information ................................................................................................. 10-4

10.3.4 HMI Configuration................................................................................................................................................. 10-5

10.3.5 High-level Computer Configuration .......................................................................................................................... 10-5

10.3.6 Programming and Configuration Software ................................................................................................................ 10-5

10.3.7 CBIS/ISAT Benchmark Data................................................................................................................................... 10-5

10.3.8 Change Summary Log........................................................................................................................................... 10-6 for Checked Baggage Inspection Systems x December 30, 2022

CHAPTER 11 : LIFE CYCLE COST ANALYSIS ................................................................................................................................ 11-1

11.1 Cost Analysis Overview ...................................................................................................................................................... 11-2

11.2 Life Cycle Cost Analysis ..................................................................................................................................................... 11-2

11.3 Analysis Assumptions ........................................................................................................................................................ 11-2

11.3.1 Life Cycle Cost Analysis Period .............................................................................................................................. 11-2

11.3.2 Equipment Life Cycle ............................................................................................................................................ 11-3

11.3.3 Construction Period .............................................................................................................................................. 11-3

11.3.4 Real Dollar Cost ................................................................................................................................................... 11-3

11.4 Capital Costs .................................................................................................................................................................... 11-3

11.4.1 Screening Equipment Acquisition Costs ................................................................................................................... 11-4

11.4.2 Screening Equipment Direct Installation Costs .......................................................................................................... 11-4

11.4.3 Screening Equipment Upgrade Costs ...................................................................................................................... 11-5

11.4.4 Similar Screening Equipment Replacement Costs ..................................................................................................... 11-5

11.4.5 Required Building and BHS Infrastructure Modification Costs ...................................................................................... 11-5

11.5 Soft Costs ........................................................................................................................................................................ 11-6

11.6 O&M Costs....................................................................................................................................................................... 11-6

11.6.1 Screening Equipment Maintenance Costs ................................................................................................................ 11-7

11.6.2 Screening Equipment Operating Costs..................................................................................................................... 11-7

11.6.3 Incremental BHS Maintenance Costs....................................................................................................................... 11-8

11.6.4 Incremental BHS Operating Costs ........................................................................................................................... 11-9

11.7 Staffing Costs ................................................................................................................................................................... 11-9

11.7.1 TSA Personnel Costs ............................................................................................................................................ 11-9

11.7.2 Incremental Costs for Baggage Porters and Other Airport/Airline Staff ........................................................................ 11-10

11.8 Basis of Estimate Document ............................................................................................................................................. 11-10

11.8.1 Purpose ............................................................................................................................................................ 11-11

11.8.2 Executive Summary ............................................................................................................................................ 11-11

11.8.3 Project Scope Description .................................................................................................................................... 11-12

11.8.4 Methodology Used to Prepare the Estimate ............................................................................................................ 11-12

11.9 Current Working Estimate Submissions .............................................................................................................................. 11-15

11.9.1 Cost Estimate Breakouts ..................................................................................................................................... 11-17

11.9.2 Cost Estimate Pricing Substantiation ..................................................................................................................... 11-18 for Checked Baggage Inspection Systems xi December 30, 2022

11.9.3 Allocable Costs .................................................................................................................................................. 11-18

11.10 Estimate Reconciliation .................................................................................................................................................... 11-19

11.11 Estimate Trending ........................................................................................................................................................... 11-20

SECTION III : CBIS DESIGN REQUIREMENTS AND INDUSTRY BEST PRACTICES

CHAPTER 12 : CBIS DESIGN REQUIREMENTS............................................................................................................................... 12-1

12.1 CBIS Design Principles ...................................................................................................................................................... 12-2

12.2 CBIS Planning Standards ................................................................................................................................................... 12-3

12.3 BHS Capacity ................................................................................................................................................................... 12-3

12.3.1 Mainline Requirements .......................................................................................................................................... 12-4

12.3.2 Tail-to-Head Bag Spacing Requirement ................................................................................................................... 12-4

12.4 Screening Throughput Capacity Requirement ........................................................................................................................ 12-5

12.5 Bag Time-in-System .......................................................................................................................................................... 12-5

12.5.1 Time-in-System Static Calculations ......................................................................................................................... 12-5

12.5.2 Time-in-System Modeling Calculations..................................................................................................................... 12-7

12.6 Bag Travel Time Requirements ........................................................................................................................................... 12-8

12.6.1 In-Line Systems ................................................................................................................................................... 12-8

12.6.2 Mini In-Line Systems ............................................................................................................................................. 12-8

12.7 BHS Tracking ................................................................................................................................................................... 12-8

12.7.1 CBIS Positive Bag Tracking Requirements ............................................................................................................... 12-9

12.7.2 Bag Tag Identification Best Practices ..................................................................................................................... 12-13

12.7.3 Bag Length ........................................................................................................................................................ 12-14

12.8 Conveyor System Design ................................................................................................................................................. 12-14

12.8.1 CBIS Conveyor Subsystem Nomenclature.............................................................................................................. 12-14

12.8.2 Conveyor Inputs ................................................................................................................................................. 12-15

12.8.3 Divert and Merge Requirements............................................................................................................................ 12-15

12.8.4 Baggage Allocation Methodology .......................................................................................................................... 12-16

12.8.5 Conveyor System Design Best Practices ................................................................................................................ 12-16

12.8.6 Recirculation Loop Requirement ........................................................................................................................... 12-19

12.8.7 Reinsertion Line Requirement............................................................................................................................... 12-19 for Checked Baggage Inspection Systems xii December 30, 2022

12.8.8 Draft Curtains Requirement .................................................................................................................................. 12-19

12.8.9 Stack Light Requirements .................................................................................................................................... 12-20

12.8.10 System Conveyable Items.................................................................................................................................... 12-20

12.8.11 Oversize Bag Conveyance ................................................................................................................................... 12-20

12.8.12 Out-Of-Gauge Bag Conveyance ........................................................................................................................... 12-20

12.9 Fail-Safe Operation.......................................................................................................................................................... 12-21

12.9.1 Fail-Safe Operation General Requirements ............................................................................................................ 12-21

12.9.2 Fail-Safe Operation Requirements for In-Line CBIS ................................................................................................. 12-21

12.9.3 Fail-Safe Operation Requirements for a Manually Operated Mini In-Line Decision Point CBIS ........................................ 12-24

12.10 Operational Test Kit ......................................................................................................................................................... 12-25

12.11 Bag Jam Rate ................................................................................................................................................................. 12-25

12.12 EDS Maintainability Requirements ..................................................................................................................................... 12-26

12.12.1 Service Access................................................................................................................................................... 12-26

12.12.2 Environment ...................................................................................................................................................... 12-27

12.12.3 Storage and Spare Parts Access........................................................................................................................... 12-29

12.12.4 EDS Replacement .............................................................................................................................................. 12-29

12.12.5 Quick Disconnect Standard .................................................................................................................................. 12-29

12.12.6 EDS Power Requirements ................................................................................................................................... 12-29

12.12.7 EDS Network ............................................................................................................

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .