TS02 - CALCULATION OF SELF PERFORMED WORK.pdf
PDF 103 KB Posted
- Solicitation number
- 36C24923B0019
About this file
This document provides a template for calculating the percentage of self-performed work on a general construction contract. Offerors must perform at least 15 percent of personnel costs with their own employees or those of verified Service Disabled Veteran Owned Small Business subcontractors. The template requires breaking down costs by specification division and calculating the percentage of self-performed personnel costs out of total personnel costs for prime contractors and all subcontractors. It relates to the federal contract opportunity for upgrading energy management system infrastructure at Department of Veterans Affairs facilities under solicitation number 36C24923B0019. Responders must use this template to demonstrate compliance with self-performance requirements for the contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24923B0019 0003.docx | DOCX document | |
| 36C24923B0019 0002.docx | DOCX document | |
| 36C24923B0019 0001.docx | DOCX document | |
| Attachment B- Control Panel Schedule.xlsx | XLSX spreadsheet | |
| 36C24923B0019_1.pdf | ||
| WD TN20230178 05122023.pdf | ||
| General Conditions Breakout 6-17-2014.xlsx | XLSX spreadsheet | |
| 626-15-106 EMS Specifications.pdf | ||
| revised_ Attachment A- 230923 Direct Digital Control System for HVAC_01.docx | DOCX document | |
| revised_ 626-15-106 EMS Drawings_01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK (xxx-xx-xxx)
Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes with 237 and 238 prefix) of the cost of the contract performance incurred for personnel must be performed by the Service Disabled Veteran Owned Small Business (SDVOSB) awardee or those of a verified SDVOSB subcontractor. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.
Specification Division SDVOB Vendor (Y or N) Personnel Cost Material/Equipment Costs
Division 01 $ $ Division 02 $ $ Division 03 $ $ (Add additional lines as necessary for each Division applicable to this project)
Sub Total (Personnel Costs, Material/Equipment Costs)
Profit $ Home Office Overhead $ Bond $ Grand Total $
Calculation of self-performed personnel costs:
1. Total personnel costs * both prime and all subcontractors: $
2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $
3. Remainder is ‘Total amount of work to be self-performed under the Contract’: $
4. Self-performed work = Line 3/Line 1 x 100 = %
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)