This document provides a template for breaking out general condition costs on a schedule of values for a federal construction contract. It lists various general condition cost categories such as superintendent, project manager, field office engineer, builder's risk insurance, site maintenance, signage, travel, lodging, record documentation, and information technology. For each category, the template specifies a value field to enter the associated costs. It also provides a total line to calculate the overall general conditions costs.

The related federal contract opportunity is a solicitation to upgrade energy management system infrastructure for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The solicitation number is 36C24923B0019 and the opportunity name is K059--626-15-106 Upgrade Energy Management System Infrastructure. No further details are provided on the required products or services, response dates, or other salient information.

View the file

Other files

File Type Posted
36C24923B0019 0003.docx DOCX document
36C24923B0019 0002.docx DOCX document
36C24923B0019 0001.docx DOCX document
Attachment B- Control Panel Schedule.xlsx XLSX spreadsheet
36C24923B0019_1.pdf PDF
WD TN20230178 05122023.pdf PDF
TS02 - CALCULATION OF SELF PERFORMED WORK.pdf PDF
626-15-106 EMS Specifications.pdf PDF
revised_ Attachment A- 230923 Direct Digital Control System for HVAC_01.docx DOCX document
revised_ 626-15-106 EMS Drawings_01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GC Breakout

GENERAL CONDITIONS BREAKOUT
When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.236-88 Contract Changes-Supplement, paragraph (b)(10), the following contractual restrictions apply: Overhead and contractor’s fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made therefore. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the contractor’s overhead and/or fee percentage.
General Condition DescriptionValue
Superintendent$ - 0
Project Manager$ - 0
Field Office Engineer$ - 0
Builder's Risk Insurance$ - 0
Other Project Specific Liability Insurance$ - 0
Site Maintenance and Protection$ - 0
Progress Photos (per contract specifications)$ - 0
Dumpsters$ - 0
Office Trailer$ - 0
Storage Trailer/POD/CONEX$ - 0
Telephone (Cell and/or Landline)$ - 0
Signage (per contract specifications and/or drawings)$ - 0
Travel (must comply with Federal Travel Regulations)$ - 0
Lodging (must comply with Federal Travel Regulations)$ - 0
Record Document Preparation$ - 0
As-builts (per contract specifications)$ - 0
Weather Protection (per contract specifications)$ - 0
Infection Control (per contract specifications)$ - 0
Information Technology (Internet, etc.)$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
General Conditions Total$ - 0

File details come from the government source that posted it. Updated .