TS State of Michigan Statement of Work and Drawings - Attachment 1.pdf

PDF 4 MB Posted

Attached to
FY23 TS State of Michigan Spring Repairs
Solicitation number
69727623Q000007
Issued by

About this file

This solicitation requests quotations for repair services for the Training Ship State of Michigan. The U.S. Department of Transportation Maritime Administration seeks to award a firm fixed price contract to complete repairs described in the statement of work and drawings. Quotations are due by April 3, 2023 and must include pricing for all materials, equipment, and labor using the vendor pricing sheet. Repairs include renewing flooring, replacing handrails, installing a rescue boat and davit, refurbishing generator exhaust insulation, replacing chiller valves, conducting vibration and thermographic inspections, and providing supplemental labor and materials. The solicitation is set aside for small businesses with a NAICS code of 336611 and size standard of 1,250 employees. Award will be made to the responsible offeror with the lowest total evaluated price based on fixed unit rates for labor and materials.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T.S. State of Michigan

2023 Spring Repair Package

T.S. State of Michigan 2023 Spring Repair

GENERAL CONDITIONS AND SPECIFICATIONS

FOR REPAIRS AND RENEWALS

FOR THE

"TRAINING SHIP “STATE OF MICHIGAN”

Table of Contents

VESSEL PARTICULARS 10

ITEM NO. 101 – SERVICES 11

ITEM NO. 102 – GAS FREE CERTIFICATES 13

ITEM NO. 103 – RENEW 700‐SQFT OF FLOORING OF FOC’SLE DECK PASSAGEWAY 14

ITEM NO. 104 – REPAIR OR REPLACE APPROXIMATELY 100 LINEAR FEET OF STEEL

PIPE HANDRAILS 15

ITEM NO. 105 – TS STATE OF MICHIGAN RESCUE BOAT & DAVIT INSTALL DRAWINGS 16

ITEM NO. 106 – REFURBISH, RENEW ALL 4 SSDG EXHUAST PIPING LAGGING

INSULATION 18

ITEM NO. 107 – CARRIER™ CHILLER PLANT(S) HAND EXPANSION VALVE REPLACEMENT

ITEM NO. 108 – PERFORM A VIBRATION CONDITION MONITORING SURVEY &

THERMOGRAPHIC INSPECTION 20

ITEM NO. 109 ‐ SUPPLEMENTAL LABOR 21

ITEM NO. 110 ‐ SUPPLEMENTAL MATERIAL 22

Page

VESSEL PARTICULARS

NAME: T. S. State of Michigan (ex USNS Persistent)

TYPE: Twin screw diesel‐electric ‐ Training Vessel.

OWNERS: U. S. Government / U.S. DOT Maritime Administration

Official Number: CG003458

USCG Certification: Public Nautical School Ship

Radio Call Sign: NFSJ

ABS Classification A1‐E, Ice Strengthened Class "C", AMS, ACCU

ABS I.D. No. 8502561

IMO No. 8835451

Builder: Tacoma Boat Building Co., Tacoma WA.

Keel Laid: October 1984

Commissioned: August 1985

Port of Registry: NORFOLK, VA Length Overall 224' 00"

Beam: 43' 00" Design Draft: 15' 01"

Vertical Clearance: 71' 00" (Air Draft)

Deadweight : 2,250 tons

USCG Gross Tonnage: 1,914 tons

USCG Net Tonnage: 574 tons Cruising

Speed: 10 knots

Complement: 65 Officers and Midshipmen

Main Engines: Four (4) Caterpillar D398TA; 970 HP Main

Generators: Four (4) Kato 600 kW, 600 VAC, 3 Phase

Propulsion Motors: Two (2) General Electric, 800HP, 750 VDC

Bow Thrusters: Harbormaster 48" tunnel, 550 HP

Diesel Fuel Capacity: 228,615 gallons

Salt Water Ballast Capacity: 146, US Tons

Fresh Water Capacity: 5,099 gallons

ITEM NO. 101 – SERVICES

1.0 ABSTRACT

1.1 This item describes the requirements for providing services for the pre and post-cruise repair availability for the work that will be done at the vessel’s berth at Great Lakes Maritime Academy, Traverse City, Michigan.

2.0 REFERENCES/ENCLOSURES

2.1 None

3.0 ITEM LOCATION/DESCRIPTION

3.1 Great Lakes Maritime Academy, 715 E. Front St., Traverse City, MI 49686

4.0 GOVERNMENT FURNISHED MATERIALS/EQUIPMENT/SERVICE

4.1 None

5.0 NOTES

5.1 Provisions for services shall be considered on a per diem basis, and the total cost for the entire availability shall be included in the submitted firm-fixed-price. In the case of an increase or decrease in the length of the Contract, the cost (or credit) for services shall be based on the per diem amount, figured by dividing the submitted price by the length of Phase 1 (in days) as specified in the contractor’s proposal.

6.0 QUALITY ASSURANCE REQUIREMENTS

6.1 None additional.

7.0 STATEMENT OF WORK

7.1 Office: None required. Contractor will be allowed to utilize a space designated aboard the vessel if desired to conduct administrative work.

7.2 Shore Power: None required – shore power will be provided by Great Lakes Maritime Academy.

7.3 Compressed air: Provide 100 psi dry filtered compressed air at for their own purposed should it be required for accomplishment of repairs. Furnish, connect and disconnect all valves, fittings and hoses required. The ship’s air compressors shall not be used for any work or services.

7.4 Fire protection: Will be furnished from the vessel’s fire main system. System to remain charged at all times at areas where hot work is being performed. This is to be coordinated with the ship’s crew. Connect and disconnect all valves, fittings and hoses required.

7.4.1 The vessel’s fire pumps will be used for any work.

7.4.2 Provide contractor furnished portable fire extinguishers in all work areas where repair work is being carried out and must be of the nature and quantity that they can extinguish all types of fires.

7.4.3 The vessel’s fire extinguishers shall not be considered to fulfill the requirements of 7.4.2; however, this does not prevent personnel from using them in case of a real emergency.

7.4.4 Fire watch is to be provided on a continuous basis at all areas where hot work is being performed

7.5 Lighting: Provide adequate temporary lighting in way of repairs, surveys and inspections throughout the vessel.

7.6 Garbage and debris removal: Remove all waste, dirt and debris detailed for removal in these specifications and resulting from the work from the ship on a daily basis. All areas involved in work or traversed by workers or equipment shall be left clean and in good order.

7.6.1 Provide trash receptacles throughout the vessel to prevent trash from being littered on the vessel. Receptacles shall be emptied on a daily basis, or when required.

7.6.2 Remove hazardous materials such as paint containers, oily refuse, etc. and dispose of in accordance with local, state and federal regulations.

7.6.3 The Contractor and Owner shall make a joint survey of the entire vessel approximately one week prior to delivery to determine final clean up prior to completion of contract.

7.7 Crane service: Contractor to provide adequate crane service with qualified crane operators and riggers to accomplish any and all items within these specifications and any addenda thereto. Crane service will not be provided by the vessel’s crane/crew.

7.7.1 In addition to meeting the requirements of these specifications, the crane shall be of reach and capacity to meet the contractor’s needs; however, dock loading cannot exceed the dock’s allowable limits.

ITEM NO. 102 – GAS FREE CERTIFICATES

1.1 Work detailed in these specifications requires a hot work/gas free certificate, this item describes requirements. The contractor shall obtain required gas free certificates for "safe for workers" and "safe for hot work" from a certified Marine Chemist for all tanks or spaces where entry and/or hot work shall be required and adjacent tanks/spaces that are affected by hot work. A competent person shall maintain the certificates daily, including days when no worked is performed until such entry and hot work is completed.

2.0 REFERENCES/ENCLOSURES:

2.1 NFPA 306, Standard for the Control of Gas Hazards on Vessels.

2.2 NFPA 312, Standard for the Protection of Vessels during Construction, Repair, and

Layup.

3.0 ITEM LOCATION/DESCRIPTION

3.1 Various Locations throughout the vessel.

4.0 OWNER FURNISHED EQUIPMENT/MATERIAL/SERVICES

4.1 None.

5.0 STATEMENT OF WORK REQUIRED

5.1 Contractor shall provide the services of a Certified Marine Chemist to provide all gas free certificates in accordance with the above references.

5.2 Certificates shall be issued only by a Certified Marine Chemist and shall be maintained, on a daily basis, by a "Competent Person" as defined by the OSHA Regulations 29 CFR

1915.14 or NFPA 306.

5.3 Copies of the daily the Marine Chemist, Gas Free Certificate ‘Competent Person Log to be distributed as follows:

5.4 One copy to the MARAD representative.

5.5 One copy to the Vessel’s Master

5.6 One copy to the shipyard’s safety person.

5.7 Additional copy(s) to be displayed on the top of the gangway(s) as well as in the vicinity of the gas freed space(s).

5.8 Contractor shall provide and maintain ventilation to confined spaces as required by the

Marine Chemist, Gas Free Certificate ‘Competent Person Log to ensure the safety of personnel during work and inspections of confined spaces.

6.0 NOTES:

6.1 None

7.0 DELIVERABLES:

7.1 One copy of Marine Chemist, Gas Free Certificate ‘Competent Person Log to be provided daily to the MARAD Representative and an additional copy to the vessel’s Master.

ITEM NO. 103 – RENEW 700‐SQFT OF FLOORING OF FOC’SLE DECK PASSAGEWAY

1.0 ABSTRACT:

1.1 The intent of this item is to define the requirements for the contractor to remove existing vinyl tile flooring on the Foc’sle Deck Passageway and lay down new vinyl tile.

2.0 REFERENCES / ENCLOSURES:

2.1 46 CFR Part 167 (Public Nautical School Ships)

2.2 DWG 801 5988703 General Arrangement Above Main Deck

3.0 ITEM LOCATION / DESCRIPTION:

3.1 Location: Main Deck, BWO FR-14 to 54

4.0 GOVERNMENT FURNISHED EQUIPMENT / MATERIAL:

5.0 STATEMENT OF WORK

5.1 Contractor shall furnish all materials and consumables to complete the scope of work required.

5.2 Contractor shall remove all debris and removed materials and dispose of IAW applicable Federal, State and Local regulations as required

5.3 Test current flooring to be prepared for acceptance of new flooring and determine if current flooring will require renewal, or refurbishment

5.4 Ensure all material to be removed does not contain prohibited substances, such as asbestos.

5.5 Contractor shall utilize Lock-Out-Tag-Out procedures to disconnect items that will have to either be removed or relocated to prepare and make allowance for the floor to be prepped and the new flooring installed.

5.6 Prepare flooring to receive new flooring

5.7 Repair or replace all current galley deck drains located variously throughout as original.

5.8 Prep and coat all disturbed coatings as original

5.9 Replace all equipment that was removed or relocated to install flooring.

6.0 QUALITY ASSURANCE

6.1 All material and/or items used or renewed are to be type approved by the ABS or USCG and in compliance with ABS Rules and USCG Regulations for Fire and Volatile Organic (VOC’s).

6.2 All work to be approved by the vessel’s aster and MARAD COR

ITEM NO. 104 – REPAIR OR REPLACE APPROXIMATELY 100 LINEAR FEET OF STEEL PIPE

HANDRAILS

1.1 Repair or replace up to 100 Linear Feet of Handrails, located variously throughout the ship.

2.1 None

3.1 Location: Variously throughout the ship, specifically to be determined at ship check

5.0 STATEMENT OF WORK

5.1 Contractor will furnish all materials and consumables to complete the scope of work required in this specification.

5.2 Each linear foot of handrail consists as a top, middle bottom, rail

5.3 Top rail is 1-1/2” dia., Intermediate rails 1-3/8”. Stanchions are 8ft apart

5.4 Material ABS Copper Nickle with stainless keeper connecting rings

5.5 Crop off wasted sections of steel pipe handrails where specified and replace as original

5.6 A spacing between rails meets all USCG requirements with spacing be- tween courses not greater than 12 inches. The opening below the lowest course must not be more than 9 inches.

5.7 Prep and then coat as original

5.8 Installation must be to the satisfaction of the vessel’s Chief Engineer, Master or

MARAD COR

6.0 DELIVERABLES

6.1 None

ITEM NO. 105 – TS STATE OF MICHIGAN RESCUE BOAT & DAVIT INSTALL DRAWINGS

1.1 Maritime Administration (MARAD) DGO has a need for rapid turnaround Naval Architecture and Marine Engineering Services for the schoolship STATE OF MICHIGAN (SOMI), (sister ship to the TS GENERAL RUDDER) in conjunction with the installation of a new Palfinger Fast Rescue Boat (FRB), and A-Frame Davit.

1.2 The drawings and design will also need to take into account, the addition of six (6) new staterooms, which will also require drawings, to be installed during the vessel’s 2025 regularly scheduled required dry docking on the upper O2 Decks).

2.0 REFERENCES/ENCLOSURES

2.1 46 CFR – Chapter I, Sub-Chapter 160.156 – Rescue Boats and Fast Rescue Boats

(SOLAS)

2.2 Dwg. 0721-43600301 Foc’sle 01-Deck

2.3 1355-S9-1-1 REV C GENERAL ARRANGEMENT

2.4 General Arrangement Maindeck

2.5 General Arrangement Above Maindeck

2.6 Outboard Profile

2.7 Inboard Profile

2.8 Palfinger Provided Dwg.

2.8.1 Davit PRHE 35 - 2 Data Sheet

2.8.2 Davit Footprint 3P-5007578

2.8.3 FRB Technical_datasheet_600A-SWJ_D023584_C

2.8.4 FRB 3FA-100041E 600A SWJ

2.9 TS SOMI STATEROOM FEASIBILITY STUDY

Ship: STATE OF MICHIGAN, IMO 8835451 Tacoma Boat, Hull No. 408 LOA: 198.9′ x 43.0′ x 20.0′ School Ship (R)

PSTP, DVTP & FMEA USCG COI 65POB

FRB: Palfinger FRSQ 600A, FRSQ 600 A SWJ, 46 CFR 160.156 SOLAS Approved Fast Rescue Boat, (FRB), Weight WE (fully equipped incl. fuel) 1890 kg 1890 kg Weight WEP (fully loaded) 3130 kg 3130 kg

Davit: Palfinger GA PRHE 35-2 Davit, Winch, 04-04ES LH., SWL 36 kN

3.0 ITEM LOCATION/DESCRIPTION

3.1 Vessel is located at the Great Lakes Maritime Academy, 715 E Front Street, Traverse

City, Michigan 49686

3.2 01-Focsle Deck, Co-located with vessel’s current life rafts, starboard side.

3.3 Originally, the FRB was installed on the O1 deck port side but was moved up one deck to the current location following MARAD’s revised configuration to accommodate a Master Plan alteration for both the TS State of Michigan and its sister ship, TS General Rudder.

4.0 OWNER FURNISHED EQUIPMENT/MATERIAL/SERVICES

4.1 2022 Additional 02 Upper Deck Stateroom Feasibility Study

5.0 STATEMENT OF WORK REQUIRED

5.1 Contractor shall conduct an initial ship check to identify final location for installation of new rescue boat and staterooms.

5.2 Contractor shall discuss the options with MARAD surveyor, Chief Engineer and Master to finalize the locations and requirements.

5.3 Prepare preliminary arrangement (master conversion plan) of the modifications and obtain approval by MARAD and ship.

5.4 Prepare detailed engineering package for both modifications, including but not limited to structural, piping, electrical, HVAC, joiner drawings, and should include detailed bill of materials.

5.5 Conduct lightship weight calculations for the modifications, conduct inclining experiment to determine lightship particulars and update stability documents.

5.6 Revise and update ship’s selected record plans to reflect the current as-built condition on board the vessel, as will be required by ABS and USCG

5.6.1 General Arrangement

5.6.2 Fire & Safety Plan

5.6.3 Electrical One Line Diagram

5.7 Contractor shall submit a package that contains revisions in stability, design and engineering to ABS and USCG MSC for approval.

5.8 Arrange for:

5.8.1 ABS attended Stability Weight Test if Required

5.8.2 US Coast Guard attendance and approval

6.0 DELIVERABLES

6.1 Two (2) Full sized approved drawings and an electronic drawing in .pdf format, so it may be viewed without a special proprietary program.

ITEM NO. 106 – REFURBISH, RENEW ALL 4 SSDG EXHUAST PIPING LAGGING INSULATION

1.1 The intent of this item is to renew the insulate main engine piping, flexes and flanges with removable exhaust lagging and blankets on all four (4) Ship Service Diesel Generators (SSDG)

2.0 REFERENCES / ENCLOSURES:

2.1.1 Ref 2 - DWG 801-5988702 General Arrangement Main Deck & Below

2.1.2 Ref 8 - Photo Sheet SSDG NO.1 Current Lagging

3.0 ITEM LOCATION / DESCRIPTION:

3.1 Location – Hold Deck – Main Generator Room 3-34-0

3.2 No. 1,2,3 & 4 SSDG Exhaust Piping

5.0 CONTRACTOR FURNISHED EQUIPMENT / MATERIAL:

6.0 STATEMENT OF WORK

6.1 Contractor shall furnish all materials and consumables to complete the scope of work required, i.e. lagging/insulation and ancillary parts and equipment to secure the lagging as original

6.2 Contractor to provide all labor to remove the existing lagging and reinstall new lagging.

6.3 Contractor shall coordinate w/Original Equipment Manufacturer (OEM) for proper material to be used, as well as function and installation

6.4 Remove all poor conditioned, ripped, torn or otherwise damaged or oil-soaked lagging throughout the SSDG exhaust system

6.5 Replace lagging with OEM approved Lagging

6.6 Contractor shall remove all debris and removed materials and dispose of IAW applicable Federal, State and Local regulations as required

7.0 QUALITY ASSURANCE

7.1 All work to be done to the Satisfaction of the Chief Engineer, or MARAD COR

ITEM NO. 107 – CARRIER™ CHILLER PLANT(S) HAND EXPANSION VALVE REPLACEMENT

1.1 Replace hand expansion valves on both chillers, on the low side of the system.

2.1 Ref 2 - DWG 801-5988702 General Arrangement Main Deck & Below .pdf

3.1 Hold Deck Air Cond MCHRY Space 2-24-4

5.0 CONTRACTOR FURNISHED PARTS / EQUIPMENT / MATERIAL

5.1 Mueller B34595 1 5/8" X 1 5/8" ODF Refrigeration Sweat Angle Valve

5.2 Mueller AC17867 1 5/8” X 1 5/8" Refrigeration Sweat Straight Ball Valve W/Access

5.3 Henry 6298N 1 1/8" X 1 1/8" ODF Refrigeration Hand Expansion Valve

5.4 Carrier 5H80 1 5/8" Discharge Service Valve

5.5 Carrier 5H80 2" Suction Service Valve 1 5/8" ACR Copper Tube

5.6 Copper Refrigeration Fittings

5.7 Torch And Braze

5.8 30 LB Cylinder R-134A

6.0 STATEMENT OF WORK

6.1 Procure and provide all parts required per paragraph (5) of this work statement, plus any additional parts not mentioned if required

6.2 Recover refrigerant from each chill plant.

6.3 Cut and fit in new valve assemblies.

6.4 Pressure test system with dry nitrogen.

6.5 Evacuate system.

6.6 Start each system and charge with R-134A

7.0 DELIVERABLES / QUALITY ASSURANCE

7.1 All work must be done, and the system tested to the satisfaction of the vessel’s Chief Engineer.

7.2 Provide a complete technician report outlining what service was performed, including condition found and the remedy used to ensure proper function of the chiller.

ITEM NO. 108 – PERFORM A VIBRATION CONDITION MONITORING SURVEY & THERMOGRAPHIC

INSPECTION

1.0 ABSTRACT:

1.1 Perform a Baseline Vibration Condition Monitoring Survey & Thermographic Inspection on board the Training Ship, TS State of Michigan

2.0 REFERENCES / ENCLOSURES:

2.1 The following is an example of the type of reports generated for the State of Michigan’s Sister Ship, TS General Rudder

2.2 Ref 5 - TSGR - CAC Executive Summary - Dated 4-12-22

2.3 Ref 6 - TSGR - CAC Vibration Analysis - Dated 4-12-22

2.4 Ref 7 - TSGR - CAC Thermographic Insp - Dated 4-12-22

3.0 ITEM LOCATION / DESCRIPTION:

3.1 The ship will be located at their homeport, at the Great Lakes Maritime Academy, 1701 East Front

Street, Traverse City, MI 49686

4.0 GOVERNMENT FURNISHED EQUIPMENT / MATERIAL

4.1 None

5.0 STATEMENT OF WORK

5.1 Utilizing a portion of the relevant data listed in para (2), identify all critical machinery required to be surveyed and/or inspected

5.2 Evaluate the present operating condition of selected equipment of the vessel and provide recommendations based on the Vibration Analysis and Thermographic Inspection

5.3 Identify for the Chief Engineer and the Master, which equipment requires an at sea or dock trial to test, survey or inspect.

5.4 Provide Machine Ratings as follows:

5.4.1 Unsatisfactory: Machines that require attention.

5.4.2 Marginal: Machines that are vibrating above initial alarm levels. Increasing wear.

5.4.3 Satisfactory: Machines operating within acceptable vibration ranges.

5.4.4 Non-available: Not operating or not safe to take readings

6.0 DELIVERABLES / QUALITY ASSURANCE

6.1 All work must be done, and the system tested to the satisfaction of the vessel’s Chief

Engineer.

6.2 Conclude the survey and inspection with a discussion with the Chief Engineer and the

MARAD COR prior to departing the vessel.

6.3 Generate and provided a final report to the ship and MARAD, similar to those produced in Section 2

ITEM NO. 109 ‐ SUPPLEMENTAL LABOR

1.1 It is the intent of this item to provide supplemental labor to accomplish additional work if authorized.

2.0 REFERENCES / ENCLOSURES:

2.1 None

3.0 ITEM LOCATION / DESCRIPTION:

3.1 None

4.0 GOVERNMENT FURNISHED EQUIPMENT / MATERIAL:

4.1 None

5.0 CONTRACTOR FURNISHED EQUIPMENT / MATERIAL:

5.1 As Required

6.0 STATEMENT OF WORK:

6.1 Contractor shall furnish a unit price quote for 500 man-hours of supplemental labor. This shall be a fully burdened labor rate, and is applicable seven days a week (i.e., no overtime, penalty time or other escalations will apply).

6.2 These hours will only be allocated for industrial labor. Supervision, management, QA, yard maintenance and other such labor is considered part of the rate burden. When Supplemental Labor is required by MARAD, a Contractor-submitted Condition Report with fully documented price quotations shall be documented by a work structure breakdown on a Contractor-developed estimating form, as an attachment to the Condition Report.

6.3 Supplemental hours, if authorized, will be allocated by the COR via delivery orders. No oral directions shall be accepted by the Contractor or its personnel from any individual other than the COR. Any oral direction provided by the COR other than guidance on existing tasking shall be documented via delivery order Request for Pricing within 24 hours.

6.4 All tasking provided by the COR will normally be in writing, and no work shall begin on any tasking of another than emergency nature until received by the Contractor, negotiated and settled by the COR and/or the Contracting Officer. Any questions, concerns or disputes of tasking given (including challenges as to whether CLINs are within scope or genuine new work) shall be presented to the Contracting Officer in writing for resolution.

ITEM NO. 110 ‐ SUPPLEMENTAL MATERIAL

1.1 Contractor shall include in their quote $50,000.00 for material charges, in the event needed and ordered by the COR for supplemental growth.

2.1 In the past, MARAD has contracted the services of None

3.1 None

5.0 CONTRACTOR FURNISHED EQUIPMENT / MATERIAL:

5.1 As Required

6.0 STATEMENT OF WORK:

6.1 Contractor shall provide an allowance for up to $25,000.00 in Supplemental Material charges.

There shall be no burden on these charges for either subcontracted costs or material charges up to $50,000. If this item is modified to add additional funds in excess of $50,000 the burden will be subject to negotiation.

6.2 If Supplemental Material is required, it will be allocated by the COR via delivery orders.

6.3 The Contractor shall provide to the COR invoices for goods or services applicable to

Supplemental Material charges for each delivery order with material charges in excess of $250.00

6.4 Negotiations based on material estimates will be credited or debited accordingly, once the actual material invoice is received by the COR.

6.5 All material invoices must be received no later than the completion of each delivery order.

6.6 Retainage will not be released until all material invoices have been received and approved by the

COR. The contract cannot be closed out until all material invoices are submitted, or delivery orders will be debited accordingly.

7.0 QUALITY ASSURANCE:

7.1 All material and/or items used or renewed are to be type approved by the ABS or USCG and in compliance with ABS Rules and USCG Regulations.

- , -AGos 10-ao1-s9El870J

T-1'Cl<lS

LLI::::; '-' z1.,._ -w•:i "' :J

!i

,1·! I •

' 0

'" um

' C ro

'it·

!,l.

I, ;s JS lh a H i I

!i r I, i 1•t ,, 'l jN 0 -

'I ,!

r\ t, u ro

0"z

I

- , -AGos 10-ao1-s9El870J

T-1'Cl<lS

LLI::::; '-' z1.,._ -w•:i "' :J

!i

,1·! I •

' 0

'" um

' C ro

'it·

!,l.

I, ;s JS lh a H i I

!i r I, i 1•t ,, 'l jN 0 -

'I ,!

r\ t, u ro

0"z

TAGOS61NBDPROF

11 10

REVISIONS -

H

G

APPLICABLE SHIPS

NO.

T-AGOS 10 U$N

NO CN.IBEJI

(DEO< Rl5£ POI fR • 0.272 INCH)

""-'N, FCSLE, ,. UPPEJ! OECl<S

INBOARD PROFILE

11,.WNEI. •-7-0

>fl). Pl.AN HO. nru:

REFERENCES

r:.;oos 10---SJS-59881o4 ';'" ..

A ERICAN BUREAU Of" SHIPPING

10 SV8MIT RESUBMIT ..,,PROV,.. ,.

OAT(

11 10

RECOAI> 442

2 .,,,.., SCAI.( 1/4" • 1'-0" ts,,(ET 1 Of' 1

TAGOS60UTBDPROF

14 11 10

REVISIONS

DESC"1Pll0N

H

NA,V,HSEANT

& OIR£CTION

r 'w

G

!AS>< LICHT P/s (RID)

TV/Fl,I ,,HENNA

Ylt!ISI\.E

BOAT DA"!

F"IY NHS

TOW,NG LIGHT

0!6

P/S

UFFJ!A

BREADTH. MOWED

MOWED

ORAF"l,DESIGN s,>EF;IJ. TO\\ING

CRUISING RANGE

NET TONNAGE

G.E, PROPIJLSOON MOlQi,S RA1£D SHP

OFFlCERS ANO CREW OlHERS

43"-o· a.so N Mil.ES

CAPACITIES:

FUEL Oil AT 98

POTABLE WATER AT ,oo,i

Cl ASSlflCATION· ABS@ AH] , CLJ,SS C ICE STJ!.NGlH.NING @AWs,® ACCU.

MID5><1P

(Fa 4S

OUTBOARD PROFILE

AWORICAN BUREAU OF SHIPPING

SUBMITTED TO

OUTBOARD PROFILE

14 13

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 1/3

Copyright © 2000 - 2022 - Condition Analyzing Corporation - All rights reserved.

Condition Analyzing Corporation 1637 Race Track Rd. Suite 136 St Johns, Florida 32259 904-903-6116

U.S. MARITIME ADMINISTRATION (MARAD)

GENERAL RUDDER

Executive Summary of machine vibration data collected during the period of:

Wednesday, April 27th 2022 Through Friday, May 13th 2022

UNSATISFACTORY

Occurs

007 U #2 D/G STBD TURBOCHARGER Imbalance/wear. 1

066 U #2 FIRE/BALLAST PUMP Imbalance/flexibility/wear. Greater in the pump. 1

004 M #4 DIESEL GENERATOR CAT D-398B Monitor generator. 1

027 M PROP. MOTOR VENT FAN Fan imbalance/wear. 1

042 M #1 PROP. MOTOR LUBE OIL PUMP Decreased. Pump imbalance/foundation flexibility. 1

050 M BOW THRST. S/W COOLING PUMP Bearing wear. 1

060 M FUEL OIL TRANSFER PUMP Looseness. 1

080 M #1 STARTING AIR COMPRESSOR Compressor wear. 2

081 M #2 STARTING AIR COMPRESSOR Belt looseness/wear. 1

082 M #1 S.S. AIR COMPRESSOR Compressor wear/misalignment. 2

116 M STBD ER SUPPLY FAN Motor imbalance/flexibility. 1

120 M AC RECIRC FAN 0-2 Fan looseness/misalignment. 1

001 S #1 DIESEL GENERATOR CAT D-398B 5

002 S #2 DIESEL GENERATOR CAT D-398B

003 S #3 DIESEL GENERATOR CAT D-398B

005 S #1 D/G STBD TURBOCHARGER

006 S #1 D/G PORT TURBOCHARGER

008 S #2 D/G PORT TURBOCHARGER

009 S #3 D/G STBD TURBOCHARGER Mild imbalance. 4

010 S #3 D/G PORT TURBOCHARGER

011 S #4 D/G STBD TURBOCHARGER Mild imbalance. 5

012 S #4 D/G PORT TURBOCHARGER Mild imbalance. 5

013 S #1 D/G ATTACHED S/W COOLING

PUMP

MARGINAL Occurs

SATISFACTORY Occurs

Executive Summary of machine vibration data collected during the period of:

Wednesday, April 27th 2022 Through Friday, May 13th 2022

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 2/3

014 S #2 D/G ATTACHED S/W COOLING

015 S #3 D/G ATTACHED S/W COOLING

016 S #4 D/G ATTACHED D/W COOLING

020 S BOW THRUSTER

025 S #1 PROPULSION MOTOR

026 S #2 PROPULSION MOTOR

033 S #1 STEERING GEAR

034 S #2 STEERING GEAR

035 S STBD SHAFT SEAL

036 S PORT SHAFT SEAL

037 S EMERGENCY GENERATOR CAT.

3408TA

038 S E/G TURBOCHARGER Mild imbalance. 2

040 S LUBE OIL TRANSFER PUMP Short run. 1

043 S #2 PROP. MOTOR LUBE OIL PUMP

044 S #1 SHAFT LUBE OIL PUMP

045 S #2 SHAFT LUBE OIL PUMP

051 S #1 AUX. S/W COOLING PUMP Moderate imbalance/misalignment. 2

052 S #2 AUX. S/W COOLING PUMP Decreased. 2

061 S FUEL OIL PURIFIER

065 S #1 FIRE/BALLAST PUMP

071 S #2 A/C CHILLER

073 S #1 CHILLED WATER PUMP

074 S #2 CHILLED WATER PUMP

075 S #3 CHILLED WATER PUMP

083 S #2 S.S. AIR COMPRESSOR

084 S ROTARY COMPRESSOR

101 S DECK CRANE

102 S MAIN ANCHOR WINDLASS PUMP

103 S #1 MOORING WINDLASS

Executive Summary of machine vibration data collected during the period of:

Wednesday, April 27th 2022 Through Friday, May 13th 2022

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 3/3

104 S #2 MOORING WINDLASS 2

105 S #3 MOORING WINDLASS

111 S SUPPLY FAN 1-37-2 Moderate fan imbalance. 1

117 S PORT ER SUPPY FAN Check belts. 1

121 S STEERING GEAR SUPPLY FAN 2-96-1 2

053 N PROP. MOTOR S/W COOLING PUMP Not used. 3

070 N #1 A/C CHILLER Out of service. 3

072 N #3 A/C CHILLER Out of service. 3

077 N #1 REFRIGERATION COMPRESSOR

078 N #2 REFRIGERATION COMPRESSOR

096 N #1 BILGE PUMP Docked. 3

097 N #2 BILGE PUMP Docked. 3

098 N #3 BILGE PUMP Docked. 3

110 N HOUSE VENTILATION FAN Inaccessible. 3

112 N SUPPLY 1-35-4 Inaccessible. 3

113 N SUPPLY 1-68-3 Inaccessible. 3

114 N SUPPLY FAN AC ROOM 2-32-2 Inaccessible. 3

115 N LAUNDRY ROOM EXHAUST FAN 2-2-1 Inaccessible. 3

118 N GALLEY EXHAUST FAN Inaccessible. 3

119 N AC RECIRC FAN 2-55-2 Inaccessible. 3

NOT AVAILABLE Occurs

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 1/15

1637 Race Track Rd. Suite 136 St Johns, Florida 32259 904-903-6116

Thank you for the opportunity to complete a vibration analysis condition monitoring survey. This report contains analysis of the vibration data, including comments and recommendations for corrective action.

Survey information:

Vessel name: GENERAL RUDDER Company: U.S. MARITIME ADMINISTRATION (MARAD) Sign on Port: Galveston, TX Sign off Port: Galveston, TX Data collection start date: Wednesday, April 27th 2022 Data collection end date: Friday, May 13th 2022 Data collected by: PJR and Crew Data collection instrumentation: VA3 - 631712 - PJR, Cal due 2023-04-28 Data collection instrumentation: DC-101058-Rental, Cal due 2023-04-03

Data collection and analysis software: DDS 2022 v 3.6.2.6, CAC Decision Point v5

CAC vibration data collection:

Vibration measurements were obtained in in/sec peak and were taken on each accessible bearing location in three measurement planes. Both overall and vibration signature traces were obtained.

Vibration limit levels:

Measured vibration is compared to vibration limit levels established by CAC's experience with shipboard machinery, as well as ANSI and other standards organizations.

Experienced CAC vibration analysts factored the following:

• Trend analysis

• Readings compared to alarm levels

• Comparison to sister machines and like machinery on sister vessels

• Reported repair history sent to CAC

• Operating conditions.

CAC machine ratings:

This report categorizes machines as follows:

• Unsatisfactory: Machines that require attention.

• Marginal : Machines that are vibrating above initial alarm levels. Increasing wear.

• Satisfactory: Machines operating within acceptable vibration ranges.

• Non-available: Not operating or not safe to take readings.

CAC has the following 'Condition Monitoring' Class certificates:

• ABS Certificate Number 20-4564981-A as a "Recognized External Specialist".

• Lloyds Register Certificate Number LR21116508AS as an "Approved Service Supplier".

CAC maintains all historical data from the vessel. Additional data including vibration signatures and Report Links (PDF) are available on the vessel's home page on the CAC Decision Point ® website at www.cacvibe.net.

DISCLAIMER: CAC assumes no responsibility for machinery failures whatsoever or for any aspect of vessel or machinery operation. Liability is limited to the cost of the service work performed by CAC. CAC service personnel are considered as 'Persons in Addition to the Crew' while onboard. This report is for the use of the client only.

http://www.cacvibe.net/

Analysis of machine vibration data obtained during the period of:

Wednesday, April 27th 2022 through Friday, May 13th 2022

Machine Description CAC ID Client ID

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 2/15

066 #2 FIRE/BALLAST PUMP UNSATISFACTORY

Summary: Imbalance/flexibility/wear. Greater in the pump.

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 1 Vibration levels are excessive at rotation rate on the motor and pump. Levels are greatest on the pump in the horizontal direction. Imbalance and wear aggravated by foundation flexibility or looseness are indicated.

Recommend Inspect foundation and mounting bolts. Inspect motor cooling fan and coupling.

Service the pump, then the motor.

027 PROP. MOTOR VENT FAN MARGINAL

Summary: Fan imbalance/wear.

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 1 Comment: B point inaccessible.

Vibration levels have increased and are elevated at fan rotation rate. Fan imbalance and wear is indicated.

Recommend Inspect foundation and mounting bolts. Evaluate support structure. Clean and inspect the fan. Inspect the fan shaft, sheave, and keyway. If levels persist, renew the fan bearings. Balance the fan as a last step.

Summary: Imbalance/wear.

#2 D/G STBD TURBOCHARGER UNSATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 1 Vibration levels exceed the upper alarm at rotation rate. Imbalance and wear are indicated.

Recommend Clean and inspect the rotor. Plan service.

Summary: Monitor generator.

#4 DIESEL GENERATOR CAT D-398B MARGINAL

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 1

Comment: At speed no load Vibration levels are excessive on the driven end of the generator and greater than seen on the other units at no load. Vibration is elevated at 7,200 cpm which is either the 6X-rotation rate firing order from the engine or 2X-60Hz line frequency. Rough engine firing at no load is indicated. An electrical fault in the generator cannot be ruled out.

Recommend Retest under load. Inspect foundation bolts. Evaluate generator operation. Do not delay any planned maintenance.

Analysis of machine vibration data obtained during the period of:

Wednesday, April 27th 2022 through Friday, May 13th 2022

Machine Description CAC ID Client ID

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 3/15

050 BOW THRST. S/W COOLING PUMP MARGINAL

Summary: Bearing wear.

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 40 Occurs: 1 Comment: Recently overhauled.

Vibration levels have increased and are over the alarm. Vibration at 3.64X-rotation rate and multiples indicates a bearing fault. Levels are elevated on the motor and pump.

Recommend Review recent overhaul. Renew bearings.

042 #1 PROP. MOTOR LUBE OIL PUMP MARGINAL

Summary: Decreased. Pump imbalance/foundation flexibility.

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 1 Comment: Recently replaced with new motor/pump.

Vibration levels have decreased since the August 2021 readings but remain elevated on the pump. Vibration at rotation rate indicates imbalance and misalignment in the pump or coupling. Levels are twice as high in the horizontal direction indicating flexibility in the support skid. Levels are acceptable on the motor.

Recommend Review recent repairs. Inspect foundation, mounting bolts, and support skid.

Evaluate condition of skid mounts. Inspect the coupling and check alignment. If levels persist, replace the pump.

Summary: Looseness.

FUEL OIL TRANSFER PUMP MARGINAL

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 1 Vibration levels are over the alarm on the motor and driven end of the pump. Levels are greatest at 3X-motor rotation rate in the axial direction indicating looseness or misalignment. Vibration at 6X-pump rotation rate is likely characteristic and affected by flow. Additional vibration at 35,760 cpm has been seen in the past and is likely gear mesh.

Recommend Inspect foundation and mounting bolts. Inspect motor cooling fan, shaft, and coupling for looseness. Check alignment. Verify gearbox lubrication. If levels persist, service the motor.

Analysis of machine vibration data obtained during the period of:

Wednesday, April 27th 2022 through Friday, May 13th 2022

Machine Description CAC ID Client ID

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 4/15

080 #1 STARTING AIR COMPRESSOR MARGINAL

Summary: Compressor wear.

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 2 Vibration levels are excessive and greater than on the #2 compressor. The greatest readings are in the horizontal direction on the compressor at 780 rpm or compressor rotation rate. Vibration at 390 cpm and multiples is seen on the other reciprocating compressors and may come from the belts. Levels are excessive on the motor but come from the compressor.

Recommend Inspect foundation, mounting bolts, and skid. Evaluate condition of skid mounts.

Inspect sheaves and belts. Service the compressor.

082 #1 S.S. AIR COMPRESSOR MARGINAL

Summary: Compressor wear/misalignment.

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 2 Vibration levels are excessive and greater than on the #2 compressor. Vibration at 780 rpm indicates imbalance and wear in the compressor. Misalignment cannot be ruled out. Levels are excessive on the motor but come from the compressor.

Vibration at 420 cpm and multiples likely comes from the belts.

Recommend Inspect foundation, mounting bolts, and skid. Evaluate condition of skid mounts.

Inspect sheaves and belts. Check alignment. Service the compressor.

081 #2 STARTING AIR COMPRESSOR MARGINAL

Summary: Belt looseness/wear.

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 1 Vibration levels have increased at 1,200 cpm or 3X-belt rate. Belt looseness or wear is indicated.

Recommend Inspect belts and sheaves.

116 STBD ER SUPPLY FAN MARGINAL

Summary: Motor imbalance/flexibility.

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 1 Vibration levels are elevated at motor rotation rate. Motor or sheave imbalance is indicated. Levels may be aggravated by support flexibility.

Recommend Inspect foundation and mounting bolts. Evaluate support. Inspect the motor sheave. Service the motor.

Analysis of machine vibration data obtained during the period of:

Wednesday, April 27th 2022 through Friday, May 13th 2022

Machine Description CAC ID Client ID

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 5/15

120 AC RECIRC FAN 0-2 MARGINAL

Summary: Fan looseness/misalignment.

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 1 Vibration levels are elevated at 2X-fan rotation rate. Levels are greatest in the axial direction. Looseness in a fan component is indicated. Misalignment cannot be ruled out.

Recommend Verify foundation and mounting bolts. Evaluate condition of flexible mounts. Inspect fan sheave, shaft, and keyway for looseness. Check alignment. Clean and inspect the fan. If levels persist, renew the fan bearings.

002 #2 DIESEL GENERATOR CAT D-398B SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 5 Comment: At speed no load Vibration levels are acceptable. Firing order vibration increased on the generator at no load. The same effect is seen on all four generator.

005 #1 D/G STBD TURBOCHARGER SATISFACTORY

Vibration levels are acceptable.

001 #1 DIESEL GENERATOR CAT D-398B SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 5 Comment: At speed no load Vibration levels are acceptable. Firing order vibration increased on the generator at no load. The same effect is seen on all four generator.

003 #3 DIESEL GENERATOR CAT D-398B SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 5 Comment: at speed no load Vibration levels are acceptable. Firing order vibration increased on the generator at no load. The same effect is seen on all four generator.

Analysis of machine vibration data obtained during the period of:

Wednesday, April 27th 2022 through Friday, May 13th 2022

Machine Description CAC ID Client ID

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 6/15

008 #2 D/G PORT TURBOCHARGER SATISFACTORY

010 #3 D/G PORT TURBOCHARGER SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 4

012 #4 D/G PORT TURBOCHARGER SATISFACTORY

Summary: Mild imbalance.

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 5 Vibration levels are acceptable. Rotation rate vibration has increased indicating mild imbalance or wear. Wash the rotor. Monitor for further increases.

006 #1 D/G PORT TURBOCHARGER SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 5 Vibration levels are acceptable.

Summary: Mild imbalance.

#3 D/G STBD TURBOCHARGER SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 4 Vibration levels are acceptable. Rotation rate vibration has increased indicating mild imbalance or wear. Wash the rotor. Monitor for further increases.

Summary: Mild imbalance.

#4 D/G STBD TURBOCHARGER SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 5 Vibration levels are acceptable. Rotation rate vibration has increased indicating mild imbalance or wear. Wash the rotor. Monitor for further increases.

Analysis of machine vibration data obtained during the period of:

Wednesday, April 27th 2022 through Friday, May 13th 2022

Machine Description CAC ID Client ID

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 7/15

014 #2 D/G ATTACHED S/W COOLING PUMP SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 2 Vibration levels are acceptable. Vibration at 57,600 cpm is greater than seen on the other pumps and can be monitored.

016 #4 D/G ATTACHED D/W COOLING PUMP SATISFACTORY

025 #1 PROPULSION MOTOR SATISFACTORY

Fwd Draft: 14.25 Aft Draft: 14.75 Propeller RPM: 80 Occurs: 5 Comment: Crew data Vibration levels are acceptable. Readings were taken by CAC at the dock and by the crew underway. Vibration at 102X-rotation rate has been seen in the past and can be monitored. Vibration at 6X-line frequency is typical for the DC motor.

013 #1 D/G ATTACHED S/W COOLING PUMP SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 2 Vibration levels are acceptable.

015 #3 D/G ATTACHED S/W COOLING PUMP SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 2 Vibration levels are acceptable.

020 BOW THRUSTER SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 40 Occurs: 2 Comment: Pierside.

Vibration levels are acceptable at low rpm.

Analysis of machine vibration data obtained during the period of:

Wednesday, April 27th 2022 through Friday, May 13th 2022

Machine Description CAC ID Client ID

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 8/15

033 #1 STEERING GEAR SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 40 Occurs: 5 Vibration levels are acceptable. Slight vibration at multiples of 12X-rotation rate is characteristic.

035 STBD SHAFT SEAL SATISFACTORY

Fwd Draft: 14.25 Aft Draft: 14.75 Propeller RPM: 80 Occurs: 3

026 #2 PROPULSION MOTOR SATISFACTORY

Fwd Draft: 14.25 Aft Draft: 14.75 Propeller RPM: 80 Occurs: 5 Comment: Crew data Vibration levels are acceptable. Readings were taken by CAC at the dock and by the crew underway. Vibration at 102X-rotation rate has been seen in the past and can be monitored. Vibration at 6X-line frequency is typical for the DC motor.

034 #2 STEERING GEAR SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 40 Occurs: 5 Vibration levels are acceptable. Vibration at multiples of 12X-rotation rate is characteristic.

036 PORT SHAFT SEAL SATISFACTORY

Fwd Draft: 14.25 Aft Draft: 14.75 Propeller RPM: 80 Occurs: 3

Analysis of machine vibration data obtained during the period of:

Wednesday, April 27th 2022 through Friday, May 13th 2022

Machine Description CAC ID Client ID

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 9/15

037 EMERGENCY GENERATOR CAT. 3408TA SATISFACTORY

Comment: No load.

Vibration levels are similar to the trend and are acceptable.

040 LUBE OIL TRANSFER PUMP SATISFACTORY

Summary: Short run.

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 1

Comment: Tank full.

Vibration levels are acceptable. The machine was short run which resulted in incomplete testing.

Vibration at multiples of 11X-rotation rate are characteristic of the pump. Sideband vibration can be monitored.

044 #1 SHAFT LUBE OIL PUMP SATISFACTORY

Summary: Mild imbalance.

E/G TURBOCHARGER SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 2 Vibration levels are acceptable. Vibration at rotation rate indicates mild imbalance or wear. Wash the rotor. Monitor for increases.

043 #2 PROP. MOTOR LUBE OIL PUMP SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 4

Vibration levels are acceptable. Vibration at multiples of 12X-rotation rate is characteristic of the pump.

Analysis of machine vibration data obtained during the period of:

Wednesday, April 27th 2022 through Friday, May 13th 2022

Machine Description CAC ID Client ID

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 10/15

051 #1 AUX. S/W COOLING PUMP SATISFACTORY

Summary: Moderate imbalance/misalignment.

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 2 Comment: Recently overhauled.

Vibration levels are below the alarm but have increased following overhaul.

Vibration at 1X-rotation rate indicates mild imbalance and misalignment. Check the foundation bolts and alignment. Monitor.

061 FUEL OIL PURIFIER SATISFACTORY

071 #2 A/C CHILLER SATISFACTORY

Vibration levels are acceptable. Vibration at 2X-rotation rate is characteristic.

045 #2 SHAFT LUBE OIL PUMP SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 5 Vibration levels are acceptable. Vibration at 2X-rotation rate is characteristic of the pump.

Summary: Decreased.

#2 AUX. S/W COOLING PUMP SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 2

Comment: Recently overhauled.

Vibration levels are acceptable. Levels decreased following overhaul.

065 #1 FIRE/BALLAST PUMP SATISFACTORY

Analysis of machine vibration data obtained during the period of:

Wednesday, April 27th 2022 through Friday, May 13th 2022

Machine Description CAC ID Client ID

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 11/15

074 #2 CHILLED WATER PUMP SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 1

083 #2 S.S. AIR COMPRESSOR SATISFACTORY

Vibration levels are acceptable. Previous vibration at motor rotation rate has decreased. Compressor vibration is greatest on the motor due to transmissibility in the shared skid. Vibration on the compressor itself is similar to the trend and less than seen on the #1 unit.

101 DECK CRANE SATISFACTORY

073 #1 CHILLED WATER PUMP SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 1 Vibration levels are acceptable.

075 #3 CHILLED WATER PUMP SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 2 Vibration levels are acceptable.

084 ROTARY COMPRESSOR SATISFACTORY

Analysis of machine vibration data obtained during the period of:

Wednesday, April 27th 2022 through Friday, May 13th 2022

Machine Description CAC ID Client ID

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 12/15

103 #1 MOORING WINDLASS SATISFACTORY

105 #3 MOORING WINDLASS SATISFACTORY

117 PORT ER SUPPY FAN SATISFACTORY

Summary: Check belts.

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 1 Vibration levels are below the alarm. Vibration at multiples of 660 cpm, greatest at 4X, is likely from the belts and indicates mild looseness. Check belt tightness. Continue to monitor.

102 MAIN ANCHOR WINDLASS PUMP SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 2 Vibration levels are acceptable.

104 #2 MOORING WINDLASS SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 2 Vibration levels are acceptable.

111 SUPPLY FAN 1-37-2 SATISFACTORY

Summary: Moderate fan imbalance.

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 1 Vibration levels are acceptable. Vibration at 1X-fan rotation rate indicates moderate imbalance. Cleaning the fan may reduce imbalance levels.

Analysis of machine vibration data obtained during the period of:

Wednesday, April 27th 2022 through Friday, May 13th 2022

Machine Description CAC ID Client ID

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 13/15

053 PROP. MOTOR S/W COOLING PUMP NOT AVAILABLE

Summary: Not used.

Fwd Draft: 0 Aft Draft: 0 Propeller RPM: 0 Occurs: 3 No data available.

072 #3 A/C CHILLER NOT AVAILABLE

Summary: Out of service.

078 #2 REFRIGERATION COMPRESSOR NOT AVAILABLE

121 STEERING GEAR SUPPLY FAN 2-96-1 SATISFACTORY

Fwd Draft: 15 Aft Draft: 15 Propeller RPM: 0 Occurs: 2

Vibration levels are similar to August 2021 readings. Fan vibration is seen greatest on the motor.

Monitor for increases.

Summary: Out of service.

#1 A/C CHILLER NOT AVAILABLE

Fwd Draft: 0 Aft Draft: 0 Propeller RPM: 0 Occurs: 3

No data available.

077 #1 REFRIGERATION COMPRESSOR NOT AVAILABLE

Analysis of machine vibration data obtained during the period of:

Wednesday, April 27th 2022 through Friday, May 13th 2022

Machine Description CAC ID Client ID

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 14/15

097 #2 BILGE PUMP NOT AVAILABLE

Summary: Docked.

Fwd Draft: 0 Aft Draft: 0 Propeller RPM: 0 Occurs: 3 Comment: Crew to take data underway.

110 HOUSE VENTILATION FAN NOT AVAILABLE

Summary: Inaccessible.

Fwd Draft: 0 Aft Draft: 0 Propeller RPM: 0 Occurs: 3

Comment: Safety concern.

Summary: Docked.

#1 BILGE PUMP NOT AVAILABLE

Fwd Draft: 0 Aft Draft: 0 Propeller RPM: 0 Occurs: 3 Comment: Crew to take data underway.

No data available.

Summary: Docked.

#3 BILGE PUMP NOT AVAILABLE

Fwd Draft: 0 Aft Draft: 0 Propeller RPM: 0 Occurs: 3

Comment: Crew to take data underway.

No data available.

Summary: Inaccessible.

SUPPLY 1-35-4 NOT AVAILABLE

Fwd Draft: 0 Aft Draft: 0 Propeller RPM: 0 Occurs: 3

Comment: Safety concerns.

Analysis of machine vibration data obtained during the period of:

Wednesday, April 27th 2022 through Friday, May 13th 2022

Machine Description CAC ID Client ID

Prepared for U.S. MARITIME ADMINISTRATION (MARAD), GENERAL RUDDER (06/01/2022) | Page 15/15

113 SUPPLY 1-68-3 NOT AVAILABLE

Fwd Draft: 0 Aft Draft: 0 Propeller RPM: 0 Occurs: 3

115 LAUNDRY ROOM EXHAUST FAN 2-2-1 NOT AVAILABLE

Fwd Draft: 0 Aft Draft: 0 Propeller RPM: 0 Occurs: 3

119 AC RECIRC FAN 2-55-2 NOT AVAILABLE

Fwd Draft: 0 Aft Draft: 0 Propeller RPM: 0 Occurs: 3 Comment: Safety concerns.

No data available.

Summary: Inaccessible.

SUPPLY FAN AC ROOM 2-32-2 NOT AVAILABLE

Fwd Draft: 0 Aft Draft: 0 Propeller RPM: 0 Occurs: 3

No data available.

Summary: Inaccessible.

GALLEY EXHAUST FAN NOT AVAILABLE

Fwd Draft: 0 Aft Draft: 0 Propeller RPM: 0 Occurs: 3

THERMOGRAPHIC INSPECTION

April 2022

Thermographic Inspection – General Rudder – April 2022

Client: Crowley Government Services for the US Maritime Administration

Vessel: GENERAL RUDDER

Start: April 27, 2022 End: April 28, 2022

Embark: Galveston, TX Disembark: Galveston, TX

The purpose of this thermographic inspection is to:

• Evaluate the operating condition of the ship’s electrical systems

• Isolate the locations of "hot spots" and recommend necessary corrective measures.

Temp Rise: Evaluation:

5° ‐ 9° C Corrective measures required at next scheduled maintenance period

10° ‐ 19° C Corrective measures required on a priority‐scheduling basis 20° ‐ 29° C Corrective measures required as soon as possible

30° C and up Corrective measures required immediately

ITEMS FOUND IN NEED OF CORRECTION:

Item #1 ‐ 1 Aux Cooling Pump ‐ 37oC rise (CORRECTED) Item #2 ‐ 1 Aux Cooling Pump ‐ 76oC rise (CORRECTED) Item #3 ‐ Port Aft Capstan –26oC rise Item #4 ‐ STBD Aft Capstan – 8oC rise

Item corrected Equipment: Item #1 ‐ 1 Aux Cooling Pump ‐ 37oC rise (CORRECTED)

Component/Lead: Breaker – Upper Right Lead

Panel/Deck Location: Generator Rm MCC 1A

Severity: Corrected

BEFORE –37oC difference AFTER – 2oC difference

IR_0773 IR_00781

Evaluation

Measurements: (BEFORE) Upper left lead 64oC, middle lead 68oC, right lead 101oC (AFTER) Lower left lead 53oC, middle lead 51oC, right lead 55oC

Probable Causes: Dirty/loose connection(s).

Recommendations: Clean/tighten connection(s). Replace burned lead.

Enter corrective actions below:

Date: 04/28/2022 Performed By: 1 A/E

Corrections:

Cleaned and tighten connections.

Item corrected Equipment: Item #2 ‐ 1 Aux Cooling Pump ‐ 76oC rise (CORRECTED)

Component/Lead: Terminal Strip – Upper Right Lead

Panel/Deck Location: Generator Rm MCC 1A

Severity: Corrected

BEFORE – 76oC difference AFTER –3oC difference

IR_0769 IR_0783

Measurements:…