True_North_Remediation_Diagrams.pdf

PDF 3 MB Posted

Attached to
Jennings House Remediation and Remodel
Solicitation number
2024-IFB-080
Issued by
Allegheny County, Philadelphia City, Illinois

About this file

The document is a set of remediation diagrams prepared by True North Consultants, detailing a comprehensive lead paint stabilization and asbestos abatement project for a residential building. The drawings (Figures 1-3) provide floor plans with specific annotations for removing lead-based paint, asbestos-containing materials, drywall, and other hazardous components across multiple rooms and areas. The scope of work includes detailed instructions for contractors regarding lead stabilization, lead paint removal from various surfaces (walls, ceilings, wood), asbestos abatement, and general renovation specifications.

The diagrams outline specific requirements for hazardous material removal, including contractor responsibilities for handling lead-based paint in areas with varying pressure conditions, removing asbestos-containing materials in accordance with federal, state, and local regulations, and performing comprehensive environmental remediation. The project appears to involve a complete interior renovation with a focus on environmental safety, requiring specialized techniques for lead and asbestos removal, surface preparation, and potential reconstruction. Each drawing includes a legend and drawing notes that specify precise actions for different areas and surfaces, indicating a methodical approach to environmental remediation and building restoration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T220345_Jennings_Fig1_REV2024.09.11

T220345_Jennings_Fig2_REV2024.09.11
T220345_Jennings_Fig3_REV2024.09.11

File details come from the government source that posted it. Updated .