_22042_Jennings_House_Project_Manual.pdf

PDF 6 MB Posted

Attached to
Jennings House Remediation and Remodel
Solicitation number
2024-IFB-080
Issued by
Allegheny County, Philadelphia City, Illinois

About this file

This is a Project Manual for exterior improvements and bathroom renovation at the Jennings House, issued by the Village of Schaumburg Department of Engineering and Public Works, located at 220 Civic Drive in Schaumburg, Illinois. The project, numbered 22042 and dated March 2, 2023, involves comprehensive interior and exterior improvements, with a specific focus on bathroom renovation. The project manual includes detailed sections covering demolition, masonry restoration, carpentry, joint sealants, gypsum board assemblies, tiling, painting, and toilet accessories, along with architectural drawings for demolition, new work plans, and mechanical/electrical notes.

An important aspect of the project is the asbestos abatement protocol, developed by True North Consultants, which outlines specific removal and disposal procedures for asbestos-containing materials. The protocol specifically targets the first-floor bathroom (Room 103B), requiring critical barrier installation, HEPA air filtration, pre-cleaning, and removal of asbestos-containing drywall systems on the east wall. The abatement process must comply with federal, state, and local regulations, with particular attention to lead mitigation and lead-safe work practices. The comprehensive approach ensures proper handling of potentially hazardous materials during the renovation process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

FOR

EXTERIOR IMPROVEMENTS & BATHROOM

RENOVATION

AT

JENNINGS HOUSE

220 CIVIC DRIVE

SCHAUMBURG, ILLINOIS 60193

OWNER:

VILLAGE OF SCHAUMBURG

DEPARTMENT OF ENGINEERING AND PUBLIC WORKS

714 SOUTH PLUM GROVE ROAD

SCHAUMBURG, ILLINOIS 60194

DATE: MARCH 2, 2023

PROJECT NO. 22042

INTERIOR AND EXTERIOR IMPROVEMENTS &

BATHROOM RENOVATION

ARCON 22042 00 01 10 - 1 TABLE OF CONTENTS

TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

Section 00 01 10 – Table of Contents 00 01 10-1 Section 00 01 15 – List of Drawings 00 01 15-1 Section 00 31 00 – Available Project Information 00 31 00-1-65

DIVISION 01 – GENERAL REQUIREMENTS

Section 01 10 00 – Summary 01 10 00-1-4 Section 01 20 00 – Price and Payment Procedures 01 20 00-1-3 Section 01 21 00 – Allowances 01 21 00-1 Section 01 23 00 – Alternates 01 23 00-1 Section 01 30 00 – Administrative Requirements 01 30 00-1-8 Section 01 40 10 – Quality Requirements 01 40 10-1-4 Section 01 50 00 – Temporary Facilities and Controls 01 50 00-1-3 Section 01 60 00 – Product Requirements 01 60 00-1-3 Section 01 61 16 – Volatile Organic Compound (VOC) Content Restrictions 01 61 16-1-3 Section 01 70 10 – Execution and Closeout Requirements 01 70 10-1-8 Section 01 78 00 – Closeout Submittals 01 78 00-1-4

DIVISION 02 – EXISTING CONDITIONS

Section 02 41 00 – Demolition 02 41 00-1-3

DIVISION 04 – MASONRY

Section 04 01 20 – Masonry Restoration 01 01 20-1-4 Section 04 20 00 – Unit Masonry 04 20 00-1-6 Section 04 27 00 – Masonry Assemblies 04 27 00-1-8

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

Section 06 10 00 – Rough Carpentry 06 10 00-1-2

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

Section 07 92 00 – Joint Sealants 07 92 00-1-6

DIVISION 09 – FINISHES

Section 09 21 16 – Gypsum Board Assemblies 09 21 16-1-7 Section 09 24 00 – Cement Plastering 09 24 00-1-3 Section 09 30 00 – Tiling 09 30 00-1-5 Section 09 91 13 – Exterior Painting 09 91 13-1-4 Section 09 91 23 – Interior Painting 09 91 23-1-6

DIVISION 10 – SPECIALTIES

Section 10 28 00 – Toilet, Bath, and Laundry Accessories 10 28 00-1-3

ARCON 22042 00 01 15 - 1 LIST OF DRAWINGS

SECTION 00 01 15

LIST OF DRAWINGS

G0.1 COVER SHEET

A0.1 DEMOLITION PLAN AND NOTES

A1.1 NEW WORK PLANS AND NOTES AND IMAGES – LOWER AND GROUND LEVEL

A1.2 NEW WORK PLANS AND NOTES – UPPER LEVEL

A1.3 MECHANICAL, PLUMBING, ELECTRICAL PLANS AND NOTES AND INTERIOR

ELEVATIONS

A3.1 EXTERIOR IMAGES AND NOTES

END OF SECTION 00 01 15

ARCON 22042 00 31 00-1 AVAILABLE PROJECT

INFORMATION

SECTION 00 31 00

AVAILABLE PROJECT INFORMATION

PART 1 GENERAL

1.01 EXISTING CONDITIONS

A. Certain information relating to existing conditions and structures is available to bidders but will not be part of Contract Documents.

B. Asbestos Abatement Protocol: Jennings House, 220 Civic Drive, Schaumburg, IL 60193, produced by Truenorth Consultants, Inc., 1000 East Warrenville Road, Suite 140, Naperville, IL 60564, dated February 14, 2023.

1. This report identifies:

a. Section 1: Lead Mitigation Scope of Work

b. Section 2: Lead Mitigation Specifications

c. Section 3: Lead-Safe Work Practices

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

END OF SECTION 00 31 00

Prepared for:

ARCON Associates, Inc.

2050 S. Finley Road

Lombard, Illinois 60148

Prepared by:

True North Consultants, Inc.

1000 E. Warrenville Road, Ste. 140 Naperville, IL 60564

Phone: 630.717.2880

ASBESTOS ABATEMENT PROTOCOL

Jennings House 220 Civic Drive

Schaumburg, Illinois 60193

Date: September 11, 2024

Project Number: T220345

Table of Contents

SECTION 1 SCOPE OF WORK

SECTION 2 ASBESTOS ABATEMENT SPECIFICATIONS

PROJECT NO. T220345 / September 11, 2024 Jennings House – Schaumburg, IL

SECTION 1

Scope of Work

SCOPE OF WORK

2020 Civic Drive

Schaumburg, Illinois 60193

True North Consultants, Inc. (Consultant) on behalf of ARCON Associates, Inc. (Engineer) has developed the following Scope of Work for asbestos abatement activities to be performed at the Jennings House located at 220 Civic Drive in Schaumburg, Illinois. The Scope of Work will include the following:

ASBESTOS ABATEMENT

A. Remove and dispose of asbestos-containing materials (ACM) and asbestos-contaminated materials in accordance with specifications and applicable federal, state, and local regulations as detailed below:

1) 1st Floor Bathroom (Room 103B)

Install critical barriers over windows, doors, HVAC supply and return vents, and other openings to the work area and utilize High Efficiency Particulate Air (HEPA) air filtration devices (AFDs) to establish negative pressure within the regulated area.

Conduct pre-cleaning of moveable objects and remove all moveable objects from the work area. Protect/cover all non-moveable items and all non-cleanable surfaces within the regulated area.

Remove and dispose of the asbestos-containing drywall system (i.e. drywall, joint compound, and tape) located on the east wall within the bathroom utilizing gross removal methods as identified in Figure 2. Although the drywall tape was the only component determined to be an asbestos-containing material, the drywall and joint compound has been determined to contain <1% asbestos as a composite system. Therefore, drywall and joint compound shall be treated as an asbestos-containing material for the purpose of removal, disposal, and worker protection.

Remove all dust/debris throughout the work area and containerize for disposal.

Conduct HEPA vacuuming and wet wiping of all surfaces throughout the work area.

Dispose of all waste materials as asbestos-containing waste in accordance with applicable federal, state, and local regulatory requirements.

2) Basement Restrict access of work areas to non-asbestos abatement personnel and regulate the work areas utilizing warning signs and caution tape at entrances to the work areas.

Conduct pre-cleaning of moveable objects and remove all moveable objects from the work area. Protect/cover all non-moveable items and all non-cleanable surfaces within the regulated area.

Remove and dispose of damaged asbestos-containing pipe insulation and/or mud joint fittings utilizing glovebag removal methods within a mini-enclosure within the basement at locations identified in Figure 1.

Seal the exposed ends of asbestos-containing pipe insulation with a bridging encapsulant following removal procedures.

Seal the exposed and damaged asbestos-containing drywall tape with a bridging encapsulant at locations identified in Figure 1.

Remove all dust/debris throughout the work area and containerize for disposal.

Conduct HEPA vacuuming and wet wiping of all surfaces throughout the work area.

3) Exterior Restrict access of work areas to non-asbestos abatement personnel and regulate the work areas utilizing warning signs and/or caution tape.

Place polyethylene sheeting beneath the abatement area.

Remove and dispose of asbestos-containing expansion joint caulk on the exterior of the structure utilizing non-friable removal methods at locations identified in Figure 2.

Remove all dust/debris throughout the work area and containerize for disposal.

Conduct HEPA vacuuming and wet wiping of all surfaces throughout the work area.

B. The Contractor shall ensure that all areas adjacent to abatement areas are adequately protected and that gross removal abatement areas are maintained under negative pressure for the duration of abatement activities in accordance with applicable regulatory requirements.

C. The Contractor shall assume that any dust and debris present or generated during the asbestos abatement and decontamination activities is contaminated with asbestos and shall adequately protect and clean areas of contamination as necessary. In that the removal of existing walls in specified areas may incidentally result in the comingling of wall insulation materials, comingled materials within said abatement areas shall be removed and disposed of as ACM waste.

D. The Contractor shall ensure that surfaces within the work area and surfaces outside of the work area where visible debris is present as a result of Contractor work activities have been HEPA vacuumed and wet wiped and are free of visible dust and debris at the completion of abatement.

E. At the completion of abatement activities, aggressive clearance air monitoring shall be performed for the negative pressure enclosure. The Contractor shall ensure that air quality within each abatement area meets existing IDPH/EPA/OSHA clearance criteria prior to the removal of work barriers and engineering controls.

SECTION 2

Asbestos Abatement Specifications

ASBESTOS ABATEMENT SPECIFICATIONS

Asbestos abatement activities shall be conducted in accordance with applicable Environmental Protection Agency (EPA), Occupational Safety and Health Administration (OSHA), and Illinois Department of Public Health (IDPH) regulations and all other standards and codes governing asbestos abatement and any other environmental work or trade work performed in conjunction with the abatement.

PART 1 GENERAL

1.1 SUMMARY

A. This specification covers the abatement of asbestos-containing materials and asbestos hazards from the building structure and components as detailed within Section 1 of this Asbestos Abatement Protocol.

B. Unless otherwise noted, references to “Contractor” means “Asbestos Abatement

Contractor”.

C. All asbestos related work activities shall be performed in strict accordance with applicable

EPA, OSHA, Illinois Department of Public Health (IDPH), and local regulations, as well as any other applicable codes and regulations that may apply.

D. Where compliance with two or more industry standards or sets of requirements is specified and overlapping of those different standards or requirements establishes different or conflicting minimums or levels of quality, the most stringent requirements, or “state of the art,” is intended and will be enforced, unless specifically detailed language written into Contract Documents clearly indicates that a less stringent standard is permitted.

E. Personal exposure monitoring (OSHA sampling) as required by the Occupational Safety and Health Administration Asbestos Standard for the Construction Industry 29 CFR

1926.1101 shall be the responsibility of the Contractor.

1.2 WORK INCLUDED

A. The Scope of Work shall include the provision of all labor, equipment, materials, insurance, and permits necessary to remove, cleanup, and dispose of all asbestos-containing materials (ACM) and ACM contaminated materials as specified herein.

B. The Scope of Work includes, but is not limited to the removal of all friable and non-friable asbestos-containing materials and decontamination of areas of contamination as listed in contract documents, including pre-cleaning work areas, moving furnishings, establishing regulated areas, isolating work areas, protecting adjacent areas, containment of regulated areas, decontamination of work areas, and packaging, transport and disposal of regulated materials necessary to complete the Scope of Work.

C. Any building materials or components (i.e. Existing ceiling systems, ductwork, light fixtures and diffusers and grilles) which are scheduled to be recycled, re-used or salvaged shall be protected from contamination. If existing components or adjacent areas are contaminated by the Contractor, the Contactor shall pay all costs associated with the clean-up and/or disposal of contaminated materials.

D. The Contractor shall abate asbestos hazards and cleanup ACM, ACM-contaminated debris, and non-cleanable components and surfaces within the abatement area.

E. The Contractor is responsible for restoring the work area and auxiliary areas utilized during the abatement to conditions equal to or better than original.

F. The work specified herein shall be performed by competent persons trained, knowledgeable and qualified in the techniques of abatement, handling and disposal of asbestos-containing and asbestos-contaminated materials, and the subsequent cleaning of contaminated areas in compliance with all applicable Federal, State, and Local regulations.

G. Project related documents as specified herein shall be submitted to the Engineer/Owner prior to, during, and at the completion of abatement activities to document compliance with project specifications and for inclusion in a final project completion report.

1.3 QUALITY ASSURANCE

A. Contractor Qualifications

1. The Contractor shall meet, at a minimum, the qualifications and licensure requirements of the Illinois Department of Public Health.

2. Contractor shall ensure that all asbestos abatement work activities are supervised by a qualified competent person, in accordance with applicable OSHA regulations.

B. Applicable Standards and Guidelines

1. All work shall be done in strict accordance with applicable Federal, State and Local regulations, standards and codes governing asbestos abatement and any other environmental work or trade work done in conjunction with the abatement.

2. The most recent edition of any relevant regulations, standards, documents, or codes shall be in effect. Where conflict among the requirements of with these specifications exists, the most stringent requirements shall be utilized.

3. The following regulations shall be adhered to in addition to any other applicable regulations and standards:

a. Illinois Department of Public Health (IDPH)

1) Rules for Asbestos Abatement for Public and Private Schools and Commercial and Public Buildings in Illinois (77 Ill. Adm. Code 855)

b. Occupational Safety and Health Administration (OSHA)

1) Title 29 Code of Federal Regulations (CFR) Section 1926.1101 – Construction Standard for Asbestos

2) Title 29 CFR Section 1910.134 General Industry Standard for Respiratory Protection

3) Title 29 CFR Section 1910.20 Access to Employee Exposure and Medical Records

4) Title 29 CFR Section 1910.1200 Hazard Communication

5) Title 29 CFR Section 1926.62 Lead Exposure in Construction

c. Environmental Protection Agency (EPA)

1) Title 40 CFR Part 61 Subparts A and M (Revised Subpart B) – National Emission Standard for Hazardous Air Pollutants (NESHAP)

1.4 NOTIFICATION AND SUBMITTALS

A. Upon notice of contract award, the Contractor shall submit the following items to the Engineer/Owner:

1. A complete list of all Sub-Contractors and foremen who are to work under this

Contract.

2. Copies of the appropriate insurance policies certifying that the Contractor is insured to perform asbestos and/or environmental abatement and has the duty to indemnify the Owner and Engineer for such abatement.

3. Proposed adjustments for work areas, decontamination chambers, equipment rooms, waste-outs, dumpsters, negative air exhaust points, and utility hook-ups.

4. Supervisor’s licenses and other data sufficient to demonstrate compliance with specified requirements.

5. A copy of the demolition/renovation/asbestos abatement notice submitted to the

EPA and any and all appropriate federal, state, and local agencies responsible for the enforcement of asbestos regulations.

6. When rental equipment is to be used in abatement areas or to transport asbestos-contaminated waste, a written notification concerning intended use of the rental equipment must be provided to the rental agency with a copy submitted to the Engineer.

B. Prior to the initiation of asbestos abatement activities, the Contractor shall submit the following items to the Engineer/Owner:

1. Documentation that arrangements for the transport and disposal of asbestos-containing or contaminated materials and supplies have been made. The name and location of the disposal site, a copy of handling procedures, and a list of protective equipment utilized for asbestos disposal at the landfill, prepared and signed by the Landfill Owner/Operator, shall be obtained and submitted.

2. Documentation that each worker and supervisor has the appropriate training and/or license.

3. Documentation from a physician that all employees or agents who may be exposed to airborne asbestos in excess of background levels has been medically monitored to determine if the employee is physically capable of working while wearing the require respiratory equipment without suffering adverse health effects.

Documentation that personnel have received medical monitoring as required by OSHA 29 CFR 1926.1101 shall be submitted.

4. A list of NIOSH approvals for all respiratory protective devices utilized on site. In addition, manufacturer certification of HEPA filtration capabilities for all cartridges and filters shall be submitted.

5. Documentation that all of the Contractor’s employees and agents who must enter the work area have passed respirator fit tests and have been assigned respirators which fit. This fit testing shall be in accordance with qualitative procedures as detailed in the OSHA Standard 29 CFR 1910.1025 Appendix D Qualitative Fit Test Protocol (1985).

6. Manufacturer’s certification that HEPA vacuums, negative air pressure equipment, and other local exhaust ventilation equipment conform to ANSI Z 9.2-79.

7. Safety Data Sheets (SDS) or Material Data Sheets (MSDS) from supplier or manufacturer for all chemicals proposed for use on the Project.

8. Drawings for layout and construction of decontamination enclosure systems and barriers for isolation of the work area, where applicable.

C. During asbestos abatement activities, the Contractor shall submit the following items to the Engineer/Owner:

1. Weekly job progress reports detailing abatement activities. Include review of progress with respect to previously established milestones and schedules, problems and action taken, injury reports, and equipment breakdown.

2. Results of personal exposure monitoring performed by the Contractor.

3. Copies of all transport manifests, trip tickets, and disposal receipts for all asbestos waste materials removed from the Work Area during the abatement process.

4. Copies of worksite entry logbooks with information on worker and visitor access.

5. Logs documenting filter changes on respirators, HEPA vacuums, negative pressure ventilation units, and other engineering controls.

6. Copies of worker documentation for all employees authorized to enter work areas.

D. At the completion of asbestos abatement activities, the Contractor shall submit the following items to the Engineer/Owner:

1. Written certification by the Contractor that all work has been completed in conformance with all applicable Federal, State, and local asbestos regulations and that all asbestos-containing and contaminated material has been removed from the site and legally transported and disposed of at an approved and licensed waste disposal facility.

2. Copies of all remaining transport manifests for all asbestos waste materials removed upon the completion of abatement activities as well as any project related documentation not previously submitted to the Engineer.

PART 2 - PRODUCTS

2.1 GENERAL

A. Deliver all materials in the original packages, containers, or bundles bearing the name of the manufacturer and the brand name (where applicable).

B. Store all materials subject to damage off the ground, away from wet or damp surfaces and under cover sufficient enough to prevent damage or contamination. Non-abatement equipment and materials shall be stored outside of the Work Area until abatement is completed.

C. All equipment and materials shall be completely clean before being brought on Site.

2.2 TOOLS AND EQUIPMENT

A. A sufficient quantity of negative pressure ventilation units equipped with HEPA filtration and operated in accordance with ANSI Z 9.2-79 (Local Exhaust Ventilation requirements) and EPA guidance document EPA 560/5-85-024 Guidance for Controlling Friable Asbestos-Containing Materials in Buildings Appendix J: Recommended Specifications and Operating Procedures For the Use of Negative Pressure Systems for Asbestos Abatement shall be utilized so as to provide one workplace air change every 15 minutes.

The Contractor shall increase the air exchange rate to six times per hour if chemical solvents or removers are to be used in the Work Area.

Total required air flow shall be calculated as follows:

Total ft3/min = Vol. of work area

15 min.

Total required number of units shall be calculated as follows:

Total Units = Total ft3/min Capacity of units

B. Respirators shall be NIOSH approved for use with asbestos, or other contaminants anticipated in the work.

C. Contractor is fully responsible for complying with OSHA rules for other Safety equipment such as hard hats, safety harnesses, eye protection, gloves, footwear, and any other safety devices used on the Site.

D. Airless sprayers shall have pumps capable of providing 125 pounds per square inch (psi) at the nozzle tip at a flow rate of 2 gallons per minute for spraying amended water.

2.3 MATERIALS

A. Contractor shall ensure that encapsulants and sealants used as primers, basecoats, or covering existing materials are compatible with the respective existing or reinstallation materials and their manufacturers’ warranties.

B. Polyethylene sheeting for all applications shall be 6 mil nominal thickness for floors and drop cloths, and 4 mil polyethylene sheeting for walls. Polyethylene sheeting utilized for worker decontamination enclosures shall be opaque white or black in color.

C. Tape shall be 2” or 3” duct tape or other waterproof tape suitable for joining poly seams and attaching polyethylene sheeting to surfaces.

D. Spray adhesives shall be non-flammable and shall be designated with a low-VOC or zero- VOC content.

E. Disposal bags shall be 6 mil nominal thickness, pre-printed with labels as required by applicable EPA and OSHA requirements with the owners name, date of the project, and shall include the following information:

DANGER

Contains Asbestos Fibers May Cause Cancer

Do Not Breathe Dust Avoid Creating Dust

F. Brushes utilized for removing loose asbestos-containing material shall have nylon or fiber bristles.

G. Disposable suits, hoods, and foot coverings shall be TYVEK or similar.

H. Solvents shall be compatible with any primers, mastics, adhesives, paints, coatings, or other surfacing materials to be installed following their use.

I. A sufficient supply of disposable mops, rags and sponges for work area decontamination shall be present at all times.

PART 3 - EXECUTION

3.1 WORK AREA ISOLATION AND PREPARATION

A. Work Area Isolation

1. The Contractor shall establish a regulated work area in accordance with 29 CFR 1910.1001(e)(1) and (2).

2. Where lockable doors are not present, contaminated work area shall be separated from uncontaminated / occupied areas of the building by poly sheeting.

3. In areas where glove bag removal or patch and repair will be performed outside of a negative pressure containment, a barrier shall be constructed around the work area, and asbestos warning signs shall be posted.

4. Access to the work area shall be limited to the authorized personnel.

B. Work Area Preparation

1. Post caution signs meeting the specifications of OSHA 29 CFR 1926.1101 (k) (6) at any location and approaches to a location where airborne concentrations of asbestos may exceed ambient background levels. Signs shall be posted at a sufficient distance from the work area to permit an employee to read the sign and take the necessary protective measures to avoid exposure. Additional signs need to be posted following construction of workplace enclosure barriers.

2. Shut down and lock out electric power to all work areas. Provide temporary power and lighting. Ensure safe installation (including ground fault circuit interrupters) at the source for temporary power sources and equipment in compliance with all applicable electrical code requirements and OSHA requirements for temporary electrical systems. All costs for electricity shall be paid for by the Owner.

3. Shut down and lock out all heating, ventilating, and air conditioning (HVAC) components that are in, supply or pass through the work area. Appropriate equipment and control measures shall be utilized to prevent contamination of building spaces during this operation.

4. Seal all intake and exhaust vents in the work area with tape and 6-mil polyethylene.

Also seal any seams in the system components that pass through the work area.

Remove all HVAC system filters and place in labeled 6-mil polyethylene bags for staging and eventual disposal as asbestos contaminated waste.

5. The Contractor shall provide sanitary facilities for abatement personnel outside of the enclosed work area and maintain them in a clean and sanitary condition throughout the project.

6. The Owner will provide cold water for construction purposes where available. The Contractor may connect to the Owner’s existing system where available.

7. Seal off all windows, doorways, elevator openings, corridor entrances, drains, ducts, grilles, grates, diffusers, and any other openings between the work area and uncontaminated areas outside of the work area with minimum 6-mil polyethylene sheeting and tape.

8. For all gross removal abatement areas, establish a negative pressure enclosure with polyethylene as necessary. All non-cleanable surfaces shall be plasticized and protected as necessary.

9. Negative pressure shall be established within full containment enclosures at -0.02” H2O.

10. Maintain emergency and fire exits from the Work Areas or establish alternative exits acceptable to the local fire department and applicable codes.

C. Worker Decontamination Enclosure Systems

1. Worker decontamination enclosure systems shall be provided at all locations where workers will enter or exit the Work Area in accordance with applicable OSHA

2. Worker decontamination enclosure systems constructed at the work site shall utilize

6-mil opaque black or white polyethylene sheeting or other acceptable materials for privacy.

3. The worker decontamination enclosure system shall be constructed with three (3) chambers including, at a minimum, a clean room, shower room, and an equipment room, each separated from each other by a curtained doorway.

4. Entry to and exit from decontamination enclosure system chambers shall be through curtained doorways consisting of three sheets of overlapping polyethylene sheeting.

All sheets will be secured at the top. The first and third sheets will be secured at the side opposite the side from which the middle sheet is secured. All sheets shall have weights attached to the bottom to ensure that they straight and maintain a seal over the doorway when not in use.

5. The clean room shall be sized to adequately accommodate the work crew. Benches and clothes hooks shall be provided. Shelves for storing respirators shall also be provided in this area. Clean work clothes (if required under disposables), clean disposable clothing, replacement filters for respirators, towels, and other necessary items shall be provided in adequate supply at the clean room. A location for postings shall also be provided in this area. Whenever possible, a lockable door shall be used to permit access to the clean room from outside the work area. Lighting, heat, and electricity shall be provided as necessary. This space shall not be used for office space, or for storage of other than specifically designated tools, equipment or materials.

6. Shower facilities shall be provided which comply with 29 CFR 1910.141 (d)(3). The shower room shall contain one or more showers as necessary to adequately accommodate workers. Each shower head shall be supplied with hot and cold water adjustable at the tap. The shower enclosure shall be constructed to insure against leakage of any kind. An adequate supply of soap, shampoo, and towels shall be supplied by the Contractor and available at all times. Shower water shall be drained, collected, and filtered through a system with at least 0.5-1.0 micron particle size capability. (Note: a system containing a series of several filters with progressively smaller pore sizes is recommended to avoid rapid clogging of filtration system by large particles).

7. The equipment room shall be used for storage of equipment and tools at the end of a shift after they have been decontaminated using a HEPA filtered vacuum and/or wet cleaning techniques as appropriate. Replacement filters (in sealed containers until used) for HEPA vacuums and negative pressure ventilation equipment, extra tools, containers of surfactant and other materials and equipment that may be required during abatement may also be stored here. A drum lined with a labeled 6-mil polyethylene bag for collection of disposable clothing shall be located in this room. Contaminated footwear (e.g. rubber boots, other reusable footwear) shall be stored in this area for reuse the following workday.

D. Waste Container Pass-Out

1. Wherever possible, the waste container pass-out shall be located where there is direct access from the work area to the outside of the building.

2. Waste-out shall be conducted on a daily basis. All bagged waste shall be double bagged and sealed with duct tape "goose neck" ties or double wrapped and sealed with duct tape. The waste transporters will hand carry or use only the contractor's plastic gurneys for bagged or wrapped waste. The gurneys will not be overloaded, so as not to expose the polyethylene bags to punctures and/or tears. NOTE: a current fit test certificate will be required for users of half-mask respirators.

E. Emergency Exits

1. Emergency exits shall be maintained at all times in accordance with applicable codes and standards.

F. Maintenance of Workplace Barriers and Decontamination Enclosure Systems

1. All polyethylene barriers inside the work area, in the worker decontamination enclosure system, in the waste container pass-out, and at partitions constructed to isolate the work area from occupied areas shall be inspected at least twice daily:

prior to the start of each day's abatement activities, and subsequent to the finish of each day's abatement activities. Documentation of these inspections and observations shall be kept in the daily project log.

2. Damage and defects in the enclosure system are to be repaired immediately upon discovery.

3. Use smoke tubes to test the effectiveness of the barrier system when directed by the Owner or Engineer.

4. At any time during the abatement activities after the barriers have been erected, if visible material is observed outside of the work area or if damage occurs to barriers, work shall immediately stop, repairs shall be made to the barriers, and debris/residue shall be cleaned up using appropriate HEPA vacuuming and wet cleaning procedures.

5. If air samples collected outside of the work area during abatement activities indicate airborne fiber concentrations greater than 0.01 f/cc or pre-measured background levels (whichever is lower), work shall immediately stop for inspection and repair of barriers. Cleanup of surfaces outside of the work area using HEPA vacuum and wet cleaning techniques may be necessary.

6. Install and initiate operation of negative pressure ventilation equipment as needed to provide a minimum of 4 work area volumes of air exchange per hour. Openings made in the enclosure system to accommodate these units shall be made airtight with tape and/or caulking as needed. The discharge of negative air exhaust ventilation must be to the outside of the building and shall not be exhausted into occupied areas. If more than one unit is installed, they should be turned on one at a time checking the integrity of wall barriers for secure attachment and need for additional reinforcement. Ensure that adequate power supply is available to satisfy the requirements of the ventilating units.

7. A negative air pressure differential of at least - 0.02 inches of water column, relative to outside ambient air pressure, shall be maintained at all times throughout the contained areas.

8. Instrumentation for measuring pressure differential shall be provided by the Contractor in accordance with OSHA Regulations 29 CFR 1926.1101.

G. Commencement of Work

1. Commencement of work shall not occur until:

a. Enclosure systems have been constructed and tested.

b. Negative pressure ventilation systems are functioning adequately.

c. All pre-abatement submittals, notifications, postings and permits have been provided and are satisfactory to the Owner or Engineer.

d. All equipment for abatement, clean-up, and disposal is on hand.

e. All worker training certification is completed.

f. All containments have been inspected and approved by the Engineer.

3.2 WORK AREA ENTRY AND EXIT

A. Personnel Entry and Exit

1. All workers and authorized personnel shall enter the work area through the worker decontamination enclosure system, where applicable.

2. All personnel entering or leaving the work area must sign the access log located in or near the clean room.

3. Before entering the work area, all personnel shall read and be familiar with all posted regulations, personnel protection requirements (including work area entry and exit procedures) and emergency procedures. A sign-off sheet shall be used to acknowledge that these have been reviewed and understood by all personnel prior to entry.

4. All personnel shall first proceed to the clean room, remove all street clothes and don appropriate respiratory protection and launderable and/or disposable coveralls, as well as head and foot coverings. Hard hats, gloves, etc. shall also be utilized if conditions so indicate. Clean respirators and protective clothing shall be provided and utilized by each person for each separate entry into the work area.

5. Personnel wearing designated protective equipment shall proceed from the clean room through the shower and equipment rooms to the main work area.

6. Before leaving the work area, all personnel shall remove gross contamination from the outside of respirators and protective clothing by brushing and/or wet wiping procedures. (Small HEPA vacuums with brush may be utilized for this purpose, however, larger machines may tear the suits). Each person shall clean the bottoms of their protective footwear in the walk off pan just prior to entering the equipment room.

7. Personnel shall proceed to equipment room where they remove all protective equipment except respirators. Deposit disposable (and launderable) clothing into appropriately labeled containers for disposal (and laundering).

8. Reusable, contaminated footwear shall be stored in the equipment room when not in use in the work area. Upon completion of abatement, the footwear shall be disposed of as asbestos contaminated waste. (Rubber boots may be decontaminated at the completion of the abatement for reuse).

9. Prior to removing the respirator, personnel will proceed to the shower room, and wash exposed face areas as well as the respirator under running water. The respirator is then removed, and a shampoo and shower is taken to remove any residual asbestos contamination. Various types of respirators will require slight modification of these procedures. A type C respirator with HEPA disconnect protection may be disconnected in the equipment room and worn into the shower.

A powered air-purifying respirator face piece will have to be disconnected from the filter/power pack assembly which is not waterproof, upon entering the shower. A dual cartridge respirator may be worn into the shower. Cartridges must be replaced for each new entry into the work area.

10. After showering and drying off, proceed to the clean room and don clean disposable

[and/or launderable] clothing if there will be later re-entry of the work area or street clothes if it is the end of the work shift.

11. These procedures shall be posted in the clean room and equipment room.

B. Equipment and Waste Container Pass-out

1. Asbestos contaminated waste that has been containerized shall be transported out of the work area through the waste container pass-out.

2. Workers, donning appropriate protective clothing and respirators, inside the work area shall clean the outside of properly labeled containers (bags, drums, or wrapped components) using HEPA vacuums and wet wiping techniques and transport them into the waste container pass-out area.

3. Workers, donning protective clothing and appropriately assigned respirators, shall enter the waste container pass-out area from outside the work area, enclose the drums (bags, drums, or wrapped components) in clean, labeled, 6-mil polyethylene bags and remove them from the area to the outside.

4. If workers cannot transport the waste immediately from the container pass-out to the exterior and dispose of in the dumpster, the following procedures shall be followed:

a. Waste and equipment shall be placed in a cart lined with a minimum of one layer of six mil plastic sheeting. The cart shall not be overloaded, which may cause tipping. The top of the cart shall be covered with a minimum of one layer of six mil plastic sheeting. The plastic sheeting shall be secured.

b. The loaded cart shall be carefully taken to and unloaded in the enclosed waste storage unit.

5. The exits from this decontamination unit shall be secured to prevent unauthorized entry.

6. Waste-out shall be conducted on a daily basis. All bagged waste shall be double bagged and sealed with duct tape “goose neck” ties.

3.3 TRAINING AND PERSONAL PROTECTION

A. Training

1. Prior to commencement of abatement activities, all personnel who will be required to enter the work area or handle containerized asbestos containing materials must have received adequate training in accordance with Part 4 of this document as well as any other applicable federal and/or local requirements.

2. Special on-site training on equipment and procedures unique to this job site shall be performed as necessary or required by the Contractor.

3. Training in emergency response and evacuation procedures shall be provided.

B. Respiratory Protection

1. All respiratory protection shall be provided to workers and maintained in accordance with the contractor’s written respiratory protection program, which includes all items in OSHA 29 CFR 1910.134 (b) (1-11). This program shall be posted outside of the clean room of the worker decontamination enclosure system.

2. Workers shall be provided with individually identified (marked with waterproof designations) respirators.

3. Contractors shall use available historical data to perform an initial exposure assessment prior to the initiation of abatement activities. The minimum level of respiratory protection allowed during abatement activities shall be Powered Air Purifying Respirators unless and until air sampling and laboratory data support the use half-mask air purifying respirators which will then be the minimum allowable respiratory protection for the removal and cleanup phases of this project.

C. Fit Testing

1. Workers must perform positive and negative pressure fit tests each time a respirator is put on, whenever the respirator design so permits. Powered air-purifying respirators shall be tested for adequate flow as specified by the manufacturer.

2. Workers shall be given a qualitative fit test in accordance with procedures detailed in the OSHA Standard (29 CFR 1926.1101, Appendix C, Qualitative Fit Test Protocols) for all respirators to be used on this abatement project. An appropriately administered quantitative fit test may be substituted for the qualitative fit test. NOTE:

All respirators used on this project must have the capacity to function safely in the negative pressure mode, so as to insure a level of respiratory protection, in the event of battery pack, AC power, or compressor failures.

3. Documentation of adequate respiratory fit testing must be provided to the Engineer.

4. Additional respirators (minimum of 2 of each type) and training on their donning and use must be available at the work site for authorized visitors who may be required to enter the work area.

D. Protective Clothing

1. Disposable clothing including head, foot, and full body protection shall be provided in sufficient quantities and sizes for all workers and authorized visitors.

2. Hard hats, protective eyewear, gloves, rubber boots, and/or other footwear shall be provided as required for workers and authorized visitors. Safety shoes may be required for some activities.

3. Non-disposable footwear and/or clothing shall remain in the work area and shall be disposed of as contaminated material at the end of the project.

3.4 ABATEMENT PROCEDURES

A. Gross Removal and Decontamination within Negative Pressure Enclosure

1. Clean and isolate the work area as specified herein.

2. Wet all asbestos containing material with an amended water solution using equipment capable of providing a fine spray mist, in order to reduce airborne fiber concentrations when the material is disturbed. Saturate the material to the substrate, however, do not allow excessive water to accumulate in the work area. Keep all removed material wet enough to prevent fiber release until it can be containerized for disposal. It is important to maintain humidity in the work area (by misting or spraying) to assist in fiber settling and reduce airborne concentrations. Wetting procedures are not equally effective on all types of asbestos-containing materials, but shall nonetheless be used in all cases.

3. Saturated asbestos containing material shall be removed in manageable sections.

Removed material shall be containerized before moving to a new location for continuance of work. Surrounding areas shall be periodically sprayed and maintained in a wet condition until visible material is cleaned up.

4. Containers (6-mil polyethylene bags or drums) shall be sealed when full. Bags shall not be overfilled. They shall be securely sealed to prevent accidental opening and leakage by tying the tops of the bags in an overhand knot or by taping in gooseneck fashion. Do not seal the bags with wire or cord. Bags shall be decontaminated on exterior surfaces by HEPA vacuuming and wet cleaning before being placed in clean drums or bags in the waste decontamination pass-out enclosure.

5. For drywall and joint compound removal only, the Contractor may elect to line the interior of the dumpster with polyethylene sheeting to create a “bladder bag” on the interior of the dumpster. Waste materials may be placed directly within the lined dumpster in lieu of bagging the materials as long as the route of access is adequately protected.

6. Large components removed intact may be wrapped in two layers of 6-mil polyethylene sheeting secured with tape for transport to the landfill.

7. Asbestos-containing waste with sharp-edged components (e.g. nails, screws, metal lath, tin sheeting) will tear polyethylene bags or sheeting, and thus must be placed in drums and/or burlap bags for disposal.

8. After completion of all stripping work, surfaces from asbestos containing material have been removed shall be wet-brushed and sponged or cleaned by some equivalent method to remove all visible residue.

9. Clean-up shall proceed in accordance with Section 3.5.

B. Glovebag Removal within a Regulated Area

1. All glovebag removal activities shall be performed within a mini-enclosure within a regulated area. Glove bag procedures for the removal of thermal system insulation shall be conducted using commercially available glove bags of 6-mil clear polyethylene or equivalent, appropriately sized for the project.

2. Prior to performing glove bag removal procedures, the work area shall be isolated to restrict access of work areas to non-abatement personnel. Warning signs and caution tape shall be posted at the entrances to the restricted area in order to avoid any accidental entry into the work area.

3. Each work area where glovebag operations are to be performed shall be pre-cleaned prior to the initiation of removal activities.

4. Remote decontamination facilities shall be constructed consisting of at least a clean room, shower room, and equipment room within a reasonable proximity to the Work Area as approved by the Consultant.

5. Glovebag removal procedures shall be done by a minimum of two licensed asbestos workers trained in glovebag removal procedures and equipped with respiratory protection and two disposable coveralls.

6. All necessary tools shall be brought into the regulated area prior to the initiation of glove bag removal procedures.

7. Glovebags shall be sized to adequately fit the diameter of thermal system insulation to be removed. Do not attempt to use a glove bag on piping hotter than 150 degrees F.

8. Glovebag removal procedures shall be performed as follows:

a. Place all the tools and material necessary to remove and seal the covering in the tool pouch or in the bottom of the bag.

b. Attach the glove bag around the pipe and seal the ends of the glove bag securely to the pipe utilizing duct tape to create an airtight seal. The integrity of the seals shall be tested by smoke testing prior to the initiation of removal.

c. Make a small hole in the center of the bag just below the pipe (6 inches) and insert the water sprayer. Seal this hole airtight with tape. The subject thermal system insulation shall be misted with amended water prior to and during removal activities.

d. Use tools to cut existing wires, bands, or metal jacketing. Care must be taken when removing these to avoid ruptures of the bag from the sharp edges. The material removed should be gently placed on the bottom of the bag to avoid rips and tears.

e. Cut the ends of the insulation and slit lengthwise to remove insulation from the associated pipe.

f. Spray unprotected pipe with amended water and use tools to fully remove any residual dust and debris from pipe surfaces.

g. Seal exposed ends of insulation with bridging encapsulant or duct tape.

h. Spray tools and amended water to clean and place tools within the one of the rubber gloves.

i. Turn the glove inside out and twist and twist and seal end of glove from the inner portion with duct tape. Sever the center of the duct tape to create two separate bags.

j. Remove the water wand and replace it with the HEPA vacuum. Seal the hole and collapse the bag with the vacuum. This will create negative pressure in the bag and help reduce tears and leaks.

k. Twist the glove bag several times and seal the connection with duct tape.

l. Place a 6-mil polyethylene disposal bag under the glove bag, remove the tape, and place the sealed glovebag into the disposal bag.

C. Non-friable Removal within a Regulated Area

1. All asbestos-containing expansion joint caulk removal activities shall be conducted to the exterior of the building in accordance with applicable federal, state, and local

2. Restrict access of work areas to non-asbestos abatement personnel and regulate the work areas utilizing warning signs and/or caution tape.

3. Place 6 mil polyethylene sheeting on the ground outside the abatement areas to catch any debris generated during removal activities.

4. Wet expansion joint caulk with an amended water solution using equipment capable of providing a fine spray mist to reduce airborne fiber concentrations when the material is disturbed.

5. Using manual methods, remove any expansion joint caulk adhered to the exterior systems in one piece (to the extent feasible). Removal methods shall employee the use of wet methods and HEPA vacuuming to ensure that materials are not rendered friable.

6. Place all ACM waste in a lined dumpster for disposal. The Contractor shall take efforts to ensure expansion joint caulk is not dislodged during material handing activities and shall clean any debris generated.

7. Utilize HEPA vacuums and wet methods to clean debris off of horizontal surfaces and on remaining polyethylene sheeting. Dispose of polyethylene sheeting and debris in the lined dumpster.

3.5 CLEAN UP PROCEDURES

A. Clean-up Procedures Shall Include the Following:

1. Remove and containerize all visible accumulations of asbestos containing material and asbestos contaminated debris utilizing rubber dust pans and rubber squeegees to move material around. Do not use metal shovels to pick up or move accumulated waste. Special care shall be taken to minimize damage to floor sheeting.

2. Wet clean all surfaces in the work area using rags, mops, and sponges as appropriate. To pick up excess water and gross wet debris, use a HEPA wet-dry vacuum.

3. The Contactor shall ensure that all mastic removal and cleaning activities are performed in accordance with manufacturer recommendations and applicable regulatory requirements. The cleaning of concrete floors shall be performed utilizing a three-phase cleaning process (initial, second and third clean).

4. The negative pressure ventilation units shall remain in continuous operation.

Decontamination enclosure systems shall remain in place and be utilized.

5. After cleaning the work area, wait until all the surfaces become dry to allow fibers to settle and HEPA vacuum and wet clean all objects and surfaces in the work area again.

6. Remove all containerized waste from the area and waste container pass-out.

7. Decontaminate all tools and equipment and remove at the appropriate time in the cleaning sequence.

8. Inspect the work area for visible residue. If any accumulation of residue is observed, it will be assumed to be asbestos and the settling period/cleaning cycle repeated.

9. The work areas shall be cleaned until the Owner and/or the Engineer has determined that the results of his visual inspection are satisfactory. Clearance air testing will be passed when laboratory results indicate airborne fiber concentrations of less than or equal to 0.01 fibers per cubic centimeter (using phase contrast microscopy) or 70 structures per square millimeter (using transmission electron microscopy) at all sampling locations. Sample methodology and clearance criteria shall meet regulatory and specification requirements as identified herein. Additional cleaning cycles shall be provided, as necessary, at no cost to the Owner/Engineer until these criteria have been met.

10. Following the satisfactory completion of clearance air monitoring, the remaining barriers may be removed and properly disposed of. A final visual inspection by the Engineer shall insure that no contamination remains in the work area. Unsatisfactory conditions may require additional cleaning and air monitoring which shall be performed at the Contractor’s expense at no additional cost to the Owner.

11. All HEPA filtration units shall remain in operation until the containment has successfully…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .