5-20-19

Trabuco Creek Sites

TCFD 7.1 – small remnant, no photo

TCFD 7.1

Structure Height (ft)

Structure Thickness (ft)

Structure Length (ft)

2 2 10

TCFD 11

Structure Height (ft)

Structure Thickness (ft)

Structure Length (ft)

6.5 2 40

Portion of center have been removed, however spillway is still intact on stream bottom as well as much of the walls.

TCFD 11.1

33.67448, -117.52498

Structure Thickness (ft)

Structure Length (ft)

3 2-3 21

Dam continues to become more exposed as degradation of stream materials continue due to downstream barrier removal.

TCFD 11.2

33 40’ 29.98 deg N 117 31 ‘ 26.20 deg W

Structure Thickness (ft)

Structure Length

3 2-3 30, in 3 pieces

TCFD 11.2 photo 2

Holy Jim Canyon Sites

HJFD5- small remnant, no photo

HJFD 5

Structure Height (ft)

Structure Thickness (ft)

Structure Length

2 2 8

HJFD 9

(ft)

Structure Thickness (ft)

Structure Length (ft)

3 2 9

Dam continues to become more exposed as degradation of stream materials continue due to downstream barrier removal.

HFJD 12

(ft)

Structure Thickness (ft)

Structure Length (ft)

3.5 1.5 18

Partial removal in 2018.

HJFD 14

(ft)

Structure Thickness (ft)

Structure Length (ft)

6 2.5 21

Center of dam is missing along with gate, the rest is intact. Partial removal in 2018.