5-20-19
Trabuco Creek Sites
TCFD 7.1 – small remnant, no photo
TCFD 7.1
Structure Height (ft)
Structure Thickness (ft)
Structure Length (ft)
2 2 10
TCFD 11
Structure Height (ft)
Structure Thickness (ft)
Structure Length (ft)
6.5 2 40
Portion of center have been removed, however spillway is still intact on stream bottom as well as much of the walls.
TCFD 11.1
33.67448, -117.52498
Structure Thickness (ft)
Structure Length (ft)
3 2-3 21
Dam continues to become more exposed as degradation of stream materials continue due to downstream barrier removal.
TCFD 11.2
33 40’ 29.98 deg N 117 31 ‘ 26.20 deg W
Structure Thickness (ft)
Structure Length
3 2-3 30, in 3 pieces
TCFD 11.2 photo 2
Holy Jim Canyon Sites
HJFD5- small remnant, no photo
HJFD 5
Structure Height (ft)
Structure Thickness (ft)
Structure Length
2 2 8
HJFD 9
(ft)
Structure Thickness (ft)
Structure Length (ft)
3 2 9
Dam continues to become more exposed as degradation of stream materials continue due to downstream barrier removal.
HFJD 12
(ft)
Structure Thickness (ft)
Structure Length (ft)
3.5 1.5 18
Partial removal in 2018.
HJFD 14
(ft)
Structure Thickness (ft)
Structure Length (ft)
6 2.5 21
Center of dam is missing along with gate, the rest is intact. Partial removal in 2018.