TP09 Final Drawings - 28 Pages 657-22-111JC.pdf
PDF 23 MB Posted
- Solicitation number
- 36C25524R0108
About this file
This document appears to be the final drawings for Solicitation Number 36C25524R0108, titled "Z2DA--657-22-111JC, PREPARE SITE FOR NEW MAGNETIC RESONANCE IMAGING, ROOM A279." The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 for the preparation of a site for a new magnetic resonance imaging room. The final drawings provide the technical specifications and plans for the site preparation work. The solicitation is seeking bids for this construction project, and the drawings would be critical for contractors to develop their proposals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2T
2T2 1A
1B
6 6A7
8B11
1T
5T 14 3
E
G
H
J
BELL AVE.
ENRIGHT AVE.
DELMAR AVE.
SP
R
IN
G
S T.
G R
AN
D
A
VE
EMPLOYEE PARKING
YELLOW
VALET PARKING
PURPLE
BUILDING SCHEDULE
1 MAIN HOSPITAL & CLINICAL ADDITION
1A EMERGENCY GENERATOR VAULT
1B EMERGENCY GENERATOR VAULT
1T MODULAR BUILDING
2 EDUC., MED. MEDIA, CHAPEL & RESRCH.
2T METHADONE CLINIC
2T2 OATP CLINIC
3 IRM & RESEARCH
4 NON-VA CARE / AFGE
5T OEF/OIF
6 RESEARCH
6A RESEARCH
7 RESEARCH
7A RESEARCH
8 BOILER PLANT
8A CHILLER PLANT
8B EMERGENCY GENERATOR
8C CHILLER BUILDING
9 PARKING GARAGE - UNDER CONST.
10 FLAG POLE
11 GAS METER HOUSE
12 BRINE TANKS
14 GARAGE
16 ENGINEERING / TRANSITION CARE TEAM
17 SWITCH GEAR BUILDING
24 WASTE STORAGE FACILITY
29 UNDER CONSTRUCTION
DEC DECON TRAILER
8A 7A
29BUILDING
(NON VA)
DEC
0' 200'
300'
400'
500'100'
SCALE REFERENCE
P
EMPLOYEE PARKING
YELLOW
L
PATIENT PARKING
BLUE
VACANT LOT
(NON VA)
UNDER
CONSTRUCTION
AMEREN MISSOURI
SUBSTATION
UP
DOWN
UP
F
PHYSICIAN PARKING
RED
EMPLOYEE PARKING
YELLOW
R Q
PATIENT PARKING
BLUE
A
A
PATIENT PARKING
BLUE
PATIENT PARKING
BLUE
8C
EMPLOYEE PARKING
YELLOW
SALT
STORAGE
N M
S
TO
IN
TE
R
ST
AT
E
JOHN COCHRAN DIVISION
PREPARE SITE FOR NEW
MAGNETIC RESONANCE
IMAGING ROOM A279
US DEPARTMENT OF VETERANS AFFAIRS
VA ST. LOUIS HEALTH CARE SYSTEM
VA PROJECT NUMBER: 657-22-111JC
DRAWING INDEX
GENERAL
01-GI-001 COVER SHEET
01-GI-002 GENERAL NOTES
01-GJ-003 ICRA AND ILSM ASSESSMENT
01-GJ-501 ICRA DETAILS
01-GJ-502 ICRA DETAILS
01-GJ-503 ICRA DETAILS
01-GJ-504 ICRA DETAILS
01-CS-101 CIVIL SITE PLAN
ARCHITECTURAL
01-AE-121 FLOOR PLAN AND ICRA ANALYSIS
01-AE-122 REFLECTED CEILING PLAN
01-AE-131 ROOF PLAN
STRUCTURAL
01-SF-121 FLOOR DEMOLITION AND REPAIR ROOM A279
MECHANICAL
01-MG-501 MECHANICAL SYMBOLS
01-MG-502 MECHANICAL DETAILS
01-MG-601 MECHANICAL SCHEDULES
01-MH-121 HYDRONIC PLAN - FLOOR 02
01-MH-122 MECHANICAL PLAN - FLOOR 02 DEMOLITION
01-MH-123 MECHANICAL PLAN - FLOOR 02 REVISION
01-MH-131 MECHANICAL ROOF PLAN - FLOOR 03 DEMOLITION
01-MH-132 MECHANICAL ROOF PLAN - FLOOR 03 REVISION
ELECTRICAL
01-EG-501 ELECTRICAL SYMBOLS
01-EG-502 ELECTRICAL DETAILS
01-EG-503 ELECTRICAL DETAILS
01-EG-504 ELECTRICAL DETAILS
01-EG-601 ELECTRICAL ONE-LINE DIAGRAM AND FIXTURE SCHEDULE
01-EL-121 LIGHTING PLAN - FLOOR 02
01-EP-121 POWER PLAN - FLOOR 02
01-EP-131 POWER PLAN - FLOOR 03
OVERALL CAMPUS SITE PLAN
DRAWING INDEX LEGEND
BUILDING NUMBER SHEET TYPE DESIGNATORS
0 = GENERAL
1 = PLANS
2 = ELEVATIONS
3 = SECTIONS
4 = LARGE-SCALE VIEWS
5 = DETAILS
6 = SCHEDULES & DIAGRAMS
7 = USER DEFINED
8 = USER DEFINED
9 = 3D REPRESENTATIONS
DISCIPLINE DESIGNATORS EXAMPLES
GI = GENERAL INFORMATION
GC = GENERAL CONTRACT
GJ = ICRA
CS = CIVIL SITE
AD = ARCHITECTURAL DEMOLITION
AS = ARCHITECTURAL SITE
AE = ARCHITECTURAL ELEMENTS
FLOOR PLANS, ELEVATIONS, DETAILS
AI = ARCHITECTURAL INTERIORS
AG = ARCHITECTURAL GRAPHICS
AF = ARCHITECTURAL FINISHES
AC = ARCHITECTURAL CEILING PLAN
AW = ARCHITECTURAL WAYFINDING
AP = ARCHITECTURAL SPACE PLANNING
FLOOR PLANS & SCHEDULES
AL = ARCHITECTURAL LIFE SAFETY
DRAWINGS
SG = STRUCTURAL GENERAL
SF = STRUCTURAL FRAMING
MG = MECHANICAL GENERAL
MH = MECHANICAL HVAC
PG = PLUMBING MEDICAL GAS
PL = PLUMBING FIXTURES
EG = ELECTRICAL GENERAL
EL = ELECTRICAL LIGHTING
FLOOR NUMBER ON PLAN SHEETS
SHEET NUMBER
##-XX-###
PROJECT LOCATOR
TO
IN
TE
R
ST
AT
E
COVER SHEET
01-GI-001
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration
PREPARE SITE FOR NEW MRI -
ROOM A279
657-22-111JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
1 S. Memorial Dr.
Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
05/31/2024 WJS RE
100% BID DOCUMENTS
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9VA FORM 08-6231
A
B
C
D
E
F
A
B
C
D
E
F
MEANS OF EGRESS TO
EXTERIOR OF BUILDING
CHUTE, 2HR
FIRE BARRIER, 1HR
FIRE BARRIER, 2HR
SMOKE BARRIER
HAZARDOUS AREA
CONSTRUCTION AREA
LIFE SAFETY
SYMBOL LEGEND
CONSTRUCTION BARRIER
Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
1 S. Memorial Dr.
FULLY SPRINKLERED
PREPARE SITE FOR NEW MRI -
ROOM A279
657-22-111JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration
B
A
C
D
E
F
VA FORM 08-6231 1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100 % BID DOCUMENTS
02/10/2023 BD LB
01-GI-002
GENERAL NOTES
LAVATORY
LINEAR FEET
LINTEL
KNEE BRACE
LAV
LF
LNTL
KB
BD
BL
BLDG
BLKG
BOD
BR
BTWN
ACT
ADJ
ADJC
AFF
ALT
ALUM
ARCH
AVG
REFER TO THE MATERIAL LEGEND FOR ABBREVIATIONS RELATED TO FINISHES NOT HERE LISTED
BOARD
BLINDS
BUILDING
BLOCKING
BOTTOM OF DECK
BRICK
BETWEEN
ACOUSTIC CEILING TILE
ADJUSTABLE
ADJACENT
ABOVE FINISHED FLOOR
ALTERNATE
ALUMINUM
ARCHITECTURAL
AVERAGE
ABBREVIATIONS LIST
ON CENTER
OUTSIDE FACE
OPENING
OPPOSITE
OC
OF
OPNG
OPP
NIC
NOM
NTS
NOT IN CONTRACT
NOMINAL
NOT TO SCALE
R
RB
RD
REF
REINF
REQD
REV
RLG
RM
RO
RISER OR RADIUS
RUBBER BASE
ROOF DRAIN
REFERENCE
REINFORCED
REQUIRED
REVISION
RAILING
ROOM
ROUGH OPENING
P
PBD
PLAM, PL
PLBG
PLS
PR
PREF
PROP
PT
PTD
PTN
PWD
PAINT
PARTICLE BOARD
PLASTIC LAMINATE
PLUMBING
PLASTIC
PAIR
PREFINISHED
PROPERTY
PRESSURE TREATED
PAINTED
PARTITION
PLYWOOD
C
CAB
CB
CC
CG
CJ
CL
CLNG
CMU
COL
CONC
CONST
CONT
CP
CRT
CS
CSJ
CST
CT
CARPET
CABINET
CATCH BASIN
CONCRETE, COLORED
CORNER GUARD
CONTROL JOINT
CENTERLINE
CEILING
CONCRETE MASONRY UNIT
COLUMN
CONCRETE
CONSTRUCTION
CONTINUOUS
COMMUNICATIONS PANEL
CATHODE RAY TUBE
CONSTRUCTION JOINT
CONCRETE, SEALED
CONCRETE, STAINED
CERAMIC TILE
EA
EJ
ELECT
ELEV
EP
EQ
EQUIP
EWC
EXT
EXTG
EACH
EXPANSION JOINT
ELECTRICAL
ELEVATION
ELECTRICAL PANEL
EQUAL
EQUIPMENT
ELECTRIC WATER COOLER
EXTERIOR
EXISTING
DEMOLITION
DIAMETER
DIMENSION
DOWN
DOOR
DOWNSPOUT
DETAIL
DRAWING
DEMO
DIA
DIM
DN
DR
DS
DTL
DWG
MAS
MAT
MAX
MDF
MECH
MFR
MH
MIN
MIR
MISC
MO
MTD
MTL
MASONRY
MATERIAL
MAXIMUM
MEDIUM DENSITY FIBERBOARD
MECHANICAL
MANUFACTURER
MANHOLE
MINIMUM
MIRROR
MISCELLANEOUS
MASONRY OPENING
MOUNTED
METAL
T
TC
TEL
TGL
TJ
TS
TW
TYP
TREAD
TOP OF CONCRETE
TELEPHONE
TEMPERED GLASS LITE
TOP OF JOIST
TOP OF STEEL
TOP OF WALL
TYPICAL
VB
VCT
VERT
VIF
YARDYD
W
W/
WCL
WD
WDW
WF
WO
WPG
WIDTH
WITH
WATER CLOSET
WOOD
WINDOW
WIDE FLANGE
WITHOUT
WATERPROOFING
VINYL BASE
VINYL COMPOSITION TILE
VERTICAL
VERIFY IN FIELD
UF
UON
UR
UNFINISHED
UNLESS OTHERWISE NOTED
URINAL
JOINT
IF
INSUL
JT
HC
HD
HDBD
HDW
HDWD
HM
HOR
HR
HT
HWH
INSIDE FACE
INSULATION
HOLLOW CORE
HEAD
HARDBOARD
HARDWARE
HARDWOOD
HOLLOW METAL
HORIZONTAL
HANDRAIL
HEIGHT
HOT WATER HEATER
GRANITE
GAUGE
GLASS
GRADE
GROUT
GYPSUM WALLBOARD
G
GA
GL
GR
GT
GWB
FABRICATED
FAN COIL UNIT
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER CABINET
FINISH FLOOR
FINISH GRADE
FIRE HOSE CABINET
FINISH
FLOOR
FLASHING
FLOOR TILE
FIREPROOFING
FIRE RATING
FIBERGLASS REINFORCED PANEL
FLOOR SINK
FEET
FOOTING
FIRE TREATED WOOD
FABRIC WRAPPED PANEL
SC
SCH
SECT
SHTH
SIM
SK
SM
SOF
SPEC
SQ
SSM
SST
STD
STL
STR
SUSP
SW
SYS
SOLID CORE
SCHEDULE
SECTION
SHEATHING
SIMILAR
SINK
SHEET METAL
SOFFIT
SPECIFICATIONS
SQUARE
SOLID SURFACING MATERIAL
STAINLESS STEEL
STANDARD
STEEL
STRUCTURE
SUSPENDED
SLAT WALL
SYSTEM
FAB
FCU
FD
FDN
FEC
FF
FG
FHC
FIN
FLR
FLG
FLT
FPG
FR
FRP
FSK
FT
FTG
FTWD
FWP
LEGEND - SYMBOLS
T.O.
X'-X" A.F.F.
X
X
XXX
X
X
CONTROL POINT
KEYED NOTE
CENTER LINE MARK
REVISION NUMBER
X
ELEVATION DATUM
EXISTING COLUMN LINE
NEW COLUMN LINE
EXTERIOR ELEVATION MARK
X = ELEVATION NUMBER
Y = SHEET NUMBER
NEW PARTITION
NEW DOOR
W/ DOOR NUMBER
ROOM NAME & NUMBER
WINDOW NUMBER
PARTITION TYPE
DEMOLISHED DOOR
EXISTING DOOR
DETAIL MARK
X = DETAIL NUMBER
Y = SHEET NUMBER
NORTH ARROW
SECTION MARK
X = SECTION NUMBER
Y = SHEET NUMBER
EXISTING PARTITION
DEMOLISHED PARTITION
INTERIOR ELEVATION MARK
X = ELEVATION NUMBER
Y = SHEET NUMBER
X
YY.Y
X
YY.Y
X
STEEL
CONCRETE
ALUMINUM
BRICK
WOOD
(FINISHED)
COMPACTED GRAN. FILL
BATT
INSULATION
GYPSUM WALL BOARD
(SMALL SCALE)
CONTINUOUS
WOOD BLOCKING
HATCH INDICATIONS SHOWN AS GUIDE ONLY; HATCHING SCALES MAY NEED TO BE MODIFIED DEPENDING UPON SCALE USED
MATERIALS INDICATION
NON-CONTINUOUS
WOOD BLOCKING
EARTH
GYPSUM WALL BOARD
(LARGE SCALE)
PLYWOOD
RIGID
INSULATION
SAND
PRECAST
ASPHALT
XX
X
X
YY.Y
X
YY.Y
PHASE ALL DEMOLITION & CONSTRUCTION TO BE SEQUENCED & COORDINATED TO INSURE THAT
THE BUILDING OWNER'S OPERATIONS ARE CONTINUOUSLY MAINTAINED.
2. THESE PLANS REFLECT INFORMATION GATHERED FROM EXISTING CONDITIONS DRAWINGS &
ARCHITECT'S FIELD VERIFICATION. CONTRACTOR SHALL VERIFY ACCURACY OF INFORMATION
PRIOR TO COMMENCEMENT OF ANY DEMOLITION AND /OR CONSTRUCTION ACTIVITIES AND REPORT
ANY DISCREPANCIES TO COR.
3. ITEMS TO BE DEMOLISHED, REMOVED, OR RELOCATED ARE SHOWN DASHED OR AS NOTED ON
DRAWINGS. EXISTING ITEMS TO REMAIN SHALL BE PROTECTED DURING CONSTRUCTION BY
CONTRACTOR. PATCH & REPAIR ALL RESULTING SURFACES TO REMAIN.
4.
1.
COORDINATE ALL WORK BETWEEN TRADES AS REQUIRED TO INSURE TIMELY & PROPER
INSTALLATION OF ALL BUILDING SYSTEMS.
5.
6.
ACCESS TO EMPLOYEE ENTRY AND EXIT DOORS MUST BE MAINTAINED THROUGHOUT
CONSTRUCTION. PROVIDE ALL VA REQUIRED BARRIERS AND SIGNAGE AT THE LIMITS OF THE
CONSTRUCTION SITE.
7.
PROVIDE FULLY SEALED DUST PARTITIONS AS REQUIRED AT ALL LOCATIONS WHERE
CONSTRUCTION MEETS THE EXISTING BUILDING IN ORDER TO MAINTAIN A CLEAN DUST-FREE
ENVIRONMENT INSIDE THE BUILDING.
8.
ALL GYPSUM BOARD USED IN THIS PROJECT SHALL BE TYPE "X"
CONTRACTORS SHALL VISIT THE SITE TO FAMILARIZE THEMSELVES WITH THE EXISTING
CONDITIONS AND INCLUDE THE WORK NECESSARY TO COMPLY WITH THE SCOPE OF THE WORK.
ADDITIONAL COMPENSATION WILL NOT BE CONSIDERED FOR EXTRA WORK WHEN SUCH WORK
COULD HAVE BEEN REASONABLY ASCERTAINED FROM THE PRE BID SITE VISIT REVIEW OF THE
EXISTING CONDITIONS AND THE WORK SCOPE DESCRIBED IN THE DOCUMENTS.
10.
COORDINATION OF ALL WORK AS DESCRIBED ON THE DOCUMENTS IS THE GENERAL
CONTRACTOR'S RESPONSIBILITY.
11.
PERFORM WORK IN ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS, AND
ORDINANCES HAVING JURISDICTION
12.
IMMEDIATELY REPORT DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND FIELD
CONDITIONS, CONFIRM THE WORK IS BUILDABLE AS SHOWN.
ALL DIMENSIONS ARE FROM COLUMN CENTER LINE TO FACE OF PARTITION U.O.N. UNDER NO
CIRCUMSTANCES SHALL ANY MEASUREMENT BE SCALED FROM THE DRAWINGS. ANY
MEASUREMENTS NOT GIVEN AN ACTUAL NUMBER DIMENSION SHOULD BE BROUGHT TO THE
ATTENTION OF THE ARCHITECTS BEFORE PROCEEDING
13. ALL WOOD USED IN THIS PROJECT SHALL BE FIRE-RETARDANT TREATED
14. ALL NEW PARTITIONS, UNLESS OTHERWISE SHOWN, SHALL BE 20 GA. MTL STUDS
15. COORDINATE & PROVIDE BLOCKING AS REQUIRED FOR MILLWORK & ITEMS ATTACHED OR
MOUNTED TO WALLS & CEILINGS
16. ALL INSULATING MATERIALS WITHIN WALLS & IN UNCONCEALED SPACES SHALL HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED INDEX OF NOT MORE THAN 450
17. ALL MATERIALS EXPOSED WITHIN PLENUMS ARE REQUIRED TO BE NON-COMBUSTIBLE OR SHALL
HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE DEVELOPED INDEX OF NOT
MORE THAN 50 AS DETERMINED IN ACCORDANCE WITH ASTM E-84
18. PROJECT LIMIT LINES INDICATES THE AREA OF A MAJORITY OF THE PROJECT WORK. BUT SOME
WORK WILL BE REQUIRED OUTSIDE OF THE PROJECT LIMITS. REFER TO DRAWINGS AND
SPECIFICATIONS FOR INFORMATION.
THE CONTRACTING OFFICER’S REPRESENTATIVE (COR) WILL PERFORM FIELD VERIFICATION AS
REQUIRED FOR THE DURATION OF THE PROJECT TO MONITOR PROJECT PROGRESS.
UTILITY SHUT DOWNS WILL BE COORDINATED BY IPT (INTEGRATED PROJECT TEAM) INCLUDING: COR, VA
FACILITY OPERATIONS, AND GENERAL CONTRACTOR.
ANY INTEGRATED PROJECT TEAM MEMBER (IPT) INCLUDING BUT NOT LIMITED TO: CONTRACTORS / SUB- CONTRACTORS, ARCHITECTS AND/OR ENGINEERS WHO ENTER THE PROJECT BOUNDARY SHALL WEAR ALL PROPER PERSONAL PROTECTIVE EQUIPMENT (PPE’S: CERTIFIED BY OSHA) AT ALL TIMES. SUCH PPE’S INCLUDE: HARD HATS, SAFETY GLASSES, PROPER SHOES, HIGH VISIBILITY SHIRTS, ETC.
IF THE PROJECT AREA AND AREAS AFFECTED BY THE PROJECT INCLUDE EXISTING EQUIPMENT, SURFACES, FINISHES, MATERIALS, ETC., NOT TO BE REMOVED, THE CONTRACTOR MUST PROTECT THIS
EQUIPMENT FROM DUST, DEBRIS, DAMAGE, ETC. THE CONTRACTOR MUST ALSO CLEAN THESE
ITEMS/SURFACES TO THE ORIGINAL CONDITION FOUND AT THE START OF THE PROJECT PRIOR TO FINAL
INSPECTION.
PATCH ALL FINISHES WHERE DISTURBED BY THE WORK AND WHERE UNFINISHED SURFACES HAVE BEEN EXPOSED BY DEMOLITION. PATCHING MUST MATCH ADJACENT MATERIALS, COLORS, AND FINISHES.
WALL SURFACES THAT ARE PATCHED SHALL HAVE THE FINISHES (PAINT, VINYL WALL COVERING, ETC.)
REPLACED FROM CORNER TO CORNER AND FLOOR TO CEILING.
UNLESS OTHERWISE INDICATED, FINISH ALL NEW FRAMES AND PARTITIONS TO MATCH SURROUNDING.
NEW HOLLOW METAL DOORS SHALL BE PAINTED SAME COLOR AS FRAMES. EXISTING PARTITIONS
RECEIVING NEW DOOR FRAMES THAT HAVE VINYL WALL COVERING (VWC) SHALL HAVE THE VWC
COMPLETELY REMOVED AND REPLACED WITH NEW VWC OF MATCHING TEXTURE AND COLOR.
CORRIDOR WALLS AND PLUMBING PARTITIONS SHALL BE CONSIDERED 1 HOUR FIRE / SMOKE RATED WALLS AND NEW OR EXISTING PENETRATIONS MUST BE SEALED ACCORDINGLY WITH UL APPROVED FIRE STOPPING MATERIAL THE SAME DAY THE PENETRATION IS MADE OR DISCOVERED. ALL FLOOR SLABS, VERTICAL SHAFTS AND STAIRWELLS SHALL BE CONSIDERED 2 HOUR FIRE / SMOKE RATED SEPARATIONS AND SHALL BE SEALED ACCORDINGLY IN THE MANNER LISTED HEREIN. PENETRATIONS THROUGH THE
EXTERIOR WALLS SHALL BE SEALED WATERTIGHT.
IF EXISTING WALLS ARE TO BE USED AS DUST OR SMOKE BARRIERS SEPARATING THE CONSTRUCTION AREA FROM THE MEDICAL CENTER, THE CONTRACTOR IS RESPONSIBLE FOR SEALING ALL EXISTING PENETRATIONS IN THIS WALL, EXTENDING WALL TO CEILING SLAB AND ANY OTHER WORK TO ENSURE
THE WALL MEETS THE REQUIREMENTS IN THE GENERAL REQUIREMENTS SPECIFICATIONS FOR
CONSTRUCTION BARRIERS.
WHENEVER EXISTING EQUIPMENT, PIPING, DUCTS, ETC., ARE REQUIRED TO BE REMOVED, SUCH REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS, FOUNDATIONS, ETC., UNLESS NOTED OTHERWISE.
AFTER REMOVAL; FLOORS, WALLS, AND CEILINGS SHALL BE FINISHED TO MATCH ADJOINING SURFACES.
UTILITY WORK THAT WILL REQUIRE A SHUTDOWN OF EXISTING SERVICE WILL BE DONE AT TIMES OTHER
THAN NORMAL WORKING HOURS AT NO ADDITIONAL COST TO THE GOVERNMENT. WORK MUST BE
SCHEDULED WITH THE COR.
ALL NEW VERTICAL AND HORIZONTAL DUCTS, PIPES, CONDUITS, ETC., IN FINISHED ROOMS OR AREAS
THROUGHOUT BUILDING, NOT ENCASED IN MASONRY OR CONCRETE CONSTRUCTION, SHALL BE
ENCLOSED IN METAL STUDS AND DRYWALL CHASE WALLS AS DETAILED IN THE DRAWINGS AND FINISHED
TO MATCH THE ROOM FINISH.
WORK THAT MUST OCCUR IN OCCUPIED AREAS OF THE MEDICAL CENTER OR DISRUPT A MEDICAL CENTER FUNCTION, WILL BE DONE AT TIMES OTHER THAN NORMAL WORKING HOURS AT NO ADDITIONAL
COST TO THE GOVERNMENT. WORK MUST BE SCHEDULED WITH THE VA PROJECT ENGINEER.
CONTRACTOR SHALL NOT INSTALL CONDUIT, PIPING, LIGHTING, OR OTHER OBSTRUCTIONS UNDER ADJACENT HVAC EQUIPMENT THAT WILL ELIMINATE OR OBSTRUCT ACCESS TO COILS, MOTORS, VALVES, SWITCHES, PANELS, ETC.
BEFORE THE CONTRACTOR BEGINS WORK CONTRACTOR SHALL RECORD ANY EXISTING SYSTEM
INFORMATION SUCH AS TEMPERATURE, FLOW RATE, PRESSURE, CURRENT, VOLTAGE, OR ANY OTHER INFORMATION NECESSARY FOR HIM TO RETURN THE AFFECTED SYSTEM TO ORIGINAL OPERATING CONDITION. UNLESS NOTED OTHERWISE IT IS ASSUMED THAT ALL SYSTEMS (HVAC, ELECTRICAL, PLUMBING, ETC.) ARE WORKING PROPERLY IN EVERY MANNER AT THE BEGINNING OF THE PROJECT.
THE CONTRACTOR'S RECORDED MEASUREMENTS MUST BE SUBMITTED TO THE PROJECT ENGINEER
FOR REVIEW AND ACCEPTANCE BEFORE ANY DEMOLITION OR OTHER RELATED WORK CAN PROCEED.
THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING ACCESS DOORS TO
CONSTRUCTION AREAS, EXISTING MECHANICAL AND ELECTRICAL AREAS, ASSIGNED STORAGE AREAS, EQUIPMENT ACCESS AREAS, ETC. DOORS MUST BE RESTORED TO THE CONDITION ENCOUNTERED AT BEGINNING OF PROJECT. THIS INCLUDES DOOR REPLACEMENT, HARDWARE REPLACEMENT, HARDWARE
REPAIR, DOOR REPAIR, ETC.
CONTRACTOR MUST PROVIDE HIS OWN EQUIPMENT FOR MOVING OF MATERIALS, EQUIPMENT AND
TRASH. THIS INCLUDES CARTS FOR REMOVAL OF DEMOLITION MATERIALS, PALLET JACKS FOR
EQUIPMENT MOVING, TWO OR FOUR WHEEL CARTS FOR EQUIPMENT TRANSFER, ETC. CONTRACTOR MAY NOT BORROW VA OWNED EQUIPMENT FOR THIS PURPOSE. CARTS OR GONDOLAS FOR REMOVING
DEMOLISHED MATERIALS MUST HAVE HARD LIDS AND BE SEALED WHEN MOVING THROUGH THE
HOSPITAL..
SEVERE NOISE PRODUCING WORK WILL NOT BE ALLOWED DURING NORMAL WORKING HOURS
AND MUST BE SCHEDULED WITH THE VA PROJECT ENGINEER FOR OTHER TIMES. THIS INCLUDES
JACK-HAMMERING CONCRETE, SAW-CUTTING CONCRETE, REPETITIVE HAMMER DRILLING OF
CONCRETE, ETC.
THE VA DOES NOT PROVIDE PHONES FOR THE CONTRACTOR’S USE. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO COVER THE COSTS OF THE INSTALLATION OF A TEMPORARY LAND LINE
PHONE. THE CONTRACTOR SHALL CONTACT THE PHONE COMPANY TO HAVE THIS PHONE
INSTALLED.
ALL ELECTRICAL CIRCUITRY TO BE CONCEALED INCLUDING MASONRY WALLS UNLESS
OTHERWISE SPECIFIED. CIRCUITING FOR ELECTRIC DOOR HOLD OPENS IN MASONRY WALLS
SHALL BE SURFACE RACEWAY.
DRAWINGS ARE DIAGRAMMATIC AND SHOW ONLY THE GENERAL ARRANGEMENT OF EACH
SYSTEM. BECAUSE OF SMALL SCALE OF DRAWINGS IT IS NOT POSSIBLE TO SHOW OR INDICATE
ALL BRANCHES, OFFSETS, FITTINGS, BOXES, AND ACCESSORIES WHICH MAY BE REQUIRED.
CONTRACTOR MUST CAREFULLY INVESTIGATE STRUCTURAL AND FINISH CONDITIONS
AFFECTING ALL WORK, FURNISHING SUCH FITTINGS, TRAPS, VALVES, BOXES, ACCESSORIES,
ETC., AS MAY BE REQUIRED.
LOCATIONS OF NEW EQUIPMENT, PIPING, AND ASSOCIATED ITEMS SHOWN ON THE DRAWINGS
ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION AND
ELEVATION FOR ALL WORK, INCLUDING CONNECTIONS TO EXISTING WORK. ALL OFFSETS,
FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR A COMPLETE AND FUNCTIONAL
SYSTEM SHALL BE PROVIDED AT NO ADDITIONAL COST.
ALL EXISTING DUCTWORK, ELECTRICAL OR MECHANICAL PIPING, CABLE TRAYS, ETC., IS NOT
NECESSARILY SHOWN ON THE DRAWINGS. PRIOR TO ANY DEMOLITION AND CONSTRUCTION
WORK, THE CONTRACTOR SHALL FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING
EQUIPMENT, DUCTWORK, PIPING, ETC. AND REPORT ANY DISCREPANCIES TO THE COR.
WORK TO BE DONE ON EXISTING ROOFS, SUCH AS ROOF PENETRATIONS OR STANDS, OR
ANYTHING THAT DAMAGES THE INTEGRITY OF THE ROOF, THIS WORK MUST BE DONE BY A
CONTRACTOR LICENSED BY THE ROOFING MEMBRANE MANUFACTURER. HE/SHE MUST BE
APPROVED BY THE MEMBRANE MANUFACTURER SO AS TO NOT VOID OR INTERRUPT EXISTING
SINGLE PLY MEMBRANE ROOF WARRANTIES.
IF ASBESTOS INSULATION IS REMOVED ON THIS PROJECT ALL PIPING AND OTHER MECHANICAL
ITEMS THAT HAD THE ASBESTOS INSULATION REMOVED MUST BE RE-INSULATED WITH
MATERIALS ACCORDING TO THE SPECIFICATIONS.
WHEN WORKING IN OCCUPIED AREAS OF THE MEDICAL CENTER THE CONTRACTOR CANNOT
LEAVE TOOLS, EQUIPMENT, LADDERS, ETC., UNATTENDED WHERE THEY ARE ACCESSIBLE TO
PATIENTS, STAFF, VISITORS, ETC. CEILING TILES AND CEILING ACCESS PANELS MUST ALSO BE
REPLACED WHEN UNATTENDED, FOR SAFETY REASONS.
WATER OR LIQUIDS MUST NOT BE ALLOWED TO COME INTO CONTACT WITH NEW OR EXISTING
DRYWALL FROM CONSTRUCTION RELATED ACTIVITIES. REMOVE AND REPLACE ANY DRYWALL
THAT HAS COME INTO CONTACT WITH WATER OR OTHER LIQUIDS.
LIVE ELECTRICAL CIRCUITS ARE BURIED WITHIN THE CONCRETE FLOOR SLABS AND THERE IS NO
RECORD OF THE EXACT LOCATIONS. THE CONTRACTOR SHALL X-RAY THE FLOOR WHEREVER
THE CONTRACTOR PLANS ON DRILLING THROUGH THE CONCRETE FLOOR SLABS. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO IMMEDIATELY REPAIR ANY CIRCUIT THAT HAS BEEN CUT OR
DAMAGED.
WHEN AN EXIT IS CLOSED BECAUSE OF THIS PROJECT THE CONTRACTOR MUST INSTALL
BARRICADES AND SIGNAGE AT THE EXIT DOOR. THE CONTRACTOR MUST ALSO COVER OR
REMOVE THE LIGHTED EXIT SIGN.
CONTRACTOR SHALL PROVIDE BOXES, CONDUIT, WIRE, AND RECONNECTIONS AS REQUIRED TO
RECONNECT ANY AND ALL EXISTING LIGHT FIXTURES, RECEPTACLES, OR DEVICES REMAINING IN
USE. REMOVAL OF ANY ELECTRICAL EQUIPMENT SHALL NOT AFFECT THE OPERATION OF
EQUIPMENT REMAINING IN USE.
CONTINUITY OF ALL SERVICES TO AND FROM THE FACILITIES IN THE EXISTING BUILDING SHALL BE MAINTAINED WITHOUT INTERRUPTION, EXCEPT FOR SUCH PERIODS OF TIME WHICH THE V.A.
MAY DESIGNATE. IF TEMPORARY CONNECTIONS, ETC. ARE NECESSARY TO ASSURE THE
CONTINUITY OF SERVICE, THEY SHALL BE FURNISHED WITHOUT ADDITIONAL CHARGE TO THE
V.A. AND SHALL BE REMOVED WHEN NO LONGER NECESSARY.
ALL EXISTING CONDUIT AND WIRING MADE ABANDONED BY THIS PROJECT OR FOUND TO BE
ABANDONED DURING DEMOLITION SHALL BE REMOVED.
COORDINATE THE PROVISION AND INSTALLATION OF ALL CONTROL WIRING FOR MECHANICAL
EQUIPMENT WITH THE GENERAL CONTRACTOR AND MECHANICAL CONTRACTOR.
FOR SAFETY PURPOSES THE CONTRACTOR WILL NOT WORK ON ANY ELECTRICAL EQUIPMENT
HOT. ALL SHUTDOWNS WILL BE SCHEDULED IN ADVANCED WITH THE VA.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALL OPENINGS
SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED CONTRACTOR AT THE EXPENSE OF
THIS CONTRACTOR. ALL CONDUITS IN WALLS SHALL BE GROUTED OR SEALED INTO OPENINGS.
CONTRACTOR SHALL COORDINATE ‘IN-WALL’ & ‘OVERHEAD CEILING’ INSPECTIONS WITH VA
PROJECT ENGINEER PRIOR TO THE INSTALLATION OF FINISHES. IN-WALL INSPECTIONS REQUIRE
24 HOUR NOTIFICATION. OVERHEAD CEILING INSPECTIONS REQUIRE 48 HOUR NOTIFICATION.
CONTRACTOR TO SUPPLY A CART WITH A LOG SHEET AND FULL SET OF HARD COPY DRAWINGS
FOR ALL INSPECTIONS. LOG SHEET SHALL BE ITEMIZED BY TYPE OF INSPECTION AND BY ROOM.
NO SUCH FINISHES SHALL BE INSTALLED WITHOUT INSPECTION APPROVAL FROM PROJECT
ENGINEER.
GENERAL CONTRACTOR SHALL REMOVE ALL CONSTRUCTION DEBRIS FROM JOBSITE. ALL
CONSTRUCTION DEBRIS SHALL BE CONTAINED INSIDE CONSTRUCTION LIMITS.
ANY WORK THAT IS TO TAKE PLACE AFTER HOURS SHOULD BE RESTRICTED TO THE FOLLOWING
HOURS: 5:00PM - 7:00AM M-T, SAT & SUN. COORDINATE WITH C.O.R. THE VA MAY REQUIRE
SUNDAY WORK IN LIEU OF OTHER TIMES DUE TO CONFLICTS WITH HOSPITAL OPERATIONS ON
SATURDAYS , EVENINGS, OR OUTDOOR WEATHER TEMPERATURES. SUNDAY WORK WILL BE AT
NO ADDITIONAL COST TO VA.
CONTRACTOR SHALL FIRESEAL ALL EXISTING FLOOR AND CEILING SLAB PENETRATIONS THAT
ARE NOT PROPERLY SEALED ON THE PROJECT SIDE. ASSUME ONE FLOOR AND ONE CEILING
SLAB PENESTRATION TO BE FIRESEALED TO 2 HR RATING PER EVERY 100SF.
HOLES CUT INTO FLOOR OR CEILING SLABS THAT ARE NOT IMMEDIATELY FILLED BY PIPING,
CONDUIT OR DUCTWORK MUST BE IMMEDIATELY SEALED WITH A TEMPORARY SYSTEM
PROVIDING A 2HR FIRE REATED BARRIER.
THE CONTRACTOR SHALL CONTAIN ALL CONSTRUCTION ACTIVITY, INCLUDING STORAGE OF
MATERIAL AND EQUIPMENT, WITHIN THE CONSTRUCTION LIMITS, AT ALL TIMES BEING
RESPONSIBLE FOR AND ABIDING BY RULES AND REGULATIONS OF THE OWNER.
THERE IS NO CONTRACTOR PARKING ON VA PROPERTY BOUNDED BY GRAND, ENRIGHT, SPRING
AND BELL. CONTRACTOR PARKING IS ALLOWED IN MARKED SPACES IN THE VA LOT OPPOSITE
THE HOSPITAL AT THE CORNER OF GRAND BLVD. AND DELMAR AVE. CONTRACTOR MAY LOAD
AND UNLOAD MATERIALS IN UNRESTRICTED AREAS ONLY, AND CANNOT LEAVE A VEHICLE
UNATTENDED.
FOR DOORS BEING REPLACED AND WALLS WITHIN A CONSTRUCTION AREA: CAREFULLY REMOVE
SIGNAGE, ROOM NUMBERS, ARTWORK, ETC., AND STORE IN A PROTECTIVE BOX FOR
REINSTALLATION AT COMPLETION OF AREA. ANY DAMAGED SIGNAGE, ARTWORK, ETC., SHALL BE
REPLACED WITH NEW. VA INTERIOR DESIGNER AND COR SHALL IDENTIFY LOCATIONS FOR
REINSTALLATION.
THERE IS SPACE FOR ONLY ONE CONSTRUCTION DEMOLITION DEBRIS DUMPSTER ON SITE AT
THE DOCK. THE VA DOES NOT PROVIDE A DUMPSTER FOR THIS MATERIAL. CONTRACTORS
WORKING AT THE JC MEDICAL CENTER SHALL COOPERATE AND PROPORTIONALLY SHARE THE
COST OF THE DUMPSTERS.
19. CONSTRUCTION MATERIALS AND INSTALLATION METHODS PROVIDED AND PERFORMED BY ALL CONTRACTORS SHALL BE IN COMPLIANCE WITH VAMC FACILITY OPERATIONS, NFPA, ICRA, ILSM, VA
SPECIFICATIONS, AND AS FURTHER DESCRIBED IN THIS SCOPE.
20. PAINT ALL EXPOSED NEW AND EXISTING PIPING, CONDUIT, WIRE MOLD, ELECTRICAL PANELS, ACCESS
PANELS, ETC., TO MATCH WALL FINISH UNLESS OTHERWISE NOTED.
22.
23.
24.
21.
25.
26.
27.
28.
29.
30.
31.
32.
33.
37.
38.
39.
40.
41.
42.
43.
44.
45.
47.
48.
46.
49.
50.
51.
52.
53.
54.
55.
56.
GENERAL NOTES
GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING ALL SUBCONTRACTORS ARE AWARE OF THESE NOTES
57.
58.
59.
60.
34.
35.
36.
61.
62.
63.
05/31/2024
ICRA AND ILSM ASSESSMENT
01-GJ-003
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration
PREPARE SITE FOR NEW MRI -
ROOM A279
657-22-111JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
1 S. Memorial Dr.
Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
05/31/2024 WJS RE
100% BID DOCUMENTS
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9VA FORM 08-6231
A
B
C
D
E
F
A
B
C
D
TYPICAL
CONSTRUCTION LAYOUT
CLASS I, & II
MOBILE CONTAINMENT CART
(CONST. BARRIER TYPES)
C8
4" RUBBER COVE
WITH 16 GA. METAL
STUDS AT 16" O.C.
BOARD EACH SIDE.
WITH 5/8" GYPSUM
AS SCHEDULED
ACOUSTICAL CEILING
2' X 4' SUSPENDED
WALL CONST. TYPES (DETAILS)
TYPE A
BASE @ BOTH SIDES
4" RUBBER COVE
3 5/8" 16 GA. METAL
STUDS AT 16" O.C.
BOARD EACH SIDE.
WITH 5/8" GYPSUM
W A
LL
H
EI
G H T
V
ER
IE
S
TYPE B
C
EI
LI
N G
H
EI
G H T
'-0
ON FLOOR PLAN.
FI
EL
D V
ER
IF
Y
C
EI
LI
N G
H
EI
G H T
'-0
4 7/8"4 7/8"
W A
LL
H
EI
G H T
V
ER
IE
S
FI
EL
D V
ER
IF
Y
TO MATCH EXISTING AREA TO MATCH EXISTING AREA
ROOF METAL DECKING
BASE @ BOTH SIDES
AS SCHEDULED
ACOUSTICAL CEILING
2' X 4' SUSPENDED
ON FLOOR PLAN.
3 5/8" INSULATED WALL
WALL TO EXTEND TO
ROOF METAL DECKING
GENERAL NOTES:
LOW RISK
OFFICE AREAS
PATIENT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
CARDIOLOGY CCU ANY AREA CARING FOR
ECHOCARDIOGRAPHY
ENDOSCOPY
NUCLEAR MEDICINE
PHYSICAL THERAPY
RADIOLOGY/MRI
RESPIRATORY THERAPY
EMERGENCY ROOM
LABOR & DELIVERY
LABORATORY (SPECIMEN)
NEWBORN NURSERY
OUTPATIENT SURGERY
PEDIATRICS
IMMUNOCOMPROMISED PATIENTS
BURN UNIT
CARDIAC CATH LAB
CENTRAL STERILE SUPPLY
INTENSIVE CARE UNITS
MEDICAL UNIT
PHARMACY
POST ANESTHESIA CARE UNIT
SURGICAL UNITS
NEGATIVE PRESSURE ISOLATION ROOMS
ONCOLOGY
OPERATING ROOMS INCLUDING
C-SECTION ROOMS
LOW RISK GROUP
CONSTRUCTION PROJECT TYPE
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D
I II II III/IV
II
II III/IV
III/IV
III
III/IV
IV
IV
IV
I
I
II
CONSTRUCTION PROJECT BY PATIENT RISK
IC MATRIX - CLASS OF PRECAUTIONS:
INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK
NOTE:
LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
1. EXECUTE WORK METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE CEILING TILE DISPLACED FOR VISUAL INSPECTION.
C
LA
SS
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT WORK AREAS.
6. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
1. WIPE WORK SURFACES WITH DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
4. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
C
LA
SS
I
PRIOR TO ANY CONSTRUCTION
POST CONSTRUCTION
INSPECTION AND NON-INVASIVE ACTIVITIES
TYPE A
SMALL SCALE, SHORT DURATION ACTIVITIES
TYPE B
WHICH CREATES MINIMAL DUST.
WORK THAT GENERATES A MODERATE TO
TYPE C
HIGH LEVEL OF DUST OR REQUIRES DEMOLITION
OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES
MAJOR DEMOLITION AND CONSTRUCTION
TYPE D
PROJECTS
MATRIX OF PRECAUTIONS FOR
CONSTRUCTION & RENOVATION
I R AC (ICRA)
ROOM ELEVATION
AREA UNDER
C.O.R.
ICRA, ILSM
FIRE WATCH
MISC. FORMS
PAPER
CADDY
CONSTRUCTION
RESTRICTED AREA
THIS IS A
CONST. SUPERVISOR
NAME AND
CELL PHONE
XXXXXX XXXX XXXX
CHILLER PLANT AFTER HOURS
CONTACT PHONE XXXXX
FIRE EMERGENCY DIAL 911
XXXXXX XXXX XXXX
XXXXXX XXXX XXXX
WITH CONTACT
INFORMATION
INTERIM LIFE SAFETY MEASURES:
INFECTION CONTROL RISK ASSESSMENT:
PICRA:
UTILITIES SHUT-DOWNS:
ICRA
ILSM
CONSTRUCTION MAY OCCUR DURING REGULAR HOSPITAL
BUSINESS HOURS WITH THE FOLLOWING EXCEPTIONS:
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration
PREPARE SITE FOR NEW MRI -
ROOM A279
657-22-111JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
1 S. Memorial Dr.
Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
05/31/2024 WJS RE
100% BID DOCUMENTS
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9VA FORM 08-6231
A
B
C
D
E
F
A
B
C
D
E
F
ICRA DETAILS
01-GJ-501
4" RUBBER COVE
WITH 16 GA. METAL
STUDS AT 16" O.C.
BOARD EACH SIDE.
WITH 5/8" GYPSUM
AS SCHEDULED
ACOUSTICAL CEILING
2' X 4' SUSPENDED
WALL CONST. TYPES (DETAILS)
TYPE A
BASE @ BOTH SIDES
4" RUBBER COVE
3 5/8" 16 GA. METAL
STUDS AT 16" O.C.
BOARD EACH SIDE.
WITH 5/8" GYPSUM
W A
LL
H
EI
G H T
V
ER
IE
S
TYPE B
C
EI
LI
N G
H
EI
G H T
'-0
ON FLOOR PLAN.
FI
EL
D V
ER
IF
Y
C
EI
LI
N G
H
EI
G H T
'-0
4 7/8"4 7/8"
W A
LL
H
EI
G H T
V
ER
IE
S
FI
EL
D V
ER
IF
Y
TO MATCH EXISTING AREA TO MATCH EXISTING AREA
ROOF METAL DECKING
BASE @ BOTH SIDES
AS SCHEDULED
ACOUSTICAL CEILING
2' X 4' SUSPENDED
ON FLOOR PLAN.
3 5/8" INSULATED WALL
WALL TO EXTEND TO
ROOF METAL DECKING
GENERAL NOTES:
LOW RISK
OFFICE AREAS
PATIENT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
CARDIOLOGY CCU ANY AREA CARING FOR
ECHOCARDIOGRAPHY
ENDOSCOPY
NUCLEAR MEDICINE
PHYSICAL THERAPY
RADIOLOGY/MRI
RESPIRATORY THERAPY
EMERGENCY ROOM
LABOR & DELIVERY
LABORATORY (SPECIMEN)
NEWBORN NURSERY
OUTPATIENT SURGERY
PEDIATRICS
IMMUNOCOMPROMISED PATIENTS
BURN UNIT
CARDIAC CATH LAB
CENTRAL STERILE SUPPLY
INTENSIVE CARE UNITS
MEDICAL UNIT
PHARMACY
POST ANESTHESIA CARE UNIT
SURGICAL UNITS
NEGATIVE PRESSURE ISOLATION ROOMS
ONCOLOGY
OPERATING ROOMS INCLUDING
C-SECTION ROOMS
LOW RISK GROUP
CONSTRUCTION PROJECT TYPE
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D
I II II III/IV
II
II III/IV
III/IV
III
III/IV
IV
IV
IV
I
I
II
CONSTRUCTION PROJECT BY PATIENT RISK
IC MATRIX - CLASS OF PRECAUTIONS:
INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK
NOTE:
LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
INSPECTION AND NON-INVASIVE ACTIVITIES
TYPE A
SMALL SCALE, SHORT DURATION ACTIVITIES
TYPE B
WHICH CREATES MINIMAL DUST.
WORK THAT GENERATES A MODERATE TO
TYPE C
HIGH LEVEL OF DUST OR REQUIRES DEMOLITION
OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES
MAJOR DEMOLITION AND CONSTRUCTION
TYPE D
PROJECTS
MATRIX OF PRECAUTIONS FOR
CONSTRUCTION & RENOVATION
I R AC (ICRA)
ROOM ELEVATION
AREA UNDER
ICRA, ILSM
FIRE WATCH
MISC. FORMS
PAPER
CADDY
CONSTRUCTION
RESTRICTED AREA
THIS IS A
TYPICAL IDEAL
CONSTRUCTION LAYOUT
CLASS III
CROSS-SECTION 'A-A'
CROSS-SECTION 'A-A'
TYPICAL ALTERNATIVE
CONSTRUCTION LAYOUT
CLASS III
CLASS III (ALTERNATE)
CLASS III
1. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS IF INDICATED.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
6. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL
DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES
DEPARTMENT.
1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
2. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
3. WET MOP AREA WITH DISINFECTANT.
4. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
PRIOR TO ANY CONSTRUCTION
POST CONSTRUCTION
C
LA
SS
II
C.O.R.
CONST. SUPERVISOR
NAME AND
CELL PHONE
XXXXXX XXXX XXXX
CHILLER PLANT AFTER HOURS
CONTACT PHONE XXXXX
FIRE EMERGENCY DIAL 911
XXXXXX XXXX XXXX
XXXXXX XXXX XXXX
WITH CONTACT
INFORMATION
INTERIM LIFE SAFETY MEASURES:
INFECTION CONTROL RISK ASSESSMENT:
PICRA:
UTILITIES SHUT-DOWNS:
ICRA
ILSM
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration
PREPARE SITE FOR NEW MRI -
ROOM A279
657-22-111JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
1 S. Memorial Dr.
Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
05/31/2024 WJS RE
100% BID DOCUMENTS
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9VA FORM 08-6231
A
B
C
D
E
F
A
B
C
D
E
F
01-GJ-502
STUDS AT 16" O.C.
BOARD EACH SIDE.
WITH 5/8" GYPSUM
AS SCHEDULED
ACOUSTICAL CEILING
2' X 4' SUSPENDED
WALL CONST. TYPES (DETAILS)
TYPE A
BASE @ BOTH SIDES
4" RUBBER COVE
3 5/8" 16 GA. METAL
STUDS AT 16" O.C.
BOARD EACH SIDE.
WITH 5/8" GYPSUM
W A
LL
H
EI
G H T
V
ER
IE
S
TYPE B
C
EI
LI
N G
H
EI
G H T
'-0
ON FLOOR PLAN.
FI
EL
D V
ER
IF
Y
C
EI
LI
N G
H
EI
G H T
'-0
4 7/8"4 7/8"
W A
LL
H
EI
G H T
V
ER
IE
S
FI
EL
D V
ER
IF
Y
TO MATCH EXISTING AREA TO MATCH EXISTING AREA
ROOF METAL DECKING
BASE @ BOTH SIDES
AS SCHEDULED
ACOUSTICAL CEILING
2' X 4' SUSPENDED
ON FLOOR PLAN.
3 5/8" INSULATED WALL
WALL TO EXTEND TO
ROOF METAL DECKING
GENERAL NOTES:
LOW RISK
OFFICE AREAS
PATIENT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
CARDIOLOGY CCU ANY AREA CARING FOR
ECHOCARDIOGRAPHY
ENDOSCOPY
NUCLEAR MEDICINE
PHYSICAL THERAPY
RADIOLOGY/MRI
RESPIRATORY THERAPY
EMERGENCY ROOM
LABOR & DELIVERY
LABORATORY (SPECIMEN)
NEWBORN NURSERY
OUTPATIENT SURGERY
PEDIATRICS
IMMUNOCOMPROMISED PATIENTS
BURN UNIT
CARDIAC CATH LAB
CENTRAL STERILE SUPPLY
INTENSIVE CARE UNITS
MEDICAL UNIT
PHARMACY
POST ANESTHESIA CARE UNIT
SURGICAL UNITS
NEGATIVE PRESSURE ISOLATION ROOMS
ONCOLOGY
OPERATING ROOMS INCLUDING
C-SECTION ROOMS
LOW RISK GROUP
CONSTRUCTION PROJECT TYPE
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D
I II II III/IV
II
II III/IV
III/IV
III
III/IV
IV
IV
IV
I
I
II
CONSTRUCTION PROJECT BY PATIENT RISK
IC MATRIX - CLASS OF PRECAUTIONS:
INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK
NOTE:
LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
INSPECTION AND NON-INVASIVE ACTIVITIES
TYPE A
SMALL SCALE, SHORT DURATION ACTIVITIES
TYPE B
WHICH CREATES MINIMAL DUST.
WORK THAT GENERATES A MODERATE TO
TYPE C
HIGH LEVEL OF DUST OR REQUIRES DEMOLITION
OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES
MAJOR DEMOLITION AND CONSTRUCTION
TYPE D
PROJECTS
MATRIX OF PRECAUTIONS FOR
CONSTRUCTION & RENOVATION
I R AC (ICRA)
ANTE ROOM
ELEVATION
AREA UNDER
ICRA, ILSM
FIRE WATCH
MISC. FORMS
PAPER
CADDY
CONSTRUCTION
RESTRICTED AREA
THIS IS A
C
LA
SS
V
1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS IF INDICATED.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL.
8. ROOM AND/OR SHALL BE THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL
SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
6. WET MOP AREA WITH DISINFECTANT.
SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK
SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.
SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
PRIOR TO ANY CONSTRUCTION
POST CONSTRUCTION
1. OBTAIN APPROVAL BY MCOT TEAM TO REMOVE BARRIERS.
TYPICAL IDEAL
CONSTRUCTION LAYOUT
CLASS IV
ELEVATION
TYPE B
TYPE A
CROSS-SECTION 'A-A' MOBILE CONTAINMENT CART
CLASS IV
C.O.R.
CONST. SUPERVISOR
NAME AND
CELL PHONE
XXXXXX XXXX XXXX
CHILLER PLANT AFTER HOURS
CONTACT PHONE XXXXX
FIRE EMERGENCY DIAL 911
XXXXXX XXXX XXXX
XXXXXX XXXX XXXX
WITH CONTACT
INFORMATION
INTERIM LIFE SAFETY MEASURES:
INFECTION CONTROL RISK ASSESSMENT:
PICRA:
UTILITIES SHUT-DOWNS:
ICRA
ILSM
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration
PREPARE SITE FOR NEW MRI -
ROOM A279
657-22-111JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
1 S. Memorial Dr.
Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
05/31/2024 WJS RE
100% BID DOCUMENTS
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9VA FORM 08-6231
A
B
C
D
E
F
A
B
C
D
E
F
01-GJ-503
STUDS AT 16" O.C.
BOARD EACH SIDE.
WITH 5/8" GYPSUM
AS SCHEDULED
ACOUSTICAL CEILING
2' X 4' SUSPENDED
WALL CONST. TYPES (DETAILS)
TYPE A
BASE @ BOTH SIDES
4" RUBBER COVE
3 5/8" 16 GA. METAL
STUDS AT 16" O.C.
BOARD EACH SIDE.
WITH 5/8" GYPSUM
W A
LL
H
EI
G H T
V
ER
IE
S
TYPE B
C
EI
LI
N G
H
EI
G H T
'-0
ON FLOOR PLAN.
FI
EL
D V
ER
IF
Y
C
EI
LI
N G
H
EI
G H T
'-0
4 7/8"4 7/8"
W A
LL
H
EI
G H T
V
ER
IE
S
FI
EL
D V
ER
IF
Y
TO MATCH EXISTING AREA TO MATCH EXISTING AREA
ROOF METAL DECKING
BASE @ BOTH SIDES
AS SCHEDULED
ACOUSTICAL CEILING
2' X 4' SUSPENDED
ON FLOOR PLAN.
3 5/8" INSULATED WALL
WALL TO EXTEND TO
ROOF METAL DECKING
GENERAL NOTES:
LOW RISK
OFFICE AREAS
PATIENT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
CARDIOLOGY CCU ANY AREA CARING FOR
ECHOCARDIOGRAPHY
ENDOSCOPY
NUCLEAR MEDICINE
PHYSICAL THERAPY
RADIOLOGY/MRI
RESPIRATORY THERAPY
EMERGENCY ROOM
LABOR & DELIVERY
LABORATORY (SPECIMEN)
NEWBORN NURSERY
OUTPATIENT SURGERY
PEDIATRICS
IMMUNOCOMPROMISED PATIENTS
BURN UNIT
CARDIAC CATH LAB
CENTRAL STERILE SUPPLY
INTENSIVE CARE UNITS
MEDICAL UNIT
PHARMACY
POST ANESTHESIA CARE UNIT
SURGICAL UNITS
NEGATIVE PRESSURE ISOLATION ROOMS
ONCOLOGY
OPERATING ROOMS INCLUDING
C-SECTION ROOMS
LOW RISK GROUP
CONSTRUCTION PROJECT TYPE
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D
I II II III/IV
II
II III/IV
III/IV
III
III/IV
IV
IV
IV
I
I
II
CONSTRUCTION PROJECT BY PATIENT RISK
IC MATRIX - CLASS OF PRECAUTIONS:
INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK
NOTE:
LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
INSPECTION AND NON-INVASIVE ACTIVITIES
TYPE A
SMALL SCALE, SHORT DURATION ACTIVITIES
TYPE B
WHICH CREATES MINIMAL DUST.
WORK THAT GENERATES A MODERATE TO
TYPE C
HIGH LEVEL OF DUST OR REQUIRES DEMOLITION
OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES
MAJOR DEMOLITION AND CONSTRUCTION
TYPE D
PROJECTS
MATRIX OF PRECAUTIONS FOR
CONSTRUCTION & RENOVATION
I R AC (ICRA)
ANTE ROOM
ELEVATION
AREA UNDER
ICRA, ILSM
FIRE WATCH
MISC. FORMS
PAPER
CADDY
CONSTRUCTION
RESTRICTED AREA
THIS IS A
C
LA
SS
V
1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS IF INDICATED.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL.
8. ROOM AND/OR SHALL BE THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL
SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
6. WET MOP AREA WITH DISINFECTANT.
SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK
SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.
SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
PRIOR TO ANY CONSTRUCTION
POST CONSTRUCTION
1. OBTAIN APPROVAL BY MCOT TEAM TO REMOVE BARRIERS.
TYPICAL ALTERNATIVE
CONSTRUCTION LAYOUT
CLASS IV
CROSS-SECTION 'A-A' MOBILE CONTAINMENT CART
C O
R R
ID
O
R
H A
LL
W
A Y
CLASS IV (CONST. BARRIER TYPES)
C.O.R.
CONST. SUPERVISOR
NAME AND
CELL PHONE
XXXXXX XXXX XXXX
CHILLER PLANT AFTER HOURS
CONTACT PHONE XXXXX
FIRE EMERGENCY DIAL 911
XXXXXX XXXX XXXX
XXXXXX XXXX XXXX
WITH CONTACT
INFORMATION
INTERIM LIFE SAFETY MEASURES:
INFECTION CONTROL RISK ASSESSMENT:
PICRA:
UTILITIES SHUT-DOWNS:
ICRA
ILSM
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration
PREPARE SITE FOR NEW MRI -
ROOM A279
657-22-111JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
1 S. Memorial Dr.
Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
05/31/2024 WJS RE
100% BID DOCUMENTS
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9VA FORM 08-6231
A
B
C
D
E
F
A
B
C
D
E
F
01-GJ-504
H
F H
LINE INDICATES AREA
OF ROOF IMPACT
THIS SKYLIGHT TO BE
REMOVED AND
REINSTALLED
EXTENT OF SECURED
PICK ZONE
CRANE AREA, PROVIDE
ROAD PROTECT AS
REQUIRED TO PREVENT
DAMAGE TO DRIVE LANES
CRANE AREA. COORDINATE
EXACT LOCATION WITH COR
DOUBLE HATCHED AREA DENOTES EXTENT
OF THE CRANE AREA TO REMAIN SHUT
DOWN WHEN CRANE NOT IN USE
AREA AVAILABLE FOR STAGING DURING THE
PICK WHILE CRANE IS ON SITE. MATERIAL,
TOOLS, ETC, LEFT NO LONGER THAN 3 DAYS.
ANY DAMAGE TO LANDSCAPE TO BE REPAIRED
BY GC. SEE NOTES ON THIS SHEET FOR MORE
INFORMATION
AREA OF SHUTDOWN OF 1ST
AND 2ND FLOOR OF BUILDING
WHILE CRANE IS IN USE
NOTE: SKYLIGHT CANNOT BE
STORED ON ROOF
HATCHED AREA DENOTES EXTENT OF
THE CRANE AREA TO REMAIN SHUT
DOWN WHEN CRANE IS IN USE
EXTENT OF SECURED
PICK ZONE
G R
A N
D A
V E
Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
1 S. Memorial Dr.
FULLY SPRINKLERED
PREPARE SITE FOR NEW MRI -
ROOM A279
657-22-111JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration
B
A
C
D
E
F
VA FORM 08-6231 1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100 % BID DOCUMENTS
02/10/2023 BD LB
01-CS-101
CIVIL SITE PLAN
1" = 20'-0"
ClVIL SITE PLAN
REFERENCE SPEC SECTION 013526 SAFETY REQUIREMENTS, PARAGRAPH 1.19 CRANES FOR MORE
INFORMATION:
A. THE GC IS TO COORDINATE WITH THE COR AND PROVIDE A DETAILED LIFT PLAN PER SPEC
GIVING THE VAMC A MINIMUM OF 14 DAYS NOTICE AFTER PLAN APPROVAL FROM THE COR
B. THE GC IS TO PROVIDE PERSONNEL MEETING THE SAFETY REQUIREMENTS, STAGE ALL
ENTRY/EXITS WITHIN THE CRANE PICK AREA NOTED ON THE PLAN FOR THE ENTIRE TIME
THE CRANE AREA IS IN USE
C. THE CRANE AREA NOTED ON THE PLAN WITH A DOUBLE-HATCHED PATTERN DENOTES AN
AREA TO BE SHUT DOWN WHILE THE CRANE IS NOT IN USE. THE CRANE CAN SIT ON-SITE
FOR A MAXIMUM OF THREE DAYS AND TWO NIGHTS WHILE REMOVING THE EXISTING
SKYLIGHT AND REMOVING THE EXISTING MRI EQUIPMENT. THE EXACT LENGTH OF TIME AND
SPECIFIC DAYS TO BE SUBMITTED TO THE PICK PLAN FOR APPROVAL
D. THE GC MUST COORDINATE WITH THE COR AND OTHER TRADES AND PROJECTS IN THE
AREA TO ENSURE THAT NO TWO MEANS OF EGRESS ARE CLOSED OFF DURING THE PICK.
MORE THAN TWO MEANS OF EGRESS AND ENTRY MAY HAVE A STAGE WITH A SAFETY
PERSON BUT NO TWO EXITS CAN BE CLOSED OFF AT THE SAME TIME
E. THE EXISTING SKYLIGHT CAN BE STAGED WITHIN THE CRANE SHUT-DOWN AREA FOR A
MAXIMUM OF THREE DAYS AND TWO NIGHTS
F. THE GC IS TO REMOVE THE EXISTING SKYLIGHT AND REINSTALL THE EXISTING SKYLIGHT IN
BETWEEN THE REMOVAL OF THE EXISTING MRI AND INSTALLATION OF THE NEW MRI. THERE
WILL BE A MINIMUM OF TWO SEPARATE WEEKEND LIFTS PER THE REQUIREMENTS NOTED
ABOVE AND IN THE SPECS. THE GC CAN ELECT TO PROPERLY SECURE THE SKYLIGHT AND
PROTECT THE GLASS FOR A CRANE LIFT (REMOVAL/REINSTALLATION) TWICE, OR THE GC
CAN ELECT TO REMOVE THE EXISTING GLASS AND STORE IT OFF-SITE AT THEIR COST AND
RE-USE THE SKYLIGHT FRAMING TO PROVIDE A WATERTIGHT AND INSULATED ENCLOSURE
OF R-19 OR GREATER DURING SITE PREP FOR THE NEW MRI OR ELECT TO REMOVE AND
STORE THE ENTIRE EXISTING SKYLIGHT OFF-SITE AT THEIR COST AND TO PROVIDE A
WATERTIGHT AND INSULATED ENCLOSURE OF R-19 OR GREATER DURING SITE PREP FOR
THE NEW MRI
7 6 5 2 1348
M
L
K
J
H
1.82.52.9
98' - 2"
52TEMPORARY PARTITIONS
AND DOORS: SEE ICRA
DOCUMENTS AND DETAILS
LINE INDICATES AREA OF CONTAINMENT
FOR SHORT PERIOD OF TIME TO MODIFY
CONTROL ROOM EQUIPMENT. LIGHT TO
NO CONSTRUCTION TYPE OF WORK
THIS IS TO BE CONSIDERED THE
"PRIMARY CONSTRUCTION AREA".
THE GC CAN STORE MATERIAL ON
SITE IN THE PRIMARY
CONSTRUCTION AREA ONLY
CONTRACTOR ACCESS: SEE
ICRA DOCUMENTS AND DETAILS
LINE INDICATES AREA OF
SUITE IMPACT
MRI
A281
CONTROL
A280
MRI
A279
CORRIDOR
A271
HOLDING
A271B
VIEWING RM.
A286
CORRIDOR
A282A
EQUIPMENT
A283
OFFICE
A284
OFFICE
A285
CORRIDOR
A269
VESTIBULE
A271A
TOILET
A273
DRESS
A274
DRESSING RM.
A275
STAFF TOILET
A287
ADA DRESS
A276
DRESS
A277
CORRIDOR
A271C
WAITING RM.
A268
MRI EQUIPMENT
A201
CLEAN STOR
A268B
CONSULT
A268A
PREP
A266
HAC
A272
OI&T
A270 STORAGE
A278
VESTIBULE
A288
GOWNING 1
A267
CORRIDOR
H203
PATIENT ELEVATORS IN THIS
HALLWAY HALLWAY NOT ALLOWED
FOR CONSTRUCTION TRAFFIC
SERVICE ELEVATORS FOR
CONSTRUCTION TRAFFIC
LOCATION OF FUTURE MRI
PROVIDED FOR REFERENCE
WAITING RM.
A268
VESTIBULE
A271A
OI&T
A270
CORRIDOR
A271
HAC
A272
TOILET
A273
DRESS
A274
DRESSING RM.
A275
ADA DRESS
A276
DRESS
A277
STORAGE
A278
MRI
A279
CONTROL
A280
MRI
A281
CORRIDOR
A282A
EQUIPMENT
A283
OFFICE
A284
OFFICE
A285
VIEWING RM.
A286
STAFF TOILET
A287
VESTIBULE
A288
HOLDING
A271B
CORRIDOR
A269
CORRIDOR
A271C
CORRIDOR
H204
CORRIDOR
H203
MRI EQUIPMENT
A201
TOILET MALE
A226A
OI&T
A227
STAIR 01
S201
LOCKER
A226
ELEVATOR
LOBBY
H211
CONTROL
A235READING RM.
A234
ELEC
A228
ELEC. CLOSET
H210A
CONSULT
A268A
CLEAN STOR
A268B
GOWNING 1
A267
PREP
A266
GOWNING 2
A265
CORRIDOR
A262
HATCHED AREA INDICATES AREA
OF CONSTRUCTION IMPACT
CONSTRUCTION BARRIER PER
SPEC AND APPROVED ACUR
Code Item Description Equal To Remarks
Material Legend
ACT-1 ACOUSTICAL
CEILING TILE
ULTIMA BEVELED TEGULAR
2' X 2' X 3/4" ARMSTRONG
PT-1 PAINT HC-6
WINDHAM CREAM BENJAMIN MOORE
PT-2 PAINT HC-143
WYTHE BLUE BENJAMIN MOORE
PT-3 PAINT I-02
SUPER WHITE BENJAMIN MOORE
SVT-1 SHEET VINYL
FLOORING
MELODIA
622 MOTTLED PEWTER 6'-6" W. JOHNSONITE
RB-1 VINYL BASE 276 MYSTICAL
6" H. JOHNSONITE
Suite 1800 St. Louis, MO 63102
(314) 621 - 4343 Bob Dunn bdunn@fox-arch.com
2707 Rand Rd Indianapolis, IN 46241
(317) 646 - 9090St. Louis - Chicago
(636) 262 - 8532 Richard Kwiatkowski rkwiatkowski@sscengineering.com
1 S. Memorial Dr.
FULLY SPRINKLERED
KEYPLAN
N.T.S.
N
PREPARE SITE FOR NEW MRI -
ROOM A279
657-22-111JC
JOHN COCHRAN DIVISION
915 NORTH GRAND BLVD - ST. LOUIS, MO 63106
CONSULTANTS: ENGINEER:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Veterans Health
Administration
B
A
C
D
E
F
VA FORM 08-6231 1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
100 % BID DOCUMENTS
02/10/2023 BD LB
01-AE-121
FLOOR PLAN AND ICRA
ANALYSIS
1/4" = 1'-0"
FLOOR PLAN - FLOOR 02
Room Floor Finish
Base Finish
North Finish
East Finish
South Finish
West Finish
Ceiling FinishNumber Name
A279 MRI SVT-1 RB-1 P-1 P-1 P-2 P-1 AT-1, P-3
A280 CONTROL SVT-1 RB-1 P-1 P-1 P-2 P-1 AT-1, P-3
Grand total: 2
ROOM SCHEDULE
DOOR SCHEDULE
Mark Type Width Height Thickness HDW Group Material Rating Frame Type
52 EXISTING 4' - 0" 7' - 0" 0' - 1 3/4" EXISTING EXISTING EXISTING EXISTING
PROJECT DESCRIPTION: REPLACEMENT
OF MRI MACHINE AND HARDWARE,
SURFACES, AND FINISHES AFFECTED IN
REPLACEMENT OF MRI MACHINE. NO
CHANGE TO EXISTING OCCUPANCY, WALL
RATINGS OR EGRESS PATHS AND ACCESS
1/16" = 1'-0"
LIFE SAFETY FLOOR PLAN A279 AREA
NOTE: ALL EXISTING EQUIPMENT TO
BE REMOVED BY EQUIPMENT VENDOR
REPLACE ALL EXISTING FINISHES AND CEILING WITH NEW TO MATCH EXISTING IN ROOM A279. REFER TO DEMOLITION SPEC FOR PATCHING/REPLACEMENT OF DAMAGED MATERIAL IN OTHER ROOMS IMPACTED WITHIN THE PROJECT AREA.
NOTE: DOORS MAY BE REMOVED AND REPLACED AT CONTRACTOR DISCRESSION. DOORS MUST BE IN EQUAL OR BETTER
CONDITION THAN BEFORE CONSTRUCTION.
DEMOLITION:
A. PROTECT ALL EXISTING CONSTRUCTION TO REMAIN
B. CONSTRUCT TEMPORARY PARTITIONS AND DOORS,
COORDINATE LOCATIONS WITH EXISTING CEILING
FIXTURES.
C. REMOVE SKYLIGHT SEE CIVIL SITE PLAN
D. SALVAGE EXISTING LIGHTS AND MECHANICAL
GRILLS WHERE NOTED, STORE FOR
REINSTALLATION
E. DEMOLISH ALL GRID, HANGERS AND CEILING TILE IN
MRI SUITE A279
F. DEMOLISH MRI SYSTEM PIPING AND ELECTRICAL AS
REQUIRED
G. DEMOLISH EXISTING RF SHIELDING IN CEILING AS
REQUIRED TO ACCOMMODATE NEW WORK.
REINSTALL PER SPECS
RENOVATION:
A. PATCH AND REPAIR EXISTING FLOORING AS
REQUIRED AFTER REMOVAL OF EXISTING MRI
MACHINE
B. INSTALL NEW GRID TO MATCH PREVIOUS NON-
FERROUS CONSTRUCTION REQUIREMENTS AND
NEW TILES.
C. EXISTING FIXTURES TO BE REPLACED ONE-TO-ONE
WHERE NOTED IN PLAN.
D. REPAIR RF SHIELDING AND TEST ENCLOSURE
E. PATCH AND REPAIR WALLS AS REQUIRED DUE TO
INSTALLATION OF NEW EQUIPMENT, CONTROLS OR
SYSTEMS.
F. INSURE ROOM IS PREPARED IN ACCORDANCE WITH
MRI MANUFACTURER'S REQUIREMENTS
G. REINSTALL INTERIOR SKYLIGHT SCREEN
05/31/2024
REPLACE EXISTING FLOORING AND BASE WITH NEW
TARKETT, iQ GRANIT SD, COLOR; BEIGE 0954 IN MRI A279.
REPAIR EXISTING FLOORING OUTSIDE A279 PER SPEC.
5 2 134
L
K