ToC.pdf

PDF 28 KB Posted

Attached to
KC-46 Aircraft Battle Damage Repair Technical Order
Solicitation number
FA8609_2025_1
Issued by

About this file

This document is a Table of Contents from Technical Order 1-1H-39 related to Aircraft Battle Damage Repair (ABDR). The document outlines 12 chapters plus supplemental data covering comprehensive aircraft repair procedures, including: Damage Assessment, Structural Repair, Electrical/Avionics Systems Repair, Mechanical Systems Repair, Pneudraulic Systems Repair, Fuel System Repair, Engine Repairs, Armament System Repair, Landing Gear System Repair, Egress System Repair, Tool and Materiel Core Kit Listing, and Ballistic Damage Simulator.

The technical order includes detailed illustrations, tables, and reference materials covering specific repair procedures, material specifications, and technical data. Key areas include repair techniques for various aircraft materials and systems (metallic structures, composites, wiring, tubing), damage assessment protocols, documentation requirements using AFTO Forms 97/97A, and safety procedures. The document contains extensive technical diagrams, tables of specifications, and procedural illustrations to support maintenance and repair activities. This appears to be a comprehensive maintenance and repair manual used by the Air Force for battle damage assessment and repair of aircraft.

View the file

Other files

File Type Posted
KC-46 ABDR SOO.pdf PDF
RFI ABDR Tech Order .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T.O. 1-1H-39

TABLE OF CONTENTS

Chapter Page Chapter Page

INTRODUCTION........................................................v

SAFETY SUMMARY................................................ix

1 DAMAGE ASSESSMENT ......................................1-1

1.1 General........................................................1-1

1.2 USAF ABDR Philosophy...........................1-1

1.3 Technician Qualifications:..........................1-1

1.4 Assessor Qualifications ..............................1-1

1.5 Responsibilities ...........................................1-2

1.6 Procedures...................................................1-2

1.7 Fire/Heat Damage to Metallic

Parts........................................................1-6

1.8 Reinspection/Reevaluation .........................1-8

1.9 Structural Categories ..................................1-8

1.10 Systems Serviceability Criteria ................1-10

1.11 Damage Assessment Markings ................1-11

1.12 Documentation..........................................1-11

2 STRUCTURAL REPAIR .........................................2-1

2.1 General........................................................2-1

2.2 Publications.................................................2-1

2.3 General Structural Repair Infor-

mation.....................................................2-1

2.4 Personal Protective Equipment ..................2-1

2.5 Metallic Structures......................................2-2

2.6 Metallic Structure Repair Proce-

dures .......................................................2-4

2.7 Types of Metallic Structure Re-

pairs ........................................................2-4

2.8 External Metallic Skin Repairs ..................2-4

2.9 Internal Metallic Repairs............................2-4

2.10 Combination External/Internal

Metallic Repairs.....................................2-5

2.11 Composite Structure Repairs......................2-5

2.12 Types of Composite Structure

Repairs ...................................................2-6

2.13 Bolted Metallic Doubler Repair.................2-6

2.14 Bonded/bolted Metallic Doubler

Repair .....................................................2-6

2.15 Two Part Resin Mixing..............................2-8

2.16 Composite Ply Lay-up................................2-8

2.17 Scarfed Wet Lay-up Repair .......................2-8

2.18 Low Observable Structural Re-

pairs ........................................................2-9

2.19 Conductive Paint Coating Repair

(LO)........................................................2-9

2.20 Magnetic Radar Absorbing Mate-

rial Repair (MagRAM)........................2-10

2.21 External Metallic Doubler Repair

(LO)......................................................2-11

2.22 Flush Metallic Repairs (LO) ....................2-11

2.23 Air Inlet Duct Repairs ..............................2-12

2.24 Pressurized Area Repairs .........................2-12

2.25 Bonded Honeycomb Repair .....................2-12

2.26 Radomes....................................................2-12

2.27 Canopies/Windshields/Windows ..............2-12

2.28 Filler Material ...........................................2-12

2.29 (Reference T.O. 1-1A-9) Aero-space Metals General Data and Usage Factors................................2-12

2.29.1 Steel...........................................................2-12

2.29.2 Titanium Alloys........................................2-13

2.29.3 Aluminum Alloys .....................................2-14

2.29.4 Magnesium Alloys....................................2-16

2.29.5 Magnesium Designations .........................2-16

3 ELECTRICAL AND AVIONICS SYS-

TEMS REPAIR....................................................3-1

3.1 General........................................................3-1

3.2 Publications.................................................3-1

3.3 Electrical/Avionics Repairs ........................3-1

3.4 Wiring Identification ..................................3-2

3.5 Isolation of Nonessential Systems .............3-3

3.6 Damage to Electrical Wiring .....................3-8

3.7 Types of Repairs.........................................3-8

3.8 Common Splice Repair (In Line

Splice) ....................................................3-8

3.9 Terminal Lug Splicing (See

Figure 3-3) .............................................3-8

3.10 Splicing with Solder (See

Figure 3-4) .............................................3-9

3.11 Alternate Small Diameter Wire

Repair Methods......................................3-9

3.12 Splicing Large (#10/or larger)

Wires with Terminal Lugs (See Figure 3-6)...................................3-10

3.13 Alternate Splicing Methods for

Large Wires..........................................3-10

3.14 Damaged Wire Insulation and

Convoluted Tubing Conduit ................3-10

3.15 Shielded Cable Repair (not In-

cluding Coaxial or Triaxial Cable) Using Grounding Sheath Connector.................................3-10

3.16 Alternate Shielded Cable Repairs

(not Including Coaxial or Tri-axial Cable) ..........................................3-11

3.17 Coaxial and Triaxial Cable Re-

pair .......................................................3-12 i

3.18 Multiple Damages Within The

Same Wire Bundle...............................3-14

3.19 Cable Clamps............................................3-14

3.20 Connector Repairs ....................................3-14

3.21 Potted Connector Repair ..........................3-14

3.22 Damaged Connector Replacement ...........3-15

3.23 Associated Electrical Equipment .............3-15

4 MECHANICAL SYSTEMS REPAIR .....................4-1

4.1 General........................................................4-1

4.2 Publications.................................................4-1

4.3 Push-Pull Control rod Repairs ...................4-1

4.4 Control Cable Specifications......................4-1

4.5 Cable Repairs..............................................4-2

4.6 Cable Pulley Repair....................................4-3

4.7 Levers and Bellcranks ................................4-3

5 PNEUDRAULIC SYSTEMS REPAIR....................5-1

5.1 General........................................................5-1

5.2 Publications.................................................5-1

5.3 Damage Investigation and Evalu-

ation........................................................5-1

5.4 Tubing and Hose Repair Tech-

niques .....................................................5-2

5.5 Metal Tubing Identification

Application, and Limitations .................5-2

5.6 Tubing Manufacturing................................5-2

5.7 Flared Fitting Installation ...........................5-3

5.8 Flareless Fitting Assembly and

Installation..............................................5-4

5.9 Flareless Fitting Seal ..................................5-7

5.10 Cleaning and Sealing Tubing and

Hoses ......................................................5-7

5.11 Tubing and Hose Supports.........................5-8

5.12 High/Medium, and Low Pressure

Tubing Insertion Repairs .......................5-8

5.13 Manufacturing High Pressure

Hose Assemblies....................................5-8

5.14 Hose Installation .......................................5-10

5.15 Repairing Low Pressure Tubing

and Hoses.............................................5-10

5.16 Tubing Repairs Using H-Fitting ..............5-11

5.17 Permaswage Tubing Repair .....................5-12

5.18 Bleed Air Duct - Repairs .........................5-14

6 FUEL SYSTEM REPAIR ........................................6-1

6.1 General........................................................6-1

6.2 Publications.................................................6-1

6.3 Integral Fuel Tanks.....................................6-1

6.4 Bladder Fuel Cell Repair ...........................6-2

6.5 External Fuel Tanks ...................................6-2

6.6 Fuel System-Seals.......................................6-2

6.7 Fuel Line Repair.........................................6-2

6.8 Fuel Line Patch Repair Procedure .............6-2

6.9 Bend Damage .............................................6-3

7 ENGINE REPAIRS ..................................................7-1

7.1 General........................................................7-1

8 ARMAMENT SYSTEM REPAIR...........................8-1

8.1 General........................................................8-1

9 LANDING GEAR SYSTEM REPAIR....................9-1

9.1 General........................................................9-1

10 EGRESS SYSTEM REPAIR .................................10-1

10.1 General......................................................10-1

11 TOOL AND MATERIEL CORE KIT

LISTING.............................................................11-1

11.1 General......................................................11-1

11.2 Shelf Life Items........................................11-1

12 BALLISTIC DAMAGE SIMULATOR.................12-1

12.1 General......................................................12-1

12.2 Terms Used...............................................12-1

12.3 Improvement Reports ...............................12-1

12.4 Safety ........................................................12-1

12.5 BDS Kit Fabrication.................................12-2

12.6 Attachment Preparation ............................12-3

12.7 Operation...................................................12-4

12.8 Post Detonation.........................................12-6

A SUPPLEMENTAL DATA ......................................A-1

LIST OF ILLUSTRATIONS

Number Title Page Number Title Page

1 Effects of Repairing Combat Damage ........... viii 1-1 AFTO Form 97, Aerospace Vehicle

Battle Damage Incident Debrief/As-sessment/Repair Record ........................... 1-17

1-2 AFTO Form 97A, Aerospace Vehicle Battle Damage Assessment/Repair Record....................................................... 1-19

2-1 Aircraft Construction .................................... 2-17 ii

2-2 Blind Rivet Information................................ 2-19 2-3 Jo-bolt Information ....................................... 2-23 2-4 Composi-Lok Information ............................ 2-27 2-5 Typical External Patch Layout Tech-niques........................................................ 2-30 2-6 Extruded Angle Repairs................................ 2-34 2-7 Typical Former Repair.................................. 2-42 2-8 Typical Combination Repair ........................ 2-43 2-9 Composite Structural Repair ........................ 2-44 2-10 Low Observable Structural Repair ............... 2-52 2-11 Typical Repair of Honeycomb Core

Structure ................................................... 2-59 2-12 Canopy/Windshield/Window Temporary

Repair ....................................................... 2-66 3-1 Circuit Identification..................................... 3-17 3-2 Common Splice Repair................................. 3-18 3-3 Splicing with Terminal Lug Barrel .............. 3-18 3-4 Repairing Broken Wire by Soldering .......... 3-19 3-5 Alternate Twisted Wire Repair Method....... 3-19 3-6 Terminal Lug Splice ..................................... 3-19 3-7 Split Strand Repair........................................ 3-20 3-8 Clamp Splice................................................. 3-20 3-9 Insulation Repair ........................................... 3-21 3-10 Shielded Cable Repair .................................. 3-22 3-11 Alternate Shielded Cable Repair .................. 3-23 3-12 Pigtail Splice for Shielded Cable ................. 3-24 3-13 Typical Coaxial Cable Repair ...................... 3-25 3-14 Triaxial Cable Repair Using ST5M1344

Connector ................................................. 3-29 3-15 Alternate Coaxial Cable Repair.................... 3-33 3-16 Multiple Damage Repair .............................. 3-34 3-17 Connector with Spare Wires ........................ 3-35 3-18 By-pass Damaged Connectors, Terminal

Boards or Junction Boxes........................ 3-36 3-19 Damaged Connector Replacement ............... 3-37 4-1 Suggested Repairs for Control Rods or

Tubes .......................................................... 4-4 4-2 Manufacturing Control Rods (Male to

Male Fittings) ............................................. 4-5 4-3 Manufacturing Control Rods (Male to

Female Fittings) ......................................... 4-6 4-4 Insertion Repair for Damaged Control

Rods............................................................ 4-7 4-5 Cable Cross Section........................................ 4-8 4-6 Broken Wires in Cable ................................... 4-8 4-7 Clamp Splice and Cable Swaging Re-pairs ............................................................ 4-9 4-8 Replacement Pulley Manufacturing ............. 4-11

5-1 Hose Cut-Off Factors (In Inches) for Teflon Hose.............................................. 5-15

5-2 Proper Use of Tube Cutter ........................... 5-16 5-3 Properly Deburred Tube ............................... 5-16 5-4 Tube Bending................................................ 5-17 5-5 Tube Flaring.................................................. 5-19 5-6 Repair of Flare Union................................... 5-20 5-7 Correct and Incorrect Method of Install-ing Flared Fittings.................................... 5-21 5-8 Flareless Fitting Inspection Criteria ............. 5-22 5-9 Flareless Fitting Seal .................................... 5-23 5-10 Acceptable Tubing and Hose Clamping

Procedures ................................................ 5-24 5-11 High, Medium, and Low Pressure Tub-ing Repair (Tubing to Union Meth-od)............................................................. 5-25

5-12 High Pressure Rubber Hose Assembly ........ 5-26 5-13 Tubing Repair (Low Pressure) ..................... 5-27 5-14 Low Pressure Hose Repair ........................... 5-29 5-15 Hi-Fitting Installation Procedures ................ 5-30 5-16 Repair Bleed Air Pipelines ........................... 5-32 5-17 High Pressure Teflon Hose Assembly ......... 5-33 6-1 Integral Fuel Tank Repair .............................. 6-4 6-2 Clamp Fuel Tubing Repair ............................. 6-5 6-3 Fuel Line Patch Repair Procedures................ 6-6 6-4 Fuel Tubing Elbow Repair ............................. 6-7 12-1 Ballistic Damage Simulator (BDS) Kit........ 12-7 12-2 Launcher........................................................ 12-8 12-3 C-4 Cutter...................................................... 12-9 12-4 Roller and Tray........................................... 12-10 12-5 Attachment Strips........................................ 12-11 12-6 Fragment Package....................................... 12-12 12-7 Hose Clamp................................................. 12-13 12-8 Mounting Attachment Strips to Training

Aircraft ................................................... 12-14 12-9 Attachment Strips Installed ........................ 12-15 12-10 Rolling Out C-4 .......................................... 12-16 12-11 Cutting C-4.................................................. 12-17 12-12 C-4 Wafer.................................................... 12-18 12-13 Fragment Package Being Installed into

Launcher ................................................. 12-19 12-14 Loaded Launcher Being Mounted to

Training Aircraft .................................... 12-20 12-15 Launcher Mounted to Aircraft Before

Attachment Strips Are Folded Down ... 12-21 12-16 BDS Launcher (Loaded and Installed) ...... 12-22 12-17 Flak Blanket Over Launcher ...................... 12-23

LIST OF TABLES

Number Title Page Number Title Page

1-1 Approximate Colors of Heat Damaged Primer/Lacquer/Urethane Finishes (all temperatures in degrees Fahrenheit) ............ 1-7

1-2 AFTO Form 97 Documentation ..................... 1-12

3-1 Function and Designation Letters..................... 3-3 5-1 Torque for Fitting Nuts on Various Sizes of Tubing ...................................................... 5-5 iii

5-2 Number of Turns for Presetting Opera-tion ................................................................ 5-6

5-3 High Pressure Rubber Hose Cut-Off Fac-tors ................................................................ 5-9

5-4 Permaswage Repair with D10000 Series Tooling - Tube Material and Maxi-mum Operating Pressure Limitations

(PSI)............................................................ 5-13

11-1 Assessor Kit .................................................... 11-1 11-2 Composite PMEL Kit/Assessor Kit................ 11-2 11-3 Material List .................................................... 11-3 11-4 Tool List ........................................................ 11-15 11-5 Shelf Life Items For Reference Only........... 11-30 11-6 Composite List .............................................. 11-31 A-1 Decimal Equivalents ........................................ A-1 A-2 Bolt/Screw Hole Size Fits ............................... A-4

A-3 Recommended Torque Values (Inch- Pounds) ........................................................ A-5

A-4 Drill Bit and Extractor Sizes ........................... A-6 A-5 Gauges of Aluminum Alloy ............................ A-6 A-6 Standard Sizes for Aluminum Alloy/Cor-rosion-Resistant Steel Tubing ..................... A-7 A-7 Dimensions for Single and Double Flare

Tubing Joints ............................................... A-8 A-8 Flexible Cable Construction and Physical

Properties ..................................................... A-9 A-9 Degradation of Material Properties ............... A-10 A-10 Minimum Recommended PPE for ABDR

Operations (NBC Training Scenarios)...... A-12 A-11 Substitute Materials for Structural Repair .... A-13 A-12 Abbreviations and Acronyms ........................ A-18 iv

Blank Page

File details come from the government source that posted it. Updated .