The document is a comprehensive betterment project plan set for the Tobin Farm Estates subdivision located in Dudley, Massachusetts, prepared by the Town of Dudley and administered through a municipal betterment program authorized on October 24, 2022. The project aims to complete unfinished infrastructure work associated with the subdivision, including constructing and finishing wetland crossings, detention ponds, roadways, sidewalks, drainage systems, and stormwater management systems to prepare for potential future town meeting acceptance. The project involves multiple specific work items such as removing stumps, completing retaining walls, grading, installing fencing and guardrails, placing loam and hydroseeding, and addressing various roadway and drainage infrastructure components across Tobin Drive, Stebbins Drive, Summer Lane, and Nellie's Way.
The betterment project is divided into two construction phases, with Phase 1 containing 21 lots and Phase 2 containing 16 lots, totaling 37 lots. The work is part of a larger subdivision plan originally developed in 2002 and revised multiple times, with the current betterment project seeking to finalize and improve infrastructure to meet municipal standards. The project includes detailed engineering specifications for roadway cross-sections, drainage structures, catch basins, manholes, and landscape elements. While specific budget details are not explicitly stated, the project is being funded through a municipal betterment program, which typically allows municipalities to assess property owners for infrastructure improvements. The project involves multiple engineering and surveying firms, including Cox Environmental Engineering, Inc. and Jim Kaserski, PLS, Inc., and is scheduled for completion as of the August 29, 2023 document date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tobin catch basin report.xlsx | XLSX spreadsheet | |
| WageSchedule_20250530193723.pdf | ||
| TobinFarms-Betterment Plan Set-No3.pdf | ||
| Tobin catch basin map.JPG | JPG image | |
| Tobin_Bid Package~1.pdf | ||
| Tobin_Bid Package.pdf | ||
| Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCUS PLAN - AERIAL
TOBIN FARM ESTATES
BETTERMENT PROJECT
NELLIE'S WAY, STEBBINS DRIVE AND TOBIN DRIVE
DUDLEY, MA 01571
SHEET INDEX
No. Title Date Last Revised
1 Cover Sheet August 29, 2023
2 Scope of Work, Notes, Legend August 29, 2023
3-24 Tobin Farm Estates, Definitive Subdivision Plans May 22, 2002 September 24, 2002
REVISIONS/ISSUES
No. Note Date 1 Issued Draft June 29, 2023
2 Work Item Revisions August 29, 2023
PROJECT ADMINISTERED BY
TOWN OF DUDLEY
71 West Main Street
Dudley, MA 01571
COVER SHEET
SHEET 1 OF 24
LOCUS PLAN - GIS
Project No.: 22440
SITESITE
SITESITEREFERENCE PLAN INDEX
Title Date Last Revised
Amended Subdivision Plan of Land, Tobin Farm Estates, Owned by Wendy Patrinos, prepared by Bertin Engineering, Inc. (2 Sheets)
October 20, 2016 December 1, 2016
Plan of Land in Stebbins Drive Ext., Prepared by Summit Engineering & Survey, Inc. (1 Sheet) December 3, 2019
Draft Roadway Acceptance Plan, Tobin Farm Estates, Dudley Ma., Prepared by DC Engineering & Survey, Inc. (1 Sheet)
February 7, 2020
COMPLETION OF DEFINITIVE SUBDIVISION CONSTRUCTION
LEGEND
G R
O
VE
S
TR
EE
T
W O
R C
ES
TE
R M
A
T
-8
-0
F
-8
-0 gr av es en gi ne er in g.
co m
SC
O
PE
O
F W
O R
K , N
O
TE
S, L
EG
EN
D
TO
B
IN
F A
R M
E
ST
A
TE
S B
ET
TE
R M
EN
T
PR
O
JE
C
T
TO
W N
O F
D U
D
LE
Y
W
ES
T M
AI
N
S
TR
EE
T, D U
D
LE
Y, M
A
SHEET 2 OF 24
Project
The purpose of this project is to complete unfinished work associated with construction of the Tobin Farm Estates subdivision roads, rights-of-way, drainage systems and stormwater management systems so that said rights-of-way, said infrastructure and associated easements may be considered for acceptance by the Town of Dudley at a future Town Meeting. This project is being put forward by the Town of Dudley under a betterment program authorized on October 24, 2022 by Article 10 of the Town of Dudley Fall 2022 Special Town Meeting.
Contractor Work Items
Presented below is the list of the work to be executed by the Contractor under this contract. All work shall be completed in accordance with these plans, including ancillary work associated with each work item identified below. Where appropriate, the locations of construction items are indicated within these bid drawings.
Refer to Town of Dudley work items for coordination of contractor’s work with the Town of Dudley Highway Department.
1. In accordance with the Environmental Protection Agency 2022 Construction General Permit, prepare a Stormwater Pollution Prevention Plan (SWPPP) and file a Notice of intent (NOI) for the work. Upon satisfactory completion of the work and the establishment of permanent ground cover, file a Notice of Termination (NOT).
2. Finish constructing the Tobin Drive wetland crossing – remove stumps, complete retaining wall, grading, fence, and guard rail construction.
3. Finish constructing the Summer Lane wetland crossing – remove stumps, complete grading, fence and guard rail construction.
4. Create access to and construct Detention Pond 1 in its entirety.
5. Finish constructing Detention Pond 2.
6. Create access to and construct Detention Pond 3 in its entirety.
7. Contractor to place loam and hydroseed at sidewalk pavement edges for sidewalk –
Tobin Drive station 13+90+/- to intersection of Stebbins Drive; Stebbins Drive from intersection of Tobin Drive to intersection of Summer Lane; Summer Lane from intersection of Stebbins Drive to station 1+00+/-.
8. Stebbins Drive stations 15+00 right to 16+00 right – remove bituminous Cape Cod berm, raise asphalt base for berm, install new bituminous Cape Cod berm.
9. Lot 22 (9 Nellie’s Way) - remove existing sidewalk and driveway apron binder asphalt within right-of-way, re-grade and re-compact gravel surface, place loam and hydroseed at pavement edges.
10. Tobin Drive - Spread loam and hydroseed entire shoulder width at wetland crossing both sides of road.
11. Summer Lane - Spread loam and hydroseed behind berm: stations 0+00 to 3+74 both sides of road and entire shoulder width at wetland crossing both sides of road.
12. Stebbins Drive – Spread loam and hydroseed behind berm: left side stations 7+00 to
104. Cut and remove brush at Detention Pond 1 access and at Detention Pond 1. Town of Dudley to coordinate with Lot 44 owner relative to obtaining an access easement and physical access to Detention Pond 1.
105. Cut and remove brush at Detention Pond 2 access and at Detention Pond 2.
106. Cut and remove brush at Detention Pond 3 access and at Detention Pond 3.
Alt. 1 Cut and remove brush; excavate, prepare subgrade, place/compact gravel, fine grade/roll gravel, place binder course and top course of sidewalk asphalt - Tobin Drive station 13+90+/- to intersection of Stebbins Drive; Stebbins Drive from intersection of Tobin Drive to intersection of Summer Lane; Summer Lane from intersection of Stebbins Drive to station 1+00+/-.
Alt. 2 Lot 22 (9 Nellie’s Way) - install new sidewalk and driveway apron binder asphalt, install new top course asphalt, match new asphalt surface with existing sidewalk, and blend new top course surface down to existing driveway binder surface within right-of-way limits.
110. Cut and remove brush along Tobin Drive roadway shoulders.
111. Cut and remove brush along Summer Lane roadway shoulders.
112. Cut and remove brush along Stebbins Drive roadway shoulders.
16+24, right side station 14+20 to 16+24, around cul-de-sac perimeter, around cul-de-sac island.
13. Catch Basins A. Inspect all catch basins for construction completeness and report findings to owner.
B. Replace catch basin leveling bricks where necessary.
C. Install catch basin hoods where missing.
D. Enlarge openings in concrete tops to align with frame openings where necessary.
E. Cut and remove excess pipe protruding into catch basin where necessary.
F. Seal openings around pipes with mortar. (All catch basins) G. Remove sediment from catch basin sumps. (All catch basins)
14. Drain manholes A. Inspect all drain manholes for construction completeness and report findings to owner.
B. Install concrete or clay brick invert channels where missing.
C. Install ladder rungs. (All drain manholes) D. Seal openings around pipes with mortar. (All drain manholes)
115. Provide a Massachusetts Registered Professional Land Surveyor to prepare acceptance ways and future municipal easements.
A. Lay out, install, set drill holes and certify installed locations of right-of-way concrete bounds at points of curvature and points of tangency, install, alternative right-of-way markers (railroad spikes) in bituminous driveways and install municipal easement iron pipes.
B. Update draft acceptance plan or prepare new acceptance plan to reflect the installation of new bounds and alternative markers at rights-of-way points of curvature and points of tangency and the installation of iron pipes at municipal easements.
C. Prepare draft metes-and-bounds (aka legal) descriptions of rights-of-way and municipal easements.
D. Prepare as-built plans of rights-of-ways, municipal easements and detention ponds in accordance with Section V.J of the Town of Dudley Rules and Regulations Governing the Subdivision of Land.
Town of Dudley Work Items
Below is a list of work items that will be executed by the Town of Dudley and as such are not part of this contract (NIC). As appropriate, the locations of the work items are indicated within these bid plans.
Refer to Contractor work items for coordination of the Town of Dudley’s work with the contractor.
102. Cut and remove brush at Tobin Drive wetland crossing.
103. Cut and remove brush at Summer Lane wetland crossing.
plans, as-built plans and draft metes-and-bounds (aka legal) descriptions of rights-of-
GENERAL NOTES
CONSTRUCTION NOTES
COMPLETION OF DEFINITIVE
SUBDIVISION CONSTRUCTION
SHEET 2 OF 24
TOBIN FARM ESTATES
08-29-2023
BETTERMENT PROJECT
Contractor Add Alternate Work Items
UntitlLeedgeMndapTobin Dr
1000 ft
N➤
LEGEND
COMPLETION OF DEFINITIVE
SUBDIVISION CONSTRUCTION
SHEET 3 OF 24
TOBIN FARM ESTATES
08-29-2023
I
C5 (.'5
C7
CB'
Ci
Cl
II
cr2 C!J era c,~ C1 6
CT7
C:, !1 Cl9
CJI()
I I
DUDLEY PLA1',INING BOARD
APP/i'QV,tl UNO R Tl,E SUBONTSIDN
C'ONTROL U, W REC>c.!'f~[O
I
I I
LO'
,-VF &-17
,5!\•D ~ r fit'(.t-' 8'>ND
•NO
CH
I
L[GfND
WITI..A IID:,; FLAt. (S[[ NOTE)
BOLJNO POINT
WORCESTER COLJNTl' 1-//Grlll'Al' BOUND
FOUND
,'RON PIPE
DRILL I-IOL(
5T0Nf \+,l,ll •
• C3 I 505.00 175,0I) &!.J!I I i ~. I ] \
CJ12
C2J C2~
505.00 8~.J r H.77 M , 19 \ ~ -00 38.Jl 19.17 38.J I'
455.00 ru:::'16 98.1(;, 19 1.~ I
C25
.JfJ,78 J".2~ $7,49 l l2.,!5 C2J1 C2B, ell
"l---===1---_,J~0c.!;. OO~~ H .B '1---:!!2e.;7.~l!,,7i-,..!t0"'-"~~ I--:4-rl~ . 1~6
30.00 f m 21.ij'J 2c: -o .• s
C.3.2
C.JJ
c~
CJ5
C l6 C:J1
U 'J2'J," !W26"2 1"
_,.ID.00 50.14 45Jlll ? 'ff
125.00 aQ,42 f<l . .f. $70-J7' 11 C:
...SS.00 1~~-9 1 98 .. 97 5',1g"'W Jo.oo , , .110 J0.7~ roo'W
eo. t'i.02 • s o.:;·2~ ~8
RESERVED i;-oR USE BY TH£ RF:GISTR't OF 0£[05
I CERf/FY TfvH Tf-115 PLAN HAS f![l:N f'R[PAREO IN ACCORP,ING[
;;tiTH nil:: RULE: /\NO Rf;G!JU. TION$ QIC Tli[ R[C!STl:'Y OF' OE 0$
,I· . _.' -f , ,· ':;·:·:·. . 'i
-....._ •• ,· I ,._ . I
• ' I" __ .• ~ -- -;-;-=,.or-
~,..,,d.,- 1 R I
LOT JI
46.B l O s.f.+/ -
~ L 08 """"" + / -
LOT 29
45,0 75 s.f. +/- 1.0J Acres+/-
,I.
MAP REFERENC[
1) PLAN OF l.,/\N!) PRE"PAfi'[O ,QR 5U?ANr1[ J \fA( l[[ &: WE:Nt1" LOU 5U-'1~0
OVDtEV QX•ORO R040 DUDLEY. l#S5AGrflJS[ITS SCAl[ I " -= roa . MAY 9, 200, PR[PAl<E'D BY JIM "A5;[RSK•, PLS. UK DR[SSER HrLL ROAO f> 0 8()),: ~6 C'!o\RUOII. MA '.) I 50 7
2) Pt,\-'! or c.i\ N(j •~· Dc.JOi.EY >./ASSACl-i°l.JS[ITS' (IWfJ[D B 'S t..RAC.E u UHJJJ B!'RG fl".9/?tJAR'< I , '~!19 PAi¾ U,NO SLJRVtY/NG, i CQRPORAT[D S:OIJTf<BRIO",[ IMS$ACJI SETTS SCAL[' ) ·- ,oo ' , J) Pu\N 01' cAro;o IN DUOi..[V MASSACl~USET'S 0 1'/Nf[J !l'f (; f/ACE M J.,J NfJ 8£ G APPIL f'i . , 989 A • PA1C[ ASSOCIAl(S
NOTES:
r) rH[ [OG[ OF W[TU\ND.S D[l"I ' T[[) >/[REON JS BASED IJPON ELD SUR'lt" LOCA rJOI/ or EDGE OI" WE!lANO FLAG$ SIT OUT a,,· (;r/'l'Al'ID SUIN[Y & IJAPf'I.NG
2) rHE Pf?OP[RrY $f!C)WN HtREUN rs $1}8J Cl )(/ FLO{)()[N(; ,N ZON[S .A /WU A2 AS OE PfCT[D ON TH[ FLOO[) JNSURANCE ~ IE MAf' IQWN or DUDLEY, I.IASS~CfJJJSf'ITS wORC[SrER COUNT'!" COMMUfoJ,'T\'-P..o t~fL NUJ,l'B[R 250 02 000.3 B
J) LOTS SHOWN I l[ll[ON ... Re SVB)[Cf TO '[MPOP.,.R'I' SLOP[ &.5CM[NT5 \\'/j,Cr,1 [NCOMPASS PliOl'(J',f/) Gf(j\QING r ()fl' ROAO C.UN$fl1UC~'!O N A;5 D[l'ICTEO ON ~ PLAN cNrr7LEO • PROPQSlD 0 /?AD,~·G PUN 1'01,JN F'A,q/,1 ESTkrfs SHfCTS 7 - ! 0 OF 14 MAY 22. 2()02"
NEW
SUBJECT TO ,'JI'( FlOWl\G[ &<5£/.IENT5 VF ~ £COFID
£ fll OW aP !,n•rrr
PARCE:l ;.
4-.J. 1520 sJ. +/-
, nT~ 'I ·5!1"'E ... _...s.... • i ' ;~,69 QTll r !lf"t: ~I• nMon-rr ~ v:s11:,1i~ .!/!No El. i ll-<OS""w
SOOK I g 169 PC . .J f:2'
I
I
'r!rf A - 22
I
216,69' .- 110,:• .59
' io.i.;9, LO T 1.3 4-4 ,4 70 !!f.+/-
1. 02 kre~ / -
S/--1.EET 2 OF 2
N/r
CW.Rl.f5 l. BROO~S w,,gr J. BJlOOJ(.S
!iOOK I ~$•.•! Pl, 2~0
I I
I
7,..--"x:.,,- ·--..._-.....: :,.,-----........., ;.,a'/' (;j I
.,,,. ~ :,.,- • --- r--4-:~:::..:..,;:;:ii::uiu"rA.~ ;;-;;;;;:;:~:;:;;;;;;::::::::.L---, / / ~----J,,--=--_-,:,.,, - - - ~ - . - ~" - TOBIN FA wr • . , , , BETTERMEN
) r ~ __: ..,,-- ,,. _..,l,\ 'I ,Iv/ Q 5 0 U i TO COMPLETION OF IEFINITIVE
\ \-.:: ?·-= '.,- 'I I p O f\l Q SUBDIVISION CONJ TRUCTION
_ -.: _ SHEET4 OF24 I ' ,_..,...--~
I TOWN J;f° OUDfD' '/ '/ .S~SJ!:CT f (J 4/N n_o ... al" ,E,,SE'Mf NTS OF RfGOIW
I • , ~00 /'1,J IV~AP_.,,.,a,t..,",r A!.-f' ... ~ ,....,..yD-"~.:r~.a ....::I ) ; A , ~ . ~ -If' ...,C,.-:!' f""'it,-'I,... :i;: .=,~~~. ..
08-29-2023 I
J
I
I
Z O N I: D A TA
RES- I 5 SJN(;LE fAMIL Y R£SfDENTIAL !llSTRICT
M/Nrl,HJM LOr M u>. = ◄ J.560 SOU'\Rf ffCT
MINl l,frJM lO f FRONfAGE. ~ 150 f f EI
1./INIMUM FRON)' TARO SETB-1CK = 30 F,£IT
/,1/;//MUI./ SJI)[ YARD S[/B,\(.;K ,. !5 F£8
,".f/N/~!()1,/ R[AR YARD StT!lACK = 20 F£IT
W.XIMUM UJI t~(MW.C'l • J(l:!r
AS Pf:R SECTION 2.0 '! . 00 D£tlS!Tr Rf"GUU\f/0N5 Of rN,; ZONING BnAWS Of THC: l'OWN O OUDU:r MASSACHV5ETTS LOTS AR! TO CONfAIN A MrN/MU/d OF ON/;: (I ) ACRE Or LOT ARE-I ANO ONE J.fUNDREU f'IFTY (l' 50,) FEET OF wr FfWlll AG( _
'GRAP HIC SCALE
t ( lll raET )
1 ln.o.:h - 10 0 f'L
SUBDIVISION
of
1,5 I. Ii rr1.11
P'J.e r a .
247.9'/'
PLAN
TOBIN FARM ESTATES
prep ared for
SUZANNE J. VALL.EE
WENDY LOU S.Lf NGO
DUDLEY OXFORD ROAD
DUDLEY, MASSACHUSETTS
SCAL[ 1" = 100 ' MAY 22, 2002
REVISION # I JULY J I , 2002
REVISION #2 AUGUST 2 I, 2002
FINAL REVISION SEPTEMBER 2 4, 2002
p,-epr:wed by
JIM K.ASlfRSKI, PtS, INC.
DRESSER HILL ,~GAD P,O, BOX 56
CHAR! TON, MA 01507
508- 2'48 - 9000
SH[[T 1 OF 2·
COMPLETION OF DEFINITIVE
SUBDIVISION CONSTRUCTION
SHEET 5 OF 24
TOBIN FARM ESTATES
ITEM #14B
SUBDIVISION CONSTRUCTION
SHEET 6 OF 24
TOBIN FARM ESTATES
ITEM #12 & #112
ITEM #5 & #105
ITEM #7 & ALT. #1
ITEM #2, #10 #102, #110
ITEM #8
COMPLETION OF DEFINITIVE
SUBDIVISION CONSTRUCTION
SHEET 7 OF 24
TOBIN FARM ESTATES
ITEM #11 & #111
ITEM #14B
ITEM #11 & #111
ITEM #7 & ALT. #1
ITEM #14B
ITEM #13D
ITEM
#13C
COMPLETION OF DEFINITIVE
SUBDIVISION CONSTRUCTION
SHEET 8 OF 24
TOBIN FARM ESTATES
ITEM #9 & #ALT #2
ITEM #13B & 13C
ITEM #13B &13C
ITEM #14B
ITEM #15B
ITEM #13B
ITEM #13C & 13E
ITEM #14C
ITEM #14B
COMPLETION OF DEFINITIVE
SUBDIVISION CONSTRUCTION
SHEET 9 OF 24
TOBIN FARM ESTATES
ITEM #4 & #104
#14B
#14D
#13C
ITEM #11 & #111
ITEM #7 & ALT. #1
ITEM #12 & #112
ITEM #11 & #111
COMPLETION OF DEFINITIVE
SUBDIVISION CONSTRUCTION
SHEET 10 OF 24
TOBIN FARM ESTATES
08-29-2023
BETTERMENT PROJECT
RELOCATED
FOREBAY
ITEM #6 & #106
ITEM #12
& #112
ITEM #8
ITEM #12
& #112
ITEM #12 & #112
ITEM #7
& ALT. #1
COMPLETION OF DEFINITIVE
SUBDIVISION CONSTRUCTION
SHEET 11 OF 24
TOBIN FARM ESTATES
ITEM #7 & ALT. #1
#11 #111
ITEM #13C
ITEM #11 & #111
ITEM #14B
ITEM #9 & ALT. #2
ITEM #13C
ITEM #3C
& 13D
ITEM #14BITEM #3 & #13
#11 #111
ITEM #11 & #111
ITEM #4 & #104
ITEM #7 &
ALT. #1
COMPLETION OF DEFINITIVE
SUBDIVISION CONSTRUCTION
SHEET 12 OF 24
TOBIN FARM ESTATES
08-29-2023
BETTERMENT PROJECT
RELOCATE
FOREBAY
CONSTRUCT
FOREBAY AT THIS
LOCATION
DESIGN
DRAIN PIPE
LOCATION
APPROIXIMATE
AS-BUILT
DRAIN PIPE
LOCATION
ITEM #9 & ALT. #2
SUBDIVISION CONSTRUCTION
SHEET 13 OF 24
TOBIN FARM ESTATES
ITEM #8
ITEM #6
& #106
ITEM #5
& #105
ITEM #2 #102
#10 & #110
ITEM #7
ALT. #1
ITEM #7
ALT. #1
COMPLETION OF DEFINITIVE
SUBDIVISION CONSTRUCTION
SHEET 14 OF 24
TOBIN FARM ESTATES
ITEM #3 & #13
& #111 & #111
ITEM #4 & #104
ITEM #7 & ALT. #1
#11 & #111
ITEM #11 & #111
ITEM #7 & ALT. #1
ITEM #12 & #112
ITEM #7 & ALT. #1
COMPLETION OF DEFINITIVE
SUBDIVISION CONSTRUCTION
SHEET 15 OF 24
TOBIN FARM ESTATES
08-29-2023
BETTERMENT PROJECT
RELOCATE
FOREBAY
CONSTRUCT
FOREBAY AT
THIS LOCATION
DESIGN
DRAIN PIPE
LOCATION
APPROXIMATE
AS-BUILT DRAIN
PIPE LOCATION
SHEET 16 OF 24
TOBIN FARM ESTATES
ITEM #4 & #104
SUBDIVISION CONSTRUCTION
SHEET 17 OF 24
TOBIN FARM ESTATES
08-29-2023
BETTERMENT PROJECT
RELOCATE
FOREBAY
DESIGN
DRAIN PIPE
LOCATION
APPROXIMATE
AS-BUILT
DRAIN PIPE
LOCATION
CONSTRUCT FOREBAY
AT THIS LOCATION
SHEET 18 OF 24
TOBIN FARM ESTATES
08-29-2023
ITEM #5 & #105
ITEM #6 & #106
SUBDIVISION CONSTRUCTION
SHEET 19 OF 24
TOBIN FARM ESTATES
SHEET 20 OF 24
TOBIN FARM ESTATES
SHEET 21 OF 24
TOBIN FARM ESTATES
SHEET 22 OF 24
TOBIN FARM ESTATES
SHEET 23 OF 24
TOBIN FARM ESTATES
SHEET 24 OF 24
TOBIN FARM ESTATES
COMPLETION OF DEFINITIVE
SUBDIVISION CONSTRUCTION
REFERENCE PLAN
COMPLETION OF DEFINITIVE
SUBDIVISION CONSTRUCTION
COMPLETION OF DEFINITIVE
SUBDIVISION CONSTRUCTION
COMPLETION OF DEFINITIVE
SUBDIVISION CONSTRUCTION
File details come from the government source that posted it. Updated .