TO19_Pink_House_Lift_Station_IFC_Drawings_Final.pdf
PDF 14 MB Posted
- Attached to
- GAOA Pink House Lift Station Replacement
- Solicitation number
- 140L2625R0001
About this file
These construction design drawings detail the Pink House Lift Station Replacement project for the Bureau of Land Management's Coeur d'Alene District Office located in Orofino, Idaho. The project involves replacing an existing lift station with new infrastructure, including a new lift station, generator, transfer switch, pump control panel, electrical systems, and associated site utilities. The drawings provide comprehensive technical specifications across multiple sheets, including site plans, utility plans, electrical diagrams, and detailed mechanical components.
Key technical elements include a 25 kW propane-powered generator, a NEMA 3R transfer switch, a PumpTech model WC-23246 pump control panel with duplex pump operation, four-float control system, and a Sensaphone 1400 monitoring system. The design incorporates specific requirements for pump activation, lag/lead pump sequencing, alarm conditions, and remote telemetry capabilities. The project drawings are dated April 15, 2024, with design work completed by LBYD Federal, LLC, and are marked as 100% issued for construction drawings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Nov 17, 2017April 15, 2024
Mr. Thomas Ellestad
1. NEW 100A FUSED SWITCH AT SERVICE ENTRANCE. VERIFY LIFT
STATION POWER SYSTEM GROUND IS LOCATED AT SERVICE
ENTRANCE AND IS SIZE INDICATED ON DRAWING. (LOCATED AT
SHOWER STATION).
2. PROVIDE NEW WIRE IN EXISTING CONDUIT. ROUTING FROM
EXISTING SHOWER STATION IS UNKNOWN. IF IT IS DISCOVERED
DURING CONSTRUCTION THAT EXISTING CONDUIT IS DEFICIENT,
BRING THE DEFICIENCY TO ATTENTION OF THE GOVERNMENT.
3. NEW GENERATOR. BASIS OF DESIGN IS A KOHLER MODEL
25CCL PROPANE POWERED GENERATOR, 120/240VAC, 1PH WITH
BLOCK HEATER, ALTERNATOR STRIP HEATHER, BATTERY
CHARGER AND BATTERY HEATER, OR EQUAL. GENERATOR TO
BE ENCLOSED IN LOCKABLE HOUSING TO PROTECT FROM
WEATHER AND VANDALISM AND PROVIDE SOUND
ATTENUATION).
4. NEW TRANSFER SWITCH. BASIS OF DESIGN IS A KOHLER MODEL
KSSB AUTOMATIC TRANSFER SWITCH, 104A, WITH SURGE
PROTECTIVE DEVICE FOR 120/240VAC OPERATION, OR EQUAL.
5. NEW PUMP CONTROL PANEL. BASIS OF DESIGN IS PUMPTECH
MODEL WC-23246 PUMP CONTROL PANEL. PANEL TO CONTAIN;
· NEMA 3R ENCLOSURE, MINIMUM
· SURGE PROTECTIVE DEVICE
· HAND / OFF / AUTO OPERATION
· LEAD / LAG PUMP MOTOR DUPLEX OPERATION
· 4 FLOAT SWITCH OPERATION (OFF / LEAD ON / LAG ON / HIGH
ALARM)
· LOCAL ALARM INDICATION LIGHT ON TOP OF ENCLOSURE
· CONNECTIONS FOR REMOTE ALARM INDICATOR LIGHT
(LOCATED AT SHOWER BUILDING AREA)
· AUDIBLE ALARM INDICATION
· ALARM SILENCE AND TEST PUSH BUTTONS
· INTEGRATION WITH PUMP MANUFACTURER'S MOISTURE
DETECTION SIGNAL AND OIL LEVEL SIGNAL
· ELAPSED TIME METERS / RUNTIME COUNTERS FOR EACH
PUMP
· ANALOG DISPLAY MOUNTED ON FRONT PANEL FOR
PRESSURE TRANSMITTERS (LOCATED IN VALVE BOX, REFER
TO KEYNOTE 4 ON DETAIL C1/C-501) AND POWER SUPPLY FOR
PRESSURE TRANSMITTERS.
· INTERNAL GFI RECEPTACLE OUTLET TO POWER
SENSAPHONE MONITOR
· 2 PHASE-CONVERTING DRIVES, 1ɸ INPUT WITH 3ɸ OUTPUT.
6. CONNECT TO NEW SUBMERSIBLE PUMPS, FLOAT SWITCH
CONTROLS, PUMP MOISTURE DETECTOR MONITOR SIGNAL AND
AUTO OIL LEVEL MONITOR SIGNAL
7. CONNECT TO NEW PUMP DISCHARGE PRESSURE TRANSMITTER
LOCATED IN VALVE BOX
8. EXISTING CONDITIONS INDICATE A SENSAPHONE MONITOR IS
LOCATED IN PUMP CONTROL PANEL AND COMMUNICATION
CABLE IS IN PLACE. IF NOT, PROVIDE NEW CONDUIT AND
COMMUNICATION CABLE IN CONDUIT IN TRENCH, ALONGSIDE
EXISTING LIFT STATION POWER CONDUIT (ROUTING IS
UNKNOWN)
9. AUTOMATIC DIALER (SENSAPHONE 1400 MONITOR OR EQUAL)
· EXISTING CONDITIONS INDICATE THAT A SENSAPHONE
MONITOR IS LOCATED IN EXISTING PUMP PANEL RETAIN AND
PROTECT EXISTING SENSAPHONE MONITOR FOR USE IN NEW
PANEL, OR OBTAIN NEW AUTOMATIC DIALER AS NECESSARY.
· POWERED BY AN SENSAPHONE PART# FGD-0053, PLUG-IN
TYPE TRANSFORMER. RECEPTACLE OUTLET IN PUMP
CONTROL PANEL
· MONITOR IS POWERED BY AN SENSAPHONE PART# FGD-0053,
PLUG-IN TYPE TRANSFORMER. RECEPTACLE OUTLET IN
PUMP CONTROL PANEL
· GROUND SENSAPHONE 1400 MONITOR TO PUMP PANEL RACK
AS PER MANUFACTURER'S INSTRUCTIONS
· REFER TO INSTALLATION MANUAL FOR TYPE
COMMUNICATION CABLE AND INSTALLATION INSTRUCTIONS.
· PROGRAM MONITOR AS DESCRIBED IN SEQUENCE OF
OPERATIONS.
1. COORDINATE CONNECTIONS AND ROUTING WITH OTHER SITE
UTILITIES.
2. SINGLE LINE IS SCHEMATIC IN NATURE AND DOES NOT SHOW
ALL REQUIRED CONNECTIONS
3. CONTRACTOR IS TO SUPPLY, INSTALL AND FULLY INTEGRATE
ALL ITEMS FOR A FULLY FUNCTIONING SYSTEM.
4. ALL CONDUCTORS COPPER, UON.
E-601
D
D
E A
N
D
D
E A
N
S
M
A C
D O
N A
L D
B
C
A R
T E
R
S I N
G L
E
L
I N
E
D
I A
G R
A M
GENERAL SHEET NOTES
SHEET KEYNOTES
SCALE: NTS
ELECTRICAL SINGLE LINE DIAGRAM
B2
ALWAYS THINK
SAFETY
Project #
S h e e t
T i t l e
Date:
BLM Project #
U n i t e d
S t a t e s
D e p a r t m e n t o f t h e
I n t e r i o r
B u r e a u o f
L a n d
M a n a g e m e n t
D r a w n b y
R e v i s i o n s
A
M Q
L B
Y D
F e d e r a l
P r o j e c t
F i l e s A c t i v e
P r o j e c t s
P i n k
H o u s e
L i f t
S t a t i o n
D r a w i n g s C
A D
E d w g
A
B
C
D
2 3 4 5
A p p r o v e d b y
C h e c k e d b y
D e s i g n e d b y
Seal:
D e s c r i p t i o n
D a t e
Sheet of 8
02/03/2025
070117.019
140L0622D0002
P I N
K
H
O U
S E
L I F
T
S
T A
T I O
N
R E
P L A
C E
M E
N T
C O
E U
R
D
A
L E
N
S
T R
I C
T
O
F F
I C
E
U
S
O
R O
F I N
O
S U
C
N
S T
R U
C T
I O
N
070117.019Project No.
LBYD FEDERAL, LLC
1425 Higham Street Idaho Falls, Idaho 83402 Phone (208) 528-8718
C copyright 2022
These drawings and design intent are the sole property of LBYD FEDERAL, LLC which may not be reproduced without written permission.
S U
C
N
S T
R U
C T
I O
N
(E)
240/120V
SERVICE
PUMP
CONTROL
PANEL
NEMA 3R
G
N D
E
C
100A
NEMA 3R
DISC SW
(E)
SENSAPHONE
MONITOR
SYSTEM
GN
GROUNDING
ELECTRODE
(E) TELE.
CONNECTION &
(E) ALARM LIGHT
G
N D
C O
M M
C
A B
L E
E
C
PUMP PANEL RACK
SHOWER BUILDING AREA
G
D
C
C O
M M
C
A B
L E
G
N D
(E)
WET-WELL
(E)
VALVE
VAULT
G
N D
G
N D
G
N D
PUMP SYSTEM SEQUENCE OF OPERATIONS
FLOAT SYSTEM CONTROL AND OPERATING LOGIC.
HOA SWITCH: A HAND-OFF-AUTOMATIC SELECTOR SWITCH SHALL
BE PROVIDED FOR EACH PUMP. IN HAND MODE SELECTION, THE
PUMP WILL TURN ON IF NOT IN AN ALARM CONDITION. IN
AUTOMATIC MODE, THE PUMP WILL OPERATE BASED ON
COMMANDS FROM THE FLOAT SWITCHES.
FOUR FLOAT OPERATION: THE CONTROL PANEL WILL BE
DESIGNED FOR FOUR FLOAT OPERATION, WITH THE LEVELS
DEFINED BY THE WET WELL PHYSICAL DESCRIPTION TABLE ON
SHEET C-501. AS THE LIQUID LEVEL RISES TO THE STOP FLOAT
(PUMP SHUTDOWN ELEVATION) AND TIPS IT TO THE ON (CLOSED)
POSITION, THE PANEL WILL REMAIN INACTIVE. AS THE LIQUID
LEVEL TIPS THE LEAD FLOAT (PUMP ACTIVATION ELEVATION), THE
LEAD PUMP WILL START. IF THE LIQUID LEVEL TIPS THE LAG FLOAT
(LAG PUMP ACTIVATION ELEVATION), THE LAG PUMP WILL START. IF
THE LIQUID LEVEL TIPS THE ALARM FLOAT (HIGH WATER ALARM),
THE AUDIO/VISUAL ALARM WILL ACTIVATE. BOTH PUMPS AND THE
ALARM WILL REMAIN ACTIVE UNTIL THE LIQUID LEVEL DROPS AND
THE LAG FLOAT IS IN THE OFF (OPEN) POSITION. AT THIS TIME THE
ALARM WILL SILENCE. BOTH PUMPS WILL REMAIN ON UNTIL THE
LIQUID LEVEL DROPS TO NORMAL AND ALL FOUR FLOATS ARE IN
THE OFF (OPEN) POSITION. WHEN BOTH PUMPS HAVE STOPPED
RUNNING, THE ALTERNATOR WILL SWITCH THE LEAD PUMP AND
LAG PUMP OPERATING FUNCTIONS IN THE NEXT SEQUENCE.
ALARM OPERATION: IN ADDITION TO THE ABOVE HIGH WATER
ALARM FROM THE FLOAT SWITCH, THE CONTROL PANEL WILL
ACCEPT ANALOG AND DIGITAL SIGNALS FROM EXTERNAL DEVICES
LISTED IN SHEET KEYNOTE 6 AS ALARM CONDITIONS. THE
CONTROL PANEL WILL SEND AN ALARM SIGNAL TO THE REMOTE
ALARM INDICATOR (LOCATED AT SHOWER STATION), AND TO THE
AUTOMATIC DIALER MONITOR (SENSAPHONE 1400 MONITOR OR
EQUAL). AUTOMATIC DIALER SHALL ACCEPT ALARM SIGNALS
FROM CONTROL PANEL AND FOR PROVIDE REMOTE TELEMETRY
TO GOVERNMENT PERSONNEL
PRESSURE SENSOR SIGNAL IS FOR DISPLAY ONLY.
TRANSFER
SWITCH
NEMA 3R
GENERATOR
25 KW 120/240 VAC
1ɸ, 3W, 60HZ
NEMA 3R
GEN
100A
NEMA 3R
DISC SW
C
G
D
S
PANEL "LP"
100A NEMA
3R 10kAIC
PANEL
D
C
EN
L
(3) #1, #6 GND
1-1/2" C
SEE
PANEL
SCHEDULE
C O
N T
R O
L
E
S H
E E
T
N
O T
E
R
V
I S
S U
W
T
H
C
H A
N G
E S
P R
O
FE
SSIONA L ENGINEER
MARIO A L HA DDAD
STATE OF IDAHO
L I C E N S E D
2061470
02-03-2025
| WW Riverside Water & Sewer district - BLM Pink House Lift Station - Revised Plans and Specifications - Approval Stamped Cover Page - 4-15-2024.pdf |
| TO#19 Pink House Lift Station_IFC_Drawings_11x17_20240410.pdf |
| E-601 - Stamped.pdf |
| Sheets and Views |
| E-601 |
File details come from the government source that posted it. Updated .