TO19_Pink_House_Lift_Station_Bid_Schedule.pdf
PDF 194 KB Posted
- Attached to
- GAOA Pink House Lift Station Replacement
- Solicitation number
- 140L2625R0001
About this file
The document is a Bid Schedule for the Pink House Lift Station Replacement project, detailing multiple construction divisions and their associated work items. The bid schedule covers seven primary divisions: General Conditions, Site Work Demolition, Concrete, Metals, Finishes, Plumbing, HVAC, Electrical, and Exterior Improvements. Key components include mobilization, demolition, concrete work, pump installations, electrical systems, and generator setup, with quantities specified in lump sum or per unit (each or square foot).
The bid schedule includes a 3.5% Nez Perce Tribal Employment Rights Ordinance (TERO) administrative fee, which must be added to the project subtotal. The project involves multiple technical elements such as submersible chopper pumps, LP gas tank and piping, a 22 kW propane generator, control panel installations, pressure gauges, and electrical infrastructure components. Each division contains specific line items with quantities, though unit costs and total costs are left blank, indicating this is a bidding template for potential contractors to complete.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pink House Lift Station Replacement Bid Schedule
Description Quantity Unit Unit Cost Total Cost
Division 01 – General Conditions
Mobilization/Demobilization 1 Lump Sum
Division Subtotal
Division 02 – Site Work Demolition
Demolition/Decommissioning 1 Lump Sum
Division 03 – Concrete
Exterior Concrete Slab for Generator 1 Lump Sum
Vault Penetrations Coring 1 Lump Sum
Division 05 – Metals
Slotted Channel Framing 1 Lump Sum
Division 09 – Finishes
Epoxy Coating and Installation 177 Sq. Ft.
Division 22 – Plumbing
Submersible Chopper Pump 2 Each
Pump Piping, Valves, and Fittings 1 Lump Sum
Pump Installation 1 Lump Sum
Mercury Floats 4 Each
Valve Vault Drainpipe and Valve 1 Lump Sum
Vent Piping 1 Each
Runtime Counter Meter 2 Each
Division 23 – HVAC
LP Gas Tank and Piping 1 Lump Sum
Division 26 – Electrical
Control Panel and Installation 1 Lump Sum
Phase Converter 2 Each
Disconnect Switch Double Throw 100A
NEMA 3R
1 Each
Transmitter for Pressure Gauge 2 Each
Pump Discharge Pressure Gauge 2 Each
22 kW Propane Generator 1 Each
NEMA 3R Automatic Transfer Switch 1 Each
100A NEMA 3R Panel “LP” 1 Each
Exterior Wiring and Conduit 1 Lump Sum
Relocate/Reprogram Auto-Dialer 1 Lump Sum
Pink House Lift Station Replacement Bid Schedule
Description Quantity Unit Unit Cost Total Cost
Division 26 – Electrical (Cont.)
Relocate Wet Well Electrical Junction Box 1 Lump Sum
Division 32 – Exterior Improvements 6” Steel Pipe Removable Bollards 6 Each
Subtotal
Additional Costs (if applicable)
*Nez Perce Tribal Employment Rights Ordinance (TERO). Add Project Subtotal and Additional Costs, multiply by 3.5%.
Lump Sum
3.5%
Project Total
Each. One entire unit. Measure the actual number of units completed and accepted.
Square foot. Measurements are for area computations will be made horizontally or vertically to the surface being measured.
Lump sum. Do not measure directly. The bid amount is completed payment for all work described in the contract and necessary to complete the work for that pay item. The quantity is designated as “All”.
Estimated quantities of lump sum work shown in the contract are approximate.
*Nez Perce Tribal Employment Rights Ordinance (TERO) is applicable to this project. An Administrative fee of 3.5% (three and one-half percent) of the contract amount is due and payable to the TERO Office upon award of the contract. This fee shall be included in your bid. For further information, contact the TERO
Office at (208) 843-7363.