The document is a Bid Schedule for the Pink House Lift Station Replacement project, detailing multiple construction divisions and their associated work items. The bid schedule covers seven primary divisions: General Conditions, Site Work Demolition, Concrete, Metals, Finishes, Plumbing, HVAC, Electrical, and Exterior Improvements. Key components include mobilization, demolition, concrete work, pump installations, electrical systems, and generator setup, with quantities specified in lump sum or per unit (each or square foot).

The bid schedule includes a 3.5% Nez Perce Tribal Employment Rights Ordinance (TERO) administrative fee, which must be added to the project subtotal. The project involves multiple technical elements such as submersible chopper pumps, LP gas tank and piping, a 22 kW propane generator, control panel installations, pressure gauges, and electrical infrastructure components. Each division contains specific line items with quantities, though unit costs and total costs are left blank, indicating this is a bidding template for potential contractors to complete.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pink House Lift Station Replacement Bid Schedule

Description Quantity Unit Unit Cost Total Cost

Division 01 – General Conditions

Mobilization/Demobilization 1 Lump Sum

Division Subtotal

Division 02 – Site Work Demolition

Demolition/Decommissioning 1 Lump Sum

Division 03 – Concrete

Exterior Concrete Slab for Generator 1 Lump Sum

Vault Penetrations Coring 1 Lump Sum

Division 05 – Metals

Slotted Channel Framing 1 Lump Sum

Division 09 – Finishes

Epoxy Coating and Installation 177 Sq. Ft.

Division 22 – Plumbing

Submersible Chopper Pump 2 Each

Pump Piping, Valves, and Fittings 1 Lump Sum

Pump Installation 1 Lump Sum

Mercury Floats 4 Each

Valve Vault Drainpipe and Valve 1 Lump Sum

Vent Piping 1 Each

Runtime Counter Meter 2 Each

Division 23 – HVAC

LP Gas Tank and Piping 1 Lump Sum

Division 26 – Electrical

Control Panel and Installation 1 Lump Sum

Phase Converter 2 Each

Disconnect Switch Double Throw 100A

NEMA 3R

1 Each

Transmitter for Pressure Gauge 2 Each

Pump Discharge Pressure Gauge 2 Each

22 kW Propane Generator 1 Each

NEMA 3R Automatic Transfer Switch 1 Each

100A NEMA 3R Panel “LP” 1 Each

Exterior Wiring and Conduit 1 Lump Sum

Relocate/Reprogram Auto-Dialer 1 Lump Sum

Pink House Lift Station Replacement Bid Schedule

Description Quantity Unit Unit Cost Total Cost

Division 26 – Electrical (Cont.)

Relocate Wet Well Electrical Junction Box 1 Lump Sum

Division 32 – Exterior Improvements 6” Steel Pipe Removable Bollards 6 Each

Subtotal

Additional Costs (if applicable)

*Nez Perce Tribal Employment Rights Ordinance (TERO). Add Project Subtotal and Additional Costs, multiply by 3.5%.

Lump Sum

3.5%

Project Total

Each. One entire unit. Measure the actual number of units completed and accepted.

Square foot. Measurements are for area computations will be made horizontally or vertically to the surface being measured.

Lump sum. Do not measure directly. The bid amount is completed payment for all work described in the contract and necessary to complete the work for that pay item. The quantity is designated as “All”.

Estimated quantities of lump sum work shown in the contract are approximate.

*Nez Perce Tribal Employment Rights Ordinance (TERO) is applicable to this project. An Administrative fee of 3.5% (three and one-half percent) of the contract amount is due and payable to the TERO Office upon award of the contract. This fee shall be included in your bid. For further information, contact the TERO