TJC Standard - EC020501 EP 1-27.pdf

PDF 5 MB Posted

Attached to
Remote Temperature Monitoring Equipment and Service
Solicitation number
36C26226Q1402
Issued by

About this file

This is a Joint Commission hospital accreditation standard document effective July 1, 2025, establishing requirements for managing risks associated with hospital utility systems under Standard EC.02.05.01.

The standard outlines 27 elements of performance requiring hospitals to design and install utility systems according to National Fire Protection Association codes; maintain written inventories of operating components with risk-based prioritization for infection control, occupant needs, and patient care criticality; identify high-risk components where failure could cause serious harm or death; establish written maintenance and inspection schedules with documented frequencies; implement procedures for responding to utility system disruptions, including emergency clinical interventions and staff notifications; and map utility system distributions. Additional requirements address specific systems including medical gas storage and transfer rooms compliant with NFPA 99-2012 section 9.3.7; emergency power supply equipment maintained per manufacturers' recommendations with ambient temperature minimum 40°F; ventilation systems in critical care areas controlling airborne contaminants per NFPA 99-2012 and ASHRAE 170 standards; electrical distribution categorized by three types of essential electrical systems serving critical care, general care, and basic care rooms; hospital-grade receptacles at patient bed locations with tamper-resistant or listed covers; restrictions on power strips and extension cords; anesthesia gas administration areas with zone valves, alarm panels, and sensor monitoring per NFPA 101-2012 and NFPA 99-2012; and newly engineered smoke control systems designed and tested per NFPA 92-2012. Operating rooms are designated wet procedure locations requiring isolated power or ground-fault circuit interrupters with documented risk assessments. All utility system controls must be labeled to facilitate emergency shutdowns.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .