Thrust_Bearing_Oil_Cooling_Coils_RFQ_Package.pdf

PDF 919 KB Posted

Attached to
MT - CF THRUST BEARING OIL COOLING COIL Federal contract opportunity
Solicitation number
140R6023Q0003
Issued by
Department of the Interior Bureau of Reclamation

View the file

Other files for this federal contract opportunity

Other files attached to MT - CF THRUST BEARING OIL COOLING COIL, newest first.
File Type Posted
140R6023Q0003_Amendment_0001_SF-30_0001.pdf PDF
Sol_140R6023Q0003_Amd_0001.pdf PDF
Drawing_296-650-230-RD-1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior Bureau of Reclamation Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions Billings, Montana November 2022

Request for Quote Combined Synopsis/Solicitation No. 140R6023Q0003

Thrust Bearing Oil Cooling Coils

Montana Area Office for Canyon Ferry Powerplant, Montana

FOR OFFICIAL USE ONLY

Solicitation: 140R6023Q0003 Page 2 of 11

Bureau of Reclamation Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions Billings, Montana November 2022

TABLE OF CONTENTS

1. THRUST BEARING OIL COOLING COILS RFQ REQUIREMENTS DOC

2. SECTION B – QUOTATION SCHEDULE

3. SECTION C – SPECIFICATIONS

4. CLAUSES

5. ATTACHMENTS

A. Drawing 296-650-230-RD-1

6. PROVISIONS

END OF CONTENTS

Solicitation: 140R6023Q0003 Page 3 of 11

Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions Billings, Montana November 2022

Thrust Bearing Oil Cooling Coils RFQ Requirements Doc

General Information Contract Opportunity Type: Request for Quote (Original) All Dates/Times are: (UTC-07:00) MOUNTAIN STANDARD TIME Responses Due: 4 P.M. on 12/12/2022 Agency Reference: 40598900

Classification Product Service Code: 4420 Heat Exchangers and Steam Condensers NAICS Code: 332410 Power Boiler and Heat Exchanger Manufacturing

Description This is a combined synopsis/solicitation prepared in accordance with FAR Subpart 12.6, Agency number 140R6023Q0003 and is issued as a Request for Quotation (RFQ). This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2022-08.

This solicitation is a Small Business set-aside in accordance with FAR Part 19. The NAICS code for this order is 332410 Power Boiler and Heat Exchanger Manufacturing; PSC is 4420 Heat Exchangers and Steam Condensers, with a business size standard of 750 employees.

This supply requirement is for the design, fabrication, and delivery for two (2) thrust bearing oil cooling coils to Canyon Ferry Power Plant, Helena, Lewis and Clark County, Montana. The new oil cooling coils are not required to be installed as part of this purchase order. Installation and acceptance testing will be performed by the Government.

The new generator cooling coils shall be designed and fabricated to be a direct replacement for the existing 1953 General Electric cooling coils currently installed in the generators.

Full work requirements are contained in Section C – Specifications.

Quotation Schedule is required to be completed and submitted.

The provision at 52.212-1, Instructions to Offerors-Commercial Products and Commercial Services, applies to this acquisition.

The provision at 52.212-2, Evaluation-Commercial Products and Commercial Services, applies to this acquisition and outlines the specific evaluation criteria in paragraph (a) of that provision.

Offerors shall include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial Services, with its offer.

The clause at 52.212-4, Contract Terms and Conditions-Commercial Products and Commercial Services, applies to this acquisition.

The clause at 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Products and Commercial Services, applies to this acquisition (see attached Clauses & Provisions list for additional FAR clauses cited in this clause that are applicable to this acquisition).

Bureau of Reclamation

Solicitation: 140R6023Q0003 Page 4 of 11

Bureau of Reclamation Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions Billings, Montana November 2022

Evaluation Criteria Lowest Price Technically Acceptable

Delivery FOB Destination Bureau of Reclamation Canyon Ferry Powerplant 7700 Canyon Ferry Road Helena, MT 59602 Attn.: Wade Brilz, Phone: (406) 475-3902

Type of Award It is expected that the Government will award a Firm Fixed Price purchase order to a single contractor.

Point of Contact Send quotation and other correspondence related to this Request for Quote no later than 12 December 2022, 4 P.M. MST to Howard Heflin, hheflin@usbr.gov.

SYSTEM FOR AWARD MANAGEMENT (SAM) – Effective October 2018, all contractors interested in doing business with the Federal Government must be registered in the System for Award Management (SAM) database at the time they submit their offer. SAM registration and annual confirmation requirements must be accomplished through the SAM website at https://www.sam.gov. For assistance with registering in SAM, contact the Federal Services Desk at 1-866-606-8220.

Solicitation: 140R6023Q0003 Page 5 of 11

Bureau of Reclamation Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions Billings, Montana November 2022

SECTION B – QUOTATION SCHEDULE

Canyon Ferry Powerplant Missouri Basin Program – Montana

B.1 QUOTATION SCHEDULE – RECLAMATION:

a) Quotes will be considered for award on the following schedule, but no quotes will be considered for award on only a part of the schedule.

b) All quotes are subject to the terms and conditions of this solicitation.

c) The complete set of requirements for each item listed in the following quotation schedule is contained in the Specification Section identified in the schedule.

SCHEDULE – CANYON FERRY GENERATOR THRUST BEARING OIL COOLING COILS

Item Section Work or Material Unit of Measure

Unit Price Total Amount

1 C.1 Generator Thrust Bearing Oil Cooling Coils, extruded fin style or alternate design as approved via the Government, with a maximum operating pressure of 75 psig, differential pressure across the coils shall not exceed 15 psig, shall keep oil temperature at or below the maximum allowable temperature of 122 °F (50 °C) and must meet or exceed the cooling capacity of the existing coils depicted in the Government provided drawing.

2 Each $___________ $____________

END OF SECTION

Solicitation: 140R6023Q0003 Page 6 of 11

Bureau of Reclamation Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions Billings, Montana November 2022

SECTION C - SPECIFICATIONS

Generator Thrust Bearing Oil Cooling Coils for Hydroelectric Powerplant

This specification is for the design, fabrication, and delivery for two (2) thrust bearing oil cooling coils to Canyon Ferry Power Plant, Helena, Lewis and Clark County, Montana. The new oil cooling coils are not required to be installed as part of this purchase order. Installation and acceptance testing will be performed by the Government.

The new generator thrust bearing oil cooling coils are required to be designed, fabricated, and delivered in accordance with the accompanying purchase order clauses, specifications, and reference drawing.

The new generator cooling coils shall be designed and fabricated to be a direct replacement for the existing 1953 General Electric cooling coils currently installed in the generators.

Contractors shall submit a complete and detailed description of the items listed in Sections C.1 with their quotes for technical review by the Bureau of Reclamation before a purchase order is awarded. All items listed below shall be supplied on a single purchase order. All quoted prices must include freight charges and be shipped FOB to the destination point. Deliveries will be accepted Monday through Thursday, between the hours of 7:30 a.m. to 4:30 p.m. Mountain Time, excluding Federal holidays. Item 1 identified in Section C.1 shall be shipped concurrently to the following destination (partial delivery will not be accepted):

CF Powerplant Shipping Address:

Bureau of Reclamation Canyon Ferry Powerplant 7700 Canyon Ferry Road Helena, MT 59602 Attn.: Wade Brilz, Phone: (406) 475-3902

Technical Point of Contact (TPOC):

Bureau of Reclamation – Montana Area Office 2900 4th Avenue North, Suite 501 Billings, MT 59101 Attn.: Brock Owen (MT 611), Phone: (406) 247-7326

RFQ/Purchase Order Point of Contact Bureau of Reclamation – Regional Office, MB-5000 2021 4th Ave North Billings, MT 59101 Attn.: Howard Heflin, Phone: (406) 247-7797

Solicitation: 140R6023Q0003 Page 7 of 11

Bureau of Reclamation Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions Billings, Montana November 2022

SECTION C.1 – Thrust Bearing Oil Cooling Coils

Item 1 – Thrust Bearing Oil Cooling Coils

1) Provide a quantity of two (2) oil cooling coils in accordance with the following specifications:

2) The work to be performed under this requirement consists of designing, fabricating, and delivering two generator thrust bearing oil cooling coils and four new flanges as described as below:

a) Cooling coils shall be of one-piece construction and capable of being installed within the existing bearing oil pot without disturbing the generator thrust or upper guide bearing.

b) Cooling coils shall be designed in accordance with Bureau of Reclamation Drawing 296-650-230 with the exception of the flanges and extended piping of the inlet and outlet connections described in the Drawing Exception description in paragraph 5) below.

3) Materials:

a) The words “material” and “materials” as used in these specifications to denote items furnished by the Contractor shall mean equipment, machinery, product(s), component(s), or other item(s) procured under these specifications.

b) All materials furnished shall be new and of the highest standard industrial/commercial quality as normally used for this type of equipment, considering strength, ductility, durability, best engineering practice and the purpose for which the equipment is to be used.

c) Except as specified, materials shall conform to the most current Federal specifications or standards, or in the absence of an applicable Federal standard, materials shall conform to the most current specifications of standards of:

a) American National Standards Institute (ANSI)

b) American Society for Testing and Materials (ASTM)

c) American Society of Mechanical Engineers (ASME)

d) Institute of Electrical and Electronic Engineers (IEEE)

e) National Fire Protection Association (NFPA)

f) Or any other nationally recognized standards organization as applicable.

g) Any proposed deviation from or request to use materials not covered by the aforementioned specifications and standards, shall require Contractor submittal for approval by the Government with a justification explaining the exact nature for the deviation along with complete specification for the materials being proposed for use.

h) Standards, or sections of standards, listed within the Government’s specifications that are in error or identify incorrect standards or sections of standards, does not relieve the Contractor’s obligation to use the most recent and correction sections or standards used by industry and as

Solicitation: 140R6023Q0003 Page 8 of 11

Bureau of Reclamation Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions Billings, Montana November 2022 it pertains to the main subject matters of the paragraph identifying the incorrect standard or section. Any errors or misrepresented standards or sections of standards shall be identified by the Contractor and brought to the immediate attention of the Government’s Contracting Representative for clarification and/or correction.

i) Parts shall be made accurately to standard gauge where possible. Threads, including but not limited to those of bolts, nuts, screws, taps, pipes, and pipe fittings shall be unified screw threads conforming to ASME B1.1-2003 or ASME B1.20.1-1983 (Revised 1992).

j) All fasteners shall be permanently marked with a symbol identifying manufacturer with symbol(s) indicating grade, class, type, and other identifying marks in accordance with reference for applicable standards.

d) Cooling coil tubes:

a) Shall be constructed of copper-nickel alloy, UNS C70600 (90%Cu-10%Ni), tubing conforming to ASTM B111/B111M-18a, Standard Specification for Copper and Copper- Alloy Seamless Condenser Tubes and Ferrule Stock.

4) Design:

a) Shall be of the extruded fin style or alternate design as approved before award via the Bureau of Reclamation. For alternate design requirements see 1.c above.

b) If of the extruded fin style, each tube shall be provided with 1-5/8 inch outside diameter copper fins, 0.012-inches thick, 8 fins per inch, fastened securely to the tube by solder dipping or a continuous solder fin.

c) Shall be designed and constructed for a maximum working pressure of 75 psig. Supply cooling water pressure is approximately 25 psig at the design flow rate of approximately 20 gallons per minute (gpm), with a temperature range of 32 to 57 °F.

d) Maximum allowable oil temperature in the bearing pot is 122 °F. Maximum allowable bearing metal temperature is 176°F.

e) Structural Supports:

a) Shall be as shown on drawing 296-650-230. Contractor may provide an alternative design for the structural support brackets and submit this design to the Government for approval prior to fabrication.

b) If cooling coils are of the extruded fin type, there shall be 4 supports pieces that maintain proper coil spacing and alignment within the oil pot.

c) Each support element shall be tapped 1/2” – 13 UNC x 1.00 inch depth for lifting eye bolts.

Support elements shall be spaced to provide a balanced pick for installing and removing the cooling coils from the oil pot.

f) Design Submittal Data – Contractor shall furnish the following data, before fabrication to enable Government to verify final design of the cooling coils:

Solicitation: 140R6023Q0003 Page 9 of 11

Bureau of Reclamation Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions Billings, Montana November 2022

a) Design heat removal rate for the cooling coils in British Thermal Units/Hour (Btu/hr.)

b) Design rate of flow of cooling water required for the thrust bearing oil cooler at design conditions in gallons per minute (gpm).

c) Design water supply (delivery) pressure required to the thrust bearing oil cooler at design conditions in pounds per square inch (psi).

d) Water pressure loss (pressure differential) through the thrust bearing oil coolers shall be no greater than the original design conditions and must meet terms of these specifications.

e) Rate of flow of cooling water at minimum required heat removal rate (gpm).

f) Water pressure loss (pressure differential) through the thrust bearing oil coolers at minimum required heat removal rate and cooling water flow conditions (psi).

g) Maximum inside and outside diameter and height dimensions of assembled cooling coils (inches).

h) Total weight of the cooling coils with and without water (lbs.).

5) Drawing Exception:

a) Cooling coils shall be designed using Bureau of Reclamation drawing 296-650-230 as a guide for dimensions to fit the cooling coils into the existing oil pot.

b) Exception to the drawing shall be that the new inlet and outlet flanges will be left off and the inlet and outlet piping will be extended 12 inches and left blank. The Government will trim the ends of the piping to the proper length and fit the new flanges to match the generator into which the cooling coils are being installed.

6) Workmanship:

a) The Contractor shall be responsible for the accurate manufacturing and fabrication of materials in accordance with best modern practices and the requirements of these specifications, notwithstanding minor errors or omissions therein.

b) Safety and adequate shock-absorbing features shall be used throughout designs, especially for parts subjected to variable stress or shock, including alternating or vibrating stress or shock.

Shock-absorbing features and parts subject to vibration shall include provisions which prevent components from loosening.

7) Welding and fabrication:

a) Welding shall be performed by appropriate recommended method in accordance with Section IX, Part GW of the ASME Boiler and Pressure Vessel Code (2004).

b) Unless other provided, the design and fabrication of all welded parts shall conform to the following requirements:

Solicitation: 140R6023Q0003 Page 10 of 11

Bureau of Reclamation Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions Billings, Montana November 2022

a) Principal stress-carrying parts – The design and fabrication of welded parts subject to stress due to supply water pressure, cooling water flow, and associated local vibrations shall be in accordance with Section VIII, Division I, Part UW of the ASME Boil and Pressure Vessel Code (2004).

b) Welding qualifications – For welding of cooler component fittings, connections, and support framework, the qualification of welding procedures, welders, and welding operators shall conform to the requirements of Section IX, Part QW, of the ASME Boiler and Pressure Vessel Code (2004).

c) Brazing of cooling coil tubes and associated fittings shall conform to the specific requirements of Section IX, Part QB of the ASME Boiler and Pressure Vessel Code (2004).

8) Hydrostatic Testing:

a) The cooling coils shall be pressure tested at the factory in accordance with Section VIII, Division 1, Part UG of the ASME Boiler and Pressure Vessel Code (2004) or ASME B31.1-2004, Power Piping standards.

b) Cooling coils shall be tested to a test pressure of 125 psig. Test pressure shall be maintained for a period of not less than 1 hour after all leaks have been stopped by repair or tightening of fastening components.

c) Contractor will supply documentation to the Bureau of Reclamation TPOC for approval and acceptance of the pressure test prior to shipment of the cooling coils.

9) Packaging, Shipping and Delivery

a) Packaging:

a) Shall be included that prevents the cooling coils from being shipped uncovered and exposed to the elements with adequate protection from weather during shipping. Packaging shall also prevent damage to the cooling coils, be constructed to allow 4 inches of space between the coils and packaging walls/lid/bottom, and provide structural supports and attachment for the coils that prevent movement during shipping.

b) Shall allow loading and unloading with a forklift and be constructed in such a manner that allows the forks to be inserted under the container without the use of blocking devices.

c) Shall be constructed of plywood or other materials of sufficient thickness that will eliminate the container and coils from flexing during the loading and unloading process.

b) Shipping:

a) The cooling coils shall be shipped FOB destination to the Canyon Ferry Power Plant address listed above.

c) Delivery:

a) Delivery hours are between 7:30 am to 4:30 pm Mountain Time, Monday through Thursday, excluding Federal holidays.

Solicitation: 140R6023Q0003 Page 11 of 11

Bureau of Reclamation Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions Billings, Montana November 2022

b) Deliverer shall call ahead with an approximate time of delivery to ensure that personnel are available to receive the equipment. Point of contact name and phone number for delivery is provided with the shipping address information above.

END OF SECTION

Clauses

52.212-4 CONTRACT TERMS AND CONDITIONS –COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (NOV 2021)

---Addendum to 52.212-4---

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation: https://www.acquisition.gov/far Department of the Interior Acquisition Regulation: https://www.acquisition.gov/diar

(End of clause)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (NOV

2021)

DOI-AAAP-0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE PROCESSING

PLATFORM (IPP) (APR 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

'Payment request' means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:

https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

http://www.acquisition.gov/far http://www.acquisition.gov/diar http://www.ipp.gov/

Contractor Invoice signed by the Contracting Officer authorizing payment

The Contractor shall also submit an electronic copy of the IPP invoice to hheflin@usbr.gov once the invoice has been submitted to IPP. Failure to email the invoice may cause significant delay or possible rejection of your payment request.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

--- End of Addendum to 52.212-4---

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE

ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2022)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

(Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or

Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) (Section 1634 of Pub. L.

115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance

Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

mailto:hheflin@usbr.gov mailto:IPPCustomerSupport@fiscal.treasury.gov

(6) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[ ] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I

(Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 2402).

[ ] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).

[ ] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of

2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

[X] (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

[ ] (5) [Reserved].

[ ] (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

[ ] (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016)

(Pub. L. 111-117, section 743 of Div. C).

[X] (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors

Debarred, Suspended, or Proposed for Debarment. (Nov 2021) (31 U.S.C. 6101 note).

[ ] (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018)

(41 U.S.C. 2313).

[ ] (10) [Reserved].

[ ] (11) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) (15 U.S.C. 657a).

[X] (12) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct

2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C.

657a).

[ ] (13) [Reserved] [X] (14) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644). [ ]

(ii) Alternate I (Mar 2020) of 52.219-6.

[ ] (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644). [ ]

(ii) Alternate I (Mar 2020) of 52.219-7.

[ ] (16) 52.219-8, Utilization of Small Business Concerns (Oct 2022) (15 U.S.C. 637(d)(2) and (3)). [ ]

(17) (i) 52.219-9, Small Business Subcontracting Plan (Oct 2022) (15 U.S.C. 637(d)(4)).

[ ] (ii) Alternate I (Nov 2016) of 52.219-9. [ ]

(iii) Alternate II (Nov 2016) of 52.219-9. [ ]

(iv) Alternate III (Jun 2020) of 52.219-9. [ ] (v) Alternate IV (Sep 2021) of 52.219-9

[ ] (18) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)). [ ]

(ii) Alternate I (Mar 2020) of 52.219-13.

[ ] (19) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 637(a)(14)).

[ ] (20) 52.219-16, Liquidated Damages-Subcontracting Plan (Sep 2021) (15 U.S.C. 637(d)(4)(F)(i)).

[ ] (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Oct 2022) (15

U.S.C. 657f).

[X] (22) (i) 52.219-28, Post Award Small Business Program Representation (Oct 2022) (15 U.S.C.

632(a)(2)).

[ ] (ii) Alternate I (MAR 2020) of 52.219-28.

[ ] (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged

Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).

[ ] (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business

Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C.

637(m)).

[ ] (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) (15 U.S.C.

644(r)).

[X] (26) 52.219-33, Nonmanufacturer Rule (Sep 2021) (15U.S.C. 637(a)(17)).

[X] (27) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).

[X] (28) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Jan 2022)

(E.O.13126).

[X] (29) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

[X] (30) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

[ ] (ii) Alternate I (Feb 1999) of 52.222-26.

[ ] (31) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212). [ ]

(ii) Alternate I (Jul 2014) of 52.222-35.

[X] (32) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793). [ ]

(ii) Alternate I (Jul 2014) of 52.222-36.

[ ] (33) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).

[X] (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010)

(E.O. 13496).

[X] (35) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O.

13627).

[ ] (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

[ ] (36) 52.222-54, Employment Eligibility Verification (May 2022). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in 22.1803.)

[ ] (37) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ] (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ] (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).

[ ] (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).

[ ] (40) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).

[ ] (ii) Alternate I (Oct 2015) of 52.223-13.

[ ] (41) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

[ ] (ii) Alternate I (Jun 2014) of 52.223-14.

[ ] (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (May 2020) (42 U.S.C. 8259b). [ ]

(43) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (Oct 2015)

(E.O.s 13423 and 13514).

[ ] (ii) Alternate I (Jun 2014) of 52.223-16.

[X] (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020)

(E.O. 13513).

[ ] (45) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).

[ ] (46) 52.223-21, Foams (Jun 2016) (E.O. 13693).

[ ] (47) (i) 52.224-3 Privacy Training (Jan 2017) (5 U.S.C. 552 a). [ ]

(ii) Alternate I (Jan 2017) of 52.224-3.

[X] (48) (i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).

[X] (49) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (Oct 2022) (41 U.S.C.

chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note.

[ ] (ii) Alternate I (Jan 2021) of 52.225-3. [ ]

(iii) Alternate II (Jan 2021) of 52.225-3.

[ ] (iv) Alternate III (Jan 2021) of 52.225-3.

[ ] (50) 52.225-5, Trade Agreements (Oct 2019) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

[X] (51) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

[ ] (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302Note).

[ ] (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

[ ] (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42

U.S.C. 5150).

[ ] (55) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).

[X] (56) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services

(Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

[ ] (57) 52.232-30, Installment Payments for Commercial Products and Commercial Services (Nov 2021)

(41 U.S.C. 4505, 10 U.S.C. 2307(f)).

[X] (58) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct 2018)

(31 U.S.C. 3332).

[ ] (59) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management

(Jul 2013) (31 U.S.C. 3332).

[ ] (60) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

[ ] (61) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

[ ] (62) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).

[ ] (63) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) (46

U.S.C. 55305 and 10 U.S.C. 2631).

[ ] (ii) Alternate I (Apr 2003) of 52.247-64.

[ ] (iii) Alternate II (Nov 2021) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[ ] (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter67).

[ ] (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41

U.S.C. chapter 67).

This Statement is for Information Only: It is not a Wage Determination

Employee Class Monetary Wage-Fringe Benefits

[List as necessary]

[ ] (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[ ] (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (May 2014) ( 29U.S.C.206 and 41 U.S.C. chapter 67).

[ ] (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).

[ ] (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).

[ ] (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022).

[ ] (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).

[ ] (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C.

1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the

Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1), in a subcontract for commercial products and commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or

Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or

Provided by Kaspersky Lab and Other Covered Entities (Nov 2021) (Section 1634 of Pub. L. 115-91).

(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video

Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L.

115-232).

(v) 52.219-8, Utilization of Small Business Concerns (Oct 2022) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(vii) 52.222-26, Equal Opportunity (Sep 2015) (E.O.11246).

(viii) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).

(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).

(x) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).

(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec

2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xii) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).

(xiii) (A) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O

13627). (B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O.

13627).

(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to

Contracts for Maintenance, Calibration, or Repair of Certain Equipment- Requirements (May2014) (41 U.S.C. chapter 67).

(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to

Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).

(xvi) 52.222-54, Employment Eligibility Verification (May 2022) (E.O. 12989).

(xvii) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022).

(xviii) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).

(xix) (A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a). (B) Alternate I (Jan 2017) of

52.224-3.

(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Nov 2021) (42

U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46

U.S.C. 55305 and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of clause)

Contract Documents, Exhibits, or Attachments

Attachment: Drawing 296-650-230-RD-1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

SAFETY

AutoCAD SHX Text

ALWAYS THINK

AutoCAD SHX Text

UNITED STATES

AutoCAD SHX Text

DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

BUREAU OF RECLAMATION

AutoCAD SHX Text DESIGNED_ _ _ _ _ _ _ _ _ _ _ _ _ _ CHECKED _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

AutoCAD SHX Text DRAWN _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ TECH. APPR._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

APPROVED_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

AutoCAD SHX Text

PLOT INFORMATION

AutoCAD SHX Text

PICK-SLOAN MISSOURI BASIN PROGRAM

AutoCAD SHX Text

HELENA-GREAT FALLS DIVISION - CANYON FERRY UNIT - MONTANA

AutoCAD SHX Text

CANYON FERRY

AutoCAD SHX Text

GENERATOR 1, 2, AND 3

AutoCAD SHX Text

THRUST BEARING OIL COOLING SYSTEM - PIPING DETAIL

AutoCAD SHX Text

M. FERGUSON

AutoCAD SHX Text

GARY MCDANEL

AutoCAD SHX Text

PAUL M. BACKLUND

AutoCAD SHX Text

PAUL M. BACKLUND, SUPRY FACILITY OPERATION SPECIALIST

AutoCAD SHX Text

DAN JEWELL

AutoCAD SHX Text

DAN JEWELL, AREA MANAGER

AutoCAD SHX Text

BILLINGS, MONTANA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 9/15/2005

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OCTOBER 18, 2005 08:25

AutoCAD SHX Text 296-650-230-1-0

AutoCAD SHX Text

CWEISSER

AutoCAD SHX Text 3 7/8" Bolt circle

AutoCAD SHX Text

THRUST BEARING COOLING COILS

AutoCAD SHX Text

TOP VIEW

AutoCAD SHX Text 1/2"%%129

AutoCAD SHX Text 1"%%129

AutoCAD SHX Text 1/2"%%129 Typ.

AutoCAD SHX Text 2"%%129

AutoCAD SHX Text

NOTES

AutoCAD SHX Text General Electric Dwg T-9742927. There are 14 coils made of 1-inch finned copper tubing. The diameter of the tubing in the finned areas is 1 5/8". The coils are bent circular and there is an outer and inner ring with seven (7) tubes stacked vertically in each ring. There is a 1/4" steel brass stiffener plate located in between the 3rd and 4th tubes vertically from the bottom that provides rigidity to the coils. Vertically, the tubes are arranged on 2 1/4" centers. The diameter of the outer ring is 68" center to center. The diameter of the inner ring is 59" center to center. There are six (6), 1" brackets spaced evenly around the cooling coils that hold the coil tubes in place. The intake and the outlet of the cooling coil is fabricated with 2" copper tubing and both feed a common manifold.

AutoCAD SHX Text 1.

AutoCAD SHX Text 2.

AutoCAD SHX Text 3.

AutoCAD SHX Text 4.

AutoCAD SHX Text 5.

AutoCAD SHX Text 6.

AutoCAD SHX Text 7.

AutoCAD SHX Text 8.

AutoCAD SHX Text 9.

AutoCAD SHX Text

THRUST BEARING COOLING COILS DETAIL

AutoCAD SHX Text eye bolts

AutoCAD SHX Text Lifting

AutoCAD SHX Text 1/2" 13

AutoCAD SHX Text Thread

AutoCAD SHX Text 1"%%129 Hole

AutoCAD SHX Text 1/2" bolts 13

AutoCAD SHX Text Threaded for

AutoCAD SHX Text Actual

AutoCAD SHX Text location

AutoCAD SHX Text stiffener P

AutoCAD SHX Text Welded to radius

AutoCAD SHX Text L

AutoCAD SHX Text 1 5/8" Holes with

AutoCAD SHX Text 1/2" round rubber

AutoCAD SHX Text softners for 1" copper

AutoCAD SHX Text Bottom

AutoCAD SHX Text See Note 5; steel, AutoCAD SHX Text as is support hanger

AutoCAD SHX Text 1/2" Copper drain line

AutoCAD SHX Text with 1/2" copper tee

AutoCAD SHX Text centered and level

AutoCAD SHX Text R=1" Typ.

AutoCAD SHX Text 1/2" Tee

AutoCAD SHX Text sweat fitting

AutoCAD SHX Text Riser

AutoCAD SHX Text Riser

AutoCAD SHX Text Recreation of existing conditions. Not intended to modify the original design intent. Information is accurate to the best of our knowledge.

Provisions

52.212-1 INSTRUCTIONS TO OFFERORS–COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

(NOV2021)

---Addendum to 52.212-1---

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

Federal Acquisition Regulation: https://www.acquisition.gov/far Department of the Interior Acquisition Regulation: https://www.acquisition.gov/diar

(End of provision)

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)

DIAR 1452.215-71 USE AND DISCLOSURE OF PROPOSAL INFORMATION -- DEPARTMENT OF THE

INTERIOR (APR 1984)

(a) Definitions. For the purposes of this provision and the Freedom of Information Act (5 U.S.C. 552), the following terms shall have the meaning set forth below:

(1) "Trade Secret" means an unpatented, secret, commercially valuable plan, appliance, formula, or process, which is used for making, preparing, compounding, treating or processing articles or materials which are trade commodities.

(2) "Confidential commercial or financial information" means any business information (other than trade secrets) which is exempt from the mandatory disclosure requirement of the Freedom of Information Act, 5 U.S.C. 552. Exemptions from mandatory disclosure which may be applicable to business information contained in proposals include exemption (4), which covers "commercial and financial information obtained from a person and privileged or confidential," and exemption (9), which covers "geological and geophysical information, http://www.acquisition.gov/far http://www.acquisition.gov/diar including maps, concerning wells."

(b) If the offeror, or its subcontractor(s), believes that the proposal contains trade secrets or confidential commercial or financial information exempt from disclosure under the Freedom of Information Act, (5 U.S.C. 552), the cover page of each copy of the proposal shall be marked with the following legend:

"The information specifically identified on pages of this proposal constitutes trade secrets or confidential commercial and financial information which the offeror believes to be exempt from disclosure under the Freedom of Information Act. The offeror requests that this information not be disclosed to the public, except as may be required by law. The offeror also requests that this information not be used in whole or part by the government for any purpose other than to evaluate the proposal, except that if a contract is awarded to the offeror as a result of or in connection with the submission of the proposal, the Government shall have the right to use the information to the extent provided in the contract."

(c) The offeror shall also specifically identify trade secret information and confidential commercial and financial information on the pages of the proposal on which it appears and shall mark each such page with the following legend:

"This page contains trade secrets or confidential commercial and financial information which the offeror believes to be exempt from disclosure under the Freedom of Information Act and which is subject to the legend contained on the cover page of this proposal."

(d) Information in a proposal identified by an offeror as trade secret information or confidential commercial and financial information shall be used by the Government only for the purpose of evaluating the proposal, except that (i) if a contract is awarded to the offeror as a result of or in connection with submission of the proposal, the Government shall have the right to use the information as provided in the contract, and (ii) if the same information is obtained from another source without restriction it may be used without restriction.

(e) If a request under the Freedom of Information Act seeks access to information in a proposal identified as trade secret information or confidential commercial and financial information, full consideration will be given to the offeror's view that the information constitutes trade secrets or confidential commercial or financial information. The offeror will also be promptly notified of the request and given an opportunity to provide additional evidence and argument in support of its position, unless administratively unfeasible to do so. If it is determined that information claimed by the offeror to be trade secret information or confidential commercial or financial information is not exempt from disclosure under the Freedom of Information Act, the offeror will be notified of this determination prior to disclosure of the information.

(f) The Government assumes no liability for the disclosure or use of information contained in a proposal if not marked in accordance with paragraphs (b) and (c) of this provision. If a request under the Freedom of Information Act is made for information in a proposal not marked in accordance with paragraphs (b) and (c) of this provision, the offeror concerned shall be promptly notified of the request and given an opportunity to provide its position to the Government. However, failure of an offeror to mark information contained in a proposal as trade secret information or confidential commercial or financial information will be treated by the Government as evidence that the information is not exempt from disclosure under the Freedom of Information Act, absent a showing that the failure to mark was due to unusual or extenuating circumstances, such as a showing that the offeror had intended to mark, but that markings were omitted from the offeror's proposal due to clerical error.

(End of provision)

---End of Addendum to 52.212-1---

52.212-2 EVALUATION-COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

Lowest Price Technically Acceptable

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.