Sol_140R6023Q0003_Amd_0001.pdf
PDF 89 KB Posted
- Attached to
- MT - CF THRUST BEARING OIL COOLING COIL Federal contract opportunity
- Solicitation number
- 140R6023Q0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140R6023Q0003_Amendment_0001_SF-30_0001.pdf | ||
| Drawing_296-650-230-RD-1.pdf | ||
| Thrust_Bearing_Oil_Cooling_Coils_RFQ_Package.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R6023Q0003 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Billings MT 59107
R60
PO Box 36900 Regional Office Great Plains Region Bureau of Reclamation
12/01/20220001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/18/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is to notify industry of questions that have been asked and answered by the
Government.
The date/time offers due has not been extended as part of this solicitation amendment.
Period of Performance: 12/21/2022 to 03/31/2023
Question 1. Section C.1 paragraph 4.a states that for alternate design requirements see 1.c above. I do not see anything regarding 1.c. Can you point me in the right direction if I am missing something? What will be the process for proposing alternate designs?
Answer 1. Specification is supposed to say: "Shall be of the extruded fin style or alternate design as approved before award via the Bureau of Reclamation. Alternate designs
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Stormy Gallagher
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R6023Q0003/0001 will be considered provided they conform to all requirements specified within C.1."
Question 2. Section C.1 paragraph 4.b states that if of the extruded fin style then the tubes shall be solder dipped, etc. Solder dipping is not necessary with extruded fins. Did this paragraph intend to state that if NOT of the extruded fin style then the tubes shall be solder dipped, etc?
Answer 2. Specification is correct as written.
Question 3. Are the tubes arranged with 180 degree U-bends on the end opposite the piping?
Answer 3. See Drawing 296-650-230-RD-1
Question 4. Would it be acceptable to use 90/10 copper nickel for the supply/return headers and weld the 90/10 copper-nickel tubes to the headers in accordance with the ASME Section IX welding code rather than brazing?
Answer 4. If design is in accordance with specification requirements it will be considered by Bureau of Reclamation prior to award.
Question 5. Is this the first replacement of these coils?
Answer 5. No, Over the Generator's 70 yr life span all 3 have been replaced before at one point or another. The most recent award was in FY21 using these same specs.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .