This is an Addendum 1 to an Invitation to Bid issued by the Connecticut Department of Energy and Environmental Protection (DEEP) for a standardized cold storage building construction project at Thomaston Garage, located at 422 Watertown Road, Thomaston, Connecticut. The project is identified under solicitation number DEPA00013203605/DEEP062526CM, with a bid opening scheduled for 2:00 P.M. Local Time on July 31st, 2026. The addendum, dated June 30, 2026, revises the pre-bid meeting date from July 22nd to July 15th, maintaining the same time and location for the meeting. This addendum clarifies that the Office of State Building Inspector (OSBI) permitting review is underway and requires the awarded contractor to submit their proposed prefabricated building system for OSBI review before a permit can be issued.
No pricing, set-asides, funding sources, or additional contract terms are specified in this addendum document, which serves solely to communicate schedule modifications and permitting procedural requirements to prospective bidders.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineering, Safety, and Sustainability Division
163 Great Hill Road • Portland, CT 06480 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer
Project Name:
Project Location:
Project/ Solicitation
Number:
Invitation to Bid Addendum #1
DEEP Standardized Cold Storage Building at Thomaston
Garage
422 Watertown Road, Thomaston, CT
DEPA00013203605/DEEP062526CM
Date: 06/30/2025
Bid Opening 2:00 P.M. Local Time July 31st, 2026
Addendum 1 June 30, 2026
Attachments included with this addendum are listed below:
ATTACHMENT A: Pre-Bid Meeting Agenda and Schedule
1.) REVISE – 00 25 13 Pre-Bid Meeting Agenda – REV 1:
a. Date for pre-bid meeting changed from July 22nd up by one week to July 15th. No change for time and location of meeting.
2.) Clarification: OSBI Permitting Review:
a. OSBI review has started, but requires the delegated design of a prefabricated structure submittal to be reviewed, before a permit can be issued by OSBI. Only the Awarded contractor will be required to submit their proposed prefabricated building system for review by OSBI.