Thiessen_2_Paving_Project_Bid Analysis_Comparison.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
#256059 Ewald Water Main Replacement, Phase 2
Solicitation number
S-KS0043-00014617
Issued by
Marion County, Oregon

About this file

This is a bid analysis and comparison spreadsheet for the Thiessen 2 Paving Project, prepared for evaluation by a state or local public works agency. The document compares the engineer's estimate against six contractor bids (Brix Paving Northwest, Inc.; Granite Construction Company; Eagle-Elsner, Inc.; Knife River Corp. Northwest; KNL Industries, Inc.; and Nutter Corporation) across 22 line items encompassing site preparation, traffic control, erosion management, pavement removal and replacement, and surface restoration. The project scope includes mobilization, temporary work zone traffic control across five separate locations, asphalt pavement removal and reconditioning of approximately 17,200 square yards, installation of 4,400 tons of Level 2, 1/2-inch asphalt concrete pavement, and various supplementary items such as construction survey work and pavement markers. The bid tabulation shows individual unit prices and total prices for each contractor, with bids ranging from approximately $661,939 to $1,025,935, reflecting significant variance in pricing strategies across bidders.

The spreadsheet provides side-by-side comparison of the engineer's estimate ($955,230) against the low bid from KNL Industries, Inc. ($661,939) and tracks maximum, minimum, and average pricing across all bidders for each line item. Notable pricing variations occur in major cost categories such as mobilization (ranging from $10,000 to $100,000), Level 2 asphalt pavement ($103 to $125 per ton), and removal of surfacings ($2.70 to $9.00 per square yard), indicating different contractor approaches to project execution and material sourcing. The average of all bids totals $802,608.96, positioned between the engineer's estimate and the range of individual bids. The document does not specify contract award dates, funding sources, set-aside provisions, or incumbent contractor information; however, it serves as the analytical tool for evaluating competitive bids and supporting procurement decisions for this paving project.

View the file

Other files

File Type Posted
Notice of Intent to Award~12.pdf PDF
723000- Contract Book.pdf PDF
256059 Bid Opening Links.pdf PDF
723000 Ewald_Water_Main_Replacement_Plans.pdf PDF
723000-Bid Register_Rank.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Compare to Estimate Thiessen 2 Paving Package Estimate vs. Low Bid

Engineer's EstimateKNL Industries, Inc.Comparison (total price)Average of the Bids
Bid ItemUnitQuantityUnit PriceTotal PriceUnit PriceTotal PriceMaximumMinimumAverage Unit PriceAverage Total
101EXTRA WORK DONE ON FORCE ACCOUNT BASISFA1$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00
102MOBILIZATIONLS1$ 44,800.00$ 44,800.00$ 10,000.00$ 10,000.00$ 44,800.00$ 10,000.00$ 60,886.69$ 60,886.69
103TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE EL CENTRO WAYLS1$ 12,500.00$ 12,500.00$ 3,500.00$ 3,500.00$ 12,500.00$ 3,500.00$ 15,125.00$ 15,125.00
104TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE EL CENTRO COURTLS1$ 5,000.00$ 5,000.00$ 3,500.00$ 3,500.00$ 5,000.00$ 3,500.00$ 5,712.50$ 5,712.50
105TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE LA MESA WAYLS1$ 12,500.00$ 12,500.00$ 5,000.00$ 5,000.00$ 12,500.00$ 5,000.00$ 15,500.00$ 15,500.00
106TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE SIERRA VISTA DRIVELS1$ 10,000.00$ 10,000.00$ 3,500.00$ 3,500.00$ 10,000.00$ 3,500.00$ 12,000.00$ 12,000.00
107TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE EL CAMINO WAYLS1$ 10,000.00$ 10,000.00$ 5,000.00$ 5,000.00$ 10,000.00$ 5,000.00$ 12,750.00$ 12,750.00
108TEMPORARY PROJECT INFORMATION SIGNSSQFT75$ 40.00$ 3,000.00$ 50.00$ 3,750.00$ 3,750.00$ 3,000.00$ 61.25$ 4,593.75
109EROSION CONTROLLS1$ 3,500.00$ 3,500.00$ 5,000.00$ 5,000.00$ 5,000.00$ 3,500.00$ 6,000.00$ 6,000.00
110POLLUTION CONTROL PLANLS1$ 1,000.00$ 1,000.00$ 500.00$ 500.00$ 1,000.00$ 500.00$ 1,625.00$ 1,625.00
111CONSTRUCTION SURVEY WORKLS1$ 9,000.00$ 9,000.00$ 1,000.00$ 1,000.00$ 9,000.00$ 1,000.00$ 4,625.00$ 4,625.00
112ASPHALT PAVEMENT SAWCUTTINGLF280$ 6.00$ 1,680.00$ 3.00$ 840.00$ 1,680.00$ 840.00$ 3.75$ 1,050.00
113REMOVAL OF SURFACINGSSQYD17,200$ 8.50$ 146,200.00$ 2.70$ 46,440.00$ 146,200.00$ 46,440.00$ 3.99$ 68,585.00
1148 INCH DEPTH SUBGRADE STABILIZATIONSQYD900$ 25.00$ 22,500.00$ 40.00$ 36,000.00$ 36,000.00$ 22,500.00$ 35.13$ 31,612.50
115RECONDITIONING EXISTING ROADWAYSQYD17,200$ 6.00$ 103,200.00$ 1.30$ 22,360.00$ 103,200.00$ 22,360.00$ 1.18$ 20,210.00
116COLD PLANE PAVEMENT REMOVAL, 2 INCHES DEEPSQYD1,870$ 16.00$ 29,920.00$ 2.70$ 5,049.00$ 29,920.00$ 5,049.00$ 3.80$ 7,106.00
117EXTRA AGGREGATE FOR GRADINGTON100$ 40.00$ 4,000.00$ 60.00$ 6,000.00$ 6,000.00$ 4,000.00$ 62.50$ 6,250.00
118LEVEL 2, 1/2 INCH ACPTON4,400$ 115.00$ 506,000.00$ 108.00$ 475,200.00$ 506,000.00$ 475,200.00$ 112.75$ 496,100.00
119EXTRA FOR ASPHALT APPROACHESEACH10$ 800.00$ 8,000.00$ 500.00$ 5,000.00$ 8,000.00$ 5,000.00$ 875.00$ 8,750.00
120EXTRA FOR PAVEMENT REPAIRSQFT4,700$ 2.00$ 9,400.00$ 2.00$ 9,400.00$ 9,400.00$ 9,400.00$ 1.63$ 7,637.50
121BI-DIRECTIONAL BLUE TYPE 1AR MARKERSEACH9$ 70.00$ 630.00$ 100.00$ 900.00$ 900.00$ 630.00$ 63.75$ 573.75
122PAVEMENT BAR, TYPE B-HSSQFT80$ 30.00$ 2,400.00$ 50.00$ 4,000.00$ 4,000.00$ 2,400.00$ 32.00$ 2,560.00
Total$ 955,230.00Total$ 661,939.00Average Total$ 799,252.69

Bid Tabs

Thiessen II Paving Project Bid Tabulations
Brix Paving Northwest, Inc.Granite Construction CompanyEagle-Elsner, Inc.Knife River Corp. NorthwestKNL Industries, Inc.Nutter CorporationLow/High AnalysisAverage of the Bids
Bid ItemUnitQuantityUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalUnit PriceTotalLow UPHigh UPAverage Unit PriceAverage Total
101EXTRA WORK DONE ON FORCE ACCOUNT BASISFA1$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00
102MOBILIZATIONLS1$ 58,000.00$ 58,000.00$ 75,546.76$ 75,546.76$ 18,950.00$ 18,950.00$ 24,557.00$ 24,557.00$ 10,000.00$ 10,000.00$ 100,000.00$ 100,000.00$ 10,000.00$ 100,000.00$ 47,842.29$ 47,842.29
103TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE EL CENTRO WAYLS1$ 9,500.00$ 9,500.00$ 7,500.00$ 7,500.00$ 14,350.00$ 14,350.00$ 12,000.00$ 12,000.00$ 3,500.00$ 3,500.00$ 40,000.00$ 40,000.00$ 3,500.00$ 40,000.00$ 14,475.00$ 14,475.00
104TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE EL CENTRO COURTLS1$ 1,850.00$ 1,850.00$ 7,500.00$ 7,500.00$ 840.00$ 840.00$ 12,000.00$ 12,000.00$ 3,500.00$ 3,500.00$ 10,000.00$ 10,000.00$ 840.00$ 12,000.00$ 5,948.33$ 5,948.33
105TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE LA MESA WAYLS1$ 9,500.00$ 9,500.00$ 7,500.00$ 7,500.00$ 12,600.00$ 12,600.00$ 12,000.00$ 12,000.00$ 5,000.00$ 5,000.00$ 40,000.00$ 40,000.00$ 5,000.00$ 40,000.00$ 14,433.33$ 14,433.33
106TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE SIERRA VISTA DRIVELS1$ 7,000.00$ 7,000.00$ 7,500.00$ 7,500.00$ 2,520.00$ 2,520.00$ 15,000.00$ 15,000.00$ 3,500.00$ 3,500.00$ 30,000.00$ 30,000.00$ 2,520.00$ 30,000.00$ 10,920.00$ 10,920.00
107TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE: SE EL CAMINO WAYLS1$ 3,500.00$ 3,500.00$ 7,500.00$ 7,500.00$ 16,000.00$ 16,000.00$ 15,000.00$ 15,000.00$ 5,000.00$ 5,000.00$ 35,000.00$ 35,000.00$ 3,500.00$ 35,000.00$ 13,666.67$ 13,666.67
108TEMPORARY PROJECT INFORMATION SIGNSSQFT75$ 60.00$ 4,500.00$ 35.00$ 2,625.00$ 48.00$ 3,600.00$ 33.80$ 2,535.00$ 50.00$ 3,750.00$ 100.00$ 7,500.00$ 33.80$ 100.00$ 54.47$ 4,085.00
109EROSION CONTROLLS1$ 2,500.00$ 2,500.00$ 1,500.00$ 1,500.00$ 1,000.00$ 1,000.00$ 2,500.00$ 2,500.00$ 5,000.00$ 5,000.00$ 15,000.00$ 15,000.00$ 1,000.00$ 15,000.00$ 4,583.33$ 4,583.33
110POLLUTION CONTROL PLANLS1$ 500.00$ 500.00$ 500.00$ 500.00$ 1,000.00$ 1,000.00$ 793.00$ 793.00$ 500.00$ 500.00$ 5,000.00$ 5,000.00$ 500.00$ 5,000.00$ 1,382.17$ 1,382.17
111CONSTRUCTION SURVEY WORKLS1$ 8,000.00$ 8,000.00$ 1,000.00$ 1,000.00$ 14,000.00$ 14,000.00$ 3,500.00$ 3,500.00$ 1,000.00$ 1,000.00$ 8,500.00$ 8,500.00$ 1,000.00$ 14,000.00$ 6,000.00$ 6,000.00
112ASPHALT PAVEMENT SAWCUTTINGLF280$ 4.00$ 1,120.00$ 2.00$ 560.00$ 8.00$ 2,240.00$ 3.20$ 896.00$ 3.00$ 840.00$ 6.00$ 1,680.00$ 2.00$ 8.00$ 4.37$ 1,222.67
113REMOVAL OF SURFACINGSSQYD17,200$ 4.50$ 77,400.00$ 4.75$ 81,700.00$ 9.00$ 154,800.00$ 6.40$ 110,080.00$ 2.70$ 46,440.00$ 4.00$ 68,800.00$ 2.70$ 9.00$ 5.23$ 89,870.00
1148 INCH DEPTH SUBGRADE STABILIZATIONSQYD900$ 35.50$ 31,950.00$ 22.00$ 19,800.00$ 46.00$ 41,400.00$ 16.00$ 14,400.00$ 40.00$ 36,000.00$ 43.00$ 38,700.00$ 16.00$ 46.00$ 33.75$ 30,375.00
115RECONDITIONING EXISTING ROADWAYSQYD17,200$ 1.65$ 28,380.00$ 0.75$ 12,900.00$ 1.50$ 25,800.00$ 0.38$ 6,536.00$ 1.30$ 22,360.00$ 1.00$ 17,200.00$ 0.38$ 1.65$ 1.10$ 18,862.67
116COLD PLANE PAVEMENT REMOVAL, 2 INCHES DEEPSQYD1,870$ 4.00$ 7,480.00$ 3.50$ 6,545.00$ 13.50$ 25,245.00$ 11.40$ 21,318.00$ 2.70$ 5,049.00$ 5.00$ 9,350.00$ 2.70$ 13.50$ 6.68$ 12,497.83
117EXTRA AGGREGATE FOR GRADINGTON100$ 90.00$ 9,000.00$ 30.00$ 3,000.00$ 35.00$ 3,500.00$ 105.00$ 10,500.00$ 60.00$ 6,000.00$ 70.00$ 7,000.00$ 30.00$ 105.00$ 65.00$ 6,500.00
118LEVEL 2, 1/2 INCH ACPTON4,400$ 103.00$ 453,200.00$ 115.00$ 506,000.00$ 113.00$ 497,200.00$ 105.00$ 462,000.00$ 108.00$ 475,200.00$ 125.00$ 550,000.00$ 103.00$ 125.00$ 111.50$ 490,600.00
119EXTRA FOR ASPHALT APPROACHESEACH10$ 850.00$ 8,500.00$ 150.00$ 1,500.00$ 550.00$ 5,500.00$ 562.00$ 5,620.00$ 500.00$ 5,000.00$ 2,000.00$ 20,000.00$ 150.00$ 2,000.00$ 768.67$ 7,686.67
120EXTRA FOR PAVEMENT REPAIRSQFT4,700$ 1.50$ 7,050.00$ 1.00$ 4,700.00$ 1.50$ 7,050.00$ 2.60$ 12,220.00$ 2.00$ 9,400.00$ 2.00$ 9,400.00$ 1.00$ 2.60$ 1.77$ 8,303.33
121BI-DIRECTIONAL BLUE TYPE 1AR MARKERSEACH9$ 50.00$ 450.00$ 60.00$ 540.00$ 117.00$ 1,053.00$ 60.00$ 540.00$ 100.00$ 900.00$ 45.00$ 405.00$ 45.00$ 117.00$ 72.00$ 648.00
122PAVEMENT BAR, TYPE B-HSSQFT80$ 26.00$ 2,080.00$ 22.00$ 1,760.00$ 53.00$ 4,240.00$ 22.00$ 1,760.00$ 50.00$ 4,000.00$ 30.00$ 2,400.00$ 22.00$ 53.00$ 33.83$ 2,706.67
Total$ 741,460.00Total$ 767,676.76Total$ 862,888.00Total$ 755,755.00Total$ 661,939.00Total$ 1,025,935.00Average$ 802,608.96

File details come from the government source that posted it. Updated .