- #256059 Ewald Water Main Replacement, Phase 2
- Solicitation number
- S-KS0043-00014617
- Issued by
- Marion County, Oregon
About this file
This document is a comprehensive bid package for the City of Salem, Oregon's Ewald Water Main Replacement, Phase 2 project, involving the Public Works Department. The project encompasses installing approximately 2,900 linear feet of new 8-inch ductile iron waterline and 700 linear feet of new 12-inch ductile iron waterline to replace existing undersized waterlines in a specific service area. The project area includes Ewald Avenue S from Liberty to Tulare, Tulare Avenue S from Ewald to Charles, Kotzy Avenue S from Tulare to its termination, and Charles Avenue S from Tulare to Liberty. The bid will be received electronically through Equity Hub's Bid Locker until 2:30 p.m. on Tuesday, September 9, 2025, with a public bid opening via Zoom. The contract includes installing fire hydrants, new service connections, and associated infrastructure such as asphalt concrete pavement, sidewalks, curbs, driveways, and surface restoration.
The bid requires a 10% bid security and is subject to Oregon prevailing wage rates. Bidders must be registered with the Oregon Construction Contractors Board and comply with various state and federal nondiscrimination statutes. The City reserves the right to reject any or all bids and to waive informalities. Funding appears to be from municipal sources, with the project aimed at infrastructure improvement in a residential neighborhood. Potential bidders must obtain documents through OregonBuys, attend to all addenda, and ensure compliance with various technical specifications, including specific requirements for pipe materials, installation methods, and surface restoration. The contract includes provisions for detailed technical specifications, performance bonds, and specific construction requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice of Intent to Award~12.pdf | ||
| Thiessen_2_Paving_Project_Bid Analysis_Comparison.xlsx | XLSX spreadsheet | |
| 256059 Bid Opening Links.pdf | ||
| 723000 Ewald_Water_Main_Replacement_Plans.pdf | ||
| 723000-Bid Register_Rank.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid No. 256059 Project No. 723000
Project Manual For
Ewald Water Main Replacement, Phase 2
Ewald Ave S Waterline Replacement Bid No. 256059 / Project No. 723000
PROJECT MANUAL
TABLE OF CONTENTS
Page
INSTRUCTIONS TO BIDDERS ................................................................................................................ 00200-1
BID FORM AND BID SUPPLEMENTS ................................................................................................... 00410-1
BID FORM ...................................................................................................................................... 00410-3
BID BOND ...................................................................................................................................... 00431-1
PENAL SUM FORM ...................................................................................................................... 00431-2
CONTRACTOR DISCLOSURE FORM ........................................................................................ 00435-1
FIRST-TIER CONTRACTOR DISCLOSURE FORM ................................................................... 00436-1
FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR ............................................. 00500-1
NOTICE TO PROCEED ................................................................................................................. 00550-1
CONTRACT FORMS
PERFORMANCE BOND ................................................................................................................ 00610-1
PAYMENT BOND .......................................................................................................................... 00615-1
CERTIFICATE OF LIABILITY INSURANCE ............................................................................. 00616-1
SUBSTITUTION AND APPROVED EQUAL REQUEST FORM ................................................ 00617-1
CERTIFICATE OF SUBSTANTIAL COMPLETION ................................................................... 00618-1
APPLICATION FOR PAYMENT INSTRUCTIONS ..................................................................... 00621-1
APPLICATION FOR PAYMENT .................................................................................................. 00621-2
VALUE ENGINEERING CHANGE PROPOSAL (VECP) ........................................................... 00640-1
SUBMITTAL TRANSMITTAL ..................................................................................................... 00651-1
REQUEST FOR INTERPRETATION ............................................................................................ 00652-1
GENERAL CONDITIONS ......................................................................................................................... 00700-1
SUPPLEMENTARY CONDITIONS ......................................................................................................... 00800-1
SPECIFICATIONS (SPECIAL PROVISIONS) ....................................................................................... 01000-1
PERMITS
1200-CA Permit
Work in Right-of-Way Permit
APPENDIX A
City of Salem Inadvertent Discovery
APPENDIX B
Vac-X Report
APPENDIX C
Sunrise and Ewald Waterlines Subsurface Data Report
DRAWINGS
―END OF TABLE OF CONTENTS―
00100-1 Invitation to Bid
CITY OF SALEM, OREGON PUBLIC WORKS DEPARTMENT
Invitation to Bid
For
Ewald Water Main Replacement, Phase 2
The Contracts and Procurement Manager of the City of Salem will receive bids electronically through Equity Hub’s
Bid Locker until but not after 2:30 p.m., (Local Time) Tuesday, September 9, 2025, at which time said bids will be publicly opened and read virtually using Zoom, for the project specified herein The Zoom call in information will be posted on OregonBuys at least 3 days prior to bid opening date and time.
WORK DESCRIPTION: The Work under this contract includes installing approximately 2,900 linear feet of new 8-inch ductile iron waterline and 700 linear feet of new 12-inch ductile iron waterline to replace the existing undersized waterlines in the project area. The project area includes Ewald Avenue S from Liberty to Tulare, Tulare Avenue S from Ewald to Charles, Kotzy Avenue S from Tulare to its termination, and Charles Avenue S from Tulare to Liberty. This work also includes installing fire hydrants, new service connections, and all necessary appurtenances for waterline installation. Additionally, the project will require associated asphalt concrete pavement, portland cement sidewalks, curbs, driveways, aggregate shoulders, and restoration of existing surfaces.
PROCUREMENT DOCUMENTS: Bidders may obtain the bid documents by registering on the OregonBuys website and downloading them. Bidders shall consult the OregonBuys system regularly until closing date and time to avoid missing any notices. To register on OregonBuys go to https://oregonbuys.gov/. The City shall advertise all Addenda on OregonBuys. Prospective bidders are solely responsible for checking OregonBuys to determine whether or not any Addenda have been issued. Bid documents will not be mailed to prospective bidders.
PRE-BID CONFERENCE: No pre-Bid Conference will be held.
BID SUBMITTAL: Bids must be submitted on the bid forms furnished to the bidders. Completed bids must arrive electronically via Equity Hub’s Bid Locker at https://bidlocker.us/a/salem_or/BidLocker
NO LATE BIDS WILL BE ACCEPTED. Your bid must be uploaded prior to the Closing Date and Time. The City strongly recommends that you give yourself sufficient time and at least ONE (1) day before the closing date and time to begin the uploading process and to finalize your submission. The City accepts no responsibility for non-receipt and/or delays in receipt caused by transmission and reception problems, equipment failure, or any other similar cause. Each bid is instantly sealed and will only be visible to the City after the closing date and time.
Uploading large documents may take significant time, depending on the size of the file(s) and your internet connection speed. Minimum system requirements: Internet Explorer 11, Microsoft Edge, Google Chrome, or Mozilla Firefox. Javascript must be enabled. Browser cookies must be enabled.
Need Help?
Please contact Equity Hub at help@equityhub.us or (267) 225-1407 for technical questions related to your submission. The Vendor Guide for Bid Locker can be found at Vendor Guide for Bid Locker.
BID SECURITY: Bid security in the amount of 10 percent of the bid must accompany each bid in accordance with the Instructions to Bidders.
AWARD: The City of Salem (“City”) reserves the right to reject any or all bids, to waive informalities, and to postpone the award of the contract for thirty (30) days.
HUMAN RIGHTS: It is the express policy of the City that no person shall be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity on the grounds of race, religion, color, national origin, sex, marital status, familial status or domestic partnership, age, mental or physical disability, sexual orientation, gender identity, or source of income as provided by Salem Revised Code Chapter 97, Title VI of the Civil Rights Act of 1964 and other federal nondiscrimination laws. The City’s complete Title VI Plan may be viewed at (http://www.cityofsalem.net). Contracts for work under this bid will obligate the Contractor to comply with all applicable requirements of federal, state, and local civil rights and rehabilitation statutes, rules and regulations.
00100-2 Invitation to Bid
SOLICITATION FOR SUBCONTRACTS, INCLUDING PROCUREMENTS OF MATERIALS AND
EQUIPMENT: In all solicitations either by competitive bidding or negotiation made by the Contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the Contractor of the Contractors obligations under a contract awarded pursuant to this bid, Salem Revised Code Chapter 97, Title VI of the Civil Rights Act of 1964, and other federal nondiscrimination laws.
The City will provide ADA accommodations upon reasonable request to the Contracts and Procurement Manager.
The City is an Equal Employment Opportunity Employer.
CONTRACTOR DISCLOSURE: Prior to award, Contractor will be required to provide answers to the five questions stipulated in Salem Revised Code (SRC) 2.380(b).
PREVAILING WAGE RATES: Bids exceeding $50,000 are subject to ORS 279C.800 through 279C.870. Prevailing Wage Rates and necessary forms are available at http://www.oregon.gov/boli/WHD/PWR/Pages/Index.aspx. BOLI Prevailing Wage Rates for Public Works Contracts in Oregon dated July 5, 2025, including all amendments issued prior to September 9, 2025.
The Work will take place in Marion County, Region 2.
TECHNICAL QUESTIONS: Inquiries concerning the contents of the bid specifications should be directed to Chris Khudaverdyan, Engineering Associate, via email CKhudaverdyan@cityofsalem.net.
Shawna Self, CPPB Contracts and Procurement Manager
BID/CONTRACT NUMBER: 256059
BID CLOSING/OPENING: Tuesday, September 9, 2025, at 2:30 pm (Local Time)
00200-1 Instructions to Bidders
INSTRUCTIONS TO BIDDERS
ARTICLE 1―DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have
the meanings indicated in the General Conditions.
Additional terms used in these Instructions to Bidders have the meanings indicated below which are applicable to both the singular and plural thereof.
A. Bidder―The individual or entity who submits a Bid directly to OWNER.
B. Invitation to Bid―The public notice inviting bids for Work to be performed.
C. Contracts and Procurement Manager―The
OWNER’s Contracts and Procurement Manager. The individual and the office of the Contracts and Procurement Manager as indicated in the Invitation to Bid.
D. Successful Bidder―The lowest responsible
Bidder submitting a responsive Bid to whom OWNER (on the basis of OWNER’s evaluation as hereinafter provided) makes an award.
ARTICLE 2―COPIES OF BIDDING DOCUMENTS
2.01 The Bid, including all Addenda and attachments, are published on OregonBuys at https://oregonbuys.gov/.
All Addenda for this bid will be advertised on OregonBuys. Prospective bidder is solely responsible for checking OregonBuys to determine whether or not any Addenda have been issued.
2.02 Complete sets of Bidding Documents shall be
used in preparing Bids; OWNER assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 OWNER, in making copies of Bidding
Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
ARTICLE 3―QUALIFICATIONS OF BIDDERS
3.01 No Bid will be received or considered unless the
Bidder is licensed by the Oregon Construction Contractors Board or the Oregon State Landscape Contractors Board.
ARTICLE 4―EXAMINATION OF BIDDING
DOCUMENTS, OTHER RELATED DATA, AND
SITE
4.01 Subsurface and Physical Conditions
A. If applicable, the Supplementary Conditions identify:
1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that OWNER has used in preparing the Bidding Documents.
2. Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) that OWNER has used in preparing the Bidding Documents.
B. Copies of reports and drawings referenced in Paragraph 4.01.A, if any, will be made available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02 of the General Conditions, if any, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions or information contained in such reports or shown or indicated in such drawings.
4.02 Underground Facilities
A. Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site is based upon information and data furnished to OWNER by owners of such Underground Facilities, including OWNER, or others.
4.03 Hazardous Environmental Condition
A. The Supplementary Conditions identify those reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that ENGINEER has used in preparing the Bidding Documents.
B. Copies of reports and drawings referenced in Paragraph 4.03.A, if any, will be made available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.06 of the General Conditions has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
00200-2 Instructions to Bidders
4.04 Provisions concerning responsibilities for the
adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in Paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in Paragraph 4.06 of the General Conditions.
4.05 When requested, by Bidder more than ten days
prior to the date for closing of bids, OWNER may provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. Bidder shall comply with all applicable Laws and Regulations relative to excavation and utility locates.
4.06 Reference is made to Supplementary Conditions
for the identification of the general nature of other work, if any, that is to be performed at the Site by OWNER or others (such as utilities and other prime contractors) that relates to the Work for which a Bid is to be submitted. On request, OWNER will provide to each Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such other work.
4.07 It is the responsibility of each Bidder before
submitting a Bid to complete the following, or assume responsibility for having done so:
A. examine and carefully study the Bidding Documents, the other related data identified in the Bidding Documents, and any Addenda;
B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy Bidder as to all Federal, State, and local Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in Paragraph 4.02 of the General Conditions, and (2) reports and drawings of Hazardous Environmental Conditions, if any, at the Site which have been identified in the Supplementary Conditions as provided in Paragraph 4.06 of the General Conditions;
E. obtain and carefully study (or accept consequences of not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto;
F. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. correlate the information known to Bidder, information and observations obtained from Bidder’s visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data, if any, with the Bidding Documents;
I. promptly, pursuant to Article 7 of this section, give ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by ENGINEER is acceptable to Bidder;
and
J. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.
4.08 The submission of a Bid will constitute an
incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing
00200-3 Instructions to Bidders and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5―PRE-BID CONFERENCE
5.01 No Pre-bid Conference
5.02 A Bid submitted by a Bidder not in attendance at a
mandatory pre-Bid Conference shall be considered nonresponsive.
5.03 The Bidder must, at a minimum, be represented by a
qualified individual having experience on similar projects. A Bidder not meeting this requirement shall be considered not in attendance at the mandatory pre-Bid conference. ENGINEER will transmit to all prospective Bidders of record such Addenda as ENGINEER considers necessary in response to questions arising at the conference. Oral statements made by representatives of OWNER may not be relied upon and will not be binding or legally effective, unless confirmed by written Addenda.
ARTICLE 6―SITE AND OTHER AREAS
6.01 The Site is identified in the Bidding Documents.
Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by CONTRACTOR.
6.02 If, at the time of bidding, any restrictions exist to
the CONTRACTOR’s access or use of the Site, they are presented in the Bidding Documents.
ARTICLE 7―INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the
Bidding Documents are to be submitted to ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda and posted on OregonBuys.
Prospective bidders are solely responsible for checking OregonBuys to determine whether or not any Addenda have been issued. Questions received after the time stated in the Invitation to Bid will not be answered. Only answers in the Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, or
change the Bidding Documents as deemed advisable by Contracts and Procurement Manager.
7.03 Requests for changes to the Contract Documents
must be delivered in writing to the Contracts and Procurement Manager at contracts@cityofsalem.net not less than ten days prior to date indicated in the Invitation to Bid for the receipt of Bids. The written request for change must include a statement of the requested change or changes and the reason for the change. The written request for change must be marked “Contract Provision Request for Change” and include the Bidding Document number or other identification as specified in the Bidding Documents.
ARTICLE 8―BID SECURITY
8.01 A Bid must be accompanied by Bid security made
payable to OWNER in an amount of 10 percent of Bidder’s maximum Bid price. The security shall be in the form of a surety bond, irrevocable letter of credit issued by an institution as defined in ORS 706.008, cashier’s check, or certified check of the Bidder. If a surety bond is used, it shall be submitted on the form included in Section 00431-1 Bid Bond Form and issued by a surety meeting the requirements of paragraphs 5.01 and 5.02 of the General Conditions. Note: Due to bids being received electronic, copies of all required bonds will be accepted with electronic bid submittal, but original bonds from the apparent low bidder must be submitted by mail within 5 days of the bid opening to: Attn: Contracts & Procurement Division, PO Box 14300, Salem, OR 97309- 3986.
8.02 The Bid security of the apparent Successful
Bidder will be retained until such Bidder has executed the Agreement, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within 15 days after the Notice of Award, OWNER may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders whom OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER when the Agreement has been executed and required bonds and insurance provided, or Bids have been rejected, whereupon Bid security furnished by such Bidders will be returned.
8.03 Bid security of other Bidders whom OWNER
believes do not have a reasonable chance of receiving the
00200-4 Instructions to Bidders award will be returned within seven days after the Bid opening if the return does not prejudice the OWNER and the security of at least three bidders with the lowest bid is retained pending execution of the Agreement.
ARTICLE 9―CONTRACT TIMES
9.01 The number of days within which, or the dates by
which, Milestones, if any, are to be achieved and the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
ARTICLE 10―LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, are set
forth in the Agreement.
ARTICLE 11―SUBSTITUTE AND “APPROVED
EQUAL” ITEMS
11.01 The Contract, if awarded, will be on the basis of
materials and equipment specified or described in the Bidding Documents, or those substitute or “approved equal” materials and equipment approved by ENGINEER and identified by Addendum. The materials and equipment described in the Bidding Documents establish a standard of required type, function, durability, strength, appearance, and quality to be met by any proposed substitute or “Approved Equal” item. No item of material or equipment will be considered by ENGINEER as a substitute or “Approved Equal” unless written request for approval has been submitted by Bidder and has been received by ENGINEER at least 15 days prior to the date for receipt of Bids. Each such request shall conform to the requirements of Paragraph 6.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. ENGINEER’s decision of approval or disapproval of a proposed item will be final.
If ENGINEER approves any proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.
ARTICLE 12―SUBCONTRACTORS, SUPPLIERS,
AND OTHERS
12.01 When required by ORS 279C.370, Bidders shall
submit within two working hours after the date and time prescribed for bid closing, the First-Tier Subcontractor Disclosure Form, provided herein in Section 00436. See “Instruction for First-Tier Subcontractor Disclosure,” Section 00436, for additional information and instructions. The disclosure of subcontracts on the Bid Form is insufficient to comply with ORS 279C.370.
12.02 Not Used.
12.03 Not Used.
ARTICLE 13―PREPARATION OF BID
13.01 The Bid Form, Section 00410, is included with the
Bidding Documents and Bidder’s Bid must be submitted on this form.
13.02 All blanks on the Bid Form shall be completed by
printing in ink or by typewriter and the Bid signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each unit price item listed therein, or the words “No Bid”, “No Change”, or “Not Applicable” entered.
13.03 A Bid by a corporation shall be executed in the
corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to bind the corporation. The corporate address and state of incorporation shall be provided on the Bid Form.
13.04 A Bid by a partnership shall be executed in the
partnership name and signed by at least one partner (whose title must appear under the signature), accompanied by evidence of authority to bind the partnership. The official address of the partnership shall be provided on the Bid Form.
13.05 A Bid by a limited liability company shall be
executed in the name of the limited liability company by a member and accompanied by evidence of authority to bind the limited liability company. The state of formation of the firm and the official address of the limited liability company shall be provided on the Bid Form.
13.06 A Bid by an individual shall show the Bidder’s
name and official address.
13.07 A Bid by a joint venture shall be executed by each
joint venturer in the manner indicated on the Bid Form.
The official address of the joint venture shall be shown below the signature.
13.08 All names shall be typed or printed in ink below
the signatures.
13.09 The Bid shall contain an acknowledgement of
receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.10 The address and telephone number for
communications regarding the Bid shall be shown.
13.11 The Bid shall contain evidence of Bidder’s
business registration with the State of Oregon. Bidder’s State of Oregon contractor license number or landscape contractor license shall also be shown on the Bid Form.
00200-5 Instructions to Bidders
13.12 The Bid shall be executed by an individual with
the authority to legally obligate the Bidder in contractual matters.
13.13 Upon request of OWNER, BIDDER shall submit
proof of signature authority.
ARTICLE 14―BASIS OF BID; COMPARISON OF
BIDS
14.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid schedule.
B. The total of all Bid prices will be determined as the sum of the products of the estimated quantity of each item and the corresponding unit price bid for the item. The final quantities and Contract Price will be determined in accordance with Paragraph 11.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated total sum of any column of figures and the correct total sum thereof will be resolved in favor of the arithmetically correct total sum. Discrepancies between words and figures will be resolved in favor of the words.
D. This contract shall be awarded on the basis of total bid. The owner reserves the right to reject all bids, or to secure additional funds necessary to award the contract.
14.02 The Bid price shall include such amounts as the
Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in Paragraph 11.02 of the General Conditions.
14.03 Not Used.
ARTICLE 15―SUBMITTAL OF BID
15.01 With each copy of the Bidding Documents, a
Bidder is furnished the Bid Form, Section 00410, and, if required, the Bid Bond Form, Section 00431. The Bid Form is to be completed and submitted with the Bid security and the following data:
A. First-tier Subcontractor/Supplier Disclosure Form, Section 00436. NOTE: Please refer to Article 12, Section 12.01 for submittal requirements.
B. Contractor Disclosure Form, shall be submitted in accordance with Section 00435.
15.02 A Bid shall be submitted no later than the date and
time prescribed in the Invitation to Bid and shall be accompanied by the Bid security and other required documents requested in Paragraph 15.01. Bidders are responsible for ensuring receipt of Bids at the required location by the required time regardless of the method used to submit the Bid.
ARTICLE 16―MODIFICATION AND WITHDRAWAL
OF BID
16.01 A Bid may be modified or withdrawn by a
document executed in the manner that a Bid must be executed, delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids and marked “Bid Withdrawn” or “Bid Modification” with the Bidding Document number or other identification as specified in the Bidding Documents.
16.02 If prior to award of Contract, any Bidder files a
duly signed written notice with OWNER and promptly thereafter demonstrates to the reasonable satisfaction of OWNER that there was a material and substantial mistake in the preparation of its Bid, other than an error in judgment, OWNER may allow Bidder to withdraw its Bid, and its Bid security may be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
ARTICLE 17―OPENING OF BIDS
17.01 Bids will be opened at the time and place
indicated in the Invitation to Bid, or subsequent Addenda, and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the Base Bids and Alternate Bids, if any, will be made available after the opening of Bids.
ARTICLE 18―BIDS TO REMAIN SUBJECT TO
ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the
period of time stated in the Bid Form, Section 00410, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period consistent with OWNER’s public contracting rules.
ARTICLE 19―EVALUATION OF BIDS AND
AWARD OF CONTRACT
19.01 OWNER reserves the right to reject any or all
Bids, including without limitation, nonconforming, non-responsive, unbalanced, or conditional Bids. OWNER further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible. OWNER also reserves the right to waive all informalities not involving price, time, or changes in the Work.
00200-6 Instructions to Bidders
19.02 More than one Bid for the same Work from an
individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.
19.03 In evaluating Bids, OWNER will consider
whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or may be requested prior to the Notice of Award.
19.04 Not Used.
19.05 OWNER may conduct such investigations as
OWNER deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, Bidder’s proposed Subcontractors, Suppliers, individuals, or entities to perform the Work in accordance with the Contract Documents.
19.06 If the Contract is to be awarded, OWNER will
award the Contract to the Successful Bidder, pursuant to Article 14 and in accordance with ORS 279C.375.
19.07 A Bid will not be considered responsive unless:
A. Identifies whether the Bidder is a resident bidder as defined in ORS 279A.120.
B. It contains a statement certifying the Bidder has not discriminated and will not discriminate against a disadvantaged business enterprise, a minority-owned business, a woman-owned business, a business that a service-disabled veteran owns, or an emerging small business enterprises in obtaining any required subcontracts, pursuant to ORS 279A.110. The Bidder understands that it may be disqualified from bidding on this public improvement project if the OWNER finds that the Bidder has violated subsection (1) of ORS 279A.110.
C. It contains a statement from the Bidder that the provisions of ORS 279C.840 are to be complied with.
D. The Bidder is registered with the Construction Contractor’s Board or licensed by the State Landscape Contractor’s Board as required by ORS 671.530.
The Bid Form provides a location to include the required information.
19.08 OWNER may reject any or all Bids or cancel the
procurement and neither the OWNER, nor its agents, are liable for any cost incurred prior to issuance of a Notice of Award. All prospective Bidders who respond to an OWNER Invitation to Bid do so solely at the Bidder’s cost and expense.
19.09 OWNER may reject a bid that does not comply
with prescribed public contracting procedures and requirements, including the requirement to demonstrate the Bidder’s responsibility under ORS 279C.375(3)(b), and that the OWNER may reject for good cause all bids after finding that doing so is in the public interest.
19.10 If selected for award and as applicable, Bidder
shall submit to the City a true and correct copy of an unexpired Pay Equity Compliance Certificate issued by the Oregon Department of Administrative Services (under ORS 279A.167). The Bidder upon completion of the curriculum and assessment understands the prohibitions set forth in ORS 652.220 and in other laws or rules that prohibit discrimination in compensation or wage payment. The certificate is only required if the Bidder employs 50 or more full time workers and submitted a Bid for a procurement with an estimated contract price that exceeds $500,000.
ARTICLE 20―CONTRACT SECURITY AND
INSURANCE
20.01 Article 5 of the General Conditions set forth
OWNER’s requirements as to Performance and Payment Bonds and insurance. When the Successful Bidder delivers the executed Agreement to OWNER, it shall be accompanied by such Bonds and evidence of insurance.
20.02 Not Used.
ARTICLE 21―SIGNING OF AGREEMENT
21.01 When OWNER gives a Notice of Award to the
Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within ten (10) days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER.
ARTICLE 22―SALES AND USE TAXES
22.01 Not Used.
ARTICLE 23―RETAINAGE
23.01 Provisions concerning retainage and the
CONTRACTOR’s rights to deposit securities in lieu of retainage are set forth in the Agreement.
ARTICLE 24―CONTRACTS TO BE ASSIGNED
24.01 Information pertaining to the assignment of
contracts is contained in the Agreement, Article 10.
24.02 Not Used.
00200-7 Instructions to Bidders
ARTICLE 25―PARTNERING
25.01 – 25.05 Not Used.
ARTICLE 26―PROTEST PROCEDURES
26.01 After bids are opened and the determination is
made by OWNER to award a contract, a Notice of Intent to Award will be posted on OregonBuys and mailed to the apparent low responsive and responsible bidder. Any protests of the intent to award this Contract must be filed with the OWNER’s City Manager email:
contracts@cityofsalem.net in writing within seven days after OWNER issues a Notice of Intent to Award, but shall not be considered if filed with any other person or office, and shall not be considered if received by the appropriate official after this time.
26.02 The administrative review of protests is limited to
disputes concerning the OWNER’s contractor selection or contract award decision. This process does not provide an administrative review process for any issues or concerns which could have been raised prior to the close of the solicitation.
26.03 In order to protest the Notice of Intent to Award
of the contract, a protestor must claim and prove the following:
A. The protestor must be adversely affected by being eligible to be awarded the contract in the event the protest is successful; and
B. All lower bids or higher ranked proposals were nonresponsive; the OWNER failed to conduct the evaluation of proposals as described in the solicitation documents; the OWNER abused its discretion in rejecting the protestor’s bid or proposal as nonresponsive; or the OWNER’s evaluation or subsequent determination of award violated ORS Chapter 279A or 279C.
26.04 The written protest must include a $500.00 fee, as
established in a schedule adopted by the City Manager to cover the costs of processing the protest. A full description of the OWNER’s protest policy may be obtained by contacting the Office of OWNER’s Contracts and Procurement Manager, Attn: Contracts and Procurement Division, PO Box 14300, Salem, OR 97309- 3986. email: contracts@cityofsalem.net.
― END OF SECTION ―
00410-1 Bid Form and Bid Supplements
BID FORM AND BID SUPPLEMENTS
ARTICLE 1―BID RECIPIENT
1.01 This Bid is submitted to:
The Contracts and Procurement Manager of the City of Salem will receive bids electronically thru Equity Hub’s Bid Locker until but not after 2:30 p.m., (Local Time) Tuesday, September 9, 2025, at which time said bids will be publicly opened and read via zoom, for the project specified herein.
1.02 The undersigned Bidder proposes and agrees, if
this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2―BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of
the Section 00100―Invitation to Bid and Section 00200―Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 30 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of OWNER.
ARTICLE 3―BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged.
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions, and (2) reports and drawings of Hazardous Environmental Conditions that have been identified in the Supplementary Conditions.
E. Bidder has obtained and carefully studied (or accepts the consequences for not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto.
F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.
I. Bidder has given OWNER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by OWNER is acceptable to Bidder.
J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
K. By submitting this Bid, Bidder certifies that it has not discriminated and will not discriminate against a disadvantaged business enterprise, a minority-owned business, a woman-owned business, a business that a
00410-2 Bid Form and Bid Supplements service-disabled veteran owns, or an emerging small business enterprise in obtaining any required subcontracts, pursuant to ORS 279A.110. The Bidder understands that it may be disqualified from bidding on this public improvement project if the OWNER finds that the Bidder has violated subsection (1) of ORS 279A.110.
L. Not Used.
M. Bidder is registered with Construction Contractor’s Board or licensed by the State Landscape Contractor’s Board as required by ORS 671.530.
By submitting this Bid, Bidder certifies that all subcontractors performing construction work described in ORS 701.005(2) will be registered with the Oregon Construction Contractors Board or licensed by the State Landscape Contractors Board in accordance with ORS
701.035 to 701.055 before the subcontractors commence work under the Contract.
N. By submitting this Bid, Bidder agrees to be bound by and will comply with the provisions of ORS 279C.840 shall be included in the contract and every contractor or subcontractor is required to post the applicable Prevailing Wage Rates (PWR) in a conspicuous and accessible place in or about the work-site for the duration of the job. Contractors and Subcontractors who intentionally fail to post the PWR can be made ineligible to receive any public works contract for up to three years.
ARTICLE 4―FURTHER REPRESENTATIONS
4.01 Bidder further represents that:
A. this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over
OWNER.
E. Bidder: ____ is a resident bidder as defined in ORS 279A.120.
____ is not a resident bidder as defined in ORS 279A.120.
NOTE: Bidder is to select the applicable classification.
No. Item Quantity Unit of Measure
Unit Price or
Lump Sum Price
Figures
Total Amount
Quantity x Unit Price
General
1 Mobilization All Req'd Lump Sum $ $
2 Traffic Safety and Control a General Traffic Control All Req'd Lump Sum $ $ b PCMS Boards 2 Each $ $ c Liberty Traffic Control Phase 1 All Req'd Lump Sum $ $ d Liberty Traffic Control Phase 2 All Req'd Lump Sum $ $ e Liberty Traffic Control Phase 3 All Req'd Lump Sum $ $
3 Erosion Control Measures a Erosion Control and Sediment Prevention All Req'd Lump Sum $ $ b Silt Sacks 20 Each $ $ c Biofilter Bags 75 Each $ $
ARTICLE 5 - BASIS OF BID
5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
Unit Prices have been computed in accordance with Paragraph 11.03.B of the General Conditions.
Bidder Acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all
Unit Price Bid Items will be based on actual quantities, determined as provided in the Contract Documents.
Bid No. 256059 / Project No. 723000 00410-3 Bid Form and Bid Supplements
Lump Sum Price
Figures
Total Amount
Quantity x Unit Price d Curb Inlet Sediment Dam 2 Each $ $ e Tree Protection Fence 30 Lin. Ft. $ $
Waterline
4 Project Notification Signs 2 Each $ $
5 Foundation Stabilization (Stipulated Price) 770 Cu. Yd. 80.00$ 61,600.00$
6 12-inch Ductile Iron Pipe - Class 52, Trench
Excavation, and Crushed Rock Backfill with
Restrained Joints 697 Lin. Ft. $ $
7 8-inch Ductile Iron Pipe - Class 52, Trench
Excavation, and Crushed Rock Backfill with
Restrained Joints 2858 Lin. Ft. $ $
8 4-inch Ductile Iron Pipe - Class 52, Trench
Excavation, and Crushed Rock Backfill with
Restrained Joints 127 Lin. Ft. $ $
9 Water Service (Main to Meter) a 1-inch Water Service - Short (15 Lin. Ft. or
Shorter) 11 Each $ $ b 1-inch Water Service - Long (Longer than 15 Lin.
Ft.)
43 Each $ $ c 2-inch Water Service - Short (15 Lin. Ft. or
Shorter) 1 Each $ $ d 2-inch Water Service - Long (Longer than 15 Lin.
Ft.)
1 Each $ $
Bid No. 256059 / Project No. 723000 00410-4 Bid Form and Bid Supplements
Lump Sum Price
Figures
Total Amount
Quantity x Unit Price e 647 Ewald Ave S - 1-inch Water Service All Req'd Lump Sum $ $ f 752 Ewald Ave S - 1-inch Water Service All Req'd Lump Sum $ $ g 3820 Tulare Ave S - 1-inch Water Service All Req'd Lump Sum $ $ h 3875 Tulare Ave S - 1-inch Water Service All Req'd Lump Sum $ $ i 3895 Tulare Ave S - 1-inch Water Service All Req'd Lump Sum $ $ j 753 Kotzy Ave S - 1-inch Water Service All Req'd Lump Sum $ $ k 755 Charles Ave S Ave S - 1-inch Water Service All Req'd Lump Sum $ $ l 686 Charles Ave S Ave S - 1-inch Water Service All Req'd Lump Sum $ $ m 676 Charles Ave S Ave S - 1-inch Water Service All Req'd Lump Sum $ $ n Water Service Reconnection - 3820 Tulare Ave S All Req'd Lump Sum $ $ o Water Service Reconnection - 3892 Tulare Ave S All Req'd Lump Sum $ $ p Water Service Reconnection - 771 Ewald Ave S All Req'd Lump Sum $ $ q Water Service Reconnection - 751 Ewald Ave S All Req'd Lump Sum $ $ r Water Service Reconnection - 676 Charles Ave S All Req'd Lump Sum $ $ s Water Service Reconnection, Typical 60 Each $ $
Bid No. 256059 / Project No. 723000 00410-5 Bid Form and Bid Supplements
Lump Sum Price
Figures
Total Amount
Quantity x Unit Price
10 Fire Hydrant Assembly (From Mainline Tee) 8 Each $ $
11 Resilient Seated Gate Valves a 12-inch (FLxMJ) Resilient Seated Gate Valves 5 Each $ $ b 8-inch (FLxMJ) Resilient Seated Gate Valves 9 Each $ $ c 6-inch (FLxMJ) Resilient Seated Gate Valves 1 Each $ $ d 4-inch (FLxMJ) Resilient Seated Gate Valves 1 Each $ $
12 Ductile Iron Fittings a 12-inch Flange Adapter (FLxMJ) 4 Each $ $ b 8-inch Flange Adapter (FLxMJ) 4 Each $ $ c 12-inch Plug (FL) 2 Each $ $ d 6-inch Plug (FL) 1 Each $ $ e 4-inch Plug (FL) 1 Each $ $ f 12-inch 11.25° Bend (FLxMJ) 2 Each $ $ g 12-inch 45° Bend (ALL MJ) 2 Each $ $ h 8-inch 11.25° Bend (ALL MJ) 6 Each $ $
Bid No. 256059 / Project No. 723000 00410-6 Bid Form and Bid Supplements
Lump Sum Price
Figures
Total Amount
Quantity x Unit Price i 8-inch 22.5° Bend (ALL MJ) 1 Each $ $ j 8-inch 45° Bend (ALL MJ) 2 Each $ $ k 12-inch x 12-inch Tee (ALL FL) 2 Each $ $ l 12-inch x 8-inch Cross (ALL FL) 1 Each $ $ m 12-inch x 8-inch Tee (ALL FL) 1 Each $ $ n 12-inch x 6-inch Tee (ALL FL) 1 Each $ $ o 12-inch x 6-inch Tee (MJxFL) 1 Each $ $ p 12-inch x 4-inch Tee (All FL) 1 Each $ $ q 8-inch x 8-inch Tee (ALL FL) 3 Each $ $ r 8-inch x 6-inch Tee (MJxFL) 6 Each $ $ s 8-inch x 6-inch Tee (ALL FL) 1 Each $ $ t 12-inch x 8-inch Reducer (FLxMJ) 1 Each $ $ u 8-inch x 4-inch Reducer (FLxMJ) 1 Each $ $
13 1-inch Chlorination Tap 3 Each $ $
14 Blow Off Assemblies
Bid No. 256059 / Project No. 723000 00410-7 Bid Form and Bid Supplements
Lump Sum Price
Figures
Total Amount
Quantity x Unit Price a Blow Off Assembly per Std. 407 (2-inch) 3 Each $ $ b Blow Off Assembly per Std. 406 (6-inch) 2 Each $ $
15 Replace 18-foot section of Sanitary Sewer Main with Pressure Pipe 10 Each $ $
16…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .