TGI_38K5249307T02_c0v0.pdf
PDF 97 KB Posted
- Solicitation number
- N6264925RA035
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS RALPH JOHNSON (DDG-114), specifically for a Potable Water System Tightness and Operational Test. The instruction, dated 14-FEB-2025, is associated with project K52 and system 53311, with a Task Group Instruction number of 53311-3-300KTR. The document details quality assurance (QA) and self/force (S/F) work tasks involving accomplishing and documenting a tightness and operational test for the potable water system, referencing technical procedure TP 53311-3-300KTR. The instruction includes preparation details by Konno Atsushi and approval by Sophabmixay John, with a job summary ID of 493G1507, indicating a focused maintenance and testing procedure for the naval vessel's water system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264925RA035-0003.pdf | ||
| 2.03 N6264925RA035-0002.pdf | ||
| 2.03 N6264925RA035-0001.pdf | ||
| Attachment II Price Proposal Form N6264925RA035 (R1).xlsx | XLSX spreadsheet | |
| TGI_38K5249307T01_c0v0.pdf | ||
| Attachment II Price Proposal Form N6264925RA035.xlsx | XLSX spreadsheet | |
| Attachment V Contract Data Sheet.pdf | ||
| TGI_38K5244113A01_c0v1.pdf | ||
| Attachment IV Request for Information Form.docx | DOCX document | |
| 2.01 N6264925RA035.pdf | ||
| Attachment III Government Furnished Property (GFP-GFM listings).xlsx | XLSX spreadsheet | |
| TGI_38K5249307A01_c1v1.pdf | ||
| TGI_38K5244115A01_c0v1.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
14-FEB-2025 1104
20.14.15.2.9020 (September 2024) ICN: 38K5249307 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53311-3-300KTR TT T 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52 53311
CU PHASE TITLE: POTABLE WATER SYS (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EXSAZBM2
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
KONNO, ATSUSHI 246.2 3152434410 07-FEB-2025
APPROVED BY: CODE: PHONE: DATE:
SOPHABMIXAY, JOHN 246.2 3152432291 14-FEB-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EXSA-ZBM2
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
493G1507
Tightness & Operational Test for Potable Water System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
14-FEB-2025 1104
20.14.15.2.9020 (September 2024) (Continued) ICN: 38K5249307 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53311-3-300KTR TT T 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-114 USS RALPH JOHNSON K52 53311
CU PHASE TITLE: POTABLE WATER SYS (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 53311-3-300KTR POTABLE WATER SYS (T &
OP) - KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 53311-3-300KTR.
33/G1 QA 1 8 N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 53311-3-300KTR.
/ EXSA 1 0 N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38K5249307 KEY OP: T02
File details come from the government source that posted it. Updated .