TGI_38K5249307T01_c0v0.pdf

PDF 97 KB Posted

Attached to
USS RALPH JOHNSON (DDG-114) FY25 5C1 CNO (YOKOSUKA, JAPAN)
Solicitation number
N6264925RA035
Issued by

About this file

This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Ralph Johnson (DDG-114), dated 14-Feb-2025, with the specific focus on the Chill Water System Tightness & Operational Test. The TGI provides detailed instructions for a Quality Assurance (QA) work task involving a tightness and operational test of the chill water system, referencing technical procedure TP 51411-3-300KTR. The task is associated with job summary ID 493G1507 and involves testing and operational verification for the ship's cooling system.

The document includes administrative details such as preparation by Teranishi Shigeru and approval by Sophabmixay John, with a component number of 51411-3-300KTR. The task is assigned to zone manager Yaginuma Takehide and involves 8 man-hours for the QA work. The instruction is marked FOUO (For Official Use Only) and is part of a naval maintenance and repair process for the USS Ralph Johnson, which aligns with the broader federal contract opportunity for ship maintenance at Commander, Fleet Activities Yokosuka in Japan.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

14-FEB-2025 1103

20.14.15.2.9020 (September 2024) ICN: 38K5249307 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51411-3-300KTR TT T 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-114 USS RALPH JOHNSON K52 51411

CU PHASE TITLE: CHILL WATER SYS (T & OP) - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 2

EXSAZBM2

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TERANISHI, SHIGERU 246.2 3152433424 07-FEB-2025

APPROVED BY: CODE: PHONE: DATE:

SOPHABMIXAY, JOHN 246.2 3152432291 14-FEB-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EXSA-ZBM2

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

493G1507

Tightness & Operational Test for Chill Water System - KTR.

TGI Short Form

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

14-FEB-2025 1103

20.14.15.2.9020 (September 2024) (Continued) ICN: 38K5249307 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51411-3-300KTR TT T 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-114 USS RALPH JOHNSON K52 51411

CU PHASE TITLE: CHILL WATER SYS (T & OP) - KTR

FOUO Pg 2 of 2

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TP 51411-3-300KTR CHILL WATER SYS (T & OP) -

KTR

LAT Y

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

(G) QA work:

Accomplish/document the tightness & operational test in accordance with reference, TP 51411-3-300KTR.

33/G1 QA 1 8 N

(S) S/F work:

Accomplish/document the tightness & operational test in accordance with reference, TP 51411-3-300KTR.

/ EXSA 1 0 N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K5249307 KEY OP: T01