Attachment II Price Proposal Form N6264925RA035 (R1).xlsx
XLSX spreadsheet 74 KB Posted
- Solicitation number
- N6264925RA035
About this file
This file is a Price Proposal Form for Navy contract N6264925RA035 related to maintenance and repair work for the USS RALPH JOHNSON (DDG-114) at Commander, Fleet Activities Yokosuka Naval Base in Japan. The solicitation covers five Technical Growth Items (TGIs) involving structural, sheet metal, rigging, and system modification work, including upgrades to a High Frequency Terminal, Navy Multiband Terminal Modem, and Enterprise Remote Monitor System, along with tightness and operational tests for chill water and potable water systems.
The contract period of performance is from 14 July 2025 through 26 November 2025, with proposals due by 18 April 2025 at 10:00 AM Japan Standard Time. Interested offerors must be authorized to operate in Japan and must request access to the detailed work specification package through DoD SAFE by 11 April 2025 by emailing specified Navy point of contact representatives. The solicitation is issued by the Department of the Navy Naval Supply Systems Command and is specifically targeted at sources authorized to do business in Japan.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264925RA035-0003.pdf | ||
| 2.03 N6264925RA035-0002.pdf | ||
| 2.03 N6264925RA035-0001.pdf | ||
| TGI_38K5249307T01_c0v0.pdf | ||
| Attachment II Price Proposal Form N6264925RA035.xlsx | XLSX spreadsheet | |
| Attachment V Contract Data Sheet.pdf | ||
| TGI_38K5249307T02_c0v0.pdf | ||
| TGI_38K5244113A01_c0v1.pdf | ||
| Attachment IV Request for Information Form.docx | DOCX document | |
| 2.01 N6264925RA035.pdf | ||
| Attachment III Government Furnished Property (GFP-GFM listings).xlsx | XLSX spreadsheet | |
| TGI_38K5249307A01_c1v1.pdf | ||
| TGI_38K5244115A01_c0v1.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| OFFEROR/COMPANY NAME: | ||||||||
| CLIN | Total Labor (MH) | Labor Cost | Material Cost | ODC Cost | Proposed Price | |||
| TAB | SUMMARY | SUMMARY | CLIN 0001 (38K5244113A01) | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| SOLICITATION NO: | N6264925RA035 | CLIN 0002 (38K5244115A01) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| SHIP NAME: | USS RALPH JOHNSON (DDG-114) | CLIN 0003 (38K5249307A01, T01, T02) | 0 | ¥0 | ¥0 | ¥0 | ¥0 | |
| AVAILABILITY: | FY25 5C1 CNO | Total for All CLIN | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
Total TGIs (Specify Total) 5 Total Evaluated Price ¥0
| Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary. | |||||||||
| No. | TGI No. | DESCRIPTION | Proposed Labor | Material/ODCs | Proposed Price (JPY) | ||||
| In-House Labor (MH) | Sub-Contractor Labor (MH) | Total Labor (MH) | Overall Total Labor Cost (JPY) | Material Cost (JPY) | ODC (JPY) | ||||
| 1 | 38K5244113A01 | Accomplish Structural, Sheet Metal, False Deck, and Rigging Work for S/A 98418K High Frequency (HF) Terminal Modification (MOD) Upgrade | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 2 | 38K5244115A01 | Accomplish S/A 92881K, Structural, Sheet Metal, False Deck, and Rigging Work for Navy Multiband Terminal Modem Spiral One | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 3 | 38K5249307A01 | Accomplish S/A 88260K, Structural, Rigging, Preservation, Machine, and Piping Work for Enterprise Remote Monitor System on Ships Modification | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 4 | 38K5249307T01 | Tightness & Operational Test for Chill Water System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 5 | 38K5249307T02 | Tightness & Operational Test for Potable Water System - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 6 | |||||||||
| 7 | |||||||||
| 8 | |||||||||
| 9 | |||||||||
| 10 | |||||||||
| 11 | |||||||||
| 12 | |||||||||
| 13 | |||||||||
| 14 | |||||||||
| 15 | |||||||||
| 16 | |||||||||
| 17 | |||||||||
| 18 | |||||||||
| 19 | |||||||||
| 20 | |||||||||
| 21 | |||||||||
| 22 | |||||||||
| 23 | |||||||||
| 24 | |||||||||
| 25 | |||||||||
| 26 | |||||||||
| 27 | |||||||||
| 28 | |||||||||
| 29 | |||||||||
| 30 | |||||||||
| 31 | |||||||||
| 32 | |||||||||
| 33 | |||||||||
| 34 | |||||||||
| 35 | |||||||||
| 36 | |||||||||
| 37 | |||||||||
| 38 | |||||||||
| 39 | |||||||||
| 40 | |||||||||
| 41 | |||||||||
| 42 | |||||||||
| 43 | |||||||||
| 44 | |||||||||
| 45 | |||||||||
| 46 | |||||||||
| 47 | |||||||||
| 48 | |||||||||
| 49 | |||||||||
| 50 | |||||||||
| 51 | |||||||||
| 52 | |||||||||
| 53 | |||||||||
| 54 | |||||||||
| 55 | |||||||||
| 56 | |||||||||
| 57 | |||||||||
| 58 | |||||||||
| 59 | |||||||||
| 60 | |||||||||
| 61 | |||||||||
| 62 | |||||||||
| 63 | |||||||||
| 64 | |||||||||
| 65 | |||||||||
| 66 | |||||||||
| 67 | |||||||||
| 68 | |||||||||
| 69 | |||||||||
| 70 | |||||||||
| 71 | |||||||||
| 72 | |||||||||
| 73 | |||||||||
| 74 | |||||||||
| 75 | |||||||||
| 76 | |||||||||
| 77 | |||||||||
| 78 | |||||||||
| 79 | |||||||||
| 80 | |||||||||
| 81 | |||||||||
| 82 | |||||||||
| 83 | |||||||||
| 84 | |||||||||
| 85 | |||||||||
| 86 | |||||||||
| 87 | |||||||||
| 88 | |||||||||
| 89 | |||||||||
| 90 | |||||||||
| 91 | |||||||||
| 92 | |||||||||
| 93 | |||||||||
| 94 | |||||||||
| 95 | |||||||||
| 96 | |||||||||
| 97 | |||||||||
| 98 | |||||||||
| 99 | |||||||||
| 100 | |||||||||
| 101 | |||||||||
| 102 | |||||||||
| 103 | |||||||||
| 104 | |||||||||
| 105 | |||||||||
| 106 | |||||||||
| 107 | |||||||||
| 108 | |||||||||
| 109 | |||||||||
| 110 | |||||||||
| 111 | |||||||||
| 112 | |||||||||
| 113 | |||||||||
| 114 | |||||||||
| 115 | |||||||||
| 116 | |||||||||
| 117 | |||||||||
| 118 | |||||||||
| 119 | |||||||||
| 120 | |||||||||
| 121 | |||||||||
| 122 | |||||||||
| 123 | |||||||||
| 124 | |||||||||
| 125 | |||||||||
| 126 | |||||||||
| 127 | |||||||||
| 128 | |||||||||
| 129 | |||||||||
| 130 | |||||||||
| 131 | |||||||||
| 132 | |||||||||
| 133 | |||||||||
| 134 | |||||||||
| 135 | |||||||||
| 136 | |||||||||
| 137 | |||||||||
| 138 | |||||||||
| 139 | |||||||||
| 140 | |||||||||
| 141 | |||||||||
| 142 | |||||||||
| 143 | |||||||||
| 144 | |||||||||
| 145 | |||||||||
| 146 | |||||||||
| 147 | |||||||||
| 148 | |||||||||
| 149 | |||||||||
| 150 | |||||||||
| 151 | |||||||||
| 152 | |||||||||
| 153 | |||||||||
| 154 | |||||||||
| 155 | |||||||||
| 156 | |||||||||
| 157 | |||||||||
| 158 | |||||||||
| 159 | |||||||||
| 160 | |||||||||
| 161 | |||||||||
| 162 | |||||||||
| 163 | |||||||||
| 164 | |||||||||
| 165 | |||||||||
| 166 | |||||||||
| 167 | |||||||||
| 168 | |||||||||
| 169 | |||||||||
| 170 | |||||||||
| 171 | |||||||||
| 172 | |||||||||
| 173 | |||||||||
| 174 | |||||||||
| 175 | |||||||||
| 176 | |||||||||
| 177 | |||||||||
| 178 | |||||||||
| 179 | |||||||||
| 180 | |||||||||
| 181 | |||||||||
| 182 | |||||||||
| 183 | |||||||||
| 184 | |||||||||
| 185 | |||||||||
| 186 | |||||||||
| 187 | |||||||||
| 188 | |||||||||
| 189 | |||||||||
| 190 | |||||||||
| 191 | |||||||||
| 192 | |||||||||
| 193 | |||||||||
| 194 | |||||||||
| 195 | |||||||||
| 196 | |||||||||
| 197 | |||||||||
| 198 | |||||||||
| 199 | |||||||||
| 200 |
1_38K5244113A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 5C1 CNO | TGI 1_38K5244113A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA035 | ||||||||||
| SRF-JRMC TGI #: | 1_38K5244113A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Accomplish Structural, Sheet Metal, False Deck, and Rigging Work for S/A 98418K High Frequency (HF) Terminal Modification (MOD) Upgrade | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
HOURS
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
2_38K5244115A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 5C1 CNO | TGI 2_38K5244115A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA035 | ||||||||||
| SRF-JRMC TGI #: | 2_38K5244115A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Accomplish S/A 92881K, Structural, Sheet Metal, False Deck, and Rigging Work for Navy Multiband Terminal Modem Spiral One | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
3_38K5249307A01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 5C1 CNO | TGI 3_38K5249307A01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA035 | ||||||||||
| SRF-JRMC TGI #: | 3_38K5249307A01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Accomplish S/A 88260K, Structural, Rigging, Preservation, Machine, and Piping Work for Enterprise Remote Monitor System on Ships Modification | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
4_38K5249307T01
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 5C1 CNO | TGI 4_38K5249307T01 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA035 | ||||||||||
| SRF-JRMC TGI #: | 4_38K5249307T01 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness & Operational Test for Chill Water System - KTR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
5_38K5249307T02
| SHIP NAME/AVAILABILITY: | USS RALPH JOHNSON (DDG-114) - FY25 5C1 CNO | TGI 5_38K5249307T02 SUMMARY | |||||||||
| SOLICITATION #: | N6264925RA035 | ||||||||||
| SRF-JRMC TGI #: | 5_38K5249307T02 | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) | ||||
| DESCRIPTION: | Tightness & Operational Test for Potable Water System - KTR | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 | ||||
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | |||||||||||
| IN-HOUSE LABOR HOUR BREAKDOWN | |||||||||||
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL | |||||
| TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | ||||
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL |
| TOTAL M/Hs | 0 | TOTAL M/Hs | 0 | ||||
| COST PER M/H (¥) | <--- Please input in-house labor rate | COST PER M/H (¥) | <--- Please input sub-contractor labor rate | ||||
| LABOR COST (¥) | ¥0 | LABOR COST (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | |||||||
| MATERIAL COST BREAKDOWN | |||||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
| TOTAL (¥) | ¥0 | ||||
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | |||||
| OTHER DIRECT COST (ODC) (IF ANY) | |||||
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
File details come from the government source that posted it. Updated .