TG3 Submittal Register.xls

XLS spreadsheet 57 KB Posted

Attached to
Turbine 3 Generator Federal contract opportunity
Solicitation number
FA500421B0001
Issued by
Department of the Air Force Pacific Air Forces

About this file

This solicitation package seeks bids for the overhaul of a 5 MW turbine-generator set and auxiliary equipment at Eielson Air Force Base in Alaska. Work includes tear down, inspection, cleaning, repair of the turbine-generator and replacement of the electronic governor and machine monitoring system. Bids are due by April 6, 2021 with award anticipated between $1-5 million as a firm fixed price sealed bid contract. The site visit has already occurred and all questions were due by February 15, 2021. Bids must remain valid until August 5, 2021. The solicitation and drawings are available on SAM.gov and all contractors must register in SAM. The points of contact are listed for questions.

View the file

Other files for this federal contract opportunity

Other files attached to Turbine 3 Generator, newest first.
File Type Posted
Solicitation Amendment FA500421B00010001 SF 30 (1).pdf PDF
TG3 Bidder QA.docx DOCX document
FA500421B00010001- Conformed Copy.pdf PDF
TG3 Appendices.pdf PDF
Solicitation - FA500421B0001.pdf PDF
Wage Determination AK20210001.pdf PDF
TG3 Specs Complete.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Register

TITLE:MAINTAIN TURBINE-GENERATOR #3SUBMITTAL REGISTER
JOB NAME:FTQW 20-1001
LOCATION:Eielson AFB, Alaska
CONTRACT NO:
CONTRACTOR:
CONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITY
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
LineActivity #Trans-mittal #Specification SectionSD #Submittal DescriptionItem SubmittedParagraph #Classification: GOVT or A/E RevwrSubmitApproval Needed ByMaterial Needed ByAction CodeDate Of ActionDate FWD to APPR / Auth Date RCD From CONTRDate FWD To Other RevwrDate RCD From Other RevwrAction CodeDate Of ActionMailed To CONTR/ Date RCD From APPR AuthorityRemarks
101 11 0001Preconstruction SubmittalsAF Form 1031.3
201 11 0001Preconstruction SubmittalsAF Form 30641.4G
301 35 2601Preconstruction SubmittalsAccident Prevention Plan1.7Gif required
401 35 2601Preconstruction SubmittalsRequest for Use of Ionizing Radiation1.13.5if required
501 35 2601Preconstruction SubmittalsRequest for Use of Lasers1.13.6if required
601 35 2601Preconstruction SubmittalsRequest for Use of Radioactive Materials1.13if required
701 35 2601Preconstruction SubmittalsRequest for Use of Radio Frequency Radiation1.13.7if required
801 35 2601Preconstruction SubmittalsRequest for Use of Ultraviolet Radiation1.13.8if required
901 35 2606Test ReportsAccident Reports1.11.2Gif required
1001 35 2607CertificatesActivity Hazard Analysis1.7as required
1101 35 2607CertificatesHot Work Permit1.12
1201 45 00.1006Test ReportsConstruction Progress Photos3.4
1301 50 0006Test ReportsBackflow Preventer Tests1.3GIf applicable
1401 50 0007CertificatesBackflow Tester Certification1.3.1GIf applicable
1501 50 0007CertificatesBackflow Preventers Approval1.3GIf applicable
1601 57 1901Preconstruction SubmittalsEnvironmental Protection Plan1.6G
1701 57 1901Preconstruction SubmittalsHazmat Inventory (Initial)1.7G
1801 57 1901Preconstruction SubmittalsStormwater Pollution Prevention Plan1.19GIf applicable
1901 57 1901Preconstruction SubmittalsHazardous Waste Accumulation Log (initial)1.8.d.G
2001 57 1901Preconstruction SubmittalsContractor Employee EMS General Awareness Training Certificates.1.8.b.
2101 57 1901Preconstruction SubmittalsEielson Hazardous/Solid Waste Training Certicicates1.8.b.
2201 57 196Test ReportsSolid Waste Disposal Weight Tickets and Costs (monthly)1.5
2301 57 1906Test ReportsLab Test Results for Waste1.9Gas applicable
2401 57 1906Test ReportsHazmat Inventory (Quartery)1.9G
2501 57 1907Test ReportsHazardous Waste Accumulation Log (Initial & quarterly)1.8.d.G
2607CertificatesCompleted Spruce Lake Landfill Checklist1.5.d & Appx Bas applicable
2701 57 1911Closeout SubmittalsHazmat Inventory (Final)1.7.bG
2801 57 1911Closeout SubmittalsHaz Waste Log (Final)1.8.dG
01 57 1911Closeout SubmittalsSWPPP Compliancce Notebook1.19Gif applicable
2901 57 1911Closeout SubmittalsStormwater Notice of Termination1.19.h.if applicable
3001 78 0003Product DataSpare Parts Data1.5G
3101 78 0008Manufacturer’s InstructionsManufacturers' Warranties1.4G
3201 78 0011Closeout SubmittalsAs-Built Drawings3.1G
3301 78 0011Closeout SubmittalsRecord Drawings3.2G
3448 15 00.2001Preconstruction SubmittalsTech Rep Qualifications3.1G
3548 15 00.2001Preconstruction SubmittalsGovernor Tech Qualifications3.2G
3648 15 00.2001Preconstruction SubmittalsGenerator Test & Inspection Personnel Qualifications1.3G
3748 15 00.2001Preconstruction SubmittalsTest & Inspection Qualifications3.5.50G
3848 15 00.2002Shop DrawingsElectronic Governor wiring diagrams & shop drawings3.5.49.hG
3948 15 00.2002Shop DrawingsMachine Monitor System: Wiring diagrams & shop drawings3.5.49.iG
4048 15 00.2002Shop DrawingsProposed Deviations from the Specs.1.3Gif applicable
4148 15 00.2003Product DataElectronic Governor3.5.49.hG
4248 15 00.2003Product DataMachine Monitor Components3.5.49.iG
4348 15 00.2003Product DataOil Temperature Transmitter3.5.49.fG
4448 15 00.2006Test ReportsPre-Overhaul Vibration & clearances3.5.5 & 3.5.21G
4548 15 00.2006Test ReportsPost-Overhaul Vibration & clearances3.5.5 & 3.5.21G
4648 15 00.2006Test ReportsProximitor Target area runout3.7G
4748 15 00.2008Manufacturer's InstructionsStart-up Plan3.7G
4848 15 00.2009Manufacturer's Field ReportsLetters of Recommended Repair3.6G
4948 15 00.2010Operation & Maintenance DataElectronic Governor3.5.49.hG
5048 15 00.2010Operation & Maintenance DataMachine Monitoring System3.5.49.iG
5148 15 00.2010Operation & Maintenance DataOil Temperature Transmitter3.5.49.fG
5248 15 0.2011Closeout SubmittalsTech Rep's Inspection and Approval3.1G
5348 15 00.2011Closeout SubmittalsGovernor software, program & settings3.5.49.hG
5448 15 00.2011Closeout SubmittalsMachine Monitoring System: software, program & setttings3.5.49.iG
5548 15 00.2011Closeout SubmittalsUpdate Control Panl Wiring diagram3.5.49G
5648 15 00.2011Closeout SubmittalsPost-Overhaul Report3.9G
5748 15 00.2011Closeout SubmittalsCompleted Task Inspection List3.5.4G