TEST FOR OCTA - County of Orange Invitation for Bid
This is an Invitation for Bid (IFB #TESTOCTA) issued by the County of Orange, OC Public Works department for TEST FOR OCTA. The solicitation was released on October 1, 2026, with bids due by October 2, 2026, at 12:00 AM. The specific scope of work is referenced as "TEST OCTA" in Section 4 of the IFB document. The bid submission process is fully electronic through the County's online bidding system at https://procurement.opengov.com/portal/ocgov, and no alternative submission methods will be accepted. Bidders must carefully review all solicitation documents, including the model contract terms and conditions, before submitting their responses. The County reserves the right to make multiple awards, reject any or all bids, or withdraw the solicitation entirely at its discretion. Bids submitted in response to this IFB will be valid for 365 days following the closing date, and the County may defer award of the contract for up to 180 days after bid opening during which time bidders must guarantee their quoted prices.
Pricing must be submitted as firm, fixed prices with no cost escalations permitted without County approval, though all price decreases will automatically extend to the County. The County offers a five percent (5%) preference deduction for certified Orange County Local Small Business (OCLSB) and Disabled Veteran Business Enterprise (DVBE) bidders during evaluation, with an eight percent (8%) preference for businesses certified as both OCLSB and DVBE, provided the maximum allowable preference deduction does not exceed $100,000. DVBE preference is not applicable to public works or architecture-engineering construction projects. Bidders must obtain a valid D-U-N-S number and Unique Entity Identifier (UEI) number prior to contract award and must submit certificates of insurance, W-9 forms (or 587/590 forms for out-of-state suppliers), and execute a model contract within seven days of award notification. Award will be made to the lowest responsive, responsible bidder based on pricing and ability to meet all contract requirements and specifications.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_No._1_MA-080-23011241_Recon.pdf | ||
| Performance_Bond.pdf | ||
| Labor_and_Material_Payment_Bond.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
County of Orange, OC Public Works
Invitation for Bid for TEST FOR OCTA IFB # TESTOCTA
For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/ocgov
COUNTY OF ORANGE
OC Public Works
PROCUREMENT SERVICES
601 N. Ross St. 4th Floor
Santa Ana, CA
92701
Date: Thursday, October 1, 2026
INVITATION FOR BIDS
FOR: TEST FOR OCTA
BID MUST BE RECEIVED BEFORE:
October 2, 2026 / 12:00 am
IFB # TESTOCTA
Procurement Services Regular Office Hours:
8:00 AM to 5:00 PM
Monday through Friday
The office is closed between 12:00 PM and 1:00 PM
Table Of Contents
1. General Information
2. General Instructions
3. Protest Procedures
4. Scope of Work
5. OCLSB and DVBE Preference Policies Certification Requirements
6. Electronic Fund Transfer (EFT)
7. Pricing
8. Supplier Responses
Attachments:
A - Amendment No. 1 MA-080-23011241 Recon
County of Orange IFB
OC Public Works - TEST FOR OCTA, TESTOCTA Page 3 of 16
SECTION 1. General Information
1.1 BACKGROUND
Brief description of project.
1.2 IMPORTANT NOTICE
The County has attempted to provide all information available. It is the responsibility of each Bidder to review, evaluate, and, where necessary, request any clarification prior to submission of a bid. If any person contemplating submitting a bid in response to this IFB is in doubt as to the true meaning of any part of the solicitation documents attached hereto or finds discrepancies in or omissions from the specifications, they must submit a written request for clarification/interpretation to the County Deputy Procurement Agent
(DPA), Alan Araujo, via the County’s online biding system.
1.3 CLARIFICATION/INTERPRETATION
If clarification or interpretation of this solicitation is considered necessary by County, a written addendum shall be issued and the information will be posted on County’s online bid system. Any interpretation of, or correction to, this solicitation will be made only by addendum issued by the County DPA. All addenda will be submitted and posted on the County’s online bidding system. It is the responsibility of each Bidder to periodically check the County’s online biding system to ensure that they have received and reviewed any and all addenda to this solicitation. The County will not be responsible for any other explanations, corrections to, or interpretations of the documents, including any verbal information.
All questions or requests for interpretation must be received within this solicitation's Question &
Answer section by TBD before NO VALUE.
1.4 COMMUNICATION
Bidders are not to contact other County personnel with any questions or clarifications concerning this solicitation. All questions regarding this solicitation must be submitted via the Question & Answer section of this solicitation within the County’s eProcurement Portal at:
https://procurement.opengov.com/portal/ocgov. Any County response relevant to this solicitation other than through or approved by County is unauthorized and will be considered invalid.
County's Deputy Procurement Agent, Alan Araujo, alan.araujo@pw.oc.gov, will provide all official communication concerning this solicitation.
1.5 BID VALIDITY
Bids will be valid for a period of 365 days after IFB closing date.
1.6 LOBBYISTS
County of Orange does not require and neither encourages or discourages the use of lobbyists or other consultants for the purpose of securing business.
ORANGE COUNTY BOARD OF SUPERVISORS
AND COUNTY AGENCY OFFICERS
OC Public Works - TEST FOR OCTA, TESTOCTA Page 4 of 16
Board of Supervisors
Janet Nguyen, First District Vicente Sarmiento, Second District Donald P. Wagner, Third District
Doug Chaffee, Fourth District Katrina Foley, Fifth District
County Agency Officers
Claude Parrish, Assessor Hugh Nguyen, Clerk-Recorder
Todd Spitzer, District Attorney-Public Administrator Don Barnes, Sheriff-Coroner
Shari L. Freidenrich, Treasurer-Tax Collector Andrew Hamilton, Auditor-Controller
SECTION 2. General Instructions
2.1 REVIEW
Before submitting a bid, Bidders shall carefully review the General Instructions and examine the solicitation contents, including the Model Contract Terms, Conditions and Scope of Work. Bidders shall include in their bid response a monetary sum to cover the cost of all items included in the Contract. The Model
Contract contained in this solicitation is the Contract proposed for execution. Upon award, awarded Bidder will be required to sign and submit Contract for execution.
2.2 RESPONSIVENESS
Responsive bids shall include completed submittals/attachments provided in the Supplier Responses.
2.3 BID SUBMISSION
Electronic Bids shall be submitted via the County’s online bidding system via the following link https://procurement.opengov.com/portal/ocgov. All required sections of the IFB as listed above, must be submitted via the County’s eProurement Portal. Bidder is solely responsible for “on time” submission of their electronic bid. The County will not accept late bids and no exceptions shall be made. County will only receive those bids that were transmitted successfully.
Note: Electronic Bids cannot be viewed by County until after the solicitation deadline. If you encounter any problems with your registration, system, bid submission, or other system issues, please contact OpenGov’s support staff via the live chat option or via email at procurement-support@opengov.com.
2.4 PRICING
A. Bid Prices: The bid prices quoted on this solicitation shall be firm for the entire contract term of the awarded Contract.
B. Addenda: Bid prices offered shall reflect all addenda issued by County.
C. Scope of Work: Bids shall be submitted only for the items and/or services as stated in the Scope of
Work, Attachment A of Model Contract; bids for other than the items and/or services listed will not be considered.
mailto:procurement-support@opengov.com
OC Public Works - TEST FOR OCTA, TESTOCTA Page 5 of 16
D. Firm Prices: The County will only consider firm price bids.
E. Profit: The net amount of profit will remain firm for the entire term of the Contract. Contract adjustments which increase Contractor’s profit will not be allowed.
F. Price Decreases: All price/rate decreases will automatically be extended to the County. Please reference Paragraph – Price Increase/Decrease provision for additional information.
G. Acceptance: Bids must be provided for each item separately, “all-or-none” bids will not be accepted unless in the best interest of the County.
2.5 NO SUBSTITUTIONS
The bidder is required to meet all specifications and requirements contained in this solicitation. No substitutions will be accepted, unless prior County written approval is received.
2.6 DISCREPANCIES
Bidder shall take all responsibility for any errors or omissions in their bids. Any discrepancies in numbers or calculations shall be interpreted to reflect the lowest price to the County.
If prior to contract award, a Bidder discovers a mistake in their bid which renders the Bidder unwilling to perform under any resulting contract, the Bidder must immediately notify the buyer and request to withdraw the bid. It shall be solely within the County's discretion as to whether withdrawal will be permitted. If the solicitation contemplated evaluation and award of "all or none" of the items, then any withdrawal must be for the entire bid.
If the solicitation provided for evaluation and award on a line item or combination of items basis, the County may consider permitting withdrawal of specific line item(s) or combination of items.
2.7 BID EXPENSES
The County shall not be liable for any expenses incurred by potential Contractors in the preparation or submission of their bids. Pre-contractual expenses are not to be included in the Contractor’s Pricing Sheet. Pre-contractual expenses are defined as, including but not limited to, expenses incurred by Bidder in:
A. Preparing its bid in response to this IFB.
B. Submitting that bid to the County.
C. Negotiating with the County any matter related to the bid; and, D. Any other expenses incurred by the Bidder prior to the date of the award and execution, if any, of the
Contract.
2.8 AWARD
Upon recommendation of Contract award, Bidder will be required to submit the following documents within seven (7) days of County notification, unless otherwise specified in the solicitation:
A. Insurance: Certificate(s) of Insurance, including additional Insured Endorsement(s); refer to Model
Contract, Article-Insurance
B. W-9 Form: Current signed W-9 (Taxpayer ID No & Certification), which includes Contractor’s
Legal Business Name(s). Out of State Suppliers are required to submit a 587/590 Form.
OC Public Works - TEST FOR OCTA, TESTOCTA Page 6 of 16
2.9 ACCEPTANCE/REJECTION/AWARD
A. Bids submitted in response to this IFB may become subject to public disclosure under the California
Public Records Act, and other applicable law. The County shall not be liable in any way for disclosure of any such records. Additionally, all bids shall become the property of the County.
B. The lowest responsive, responsible Bidder will be recommended for contract award.
C. Bids will be reviewed by the County for responsiveness to all requirements. The County has the right to reject any bid deemed unresponsive or lacking the resources or experience to adequately perform the services described herein.
D. Only those responsible, responsive bids meeting all solicitation requirements and specifications shall be further reviewed for consideration for award. Award shall be based on the lowest, responsive, responsible bid.
E. Please take notice, non-acceptance of the County of Orange terms and conditions, incorporated in model contract, may deem a bid non-responsive. County may not accept any other terms, conditions, or provisions contrary to those contained within this solicitation.
F. Final award determination shall be based upon the lowest responsive, responsible bid, and may also include a review of Bidder’s ability to meet the requirements and perform the services specified in this solicitation; Bidder’s references and past performance; and Bidder’s acceptance of County of Orange terms and conditions.
G. By submitting a response to this solicitation, Bidders agree to accept the decision of the County DPA as final.
H. Awarded Bidder will be required to sign a contract upon award. If Bidder is a corporation, signature will be provided in accordance with the corporation’s code as specified in this solicitation.
2.10 RIGHTS RESERVED TO COUNTY
The County reserves the right to:
A. Request a sample for determining equality with the specified brand.
B. Waive, at its discretion, any non-material defects, irregularity, or informality, which County deems correctable or otherwise not warranting rejection of the bid that do not result in any unfair competitive advantage.
C. Verify and validate any information prior to Contract Award and during the entire term of the
Contract.
D. Make multiple awards to Bidders for services requested in this solicitation, at its sole discretion, to serve the best interests of the County
E. Accept or reject in whole or in part any or all bids received as a result of this solicitation at its sole discretion and to solicit for new bids, as the best interest of the County may require.
F. Negotiate the final Contract with the lowest, responsive and responsible Bidder or Bidders as necessary to serve the best interests of the County.
OC Public Works - TEST FOR OCTA, TESTOCTA Page 7 of 16
G. Withdraw or cancel in part or in its entirety this solicitation at any time without prior notice and furthermore makes no representation that any contract will be awarded to any Bidder responding to this solicitation.
H. Award its total requirements to one Bidder or to apportion those requirements among two or more
Bidders as the County may deem to be in its best interests; therefore, bids must be provided for each item separately; “all-or-none” bids will not be accepted unless in the best interest of the
County.
I. Defer award of this Contract for a period of 180 days after the Bid opening. During this period, Bidders shall guarantee the prices quoted in their Bids. County and the lowest responsive, responsible Bidder may mutually agree in writing to extend this deferral period.
2.11 JOINT BIDS
Where two or more Bidders desire to submit a single bid in response to a solicitation, they must do so on a prime/subcontractor basis rather than as a joint venture. The County intends to contract with a single firm or multiple firms, but not with multiple firms doing business as a joint venture.
2.12 UNFAIR PRACTICES AND OTHER LAWS
Bidder warrants that its bid complies with the Unfair Practices Act (Business and Professions Code Section
17000 et seq.) and all applicable County, State and Federal laws and regulations.
2.13 INDEPENDENCE OF BID
By submitting a bid, Bidder swears under penalty of perjury that it did not conspire with any other supplier to set prices in violation of anti-trust laws.
2.14 AMERICANS WITH DISABILITY ACT (ADA)
To comply with the non-discrimination requirements of the ADA, it is the policy of the County to make every effort to ensure that its programs, activities and services are available to all persons, including persons with disabilities. For persons with a disability needing a reasonable modification to participate in the procurement process, or for persons having questions regarding reasonable modifications for the procurement process, you must contact the buyer listed in the solicitation.
2.15 DUNS NUMBER
The County requires a valid D-U-N-S number prior to Contract Award. If needed, your company may obtain one at no cost at www.dnb.com. If you are unable to provide/obtain a D-U-N-S number, please indicate so in your bid submission response.
2.16 UNIQUE ENTITY IDENTIFIER NUMBER (UEI)
The County requires a valid UEI number prior to Contract Award. If needed, your company may obtain one at no cost at www.usfcr.com. If you are unable to provide/obtain a UEI number, please indicate so in your bid submission response.
SECTION 3. Protest Procedures
OC Public Works - TEST FOR OCTA, TESTOCTA Page 8 of 16
Any actual or prospective bidder or respondent who alleges an error or impropriety in the solicitation or award of a contract may submit a grievance or protest to Alan Araujo at alan.araujo@pw.oc.gov, as set forth herein.
PROTEST PROCEDURES
All protests shall be typed under the protestor’s letterhead and submitted in accordance with the provisions stated herein. All protests shall include at a minimum the following information:
A. The name, address, and telephone number of the protestor;
B. The signature of the protestor or the protestor’s representative;
C. The solicitation or contract number;
D. A detailed statement of the legal and/or factual grounds for the protest; and, E. The form of relief requested.
Protest of Solicitation Specifications:
A. All protests related to solicitation specifications must be submitted to the Deputy Procurement
Agent (DPA), Alan Araujo at alan.araujo@pw.oc.gov, no later than five (5) business days prior to the Closing Date of the solicitation. Protests received after the five (5) business-day deadline will not be considered by the County.
B. In the event the protest of specifications is denied, and the protestor wishes to continue in the solicitation process, the protestor must still submit a bid/response prior to the close of the solicitation in accordance with the solicitation submittal procedures provided in this solicitation.
Protest of Award of Contract:
A. Protests related to the award of a contract must be submitted to the Deputy Procurement
Agent, Alan Araujo at alan.araujo@pw.oc.gov, no later than five (5) business days after the
Notice of Solicitation Results is provided by the DPA.
B. Protests relating to a proposed contract award received after the five (5) business day deadline will not be considered by the County.
C. If the five (5) business day period expires without the receipt of a protest, the department may move forward with the contract award or if necessary, file the item for approval by the Board of
Supervisors.
Protest Process
A. In the event of a timely protest, the County shall not proceed with the solicitation or award of the contract until the DPA issues a decision on the protest.
B. Upon receipt of a timely protest, the DPA will, within ten (10) business days of receipt of the protest, issue a decision in writing which shall state the reasons for the actions taken.
C. The County may, after providing written justification, make the determination that an immediate award of the contract is necessary to protect the substantial interests of the County. The award of
OC Public Works - TEST FOR OCTA, TESTOCTA Page 9 of 16 a contract shall in no way compromise the protester’s right to the protest procedures outlined herein.
D. If the protestor disagrees with the decision of the DPA, the protestor may submit a written appeal to the County Procurement Officer requesting an appeal to the Procurement Appeals Board, in accordance with the process stated below.
APPEALS PROCESS
A. If the protestor wishes to appeal the protest decision of the Deputy Procurement Agent, the protestor must submit, within three (3) business days from receipt of the Deputy Procurement
Agent’s decision, a written appeal to the Office of the County Procurement Officer.
Written appeals must be sent by mail to the address below with a courtesy copy by email;
County of Orange/County Executive Office
County Procurement Office
400 W. Civic Center Drive, 5th Floor
Santa Ana, CA 92701
Attn: County Procurement Officer
CPOAppeals@ceo.oc.gov
B. Within fifteen (15) business days, the County Procurement Officer will review all materials in connection with the appeal, assess the merits of the protest and provide a written determination that shall contain his or her decision on whether the appeal shall be forwarded to the Procurement
Appeals Board.
C. The decision of the County Procurement Officer on whether to allow the appeal to go forward will be final and there shall be no right to any administrative appeals of this decision.
SECTION 4. Scope of Work
4.1 TEST OCTA
TEST OCTA
SECTION 5. OCLSB and DVBE Preference Policies Certification Requirements
County of Orange Local Small Business (OCLSB) Preference and Disabled Veteran Business
Enterprise (DVBE) Preference Policies Certification Requirements
5.1 OCLSB:
Effective January 1, 2020, County of Orange Board of Supervisors adopted the OCLSB Preference policy. Implementation of the OCLSB Preference policy supports local businesses, the local economy and the development of the County’s tax base.
mailto:CPOAppeals@ocgov.com
OC Public Works - TEST FOR OCTA, TESTOCTA Page 10 of 16
To be certified as a Local Small Business by the County of Orange, a business shall meet (1) and (2) below:
A. Local Business Requirements:
1. Maintains their principal center of operations (i.e. headquarters) within Orange County, and:
2. Has:
a. A business address located in the County of Orange that is not a post office box, or
b. A valid business license or certificate of occupancy issued by the County of Orange or by an Orange County city, or other documentation acceptable to the County of Orange.
B. Small Business Requirements:
1. Must be certified as a Small Business by the State of California Department of General
Services (DGS); and, C. Above requirements must be valid at the time of proposal submittal through the time of award of the contract. The terms and conditions of the contract shall additionally require the contractor to remain in compliance with the Local Business requirements (pursuant to subsection (a) above) through the term of the contract, including any extensions or renewals, and shall provide that contractor’s failure to comply may be construed by County as a material breach of the contract.
5.2 DVBE:
Effective January 1, 2021, County of Orange Board of Supervisors adopted the DVBE Preference policy.
The DVBE Preference policy supports local business opportunity, economy and the development of
County’s tax base, and in addition recognizes the service and sacrifice given by the men and women of our
Armed Forces.
To be certified as a Disabled Veteran Business Enterprise by the County of Orange, a business shall meet
(A) and (B) below:
A. Must be certified as a DVBE by the State of California Department of General Services (DGS);
and, B. DGS DVBE requirements must be valid at the time of bid/proposal submittal through the time of award of the contract. The terms and conditions of the contract shall additionally require the contractor to remain in compliance with the DVBE requirements (pursuant to subsection (a) above) through the term of the contract, including any extensions or renewals, and shall provide that the contractor’s failure to comply may be construed by the County as a material breach of the contract.
To participate as an OCLSB and/or DVBE please read and follow the process outlined in COUNTY OF
ORANGE LOCAL SMALL BUSINESS (OCLSB) AND DISABLED VETERAN BUSINESS
ENTERPRISE (DVBE) CERTIFICATION REQUIREMENTS in the SUPPLIER RESPONSES.
*NOTE: DVBE PREFERENCE IS NOT APPLICABLE TO PUBLIC WORKS OR A-E
CONSTRUCTION PROJECTS.
5.3 OCLSB/DVBE CERTIFICATION REQUIREMENTS:
County Of Orange Local Small Business (OCLSB) Preference And Disabled Veteran Business
Enterprise (DVBE) Certification Requirements https://caleprocure.ca.gov/pages/PublicSearch/supplier-search.aspx?psNewWin=true https://caleprocure.ca.gov/pages/PublicSearch/supplier-search.aspx?psNewWin=true
OC Public Works - TEST FOR OCTA, TESTOCTA Page 11 of 16
A. To participate as an OCLSB and/or DVBE the following requirements must be met:
1. Must be certified with State of California the Department of General Services (DGS) as a
Small Business.
2. Must be certified with DGS as an OCLSB and/or DVBE.
3. Maintains their principal center of operations (i.e. headquarters) within Orange County.
4. Certification must be valid at the date/time solicitation is closed, and it shall remain in effect at the time of contract award and through the term of the contract. County reserves the right to verify and/or reject incomplete documents.
5. Complete and sign the Affirmation form attached herein. The signed Affirmation form and the OCLSB Certificate are required and must be returned with the solicitation response.
Verify with County: Once a firm becomes certified by the DGS as a small business, the firm shall access the County’s OCLSB verification portal to search for their company legal name in the OCLSB verification database.
B. OCLSB or DVBE Preference provides for the following:
1. Invitation for Bid – IFB
A five percent (5%) deduction in the original bid price shall be applied to all confirmed
OCLSB or DVBE bidders for evaluation purposes. If the lowest bidder is a certified OCLSB or DVBE bidder, the contract will be awarded at the certified OCLSB or DVBE’s original bid price. The maximum allowable preference deduction is $100,000.
2. Request for Proposal - RFP
a. No Cost - Any Request for Proposals that does not include cost as a scoring criteria shall instead apply the five percent (5%) or eight percent (8%) preference percentage pursuant to the eligibility requirements above to a scoring criteria in the RFP that makes up no more than twenty percent (20%) of the total RFP.
b. With Cost - An additional five percent (5%) shall be applied to the total cost of each certified OCLSB or DVBE to obtain their final score. If the final score of any OCLSB or
DVBE matches the final score of a respondent who is not an OCLSB or DVBE, preference shall be given to the certified OCLSB or DVBE. If two or more OCLSBs and/or DVBEs have the same final score, the County shall determine the contract award based on the County’s best interests. Notwithstanding these preference procedures, the
Orange County Board of Supervisors reserves the right to award contracts in any other permissible manner in consideration of the County’s best interests.
C. Dual OCLSB and DVBE Preference provides for the following:
1. Business Certified as OCLSB and DVBE
If a State-certified OCLSB is also a State-certified DVBE, the preference given to that business shall be 8% instead of 5%.
https://caleprocure.ca.gov/pages/PublicSearch/supplier-search.aspx?psNewWin=true http://www.oclsbverify.com/
OC Public Works - TEST FOR OCTA, TESTOCTA Page 12 of 16
D. Subcontractors
If bidder is submitting subcontractors to qualify for the OCLSB or DVBE preference, bidder must demonstrate through the Staffing Plan that 20% of the total bid amount is allocated to the OCLSB and/or DVBE subcontractor(s).
*NOTE: DVBE PREFERENCE IS NOT APPLICABLE TO PUBLIC WORKS OR A-E
CONSTRUCTION PROJECTS.
SECTION 6. Electronic Fund Transfer (EFT)
If awarded, the County offers Bidder the option of receiving payment directly to its bank account via an
Electronic Fund Transfer (EFT) process in lieu of a check payment. Payment made via EFT shall also receive an Electronic Remittance Advice with the payment details via e-mail. An e-mail address shall need to be provided to County via an EFT Authorization Form. A copy of the EFT form is attached as an Exhibit to this solicitation.
SECTION 7. Pricing
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 COMPLETE REQUIRED PRICING
ATTACHMENT FORM IN
SUPPLIER RESPONSES.
1 EACH
TOTAL
SECTION 8. Supplier Responses
8.1 BID VALIDITY: *
Bids will be valid for a period of 365 days after the solicitation closing date.
☐ Please confirm
*Response required
8.2 CONTRACTOR INFORMATION
8.2.1 Name of Bidder*
Please state the Name of Bidder here.
If Bidder is a corporation, the legal name of the corporation shall be set forth in this section as the Name of Bidder and the name, title, and person authorized to sign contracts on behalf of the corporation shall be stated as well.
If Bidder is a partnership or joint venture, the true name of the firm shall be set forth as the Name of
Bidder and the name of the partner authorized to sign contracts on behalf of the partnership or joint venture shall be stated as well.
OC Public Works - TEST FOR OCTA, TESTOCTA Page 13 of 16
If submittal of this bid or signature of any document submitted with this bid is by an agent other than an officer of a corporation or a member of a partnership, a Power of Attorney must be on file with County prior to Bid opening, or must be submitted with the Bid; otherwise, the Bid may be rejected as non-responsive. You may upload this power of attorney under Additional Information later in this bid response.
*Response required
8.2.2 Company Legal Name*
*Response required
8.2.3 Company Legal Status*
Please state the status here (Corporation, Partnership, Sole Proprietor, etc.)
*Response required
8.2.4 Corporation?*
Is your firm incorporated?
☐ Yes
☐ No
*Response required
When equals "Yes"
8.2.5 State of Incorporation?*
You have indicated that your firm is incorporated. Please provide the name of the State of
Incorporation.
*Response required
When equals "Yes"
8.2.6 Contract Signature Authority - Executive Signature*
If incorporated, please provide the name, contact number, and email of the person who would provide this signature authority. The Executive Signer Authority comes from the President, Vice-President, or
Chairperson of the Board.
• Contact Full Name:
• Contact Number:
• E-mail Address:
*Response required
8.3 BIDDER CERTIFICATION
8.3.1 Conflict of Interest*
Bidder must certify either Yes or No below:
Bidder certifies current/past financial, business or other relationship(s) with the County exist/existed as follows:
OC Public Works - TEST FOR OCTA, TESTOCTA Page 14 of 16
A. (Yes) Disclose any financial, business or other relationship with the County of Orange, any other entity that the Orange County Board of Supervisors governs*, or any Orange County Board member, officer or employee, which could affect or influence award of the contract for the services you propose to provide.
B. (No) Bidder certifies that no relationships exist/existed as outlined in item I above.
*Orange County Board of Supervisors govern: All Assessment Districts, All Community Facilities
Districts, All Reassessment Districts, Housing and Community Development Commission, Housing
Successor Agency to the Orange County Development Agency, In-Home Supportive Services Public
Authority, Industrial Development Authority For Orange County, Local Redevelopment Authority
Marine Corp Air Station (MCAS) El Toro, Orange County Financing Authority, Orange County
Flood Control District, Orange County Housing Authority, Orange County Housing Authority
Acting As the Housing Successor Agency, Orange County Public Financing Authority, Orange
County Special Financing Authority, South Orange County Public Financing Authority, and the
Successor Agency to the Orange County Development Agency
☐ Yes
☐ No
*Response required
When equals "Yes"
8.3.2 Disclose any financial, business or other relationship with the County of
Orange, any other entity that the Orange County Board of Supervisors governs*, or any
Orange County Board member, officer or employee, which could affect or influence award of the contract for the services you propose to provide.* *Response required
8.3.3 Litigation*
Bidder must certify either Yes or No below:
Bidder certifies current/past litigation as follows:
A. (Yes) Bidder shall provide detailed information regarding litigation (court and case number), liens, or claims involving Bidder, or any company that holds a controlling interest in Bidder, against the County of Orange in the past seven (7) years.
B. (No) Bidder certifies that Bidder or any proposed subcontractors do not have any past or current litigation.
☐ Yes
☐ No
*Response required
When equals "Yes"
8.3.4 Bidder shall provide detailed information regarding litigation (court and case number), liens, or claims involving any proposed subcontractors, or any company
OC Public Works - TEST FOR OCTA, TESTOCTA Page 15 of 16 that holds a controlling interest in subcontractor firm(s), against the County of Orange in the past seven (7) years.* *Response required
8.3.5 Name/Ownership Changes:*
Respondent must certify either Yes or No below:
A. (Yes) Respondent certifies past company name changes and/or ownership changes, for
Respondent’s firm and any proposed subcontractor firm, as follows:
1. Respondent shall provide detailed information regarding any company name changes
(including legal business names) in the past seven (7) years.
B. (No) Respondent certifies that Respondent or any proposed subcontractors have not had any company name change or ownership changes in the past seven (7) years.
☐ Yes
☐ No
*Response required
When equals "Yes"
8.3.6 Bidder shall provide detailed information regarding any company ownership changes (including legal business names) in the past seven (7) years. * *Response required
8.4 FORMS
8.4.1 Certification Regarding Debarment *
Please download the below documents, complete, and upload.
• CERTIFICATION_REGARDING_DEB...
*Response required
8.4.2 Non-Collusion Declaration*
Each Respondent must execute the Non-Collusion Declaration contained in the solicitation and submit it with the Response.
The County of Orange may require that the Respondent, before awarding any subcontract, secure Non-
Collusion Declarations from proposed Subcontractors. The County of Orange does not conduct business with Respondents who engage in the act of Collusion.
• Non-Collusion_Declaration.pdf
*Response required
8.4.3 Confirmation of Forms and Supplemental Documents*
Please confirm that all the forms within this section have been completed accurately to the best of your knowledge and as requested and required by this Invitation for Bids.
☐ Please confirm https://government-project.s3.us-west-2.amazonaws.com/132866/22a69c85-9b3e-4060-9149-8867a5a96c07_CERTIFICATION_REGARDING_DEBARMENT_OC.pdf https://government-project.s3.us-west-2.amazonaws.com/132866/6e10352e-3491-40ac-9988-89f473e2cf1f_Non-Collusion_Declaration.pdf
OC Public Works - TEST FOR OCTA, TESTOCTA Page 16 of 16
*Response required
8.5 FINAL SUBMITTAL INFORMATION
8.5.1 Submittal Confirmation*
The Bidder declares that the only persons or parties interested in this Bid are those named herein; that this
Bid is made without collusion with any other person or entity; that the Bidder is fully informed of the conditions relating to the work to be performed; that the Bidder has carefully reviewed and complied with the Instructions to Bidders; that Bidder has carefully reviewed the Agreement, General Conditions, Plans, Special Provisions, and all other Contract Documents. The Bidder agrees that upon acceptance of this Bid by the award of the Contract, the Bidder has entered into a contract with the County of Orange, a political subdivision of the State of California (“County”), to provide all the necessary labor, materials, machinery, tools, apparatus, and other means for construction, and to complete all work as specified in the Contract
Documents in the manner, time, and according to all requirements, terms, and conditions set forth in the
Contract Documents.
The Bidder must be an individual or entity holding a valid California State Contractor’s License (number and classification as set forth in the Instructions to Bidders) in accordance with the requirements of this
Bid and Business & Professions Code Section 7028.15. By electronically submitting this Bid, Bidder certifies that the Contractor's License referenced above is in good standing and has been properly issued to Bidder.
Bidder confirms that they have read and understand and agree to the terms and conditions herewith, and are submitting a bid in response to this solicitation.
☐ Please confirm
*Response required
8.5.2 Additional Information (if needed)
For any additional information requested or required by any of your previously provided answers please upload that additional documentation here.
This includes any power of attorney that may be required as a part of this bid response.
8.5.3 TEST QUESTION*
Please download the below documents, complete, and upload.
• MA-080-26011512_EHS_Interna...
*Response required https://government-project.s3.us-west-2.amazonaws.com/311589/404bebe2-2aad-4da5-b96e-3a63bef9ed6a_MA-080-26011512_EHS_International.pdf
| SECTION 1. General Information |
| 1.1 Background |
| 1.2 Important Notice |
| 1.3 Clarification/Interpretation |
| 1.4 Communication |
| 1.5 Bid Validity |
| 1.6 Lobbyists |
| SECTION 2. General Instructions |
| 2.1 Review |
| 2.2 Responsiveness |
| 2.3 Bid Submission |
| 2.4 Pricing |
| 2.5 No Substitutions |
| 2.6 Discrepancies |
| 2.7 Bid Expenses |
| 2.8 Award |
| 2.9 Acceptance/Rejection/Award |
| 2.10 Rights Reserved to County |
| 2.11 Joint Bids |
| 2.12 Unfair Practices and Other Laws |
| 2.13 Independence of Bid |
| 2.14 Americans with Disability Act (ADA) |
| 2.15 DUNS Number |
| 2.16 Unique Entity Identifier Number (UEI) |
| SECTION 3. Protest Procedures |
| SECTION 4. Scope of Work |
| 4.1 TEST OCTA |
| SECTION 5. OCLSB and DVBE Preference Policies Certification Requirements |
| 5.1 OCLSB: |
| 5.2 DVBE: |
| 5.3 OCLSB/DVBE Certification Requirements: |
| SECTION 6. Electronic Fund Transfer (EFT) |
| SECTION 7. Pricing |
| SECTION 8. Supplier Responses |
| 8.1 Bid Validity: * |
| 8.2 Contractor Information |
| 8.2.1 Name of Bidder* |
| 8.2.2 Company Legal Name* |
| 8.2.3 Company Legal Status* |
| 8.2.4 Corporation?* |
| 8.2.5 State of Incorporation?* |
| 8.2.6 Contract Signature Authority - Executive Signature* |
| 8.3 Bidder Certification |
| 8.3.1 Conflict of Interest* |
| 8.3.2 Disclose any financial, business or other relationship with the County of Orange, any other entity that the Orange County Board of Supervisors governs*, or any Orange County Board member, officer or employee, which could affect or influence awa... |
| 8.3.3 Litigation* |
| 8.3.4 Bidder shall provide detailed information regarding litigation (court and case number), liens, or claims involving any proposed subcontractors, or any company that holds a controlling interest in subcontractor firm(s), against the County of Ora... |
| 8.3.5 Name/Ownership Changes:* |
| 8.3.6 Bidder shall provide detailed information regarding any company ownership changes (including legal business names) in the past seven (7) years. * |
| 8.4 Forms |
| 8.4.1 Certification Regarding Debarment * |
| 8.4.2 Non-Collusion Declaration* |
| 8.4.3 Confirmation of Forms and Supplemental Documents* |
| 8.5 Final Submittal Information |
| 8.5.1 Submittal Confirmation* |
| 8.5.2 Additional Information (if needed) |
| 8.5.3 TEST QUESTION* |
File details come from the government source that posted it. Updated .