The document is a comprehensive set of construction design plans (100% Design Plans) for the Town of Telluride's Tomboy Street Roadway and Canyonlands Utility Improvements project, dated June 26, 2024. The project involves the installation of approximately 770 linear feet of 10-inch sanitary sewer, four 4-foot diameter manholes, and associated utility connections, along with significant roadway improvements. The project scope includes sanitary sewer re-alignment, connecting to existing manholes on Pacific Avenue and W. Colorado Avenue, and traversing through the Canyonlands Lot. Paving work encompasses the removal and replacement of approximately 530 tons of 5-inch hot mix asphalt, including aggregate base course and subgrade preparation.

The project presents two bid alternates (A and B) with identical scope but different completion dates, allowing contractors to bid on one or both options, with award based on price and schedule. The design plans detail complex roadway cross-sections, utility trench specifications, construction phasing, and stormwater management plans. The project involves technical considerations such as construction dewatering with heavy metal removal, density and moisture testing, and maintaining existing road constraints. The design accounts for variable roadway crown angles, concrete pavement V-pan installations, and specific grading requirements across different station segments of Tomboy Street.

View the file

Other files

File Type Posted
000000 Project Specifications.pdf PDF
Contractor Bid Tab.xlsx XLSX spreadsheet
Addendum No 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

IMPROVEMENTS

09/06/2022

TOWN OF TELLURIDE

TOMBOY STREET ROADWAY & CANYONLANDS UTILITY

IMPROVEMENTS

CONSTRUCTION PLANS

PROJECT NO. 196942000

100% DESIGN PLANS

JUNE 26, 2024

BID SET

CONTACTS:

BASIS OF BEARING

BENCHMARK

KEYMAP

NTS

NORTH

SHEET INDEX

Sheet Number Sheet Title

1 COVER SHEET

2 GENERAL NOTES

3 SUMMARY OF APPROXIMATE QUANTITIES

4 HORIZONTAL CONTROL PLAN

5 TYPICAL SECTION - 1

6 TYPICAL SECTION - 2

7 REMOVAL & RESET

8 REMOVAL & RESET

9 REMOVAL & RESET

10 PAVING PLAN

11 PAVING PLAN

12 PAVING PLAN

13 ROADWAY PLAN AND PROFILE

14 CONCRETE GUTTER FLOWLINE PROFILE

15 GRADING PLAN

16 GRADING PLAN

17 GRADING PLAN

18 GRADING DETAILS

19 CROSS SECTION 1

20 CROSS SECTION 2

21 CROSS SECTION 3

22 CROSS SECTION 4

23 INITIAL SWMP PLAN

24 INITIAL SWMP PLAN

25 INITIAL SWMP PLAN

26 FINAL SWMP PLAN

27 FINAL SWMP PLAN

28 FINAL SWMP PLAN

29 SWMP DETAILS

30 SWMP DETAILS

31 SANITARY PLAN & PROFILE

32 SANITARY PLAN & PROFILE

33 CLARKS MARKET SANITARY LATERAL

CONNECTION (INFORMATION ONLY)

34 CONSTRUCTION DETAILS

35 CONSTRUCTION PHASING PLAN 1

36 CONSTRUCTION PHASING PLAN 2

36 CONSTRUCTION PHASING PLAN 2

SURVEY

09/06/2022

GENERAL NOTES:

ENVIRONMENTAL NOTES:

PAVING NOTES:

SIGNAGE AND STRIPING NOTES:

UTILITY NOTES:

CONSTRUCTION NOTES:

SUBSURFACE UTILITY ENGINEERING (SUE)

09/06/2022

EARTHWORK SUMMARY OF CALCULATIONS:

PIPE EXCAVATION: FOR SANITARY SEWER TRENCH

10-INCH MAIN TRUNKLINE

ASSUMPTIONS:

WIDTH OF TRENCH = 8 FEET

DEPTH OF TRENCH (VARIES) = 14 FEET AVG.

LENGTH OF 10-INCH SSWR PIPE = 763 LF

= 8 FT. X 14 FT. X 763 LF = 85,456 CF = 3,165 CY

STRUCTURE BACKFILL (CLASS 1)

10-INCH MAIN TRUNKLINE

STRUCTURE BACKFILL (CLASS 1)(BEDDING)

10-INCH MAIN TRUNKLINE

togren Text Box togren Text Box togren Text Box 850 + 150 = 1000 (Modified Class 1 for Manholes) togren Text Box togren Text Box

(Includes Modified Class 1 & Squeegee)

1890 + 850 (Class 6 A.B.C) + 65 (Native Class 1 for conduit) =

Native with Proctor togren Text Box 5-foot wide trench Placed from 12-inches above top of pipe to just above ground water level (assume conservative 5-foot below grade ground water level) Average depth of Class 1 Imported Fill: (5.6' X 5' X 810')/27 = 840 CY

5-foot wide trench Placed from 4-inches below invert to 12-inches above top of pipe.

Squeegee:

(2.2' X 5' X 810')/27 = 330 CY

Image togren Image

Rectangle

PA

C

IF

IC

A

VE

N U

E

LOT 45

LOT 40 LOT 39

LOT 33

LOT 32

LOT 31

LOT 30

TOMBOY STREET

W . C

O

LO

RA

DO

A

VE

TO

M

BO

Y D

R

IVE

LOT 3

TELLURIDE LODGE

LOT 29

LINE TABLE LINE TABLELINE TABLE LINE TABLE

SANITARY SEWER PROPOSED CENTERLINE

EDGE OF PAVEMENT CONTROL LINE

(CONTROL FOR ROADWAY DESIGN)

13.00' OFFSET RT. FROM TOMBOY CL

FLOWLINE CENTERLINE CONCRETE

PAVEMENT (V-PAN)

15.50' OFFSET LT. FROM TOMBOY CL

TOMBOY STREET CENTERLINE ALIGNMENT

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

NO

RTH

LEGEND

ASPHALT INSET

2% (TYP.)

VARIES PER PLAN

PA

R

C

EL

B O

U N

D

AR

Y (O

W N

ED

B

Y

TE

LL

U

R

ID

E

LO

D G

E)

1 TOMBOY DRIVE

STA: 1+60 TO 5+40

VARIES

VARIES

EX. SLOPE

MAX (10%)

PROP. SLOPE

MAX (10%) VARIES

EX

. R

IG

H

T- O

F- W

AY

VARIES

2% (TYP.)

VARIES PER PLAN

EX

. B

U

IL

D

IN

G T

O R

EM

AI

N

TYPICAL UTILITY TRENCH FOR PIPE DIAMETER 12" OR LESS ("T-SECTION" PATCH)4 TYPICAL UTILITY TRENCH FOR PIPE DIAMETER 12" OR LESS ("T-SECTION" PATCH)

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

IMPROVEMENTS

CONCRETE PAVEMENT (V-PAN)2

ROADWAY CROSS-SECTION SUMMARY:

STATIONING SECTION DESCRIPTION

1. STA. 1+60 - 2+00 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), VARIABLE CROWN TO MATCH EX. ROADWAY CONSTRAINTS, CONCRETE PAVEMENT V-PAN (TYP), VARIABLE ASPHALT TIE (LT)

2. STA. 2+00 - 3+90 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), STANDARD 2% CROWN, CONCRETE PAVEMENT V-PAN (TYP), VARIABLE ASPHALT TIE (LT)

3. STA. 3+90 - 4+40 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), 3% THRU LANE RT, VARIABLE THRU LANE LT, CONCRETE PAVEMENT V-PAN (TYP), VARIABLE ASPHALT TIE (LT)

4. STA. 4+40 - 5+40 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT), 2% THRU LANE RT, VARIABLE THRU LANE LT, CONCRETE PAVEMENT V-PAN (TYP), VARIABLE ASPHALT TIE (LT)

REFERENCE SHEETS 19 TO 22 FOR ROADWAY CROSS SECTIONS ON 20-FOOT INCREMENTS.

(4)

BEDDING & PIPE

BACKFILL

(SQUEEGEE)

SEE

SPECIFICATIONS

D

09/06/2022

OPEN-TRENCH SECTION5

CONCRETE PAN AND EXP. JOINT6

2:1MAX.

MANHOLE WATERPROOFING DETAIL7

IF

IC

A

VE

N U

E

LOT 45

LOT 40

TOMBOY STREET

EX

. F

R O

N

TA

G E

R O

AD

TELLURIDE LODGE

LEGEND

GENERAL NOTES

CONSTRUCTION NOTES

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

NO

RTH

M

ATC

H

LIN

E STA. XX+00 SEE SH

EET 7

LOT 40 LOT 39

LOT 32

LOT 31

LOT 29

LOT 30

TOMBOY STREET

TELLURIDE LODGE

TO

M

BO

Y D

R

IVE

LEGEND

GENERAL NOTES

CONSTRUCTION NOTES

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

M

AT

C H

L

IN

E

ST

A.

X

X+

S

EE

S H

EE

T

M

ATC

H

LIN

E SEE SH

EET 8

NO

LOT 29

LOT29

W . C

O

LO

RA

DO

A

VE

LOT3

(CANYONLANDS)

W . C

O

LO

RA

DO

A

VE

LEGEND

GENERAL NOTES

CONSTRUCTION NOTES

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

M

AT

C H

L

IN

E S

EE

S

H

EE

T

IF

IC

A

VE

N U

E

PA

C

IF

IC

A

VE

N

U E

LOT 45

LOT 40

TOMBOY STREET

TELLURIDE LODGE

LEGEND

CONSTRUCTION NOTES

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

NO

RTH

M

ATC

H

LIN

EET XX

LOT 31

LOT 29

LOT 30

TOMBOY DRIVE

TELLURIDE LODGE

TO

M

BO

Y D

R

IVE

LEGEND

CONSTRUCTION NOTES

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

M

AT

C H

L

IN

E

ST

A.

X

X+

S

EE

S H

EE

T

XX

M

ATC

H

LIN

E STA. XX+00 SEE SH

EET XX

LOT29LOT29

W . C

O

LO

RA

DO

A

VE

LOT 3

(CANYONLANDS) W

. C O

LO

RA

DO

A

VE

LEGEND

CONSTRUCTION NOTES

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

M

AT

C H

L

IN

E

ST

A.

X

X+

S

EE

S H

EE

T

XX

PACIFIC AVE.

TOMBOY DRIVE

TOMBOY DR-CL-RIGHT-13.000-11

1.

.4

.3

.3

FINISHED GRADE AT EDGE OF PAVEMENT

(MATCH EX.)

EX. GRADE AT EDGE

OF PAVEMENT

EN

D

V

AR

IA

BL

E R

O

AD

W

AY

C R

O

SS

S

LO

PE

S

TO

M

AT

C

H E

X.

S

EE

C

R O

SS

S

EC

TI

O N

S

SH

EE

TS

TO

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

TOMBOY EDGE OF PAVEMENT PROFILE

(13.00' OFFSET RT. FROM ROADWAY CENTERLINE)

LEGEND

GENERAL NOTES

TOMBOY DR-PAN FLOWLINE-13

1.

.4

.6

.0

.5

FINISHED GRADE AT

CONCRETE PAVEMENT (V-PAN) FLOWLINE

EN

D

V

AR

IA

BL

E R

O

AD

W

AY

C R

O

SS

S

LO

PE

S

TO

M

AT

C

H E

X.

S

EE

C

R O

SS

S

EC

TI

O N

S

SH

EE

TS

TO

EXISTING GRADE AT

CONCRETE PAVEMENT (V-PAN) FLOWLINE

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

FLOWLINE PROFILE - CONCRETE VPAN

(15.50' OFFSET LT. FROM ROADWAY CENTERLINE)

LEGEND

GENERAL NOTES

ROADWAY CROSS-SECTION SUMMARY:

STATIONING SECTION DESCRIPTION

1. STA. 1+60 - 2+00 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), VARIABLE CROWN TO MATCH EX. ROADWAY CONSTRAINTS, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

2. STA. 2+00 - 3+90 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), STANDARD 2% CROWN, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

3. STA. 3+90 - 4+40 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), 3% THRU LANE RT, VARIABLE THRU LANE LT, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

4. STA. 4+40 - 5+40 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT), 2% THRU LANE RT, VARIABLE THRU LANE LT, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

REFERENCE SHEETS 19 TO 22 FOR ROADWAY CROSS SECTIONS ON 20-FOOT INCREMENTS.

IF

IC

A

VE

N U

E

LOT 45

LOT 40

TOMBOY STREET

EX

. F

R O

N

TA

G E

R O

AD

TELLURIDE LODGE

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

NO

RTH

M

ATC

H

LIN

EET 7

LOT 31

LOT 29

LOT 30

TOMBOY STREET

TELLURIDE LODGE

TO

M

BO

Y D

R

IVE

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

M

AT

C H

L

IN

E

ST

A.

X

X+

S

EE

S H

EE

T

M

ATC

H

LIN

E SEE SH

EET 8

. C

O

LO

RA

DO

A

VE

LOT3

(CANYONLANDS)

W . C

O

LO

RA

DO

A

VE

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

M

AT

C H

L

IN

E S

EE

S

H

EE

T

TOMBOY STREET

C

IF

IC

A

VE

TOMBOY DRIVE

TOMBOY STREET

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

NO

RTH

DETAIL 1 - PACIFIC AVE. AND TOMBOY STREET INTERSECTION

1" = 5'

BARRIER CURB DETAIL GRADING INSET

1"=5'

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

ROADWAY CROSS-SECTION SUMMARY:

STATIONING SECTION DESCRIPTION

1. STA. 1+60 - 2+00 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), VARIABLE CROWN TO MATCH EX. ROADWAY CONSTRAINTS, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

2. STA. 2+00 - 3+90 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), STANDARD 2% CROWN, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

3. STA. 3+90 - 4+40 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), 3% THRU LANE RT, VARIABLE THRU LANE LT, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

4. STA. 4+40 - 5+40 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT), 2% THRU LANE RT, VARIABLE THRU LANE LT, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

NTS

NORTH

IMPROVEMENTS

09/06/2022

ROADWAY CROSS-SECTION SUMMARY:

STATIONING SECTION DESCRIPTION

1. STA. 1+60 - 2+00 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), VARIABLE CROWN TO MATCH EX. ROADWAY CONSTRAINTS, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

2. STA. 2+00 - 3+90 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), STANDARD 2% CROWN, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

3. STA. 3+90 - 4+40 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), 3% THRU LANE RT, VARIABLE THRU LANE LT, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

4. STA. 4+40 - 5+40 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT), 2% THRU LANE RT, VARIABLE THRU LANE LT, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

NTS

NORTH

IMPROVEMENTS

09/06/2022

ROADWAY CROSS-SECTION SUMMARY:

STATIONING SECTION DESCRIPTION

1. STA. 1+60 - 2+00 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), VARIABLE CROWN TO MATCH EX. ROADWAY CONSTRAINTS, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

2. STA. 2+00 - 3+90 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), STANDARD 2% CROWN, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

3. STA. 3+90 - 4+40 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), 3% THRU LANE RT, VARIABLE THRU LANE LT, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

4. STA. 4+40 - 5+40 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT), 2% THRU LANE RT, VARIABLE THRU LANE LT, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

NTS

NORTH

IMPROVEMENTS

09/06/2022

ROADWAY CROSS-SECTION SUMMARY:

STATIONING SECTION DESCRIPTION

1. STA. 1+60 - 2+00 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), VARIABLE CROWN TO MATCH EX. ROADWAY CONSTRAINTS, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

2. STA. 2+00 - 3+90 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), STANDARD 2% CROWN, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

3. STA. 3+90 - 4+40 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT.), 3% THRU LANE RT, VARIABLE THRU LANE LT, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

4. STA. 4+40 - 5+40 MATCH EDGE OF PAVEMENT ELEV RT (13.00' RT), 2% THRU LANE RT, VARIABLE THRU LANE LT, CONCRETE PAVEMENT V-PAN (5%), VARIABLE ASPHALT TIE (LT)

IF

IC

A

VE

N U

E

PA

C

IF

IC

A

VE

N

U E

LOT 45

LOT 40

TOMBOY STREET

TELLURIDE LODGE

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

NO

RTH

M

ATC

H

LIN

E STA. XX+00 SEE SH

LOT 31

LOT 29

LOT 30

TOMBOY STREET

TELLURIDE LODGE

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

M

AT

C H

L

IN

E

ST

A.

X

X+

S

EE

S H

EE

T

XX

M

ATC

H

LIN

E STA. XX+00 SEE SH

EET XX

NO

. C

O

LO

RA

DO

A

VE

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

M

AT

C H

L

IN

E

ST

A.

X

X+

S

EE

S H

EE

T

XX

NO

IF

IC

A

VE

N U

E

LOT 45

LOT 40

TOMBOY STREET

TELLURIDE LODGE

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

NO

RTH

M

ATC

H

LIN

E STA. XX+00 SEE SH

LOT 31

LOT 29

LOT 30

TOMBOY STREET

TELLURIDE LODGE

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

M

AT

C H

L

IN

E

ST

A.

X

X+

S

EE

S H

EE

T

XX

M

ATC

H

LIN

E STA. XX+00 SEE SH

EET XX

NO

. C

O

LO

RA

DO

A

VE

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

M

AT

C H

L

IN

E

ST

A.

X

X+

S

EE

S H

EE

T

XX

NO

09/06/2022

IF

IC

A

VE

N U

E

TOMBOY STREET

TELLURIDE LODGE

SANITARY SEWER PROFILE 1

.3

.0

.2

.0

.4

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

NO

RTH

M

ATC

H

LIN

E STA. 04+36 SEE SH

EET 26

LEGEND

R

Know what's below.

Call before you dig.

LOT 29

LOT 30

W. C

OLORADO AVE

CLARKS MARKET

SANITARY SEWER PROFILE 2

.5

.9

1.

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

M

AT

C H

L

IN

E

ST

A.

4+

S

EE

S H

EE

T

LEGEND

N O

R

TH

R

Know what's below.

Call before you dig.

CLARKS MARKET

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

R

Know what's below.

Call before you dig.

M

AT

C H

L

IN

E

ST

A.

4+

S

EE

S H

EE

T

NORTH

4-INCH BARRIER CURB1

IF

IC

A

VE

N U

E

LOT 45

LOT 40 LOT 40 LOT 39

LOT 33

LOT 32

LOT 31

LOT 29

LOT 30

TOMBOY DRIVE

TELLURIDE LODGE

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

LEGEND

NO

RTH

CONSTRUCTION PHASING NOTES:

ROAD

WORK

AHEAD

ROAD CLOSED

LOCAL TRAFFIC

ONLY

ROAD CLOSED

LOCAL TRAFFIC

ONLY

IF

IC

A

VE

N U

E

LOT 45

LOT 40 LOT 39

LOT 33

LOT 32

LOT 31

LOT 29

LOT 30

TOMBOY DRIVE

TELLURIDE LODGE

SHEET REVISIONS PROJECT NO./CODETOMBOY STREET ROADWAY AND UTILITY

KEYMAP

NTS

NORTH

IMPROVEMENTS

09/06/2022

LEGEND

NO

RTH

ROAD

WORK

AHEAD

ONE LANE

ROAD

ROAD

WORK

AHEAD

CONSTRUCTION PHASING NOTES:

ROAD CLOSED

LOCAL TRAFFIC

ONLY

ROAD CLOSED

LOCAL TRAFFIC

ONLY

Sheets and Views
1 COVER SHEET
2 GENERAL NOTES
3 SUMMARY OF APPROXIMATE QUANTITIES
4 HORIZONTAL CONTROL PLAN
5 TYPICAL SECTION - 1
6 TYPICAL SECTION - 2
7 REMOVAL & RESET
8 REMOVAL & RESET
9 REMOVAL & RESET
10 PAVING PLAN
11 PAVING PLAN
12 PAVING PLAN
13 ROADWAY PLAN AND PROFILE
14 CONCRETE GUTTER FLOWLINE PROFILE
15 GRADING PLAN
16 GRADING PLAN
17 GRADING PLAN
18 GRADING DETAILS
19 CROSS SECTION 1
20 CROSS SECTION 2
21 CROSS SECTION 3
22 CROSS SECTION 4
23 INITIAL SWMP PLAN
24 INITIAL SWMP PLAN
25 INITIAL SWMP PLAN
26 FINAL SWMP PLAN
27 FINAL SWMP PLAN
28 FINAL SWMP PLAN
29 SWMP DETAILS
30 SWMP DETAILS
31 SANITARY PLAN & PROFILE
32 SANITARY PLAN & PROFILE
33 CLARKS MARKET SANITARY LATERAL CONNECTION (INFORMATION ONLY)
34 CONSTRUCTION DETAILS
35 CONSTRUCTION PHASING PLAN 1
36 CONSTRUCTION PHASING PLAN 2