This Technical Specifications document is for the Town of Manchester, Connecticut's Bid No. 23/24-104 for Post Top LED Streetlight Replacements. The project involves furnishing and installing new LED post top lantern style luminaires mounted on existing fiberglass poles, which includes complete installation work such as wiring, mounting, testing, and removal and disposal of existing luminaires. The contractor must submit shop drawings, be properly licensed and insured, and use Full Cutoff LED Series 247CL luminaires manufactured by American Lighting Company or an approved equal.
The contract requires the contractor to provide a one-year warranty on the installation in addition to the manufacturer's warranty. Payment will be measured by the actual number of post top luminaires furnished, installed, and accepted, with the contract unit price including all materials, tools, equipment, and labor. The contractor must also comply with traffic control requirements, including maintaining pedestrian and vehicular access, using certified flagpersons, and following specific traffic management protocols during the streetlight replacement process. The technical specifications provide detailed guidelines for traffic control, signage, and safety measures to be implemented during the project.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL
SPECIFICATIONS
POST TOP LED STREETLIGHT
REPLACEMENTS
BID 23/24-104
Town of Manchester, CT
LUMINAIRES
TECHNICAL SPECIFICATIONS
LUMINAIRES
DESCRIPTION
“Replace Post Top Luminaire” includes the furnishing and installation of new LED post top lantern style luminaires mounted on existing fiberglass poles. This item consists of a complete installation, including wiring, mounting, testing and other incidental work as specified. It also includes the removal and disposal of existing luminaires.
SUBMITTALS
The Contractor shall submit one electronic copy (pdf) of the shop drawings associated with the proposed luminaires, area lights, poles and mast arms.
LICENSING
The Contractor shall be properly trained, certified, licensed and insured to perform installation, removal, replacement, relocation, transfer, and maintenance work on street lighting equipment in close proximity to high voltage electrical conductors (the “Work”). The Contractor is required to perform the Work on behalf of the Town of Manchester in accordance with all applicable federal, state, and local laws, regulations, safety codes and ordinances. The Contractor further certifies that all individuals performing Work on street lighting equipment have received full and adequate safety training. The Contractor acknowledges that this certification is proof of the qualifications of such Contractor. The Contractor shall indemnify and hold harmless the Town of
Manchester and all other owners of poles to which street lighting equipment is or may be attached from and against all claims, costs, liabilities, losses, judgments and expenses, including reasonable attorneys' fees, that may arise to, or be suffered by, any of them as a result of the
Contractor’s control of the street lighting equipment or occasioned wholly or in part by any act or omission of the Contractor in the performance of Work or any other activities of such persons involving such street lighting equipment or the Eversource’s distribution facilities.
MATERIALS
Post top luminaires shall be Full Cutoff LED Series 247CL as manufactured by:
American Lighting Company
One Lithonia Way
Conyers, GA 30012 www.americanelectriclighting.com or approved equal
CONSTRUCTION DETAILS
For replace items, existing luminaires, area lights and accessories shall be removed and become the property of the Contractor.
LUMINAIRES
LUMINAIRES
New luminaires shall be securely mounted on existing poles in accordance with manufacturer’s installation instructions.
The Contractor shall wire new luminaires to the existing streetlight wiring.
WARRANTY
In addition to the warranty provided by the lighting manufacturer, the Contractor shall provide a one year warranty on the installation.
MEASUREMENT AND PAYMENT
“Replace Post Top Luminaire” will be measured for payment by the actual number of post top luminaires furnished, installed and accepted. This work will be paid for at the contract unit price each for “Replace Post Top Luminaire”, complete in place, which price shall include all materials, tools, equipment and labor incidental thereto. It shall also include the removal and satisfactory disposal of existing luminaires.
MAINTENANCE AND PROTECTION OF TRAFFIC
DESCRIPTION
“Maintenance and Protection of Traffic” includes the furnishing, installation, maintenance, adjusting, cleaning, storing and removal when no longer required of all temporary signs, cones, drums, barricades or other approved traffic control devices necessary to maintain and protect traffic within the project area in accordance with the Plans, Specifications and the Town of
Manchester Traffic Control Ordinance.
It also includes furnishing certified, uniformed flagpersons capable of safely directing traffic around the work area during all lane closures where uniformed police officers are not required or when directed by the Engineer and other pertinent work necessary to comply with this specification, including but not limited to, warning of local agencies of proposed traffic change, snow removal if Contractor’s operations interfere with the normal snow removal operation, either by public agencies or private entities, when required or as directed by the Engineer.
SUBMITTALS
Unless a Traffic Detour Plan is provided elsewhere in these specifications, all temporary road closures and detours proposed by the Contractor must be approved by the Engineer prior to implementation. In these instances, the Contractor shall submit a plan of the proposed detour, complete with sign patterns, and estimated duration of detour to the Engineer for approval at least seven (7) days prior to execution. Detours will only be considered for infrequent, short-term operations.
MATERIALS
Traffic Drums
The traffic drums shall be manufactured plastic or rubber designed in accordance with the latest edition of the MUTCD. The device shall be stabilized with sandbags or other approved means. The traffic drum shall have, at a minimum, two 4” wide retroreflective orange stripes and two 6” wide retroreflective white stripes. The stripes shall be placed horizontally and alternated with the orange stripe on top. The sections of the traffic drum not covered with retroreflective sheeting shall be orange. Either Type III or Type VI
Retroreflective Sheeting, in accordance with Section M.18.09.01 of Form 817 shall be used
Traffic Cones
Traffic Cones shall be constructed of materials to a thickness to withstand impact without damage to cones or to vehicles. The traffic cones shall be 42” tall and of sufficient mass or have bases to which ballast may be added to assure that they will not be blown over or
MAINTENANCE AND PROTECTION OF TRAFFIC
displaced by wind from passing vehicles. Traffic cones shall be reflectorized utilizing
Type VI retro reflective sheeting in accordance with Sub article M.18.09.01 of Form 817.
Barricades
Barricades shall conform to the requirements of Section 9.79.02 of Form 817.
Construction Area Signs
Construction Area signs includes the furnishing of sheet aluminum or plywood construction signs and supports required on the project in accordance with the plans, the
Manual of Uniform Traffic Control Devices (MUTCD) or as directed by the Engineer.
Signs faces shall be of retro reflective sheeting, High Intensity Prismatic (Type III) and conform to section 12.20 of Form 817. Each sign will be paid for once, regardless of the number of times it is used on the project. When the signs are no longer required on the project, they shall remain the property of the Contractor.
Opposing Traffic Lane Dividers
Opposing Traffic Lane Dividers shall conform to the requirements of Section 6F.76 of the MUTCD utilizing Type III Reflective sheeting
Any other traffic control devices shall meet the minimum material requirements of Form 817 and the Manual of Uniform Traffic Control Devices (MUTCD).
RESTRICTIONS
During working hours, the Contractor shall maintain at least one lane of traffic a minimum 10’ in width on a gravel or paved surface with uniformed flagpersons directing traffic throughout the project area. At the end of each work day, the Contractor shall open the roadway to travel in both directions on a gravel or paved surface at least 20’ in width with all applicable signs, cones, drums, barricades and lane dividers required by the Engineer.
The Contractor shall schedule operations such that travel by the general public on gravel surfaces is limited to two (2) weeks.
Temporary transverse drop-offs between pavement and milled pavement or between pavement and gravel shall have a maximum 10:1 slope. Temporary longitudinal drop-offs between pavement and milled pavement or between pavement and gravel shall have a maximum 3:1 slope.
REQUIREMENTS
The Contractor shall maintain and protect traffic in the project area in accordance with the requirements and regulations of the Town of Manchester, and these Specifications. Unless otherwise specified, the Contractor must maintain pedestrian and vehicular traffic to permit access to businesses, factories, residences, and intersecting streets.
1. Advanced Warning: It shall be the sole responsibility of the Contractor to forewarn the
Town's Local Regulatory Agencies (including but not limited to the Public Works
Highway Division, Police and Fire Departments and Board of Education) at least 72 hours in advance of changes in traffic patterns due to reduction of pavement widths or closing of streets.
2. Access: The Contractor shall arrange his/her operations to properties along the street including temporary bridges to driveways, and provide access to fire hydrants, manholes, gate boxes, or other utilities. Whenever any trench obstructs traffic in or to any public way, private driveway, or property entrance, the Contractor shall take such steps as required to maintain necessary traffic and access including temporary bridging if required. The Contractor shall confine his/her occupancy of public or traveled ways to the smallest space compatible with the efficient and safe performance of the work.
The Contractor shall observe and obey all local and state laws, ordinances, regulations and permits in relation to the obstruction of streets and highways, keeping passageways open and protecting traffic where there may be danger from blasting or other construction activities.
If the Contractor's operations interfere with the removal or sanding of snow or ice by the public authorities or adjoining land owners, in an ordinary manner with regular highway equipment, the Contractor shall be required to perform such services for the public authorities or adjoining owners without charge. If the Contractor fails to do so, he shall reimburse the said authorities or adjoining owners or the Town for any additional cost to them for doing such work occasioned by conditions arising from the Contractor's operations, occupancy, or trench surfaces, together with any damage to the equipment of said parties by those conditions, or claims of any parties for damage or injury or loss by reason of failure to remove snow or ice or to sand icy spots under these conditions.
3. Maintenance: The Contractor shall maintain all traffic control devices on the project.
Traffic control devices shall be cleaned periodically to maintain retroreflectivity. Any damaged traffic control devices shall be immediately removed and replaced. It is the
Contractors responsibility to move, adjust or relocate traffic control devices as his operations change.
4. Non-Performance: Should the Contractor or his/her employees neglect to maintain traffic control devices as required in these Specifications, the Engineer may shut the work down.
If the Contractor fails to take corrective action, the Engineer may immediately and
MAINTENANCE AND PROTECTION OF TRAFFIC
without notice, furnish, install and maintain traffic control devices. The cost thereof shall be borne by the Contractor and may be deducted from any amount due or to become due to the Contractor under this contract.
The Contractor will be held responsible for any damages that the Town, Engineer, Governmental units, or their heirs or assigns may have to pay as a consequence of the
Contractor's failure to protect the public from injury, and the same may be deducted from any payments that are due or may become due to the Contractor under this contract.
5. Uniformed Flagperson: The Contractor shall be responsible for providing certified and adequately equipped personnel for directing traffic around the work area during all lane closures where uniformed police officers are not required and where directed by the
Engineer to provide adequate protection of the traveling public. Flagpersons must be certified by the American Traffic Safety Services Association (ATSSA) or the National
Safety Council (NSC).
6. Uniformed Police Officers: On designated arterial streets within the Town, the Town of
Manchester Traffic Control Ordinance requires the use of Town of Manchester uniformed police officers to be used to supplement the Contractor’s traffic control operations. It is the Contractor’s responsibility to schedule, coordinate and make payment in a timely manner for the use of uniformed police officers with the Police
Department. The Town of Manchester Police Department requires payment for services within fourteen (14) days of work. A portion of the cost to provide uniformed police officers on the streets defined in the Traffic Control Ordinance will be measured separately for payment as specified herein.
TRAFFIC CONTROL PATTERNS
Traffic control patterns shall be used when a work operation requires that all or part of any vehicle or work area protrudes onto any part of a travel lane or shoulder. For each situation, the installation of traffic control devices shall be based on the following:
Speed and volume of traffic
Duration of operation
Exposure to hazards
Traffic control patterns shall be uniform, neat and orderly so as to command respect from the motorist.
In the case of a horizontal or vertical sight restriction in advance of the work area, the traffic control pattern shall be extended to provide adequate sight distance for approaching traffic.
If a lane reduction taper is required to shift traffic, the entire length of the taper should be installed on a tangent section of roadway so that the entire taper area can be seen by the motorist.
Any existing signs that are in conflict with the traffic control patterns shall be removed, covered, or turned so that they are not readable by oncoming traffic.
When installing a traffic control pattern, a “buffer area” must be provided which shall be free of equipment, workers, materials and parked vehicles.
When required by the Engineer, the Contractor shall install temporary marking tape to designate traffic lanes until such time permanent pavement markings included in the Contract are installed.
Although each situation must be dealt with individually, conformity with the typical traffic control pattern contained herein is required. In a situation not adequately covered by the typical traffic control plans, the Contractor must contact the Engineer for assistance prior to setting up a traffic control patterns.
ALLOWABLE ADJUSTMENT OF SIGNS AND DEVICES SHOWN ON THE TRAFFIC
CONTROL PLANS
The traffic control patterns contained herein show the location and spacing of signs and devices under ideal conditions. Signs and devices should be installed as shown on these patterns whenever possible.
The proper application of the traffic control patterns and installation of traffic control devices depends on actual field conditions.
Adjustments to the traffic control patterns/plans shall be made only at the direction of the
Engineer to improve the visibility of the signs and devices and to better control traffic operations.
Adjustments to the traffic control plans shall be based on safety of work forces and motorists, abutting property requirements, driveways, side roads, and the vertical and horizontal curvature of the roadway.
The Engineer may require that the traffic control pattern be located significantly in advance of the work area to provide better sight line to the signing and safer traffic operations through the work zone.
Table I indicates the minimum taper length required for a lane closure based on the posted speed limit of the roadway. These taper lengths shall only be used when the recommended taper lengths shown on the traffic control patterns cannot be achieved.
TABLE I – MINIMUM TAPER LENGTHS
POSTED SPEED LIMIT
MILES PER HOUR
MINIMUM TAPER LENGTH IN FEET
FOR A SINGLE LANE CLOSURE
30 OR LESS
MEASUREMENT AND PAYMENT
“Maintenance and Protection of Traffic” will be measured and paid for by the actual number of days traffic control is used during active construction within contract time requirements. The contract unit price shall include all materials, labor, tools and equipment incidental to furnishing, maintaining and removing approved traffic control devices as shown on the Plan or as directed by the Engineer, and other pertinent work necessary to comply with this specification, including, but not limited to:
• providing certified, uniformed flagpersons during all lane closures as specified herein;
• notifying public authorities of any proposed traffic changes;
• furnishing, installing, relocating, replacing and removal of traffic cones, traffic drums, barricades, temporary marking tape, and opposing traffic lane dividers;
• furnishing, installing, and removing the material for a temporary traversable slope in those areas where a longitudinal dropdown exists;
• furnishing, installing, and removing the material for a temporary transition where a transverse dropdown exists;
• temporarily relocating existing signs and sign supports as many times as deemed necessary and furnishing, installing, and removing temporary sign supports and foundations if necessary during construction; and
• removal or sanding of snow or ice or removal of leaves on the roadway or sidewalk if the
Contractor's operations interfere with the removal or sanding of snow or ice or the removal of leaves by the public authorities or adjoining land owners in an ordinary manner with regular highway equipment.
“Maintenance and Protection of Traffic” will not be measured for payment for any days in which the Contractor performs work beyond the allotted contract time, adjusted for any change orders.
No claim for additional payment due to unusual construction conditions encountered or delay caused by the Contractor or other outside agencies shall be considered.