Technical_Specifications.pdf
PDF 7 MB Posted
- Solicitation number
- 2027-02B
- Issued by
- Fort Bend County, Texas
About this file
Technical Specifications Summary
This is a technical specifications document for the City of Rosenberg's Wastewater Treatment Plant No. 1A – Clarifier No. 1 Rehabilitation Project, prepared by engineering firm Garver, LLC for Bid Number 2027-02B (TXE-2027-02) in Fort Bend County, Texas. The project encompasses the complete rehabilitation of Clarifier No. 1 at the treatment facility located at 2700 Avenue A, Rosenberg, TX 77471, including demolition of existing clarifier mechanisms, installation of new clarifier equipment, electrical and control system improvements, concrete repairs, protective coatings, and grouting. Work must commence within ten days of Notice to Proceed and be completed within 365 calendar days. The contractor must submit a detailed construction schedule in Gantt Chart format within ten days of issuance of Notice to Proceed, along with a schedule of values. Construction is restricted to specified working hours (7:00 a.m. to 6:00 p.m. Monday through Friday for general areas, with different restrictions for traffic-disrupting work), and the contractor must coordinate with Owner personnel, obtain required permits at its own expense, provide construction photography documentation, and maintain monthly progress meetings. The owner retains the ability to occupy existing facilities during construction without interruption, and the one-year maintenance period begins only after issuance of a Final Completion certificate.
The contract structure utilizes lump sum and unit price bidding as indicated on the bid form, with total project budget estimated at $1,000,000. All costs including performance bonds, payment bonds, temporary facilities, equipment, labor, and supervision are the contractor's responsibility unless explicitly stated as Owner-provided. The contractor bears financial responsibility for any environmental penalties or discharge violations caused by its actions, as well as damage restoration to existing facilities and utilities within 24 hours at no additional cost to the Owner. Submittals required prior to work commencement include performance bonds, labor and material payment bonds, certificates of insurance, subcontractor lists, and schedules of values. The contractor must employ an independent testing laboratory approved by the Owner for required testing and inspections, submit shop drawings and product data for Engineer review with minimum 30-day review periods, maintain detailed project record documents throughout construction, and prepare four bound copies of Operations and Maintenance Manuals plus electronic versions on CD or USB drives upon completion. Progressive payment is conditioned upon submission of updated construction schedules satisfactory to the Engineer, and any work performed without Field Project Representative observation may require removal and replacement at no additional cost to the Owner.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
For
WASTEWATER TREATMENT PLANT NO. 1A –
CLARIFIER NO. 1 REHAB PROJECT
BID NO. 2027-02B
TXE-2027-02
SEPTEMBER 2026
DIVISION 1
GENERAL REQUIREMENTS
Rosenberg - 01010 - 1
SUMMARY OF WORK
1.0 DESCRIPTION
a. The Work. The work consists of providing the necessary labor, materials, equipment, and supervision to construct WASTEWATER TREATMENT PLANT NO. 1A – CLARIFIER NO. 1 REHABILITATION PROJECT in the City of Rosenberg, and the City ETJ, Fort Bend County, Texas.
The project includes but is not limited to providing the necessary labor, materials, equipment, supervision, and plans to construct approximately the rehabilitation of Clarifier No. 1 at WWTP No.
1A. More specifically, the Work includes, but is not limited to, construction of the following:
a. Demolition including but not limited to the existing clarifier mechanism, walkway, feedwell, scraper arm, scum baffle, overflow v-notch weir, scum collection box, control panel, complete depth of grout, and all related appurtenances as included in the Specifications and shown on the Drawings.
b. Furnish all labor, equipment, material and supervision necessary for the installation of the proposed clarifier mechanism, walkway, feedwell, scraper arm, scum baffle, overflow v-notch weir, and scum collection box, electrical, instrumentation, and controls improvements as included in the Specifications and shown on the Drawings.
c. Furnish, all labor, equipment, material, and supervision necessary for the installation of electrical and control components including but not limited to power, programming, monitoring and integration as included in the Specifications and shown on the Drawings.
d. Furnish all labor, equipment, material, and supervision necessary to complete minor concrete repairs as identified during construction.
e. Furnish and apply protective coating to concrete clarifier as included in the Specifications and shown on the Drawings.
f. Furnish all labor, equipment, material, and supervision necessary to install grouting as included in the Specifications and shown on the Drawings.
b. The Project Site. The project is located at the City of Rosenberg WWTP No. 1A. The address for the site is as follows:
2700 Avenue A Rosenberg, TX 77471 Fort Bend County Property ID: R36096
c. The Owner & Operator.
The City of Rosenberg P.O. Box 32 Rosenberg, Texas 77471 Attention: Joyce Vasut, City Manager Telephone: (832) 595-3310
d. The Engineer of Record.
Garver, LLC 12141 Wickchester Lane Suite 200 Houston, Texas 77079 Attention: Alec Macmanus, PE
(979) 321-7756
2.0 WORK SEQUENCE
Rosenberg - 01010 - 2
Within ten (10) days from the date of the Notice to Proceed, the Contractor shall submit a construction schedule to the Engineer for approval. The schedule shall be in the form of a Gantt Chart (bar chart) and shall indicate the order in which the work is to be performed. The sequence and interdependence of all major activities must be shown.
The schedule shall be drawn to a calendar time scale. The commencement and completion dates for each activity shall be shown, as well as the duration in calendar days, for each activity. The schedule shall show not only the activities for actual physical construction of the project, but also the activities such as the Contractor's submittal of shop drawings and the Engineer's review and approval of the shop drawings. Failure to include any element of work required to complete the project within the scheduled contract time shall not release the Contractor from his obligation to complete the work in accordance with the contract documents.
The Contractor shall update the construction schedule monthly to reflect the progress of the work. The updated schedules shall be submitted to the Engineer for approval. Monthly partial payments will be dependent upon submission of an updated construction schedule satisfactory to the Engineer.
If the actual progress of the work falls behind the Contractor's approved construction schedule, the Owner may elect to deduct the value of work scheduled but not completed from progress payments due. The value of the work will be determined from the Contractor's approved schedule of values. These deductions will continue until the Contractor has taken steps to bring the progress of the project back in line with the approved construction schedule.
The Engineer must approve all temporary pumping and piping methods. All temporary pumping and piping shall be at the Contractor's expense and shall be included in the base bid.
In addition to the construction schedule, Contractor shall submit a schedule of values within 10 days of the Notice to Proceed. The schedule of values should be directly related to the construction schedule.
Work shall commence promptly after written notice to commence work has been given by the Engineer and shall be carried forward to completion in an uninterrupted and timely manner. All warranties and guarantees shall commence upon Final Completion of all work.
3.0 PROGRESS REPORTING
Monthly progress meetings shall be held on dates mutually agreed to by the Engineer and the Contractor. These meetings may be held at the project site, Rosenberg City Offices, or the Engineer's office as determined by the Engineer. Items to be discussed at this meeting include progress of the work, upcoming work items, status of submittals, monthly pay estimates, etc.
3.1 USE OF PREMISES
Construction equipment and temporary storage of materials may be placed on Owner’s property with approval from the Owner and/or as shown on the plans. The Contractor shall NOT use any private property during construction unless the Contractor has obtained written permission from the property owner. The Contactor is responsible for obtaining an agreement with other property owners at no additional cost to the project. Any agreements shall be submitted to the Owner for their records.
Any damage to the existing facilities and/or utilities is to be restored and made operable within a 24-hour time frame at no additional cost to the Owner and/or the owner of the facility and/or utilities.
Rosenberg - 01010 - 3
4.0 CONTRACTS
Construct the work under lump sum and unit prices as shown on the bid form. Total Base Bid and any combination of alternates, substitutions, or supplementary items may be used to determine which Contractor will be awarded the contract. Any bids which are found to be "front-loaded" with expenses may be rejected.
5.0 OWNER OCCUPANCY
During construction, the Owner must be able to use the existing facilities as much as possible without interruption.
If the Owner occupies a part of the project, the one-year maintenance period of that part does not begin. The one-year maintenance period begins only after the Engineer has issued a certificate of Final Completion for each phase of work.
6.0 DISPOSAL OF EXCESS MATERIAL
The Contractor must haul off all excess material to be properly disposed.
7.0 SEEDING, HYDRO-MULCH SEEDING, & SOD
Hydro-mulch seeding is required for all disturbed areas within the public utility easements or rights-of-way. Bermuda Sod is required for the lift station site. Contractor to restore all disturbed areas as a result of this contract.
8.0 WORKING HOURS
The Contractor is responsible for notifying the Engineer and any adjacent landowners at least forty-eight (48) hours in advance of any 24-hour operations. Should disputes about 24-hour operation occur, the Contractor is responsible for the handling of such disputes to the satisfaction of the adjacent landowners and the City. The Engineer shall be given at least seventy-two (72) hours’ notice by the Contractor prior to any work performed on weekends or holidays.
Construction disrupting traffic shall be conducted during off-peak hours, 9:00 a.m. to 4:00 p.m. weekdays and/or weekends 7:00 p.m. Friday to 4:00 a.m. Monday, dependent upon provisions of City of Rosenberg, Texas Department of Transportation, and Fort Bend County regulations and ordinances. Exception to these times, if necessary, shall be sought during the permit application process.
For all other areas of the project, working hours shall be 7:00 a.m. to 6:00 p.m., Monday through Friday.
9.0 AREA CLEANLINESS
The roadways, driveways, and other areas affected by construction operations must be returned to original condition or better upon completion. The streets shall be cleaned daily. Should the City or Engineer instruct the Contractor to clean the streets, the Contractor shall do so by the end of the same working day. If the Contractor fails to clean the streets by the end of the same working day, the City may hire a separate Contractor to clean the streets. The amount of that street cleaning may be deducted from the next Pay Estimate due to the Contractor.
10.0 SAFETY
Contractor shall be responsible for the safety of himself, his employees, and other persons during construction operations. All work shall be done in accordance with Occupational Safety and Health Administration, safety and health regulations of the United States Government for construction, State of Texas laws and regulations, Fort Bend County regulations and City of Rosenberg ordinances.
Rosenberg - 01010 - 4
11.0 PERMITS
Permits, fees, and licenses necessary for the pursuit of the work shall be obtained and paid for by the Contractor. If an electrician is necessary for the work, the electrician shall be appropriately licensed by the State of Texas.
12.0 COORDINATION
The Contractor is responsible for all coordination with all adjacent residential property owners, utility companies, pipeline companies, ambulances, police and fire departments during construction. The Contractor shall contact the Engineer’s Representative Alec Macmanus, PE, Garver at (979) 321-7756 and the City of Rosenberg’s Representative, Melissa Peña at (832) 595-3590, 48-hours before commencing work and 24-hours before any testing or placement of concrete. The Contractor shall give a minimum of 48-hours advance notice before working on weekends or holidays.
Contractor shall notify all residents and businesses directly adjacent to the proposed work a minimum of one (1) week prior to commencing construction, where applicable. Notifications shall include, but is not limited to, project name, dates, contact information for the Contractor and the Owner. Notification example shall be submitted to Engineer for approval prior to placement.
Contractor is required to coordinate with the Owner for shutdowns, start-up and temporary facilities made to the existing infrastructure required to complete the work.
- - o 0 o - -
Rosenberg - 01070 - 1
CUTTING AND PATCHING
1.0 GENERAL
1.1 RELATED WORK
a. Division 1, General Requirements. Summary of Work.
1.2 DESCRIPTION
a. Execute cutting (including excavating and backfilling), fitting or patching of the work required to:
(1) Make several parts fit properly.
(2) Uncover work to provide for installation of ill-timed work.
(3) Remove and replace defective work.
(4) Remove and replace work not conforming to requirements of the contract documents.
(5) Remove samples of installed work as specified for testing.
(6) Install specified work in existing construction.
b. In addition to contract requirements, upon written instruction of the Engineer:
(1) Uncover work to provide for observation of covered work.
(2) Remove samples of installed materials for testing.
(3) Remove work to provide for alteration of existing work.
c. Do not endanger any work by cutting or altering the work or any part of it.
d. Do not cut or alter the work of another Contractor without written consent by the Engineer.
e. Prior to cutting which affects structural safety of the project, or the work of another Contractor, secure written approval by the Engineer.
1.3 PAYMENT FOR COSTS
a. Costs caused by ill-timed or defective work or work not conforming to the contract documents, including the cost of additional services of the Engineer, will be borne by the Contractor.
b. Work done on written instructions of the Engineer, other than defective or non-conforming work, will be paid by the Owner.
2.0 PRODUCTS
Materials required for replacement of the work removed must conform to the specifications for the type of work to be done.
3.0 EXECUTION
3.1 PREPARATION BEFORE CUTTING
Rosenberg - 01070 - 2
a. Provide shoring, bracing, and support as required to maintain structural integrity of the project.
b. Provide protection for other portions of the project.
c. Provide protection from the elements.
3.2 PERFORMANCE
a. Execute fitting and adjustment of products to provide finished installation to comply with specified tolerances and finishes.
b. Execute cutting and demolition by methods which will prevent damage to other work and will prevent settlement.
c. Execute excavating and backfilling by methods which will prevent damage to other work and will prevent settlement.
d. Restore work which has been cut or removed and install new products to provide completed work in accord with requirements of the contract documents.
e. Refinish entire surfaces as necessary to provide an even finish. On continuous surfaces, refinish to the nearest intersections. For an assembly, refinish the entire item.
Rosenberg - 01300 - 1
SUBMITTALS
1.0 PRIOR TO BEGINNING WORK
Submit the following items with the signed agreement form as a prerequisite to starting the work. Prepare the number of copies which the Contractor requires for distribution plus one (1) copy to be distributed by the Engineer. For Structural shop drawings and calculations, provide one (1) extra copy for distribution by the Engineer. The location of information concerning each submittal is referenced. Failure to make any required submittal in acceptable form within the time frame specified may be grounds for withholding payment.
a. Performance Bond. Bidding Documents, Contract Forms, General and Supplementary Conditions.
b. Labor and Material Payment Bond. Bidding Documents, Contract Forms, General and Supplementary Conditions.
c. Certificate of Insurance. General and Supplementary Conditions.
d. List of Subcontractors. General and Supplementary Conditions.
e. Schedule of Values. General Conditions and as specified in the section on Schedule of Values.
f. Material and Equipment List. Supplementary Conditions and specification sections.
g. Construction Schedule. General Conditions and as specified in the section on Construction Schedule.
2.0 DURING CONSTRUCTION
During the progress of the work make the following submittals in a timely manner to prevent any delay in the work.
a. Work Schedules. Submit progress schedules monthly as an evidence that the project will be ready for occupancy by the date of substantial completion and the date of final completion. One (1) copy is required.
b. Shop Drawings, Product Data, and Samples. Submit, in accordance with the section on Shop Drawings, Product Data and Samples included in Division 1, General Requirements. At a minimum submit the following: (As applicable to the project)
DIVISION 1 – GENERAL REQUIREMENTS
During Construction List of Subcontractors Construction Schedule Schedule of Values Pre-Construction Photos Testing Laboratory Reports Construction Notice Door Hanger/Flyer
DIVISION 2 – SITE WORK
Excavation Dewatering methods
Rosenberg - 01300 - 2
Waterline Items
PVC Piping Material Fittings (Including bends, connections, plugs, etc.)
Restrained Joints Flushing Valves Gate Valves Air Release Valves Manholes (Air Release Valve) Manhole Covers Valve Box Cover Steel Casing Blow-off Valves Tunnel Grout Trenchless Construction Plan/Methods Hydrostatic Testing Results Disinfection Method of Piping
Sanitary Sewer Items
PVC Piping Material Fittings (Including bends, reducers, connections, plugs etc.)
Restrained Joints Gate Valves Air Release Valves Manholes (Sanitary Manhole, Force Main Tie-In) Manhole Cover Valve Box Cover Steel Casing Tunnel Grout Trenchless Construction Plan/Methods Hydrostatic Testing Results
Sitework
Hydromulch Seeding Sod
DIVISION 3 – CONCRETE
Concrete Mix Design Reinforcing Steel Mill Certificates Bill of Materials Water Stops Admixtures Curing Method Grout
DIVISION 5 - METALS
Miscellaneous
Fabricated Supports in Wet Well Miscellaneous Metals Including All Supports Access Hatches & Safety Grates
Rosenberg - 01300 - 3
DIVISON 9 – COATING
Protective Coatings
Coating Schedule Surface Preparation, Application Rates Color Chart Cut Sheets for Each Paint Certificate of Sufficient Purchase (Quantities and Types)
DIVISION 11 - EQUIPMENT
Lift Station Pumps
Pumps Bases Guide Rails Manufacturer’s Report (post installation) Manufacturer’s Warranty (post installation) Operation and Maintenance Manuals
DIVISION 13 – CONTROLS AND INSTRUMENTATION
Control Panel
Enclosure Nameplates Buses Disconnect Switches Combination Starters Phase Monitors Controls
DIVISION 15 - MECHANICAL
General
Piping (DIP) Piping (SS) Piping (PVC) Piping Pressure Test Results
Valves
Air Release Valve Air & Vacuum Valve Check Valve Plug Valve Surge Relief Valve RPZ Backflow Preventer Hose Bibb and Vacuum Breaker
DIVISION 16 - ELECTRICAL
General
Disconnect Switches Boxes and Manholes
Rosenberg - 01300 - 4
Fuses Surge Protection Lighting Panel Boards Lighting Poles, Fixtures Magnetic Motor Starters Lift Station Control Panel Including Sun Shield Wire Wiring Devices Transformers Thermal, Thermal/Magnetic, Solid State Circuit Breakers Conduit Remote Control Switches Automatic Controls Manufacturer’s Certification for Automatic Controls Circuit Breakers Time Delay Switches Automatic Transfer Switch Generator
Control Panel Enclosure Nameplates Buses Disconnect Switches Combination Starters Phase Monitors Controls
Motors Rated Voltage Phases Frequency Amps (Full Load) Nominal speed (Full Load) Winding Insulation NEMA Design Letter and Code Letter Temperature Rise Bearing Type & Life Dimensions & Frame # Operation and Maintenance Manuals
Wiring (Wire, Conduit, Fittings, Pull Boxes, Etc.)
Raceways Wire Sizes & Classifications Switches & Outlets
Lighting
Dimensions Photometric Report Zonal Cavity Method of Utilization Table Voltage, type and Manufacturer of Ballast
Rosenberg - 01300 - 5
Automatic Transfer Switch Rated Amps, Voltage, and Poles Withstand Rating Dimensions Accessories Schematic Wiring Diagram Manufacturer’s Certification
Generator
Rated KW Output, Voltage, System Type, Frequency, Power Factor, Engine Type Dimensions Accessories Interconnection Drawings Schematic Drawings Brochures Generator Factory Test Report Emissions Compliance Manufacturer’s Certification
c. Mill Certificates. Submit mill certificates on the following items as required by the specifications sections.
(1) Reinforcing Steel: Division 3 - Concrete
(2) Division 5 - Metals
(3) Tanks and Welded Steel: Division 15 - Mechanical
d. Pump Tests. Submit certified running tests of booster pumps and well pumps in accordance with the applicable pump section data sheets.
e. Application for Payment. Submit applications for partial payment as specified in the General and
Supplementary Conditions and within the time specified in the agreement.
e. Change Order Proposal. A proposal for change order may be submitted to the Engineer whenever a need arises. The request must be in writing and must include sufficient information to assess the need for a change in the work, the contract time, or the contract sum.
3.0 PROJECT CLOSEOUT
With a written notice of completion submit the following items in the proper form as a condition of final acceptance of the work:
a. Project Record Documents. Submit in accordance with the section on Project Record Documents included in Division 1, Section 1720.
b. Guarantees, Warranties, and Bonds. As required in the General and Supplementary Conditions and listed in various sections of the specifications.
c. Spare Parts and Maintenance Materials. As specified in various sections of the specifications.
d. Operation and Maintenance Manual. Prepare four (4) copies of an Operation and Maintenance
Manual for the project.
Rosenberg - 01300 - 6
(1) Each copy shall be bound in standard-size, black, three (3) ring binder(s).
(2) Provide index tabs for each portion of the manual, with a minimum of one (1) tab for each item of equipment in the List of Equipment Manufacturers and one (1) tab for electrical and motor control center facilities.
(3) Provide "pouch" enclosures with three (3) ring binder edging to secure any drawings which are made a part of the manual.
(4) If standard manufacturer literature is used, mark the appropriate portions that deal with the specific equipment installed in the project.
(5) Where applicable, provide serial numbers of installed equipment.
(6) Provide nameplate information of individual motors, pumps, engines, generator, hydropneumatics tanks, etc.
(7) Provide a Table of Contents for each copy of the manual in the front of the first binder.
(8) Provide a white label on the back of the binding of each binder with the following typed title:
[PROJECT NAME]
FOR
CITY OF ROSENBERG
(Completion Date)
OPERATIONS AND MAINTENANCE MANUAL
(2) Prepare three (3) CD or USB flash drive of the Operation and Maintenance Manual for review.
See Section (e) for more details on electronic files.
(a.) Once Operation and Maintenance Manual has been approved by the Engineer the contractor is to provide a copy of all the information contained in the binders on to a CD or USB flash drive in a PDF format.
(b.) A protective case for the CD is to be provided. The Contractor is to label the front of the protective case with the typed title shown below. If a USB flash drive is submitted include a separate PDF file (labeled 00-Project Info.PDF) that contains the typed title below:
[PROJECT NAME]
for
CITY OF ROSENBERG
(Completion Date)
OPERATIONS AND MAINTENANCE MANUAL
(This manual contains ?? parts/files)
Rosenberg - 01300 - 7
e. Electronic Files.
O&M manuals shall be formatted as shown below:
Manuals received which are not bookmarked will not be accepted. When the manual is split into multiple files, use descriptive names such as the following:
Project Name – O&M Manual – Part 1.PDF
Project Name – O&M Manual – Part 2.PDF
The intent is to have as few files as possible without exceeding the file size limitation. Do this by merging small files or splitting large files. When possible, do not split large files in the middle of a section.
Rosenberg – 01321 - 1
CONSTRUCTION PHOTOS
1.0 GENERAL
1.1 SECTION INCLUDES
Photographic requirements for construction photographs and submittals. Contractor shall photograph all areas within, and adjacent surrounding areas of the proposed work area and access to the proposed work area.
1.2 MEASUREMENT AND PAYMENT
No separate payment will be made for this item. Include cost of construction photographs in the related cost bid items.
1.3 SUBMITTALS
a. Refer to Section 01300 for submittal requirements.
b. Photographs: Retain one set of construction photos throughout course of the project and available for reference at the Engineer’s request. Submit files on cloud-based software for download or two (2) USB’s of all photos taken and include a table labeling photo file name, location and direction of photo view. All submittal items must be submitted to the Engineer and approved by the Engineer prior to proceeding with the proposed work.
c. Contractor to provide photographs of any damaged and/or repaired items prior to final acceptance of construction.
1.4 QUALITY ASSURANCE
Responsible for timely execution of photographs, their vantage point, and quality.
2.0 PRODUCTS
2.1 PRECONSTRUCTION PHOTOGRAPHS
a. Prior to commencement of any construction, take digital color photographs of entire sanitary sewer path, areas within owner’s private property and streets.
b. Digital Photographs: Minimum picture quality of 2.1 megapixels at a minimum image size (resolution) of
1600 x 1200.
c. Photographs shall show on readable non-reflective chalkboard:
(1) Job number
(2) Date and time photographs were taken (Automatic date/time in negative is acceptable)
(3) Baseline station, direction of view (e.g., N, S, NW, etc.) and house number or street address and street name on chalkboard (as applicable).
d. Indicate condition of the following:
(1) Roadways and driveways
(2) Ditches
Rosenberg – 01321 - 2
(3) Curb
(4) Area between walk and curb
(5) Particular features (for example, street light, shrubs, fences, and trees)
(6) Trees, shrubs, etc. outside limits of proposed clearing
(7) Provide notation of vantage point marked for location and direction of shot, on key plan of site
e. Take sufficient number of photographs to show structural condition of concrete, condition of equipment, and condition of trees, shrubs, and grass.
f. Include identification of each photograph in an index including the following information:
(1) Name of Project
(2) Name of Contractor
(3) Date photograph was taken
Rosenberg - 01340 - 1
SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
1.0 GENERAL
a. Submit shop drawings, product data, and samples required by specification sections.
b. Shop drawings, product data, and samples are not considered a part of contract documents.
c. Schedule submissions at least 15 days before reviewed submittals will be needed.
2.0 CONTRACTOR RESPONSIBILITIES
a. Review shop drawings, product data and samples prior to submission. Verify:
(1) Field measurements
(2) Field construction criteria
(3) Catalog numbers and other data
(4) Conformance with submission requirements
b. Coordinate each submittal with contract documents and work schedules to prevent any delay in the work.
c. Contractor's responsibility for errors and omissions is not relieved by the Engineer's review of submittals.
d. At time of submission, and in writing, notify the Engineer of submittal deviations from contract documents. Contractor's responsibility for deviations from contract documents is not relieved by the Engineer's review of submittals unless the Engineer gives written acceptance of specific deviations.
e. Begin no work related to submittals until return of submittals with the Engineer's stamp and initials or signature indicating review.
f. Distribute copies after the Engineer's review.
3.0 ENGINEER'S DUTIES
a. Review submittals with reasonable promptness to prevent any delay in the work. Review for conformance with:
(1) Design concept of project
(2) Contract documents
b. Review of a separate item does not constitute review of an assembly in which the item functions.
c. Return to Contractor those submittals, which do not meet the requirements and require correction and resubmission.
d. Affix stamp and initials or signature certifying review of submittal.
e. Return reviewed submittals to Contractor for distribution.
Rosenberg - 01340 - 2
4.0 PREPARATION REQUIREMENTS
4.1 SHOP DRAWINGS
a. Preparation by a qualified detailer is required.
b. For Mechanical and Electrical work use the same sheet size as contract drawings.
c. Where necessary for clarity, identify details by reference to sheet and detail numbers on contract drawings.
d. Include on the drawing all information required for submission or submit transmittal letter containing required information.
e. Prepare the number of copies, which the Contractor requires for distribution, plus three (3) copies to be distributed by the Engineer. For Electrical and Structural shop drawings, provide one (1) extra copy for distribution by the Engineer.
4.2 PRODUCT DATA
a. Modify the manufacturer's standard schematic drawings to delete or supplement information as applicable.
b. For manufacturer's catalog sheets, brochures, diagrams, schedules, performance charts, illustrations, and other descriptive data:
(1) Clearly mark each copy to identify pertinent materials, products, or models.
(2) Show dimensions and clearances required.
(3) Show performance characteristics and capacities.
(4) Show wiring diagram and controls.
c. Include on the data all information required for submission or submit transmittal letter containing required information.
d. Prepare the number of copies, which the Contractor requires for distribution, plus three (3) copies to be retained by the Engineer. For Electrical and Structural product data, provide one (1) extra copy for distribution by the Engineer.
4.3 SAMPLES
a. Submit office samples of sufficient size and quantity to clearly illustrate:
(1) Functional characteristics of project or materials with integrally related parts and attachment devices.
(2) Full range of color samples.
b. Erect field samples and mock-ups at the project site in an acceptable location. Construct each sample complete, including work of all trades required in finished work.
c. Include in transmittal letter all information required for submission.
d. Prepare the number of samples specified.
Rosenberg - 01340 - 3
5.0 SUBMISSION REQUIREMENTS
a. Accompany submittals with a transmittal letter in duplicate.
b. Include the following information for each submittal:
(1) Date and revision dates
(2) Project title and number
(3) The names of the
(a) Engineer
(b) Contractor
(c) Subcontractor
(d) Supplier
(e) Manufacturer
(4) Identification of project or material
(5) Relation to adjacent structure or materials
(6) Field dimensions clearly identified as such
(7) Specification section number
(8) Applicable standards, such as ASTM number or Federal Specification
(9) A blank space on each shop drawing, approximately 5" x 5", for the Engineer's stamp.
(10) Identification of deviations from contract documents
(11) Contractor's stamp, initialed or signed, certifying review of submittal, verification of field measurements and compliance with contract documents.
c. Submit all required shop drawings, product data and samples for the following work at one time.
Suitably organize and index 8½" x 11", 11" x 17" and other compatibly sized material in the three
(3) ring binder. Larger shop drawings may be submitted together either rolled or folded. Include an index.
(1) Mechanical: Division 15
(2) Electrical: Division 16
6.0 RESUBMISSION REQUIREMENTS
6.1 SHOP DRAWINGS
a. Revise initial drawings as required and resubmit as specified for initial submittal.
Rosenberg - 01340 - 4
b. Indicate on drawings any changes, which have been made other than those, requested by the Engineer.
6.2 PRODUCT DATA AND SAMPLES
Submit new data and samples as required for initial submission.
7.0 DISTRIBUTION AFTER REVIEW
a. Distribute copies of shop drawings and product data which carry the Engineer's stamp to:
(1) Contractor's file
(2) Job site file
(3) Record document file
(4) Other prime contractors
(5) Subcontractors
(6) Supplier
(7) Fabricator
b. Distribute samples as directed. After review, samples may be used in construction.
Rosenberg - 01370-1
SCHEDULE OF VALUES
1.0 GENERAL
1.1 SCOPE
a. Submit a schedule of values with the contract documents.
b. Submit quantities of designated materials. List quantities of materials specified under unit price allowances.
c. Payment for materials stored on-site will be limited to those materials listed in a schedule of unit material values.
2.0 FORM OF SUBMITTAL
Submit typewritten schedule of values on 8½" x 11", plain bond, white paper. Use the table of contents of this project manual as a format for listing costs of work by sections under Divisions 2 through 16.
3.0 PREPARATION
3.1 PREPARING SCHEDULE OF VALUES
a. Itemize separate line item cost for each of following general cost items:
(1) Performance and payment bonds
(2) Field supervision and layout
(3) Temporary facilities and controls
b. Itemize separate line item cost for work required by each section of this specification.
c. Breakdown installed costs into:
(1) Delivered cost of product with taxes unpaid. The Owner is tax exempt.
(2) Total installed cost, with overhead and profit.
d. Breakdown costs to list major products or operations for each line item which has an installed value of more than $500.00.
e. Make sum of total costs for all items listed in the schedule equal to the total contract sum.
Rosenberg - 01370-2
3.2 PREPARING SCHEDULE OF UNIT MATERIAL VALUES
a. Submit separate schedule of unit prices for materials to be stored on which partial payments will be made.
b. Make a submittal form parallel to the schedule of values, with line items identified the same as line items in the schedule of values.
c. Include in unit prices only:
(1) Cost of material
(2) Delivery and unloading at site
d. Make sure that the unit price multiplied by the quantity given equals the material cost of that item in the schedule of values.
3.3 REVIEW AND RESUBMITTAL
After review by the Engineer, revise and resubmit the schedule of values or material values, if required. Resubmit revised schedules in the same manner as the original schedules.
Rosenberg - 01410 - 1
LABORATORY SERVICES
1.0 GENERAL
1.1 PAYMENT
a. The Contractor will employ and pay for services of an independent testing laboratory to perform specified testing. The Owner shall approve testing laboratory.
b. Employment of a testing laboratory in no way relieves the Contractor of his obligation to perform the work according to the contract documents.
1.2 RELATED WORK
a. General Conditions of the Contract for Construction. Inspections and testing required by laws, ordinances, rules and regulations, or orders of public authorities are the responsibility of the Contractor.
b. Specification Sections. Contained in the various specification sections are requirements for certification of products, testing, adjusting and balancing of equipment, and other tests and standards.
c. Division 2, Site Work. Subsurface exploration.
1.3 WORK INCLUDED
Testing is required in accordance with standard City of Rosenberg Design Standards, all approved rules, regulations, and ordinances, and/or these specifications.
2.0 TESTING LABORATORY
2.1 QUALIFICATIONS
a. Standards.
(1) Meet "Recommended Requirements for Independent Laboratory Qualification," latest edition, published by American Council of Independent Laboratories.
(2) Meet basic requirements of ASTM E-329, "Standards of Recommended Practice for Inspection and Testing Agencies for Concrete and Steel as Used in Construction."
(3) Submit copy of report of inspection of facilities made by Materials Reference Laboratory of National Bureau of Standards during most recent tour of inspection, with memorandum of remedies of any deficiencies reported by inspection.
2.2 DUTIES
a. Cooperate with the Engineer and Contractor and provide qualified personnel promptly on notice.
b. Perform specified inspections, sampling and testing of materials and methods of construction:
(1) Comply with specified standards, ASTM, other recognized authorities, and as specified.
(2) Ascertain compliance with requirements of the contract documents.
Rosenberg - 01410 - 2
c. Promptly notify the Engineer Contractor, and Owner of irregularities or deficiencies of work which are observed during performance of services.
d. Promptly prepare and distribute reports of inspections and tests as follows:
(1) Engineer: Two (2) copies
(2) Contractor: One (1) copy
(3) Owner: One (1) copy
(4) Other: As requested by Owner
e. Include the following information for each test as well as additional data specified in the applicable section:
(1) Date of Test
(2) Location of Test
(3) Specified Standards
(4) Test Results
(5) Remarks
2.3 LIMITS OF AUTHORITY
The laboratory is not authorized to:
a. Release, revoke, alter, or enlarge on requirements of the contract documents.
b. Approve or accept any portion of the work.
c. Perform any duties of the Contractor.
3.0 CONTRACTOR'S RESPONSIBILITIES
a. Cooperate with laboratory personnel, provide access to the work, or to manufacturer's operations.
b. Provide to laboratory, preliminary representative samples of materials to be tested, in required quantities.
c. Furnish labor and equipment:
(1) To provide access to the work to be tested.
(2) To obtain and handle samples at the site.
(3) To facilitate inspections and tests.
(4) For laboratory's exclusive use for storage and curing of test samples.
Rosenberg - 01410 - 3
d. Notify the laboratory at least 48 hours in advance of operations to allow for his assignment of personnel and scheduling of tests.
e. Arrange with the laboratory and pay for additional samples and tests required for the Contractor's convenience.
Rosenberg - 01420-1
FIELD PROJECT REPRESENTATIVE SERVICES
1.1 SCOPE
This section summarizes the duties, responsibilities, and limitations of authority of the Field Project Representative (FPR) in connection with his observation of the work.
1.2 AUTHORITY
a. The definition of the Engineer's duties provides authority for observation of the work.
b. The FPR's authority to require special inspection or testing in connection with rejected work is also provided in the General Conditions. Furthermore, the provisions that, upon request by the Contractor, the FPR observe and accept or reject any material furnished are also granted in the General Conditions.
c. The provision for removing work for observation by the FPR is set forth in the General Conditions in the paragraph concerning uncovering of work.
2.0 DEFINITIONS
a. FPR. A representative of the Engineer or Owner will be assigned authority to observe the work.
b. Working Day. FPRs are generally not required to work on Saturdays, Sundays, or legal holidays. If the Contractor plans work on a Saturday or legal holiday, prior arrangements should be made for a FPR not later than two (2) days prior to the Saturday or legal holiday.
c. Unobserved Work. Any work performed on a regular weekday, or Saturday, Sunday, or legal holiday without benefit of an observation by FPR may require removal and replacement if so directed by the FPR. Removal and replacement will be completed at no additional cost to the Owner.
3.0 DUTIES OF THE FIELD PROJECT REPRESENTATIVE
a. Assist the Contractor's superintendent in understanding the intent of the contract documents.
b. Conduct on-site observations of the work in progress as a basis for determining conformance of work, materials, and equipment with the contract documents.
c. Consider and evaluate suggestions or recommendations which may be submitted by the Contractor to the Engineer and report them with recommendations for the Engineer's final decision.
d. Be alert to the construction schedule and to conditions which may cause delay in completion, and report same to the Engineer.
e. Maintain liaison with the Contractor and all Subcontractors on the project only through the Contractor's superintendent.
f. Attend conferences held at the project site as directed by the Engineer. Report to the Engineer the results of such meetings.
Rosenberg - 01420-2
g. Advise the Engineer in advance of the schedules of tests and observe that tests at the project site, which are required by the contract documents, are actually conducted. Observe, record, and report to the Engineer all details relative to the test procedure.
h. If inspectors representing local, state, or federal agencies having jurisdiction over the project visit the site, accompany such inspectors during their trips through the project. Record and report to the Engineer's office the results of these inspections.
i. Receive samples, which are required, to be furnished at the site; record date received, from whom, and notify the Engineer of their readiness for examination; record Engineer's approval or rejection; and maintain custody of approved samples.
j. Review applications for payment submitted by the Contractor and forward them with recommendations to the Engineer for disposition.
k. Before substantial and final completion, check each incomplete or defective item as it is corrected.
l. If a situation arises during construction which requires that work be rejected, report such situation immediately to the Engineer.
m. The field project representative shall not:
(1) Authorize deviations from the contract documents.
(2) Personally conduct any tests.
(3) Enter into the area of responsibility of the Contractor's superintendent.
(4) Expedite the work for the Contractor.
(5) Advise on or issue directions relative to any aspect of construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the work.
(6) Authorize or suggest that the Owner occupy the project, in whole or in part, prior to final completion.
(7) Issue a recommendation for payment.
Rosenberg - 01500-1
TEMPORARY FACILITIES AND CONTROLS
The facilities and controls specified in this section are considered minimum for the project. After obtaining approval, the Contractor can provide additional facilities and controls which he deems necessary for proper execution of the work and to meet his responsibilities for protection of persons and property.
2.0 BUILDINGS
a. Field Office. A temporary field office is required at the work site on an approved location. This building must be weatherproof and must have a lockable door, electric illumination, air conditioning, and a sound floor above ground level.
a. Field Office. A temporary field office is not required.
b. Storage. Provide watertight storage facilities of suitable size with floor above ground level for all materials susceptible to weather damage. Storage of other materials on blocks off the ground is acceptable. Place materials to permit easy access for inspection and identification.
c. Other Buildings. The location or building of structures or the erection of tents or other forms of protection are allowed as approved.
3.0 UTILITIES
a. Job Telephone. A telephone is not required.
b. Temporary Connections. Arrange and secure all temporary connections for electricity, gas, and other services needed to do the work. The cost of connection and use is paid by the Contractor.
c. Existing Utilities. Coordinate use of existing facilities with the City of Rosenberg Utility Director, Mr. Eddie
DeLeon (832) 595-3590.
4.0 SANITATION
Provide and maintain sanitary conveniences to satisfy requirements of local or state health authorities, ordinances, and laws. Obtain approval for location, secluded from public view. Provide a self-contained, above-ground, temporary toilet facility which is sealed and leak-proof.
5.0 ACCESS ROADS AND PARKING
Access and parking at the site is not limited by provisions other than those explained under USE OF PREMISES under SUMMARY OF WORK.
Rosenberg - 01500-2
6.0 REMOVAL OF TEMPORARY FACILITIES AND CONTROLS
Prior to final completion, remove all temporary buildings, storage facilities, sanitary conveniences, and signs.
Disconnect all temporary utility connections. Clear the area of unnecessary safety items and temporary controls.
Remove or restore, as required, all temporary roads and parking areas. Clean up the entire area as specified in the section on Cleaning and Adjusting.
Rosenberg - 01571-1
TRAFFIC CHANNELIZING DEVICES
1.0 GENERAL
1.1 DESCRIPTION
a. This section specifies the requirements for furnishing, installing, relocating, maintaining, and subsequently removing the temporary traffic channelizing devices required in the City of Rosenberg. The following devices are specified herein:
(1) Barricades, Types I, II, and III
(2) Cones, tubular and conical
(3) Drums
(4) Vertical panels
(5) High level warning devices
1.2 QUALITY ASSURANCE
a. All temporary traffic channelizing devices shall comply with the requirements of the Texas Department of
Transportation (TxDOT) Manual on Uniform Traffic Control Devices for Streets and Highways and the applicable regulations and standards for Fort Bend County, Texas, and the City of Rosenberg, Texas.
b. Reference Standards Applicable to this Section:
(1) Texas Department of Transportation (TxDOT).
(a) Texas Manual on Uniform Traffic Control Devices for Streets and Highways.
(2) The above referenced standards may be obtained from:
Texas Department of Transportation Highway Building 11th and Brazos Streets Austin, Texas 78701 (512)475-2081
1.3 SUBMITTALS
Certificates shall be submitted for each traffic channelizing device, indicating that the device complies with the requirements of the TxDOT Manual on Uniform Traffic Control Devices for Streets and Highways.
1.4 MEASUREMENT AND PAYMENT
Separate measurement and payment of temporary traffic channelizing will not be made. Include cost of these items in the amount bid for “Traffic Control Systems".
Rosenberg - 01571-2
2.0 PRODUCTS
2.1 MATERIALS
Temporary traffic channelizing barricades, cones, drums, vertical panels, and high level warning devices shall comply with the requirements of Part VI, Section C - Channelizing Devices in the TxDOT Manual on Uniform Traffic Control Devices for Streets and Highways.
3.0 EXECUTION
3.1 INSTALLATION
a. Temporary traffic channelizing devices shall be installed in accordance with the requirements of Part VI of the TxDOT Manual on Uniform Traffic Control Devices for Streets and Highways and the details shown on the drawings.
b. Devices shall be maintained as necessary during the course of the work, and shall be removed from the
Work Site when no longer needed.
Rosenberg - 01710-1
CLEANING AND ADJUSTING
1.0 GENERAL
1.1 RESPONSIBILITY
a. The Contractor is responsible for cleaning and adjusting the work. If the Contractor fails to clean and adjust the work, the Owner may do so and charge the resulting costs to the Contractor.
b. Detailed cleaning and adjusting requirements for specific trades or work are specified in sections pertaining to that trade or work.
1.2 REQUIREMENTS OF REGULATORY AGENCIES
a. Fire Protection. Store volatile waste in covered metal containers and remove from premises daily.
b. Pollution Control. Conduct cleaning and disposal operations in compliance with local ordinances and antipollution laws.
(1) Remove waste materials, rubbish, and debris from the site and legally dispose at public or private dumping areas off the project site.
(2) Disposal of volatile fluid wastes and other chemical wastes in storm or sanitary sewer systems or into streams or waterways is not permitted.
c. Safety Standards. Maintain the project in accordance with safety and insurance standards.
1.3 PAYMENT
No separate payment will be made. Include cost of work in other related bid prices.
2.0 PRODUCTS
Use only cleaning materials recommended by the manufacturer of the surface to be cleaned. Employ cleaning materials as recommended by the cleaning material manufacturer.
3.0 EXECUTION
3.1 DURING CONSTRUCTION
a. Oversee cleaning and insure that the premises are maintained free from accumulations of waste material and rubbish. Do not allow waste materials, rubbish, and debris to accumulate and become unsightly or create a hazard. Provide containers and locate on site for collection of waste material, rubbish and debris.
b. At reasonable intervals during progress of the work, collect and dispose of waste material, rubbish, and debris. Handle waste in a controlled manner. Do not drop or throw materials from heights.
3.2 FINAL CLEANING AND ADJUSTING
a. Use experienced workmen or professional cleaners for final cleaning.
b. Remove grease, dust, dirt, stains, paint, oil, labels, fingerprints, and other foreign materials from interior and exterior surfaces. Repair, patch, and touch-up marred surfaces to match adjacent finishes.
Rosenberg - 01710-2
c. Broom clean paved surfaces; rake clean other surfaces of grounds.
d. If installed features of the work fail to operate or operate improperly, make the necessary adjustments to permit and insure proper operation. Remove and repair or replace maladjusted items if necessary for proper adjustment.
e. Remove all waste material and rubbish from the project area, as well as all tools, construction equipment, machinery, surplus materials, and temporary facilities.
f. Immediately prior to acceptance or occupancy, conduct a final inspection of exposed interior and exterior surfaces to verify that the work is properly cleaned. Maintain cleaning until the premises are occupied by the Owner.
3.3 ADJACENT AREAS
To the Owner's satisfaction, clean or repair adjacent areas affected by the construction. Remove dust and debris in the adjacent area. Repair, patch, and touch-up marred surfaces to match adjacent finishes.
Rosenberg - 01720-1
PROJECT RECORD DOCUMENTS
1.0 GENERAL
Prepare and maintain record documents for the project to accurately reflect the construction as built. Documents must be submitted at work completion as a condition of final acceptance.
2.0 MAINTENANCE OF RECORD DOCUMENTS
a. Maintain at the job site, one (1) copy of:
(1) Contract drawings
(2) Complete set of specifications
(3) Addenda
(4) Reviewed shop drawings
(5) Change orders and field orders
(6) Other contract modifications
(7) Field test records
(8) Correspondence
b. Store record documents in an approved location apart from documents used for construction. Do not use record documents for construction purposes. Provide files and racks for orderly storage. Maintain documents in clean, dry, legible condition. Make documents available at all times for inspection by the Engineer.
3.0 MARKING DEVICES
Mark all changes with red pencil.
4.0 RECORDING
a. Keep record documents current. Do not permanently conceal any work until required information has been recorded.
b. Label each document "PROJECT RECORD" in two-inch (2") high printed letters. Legibly mark contract drawings to record actual construction:
(1) Depths of various elements of foundation in relation to survey data.
(2) Horizontal and vertical location of underground and underslab utilities and appurtenances referenced to permanent surface improvements.
(3) Location of internal utility and appurtenances referenced to permanent surface improvements.
(4) Field changes of dimension and detail.
(5) Changes made by change order or field order.
Rosenberg - 01720-2
(6) Details not on original contract drawings.
c. Legibly mark specifications and addenda to record:
(1) Manufacturer, trade name, catalog number, and supplier of each product and item of equipment actually installed.
(2) Changes made by change order or field order.
(3) Other matters not originally specified.
d. Legibly annotate the following shop drawings to record changes made after review:
(1) Manufacturer, trade name, catalog number, and supplier of each product and item of equipment actually installed.
(2) Changes made by change order or field order.
(3) Other matters not originally specified.
5.0 SUBMITTAL
a. At time of submittal for Infrastructure Permit and Land Disturbance Permit the following documents will be needed:
Spec Books (signed) – 2 DC’s (PDF format)
Plans – 4 Full Size
Plans – 4 Half Size (5 if City Project)
Plans – 2 CD’s (PDF format)
Pre-Con…