This is a set of construction plan documents for the City of Rosenberg, Texas, prepared by Garver, LLC Engineering for the Wastewater Treatment Plant No. 1A – Clarifier No. 1 Rehabilitation project. The project involves the demolition and replacement of equipment within an existing clarifier basin at the WWTP facility located at 2700 Avenue A, Rosenberg, Texas. The scope of work includes removing and replacing the existing clarifier mechanism, rake arms, motor, scum collection equipment, and associated piping and controls. The project requires contractor coordination with the City for dewatering and sludge removal, field verification of existing utility locations and dimensions, concrete repairs to the clarifier basin following grout removal, installation of new weirs and baffles, spray system components, conduit and electrical conductor replacement, and application of protective coatings. The estimated project budget is $1,000,000 with an estimated completion timeframe of 365 calendar days. The plans are designated for 100% design and issued for bidding purposes under Bid Number 2027-02B.
Key contract requirements include contractor responsibility for all safety protocols, site drainage, storm water compliance, utility identification and protection, equipment start-up procedures, and adherence to local codes and National Electrical Code standards. The work is located within an operational wastewater treatment plant where operations must be maintained, with the individual clarifier basin designated out of service for the rehabilitation work. The contractor must power-wash the clarifier surface, repair minor structural damage, and coordinate electrical work including replacing conductors in existing conduit with minimum #12 gauge wire per National Electrical Code requirements. A bid alternate is included for direct bury conduit installation along an alternate route. The project documents include site and staging plans, demolition plans, process plan views, section views, and detailed specifications prepared by licensed professional engineer Alec R. Macmanus (Texas License #154827), with digital seal dated September 1, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF ROSENBERG, TEXAS
DESIGN DRAWN DATE SHEET
REVISIONS
REV NO. DATE DESCRIPTION
CITY BID NO.: 2027-02BSD&C PID:
FILE NUMBER
SEPT.
WWTP NO. 1A CLARIFIER NO. 1
REHABILITATION PROJECT
12141 WICKCHESTER LANE SUITE 200
HOUSTON, TX 77079
(713) 491-8333
TEXAS REGISTRATION NUMBER: F-5713
CONSTRUCTION PLANS FOR
WWTP NO. 1A CLARIFIER NO. 1 REHABILITATION PROJECT
ROSENBERG, TEXAS
ISSUE FOR BIDDING DELIVERABLE
CITY BID NO. 2027-02B
LOCATION MAP
N
N
N.T.S.
VICINITY MAP
N.T.S.
Fi le
: L :\2
5\
W
-2
R os en be rg
W W
TP
A C la rif ie r 1
R eh ab \D ra w in gs
\R
LS
R -0
1- G
1-
C O
.d w g L as t S av e:
/2
8/
:3
AM
L as t s av ed b y:
A R
M ac m an us La st p lo tte d by
: M ac m an us , A le c
R . P lo t S ty le
: G
VR
M on o x2 2-
W
IP
EO
U
T
FI
X.
ct b Pl ot S ca le
: 1 :1
P lo t D at e:
/2 8/
:3
AM
P lo tte r u se d:
D W
G T o
PD
F.
pc
ARM ARM 01
Sheet List Table
01 01-G001 COVER SHEET
02 01-G002 GENERAL & CIVIL NOTES
TEXAS
CITY OF
ROSENBERG
GARVER PROJECT NO. 2501540
01-G001
COVER SHEET
WILLIAM BENTON MAYOR
JOYCE VASUT CITY MANAGER
COUNCIL MEMBERS
RICHARD OLSON AT LARGE POSITION 1
AMANDA BARTA AT LARGE POSITION 2
FELIX VARGAS JR. DISTRICT 1, MAYOR PRO TEM
STEVEN DeGREGORIO DISTRICT 2
SCOTT PETERSON DISTRICT 3
GEORGE ZEPEDA DISTRICT 4
CITY OF ROSENBERG BID NO. 2027-02B
SEPTEMBER 2026
PROJECT LOCATION
WWTP NO. 1A
2700 AVENUE A
ROSENBERG, TX 77471
SITE & STAGING PLAN03 01-G003
CLARIFIER DEMOLITION04 10-X101
CLARIFIER PROCESS PLAN VIEW05 10-P101
CLARIFIER PROCESS SECTION VIEW06 10-P301
CITY OF ROSENBERG
APPROVED BY:
CHARLES A. KALKOMEY, P.E. DATE
CITY ENGINEER
RIGO CALZONCIN DATE
ASSISTANT CITY MANAGER
THESE SIGNATURES ARE VOID IF CONSTRUCTION HAS NOT
COMMENCED IN ONE (1) YEAR FROM DATE OF APPROVALS.
DETAILS07 99-P101
ALEC R. MACMANUS
154827 L I C E N S E D
PR O F E S S I O N A L E NG I N
EER
S T A T E O F T E X A S
DIGITALLY
SEALED:
9/1/2026
GENERAL CIVIL NOTES
1. SAFETY SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THE
CITY AND ENGINEER SHALL NOT BE RESPONSIBLE FOR SAFETY, MEANS, OR
METHODS OF THE CONTRACTOR.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL
APPROPRIATE AGENCIES BEFORE WORK COMMENCES TO VERIFY THE TYPE,
LOCATION, PROTECTION REQUIREMENTS, DEPTH OF ALL EXISTING UTILITIES,
DRAINAGE FACILITIES, AND OTHER OBSTRUCTIONS. CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH REPAIRING AND/OR
REPLACING ANY SUCH ITEMS DAMAGED DURING CONSTRUCTION.
3. THIS IS AN OPERATIONAL WASTEWATER TREATMENT PLANT. OPERATIONS
MUST BE MAINTAINED. THE INDIVIDUAL CLARIFIER BASIN CONTAINING THE
SCOPE OF WORK IS CURRENTLY OUT OF SERVICE.
4. APPROXIMATE LOCATIONS OF OVERHEAD POWER LINES MAY OR MAY NOT BE
SHOWN ON PLANS. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
VERIFYING ALL LOCATIONS IN THE FIELD AND PLAN WORK IN THESE AREAS
ACCORDINGLY.
5. CONTRACTOR IS RESPONSIBLE FOR ALL DEWATERING ACTIVITIES AND
ASSOCIATED PERMITS REQUIRED FOR ALL EXCAVATIONS REQUIRED TO
COMPLETE THE PROJECT. THE CITY WILL DEWATER THE CLARIFIER BASIN AT
THE START OF THE PROJECT.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE DRAINAGE AND
COMPLIANCE WITH ALL GOVERNMENTAL STORM WATER REGULATIONS AND
PERMITS (SWPPP) AS REQUIRED. CONTRACTOR SHALL OBTAIN NOTICE OF
INTENT FROM APPROPRIATE STATE BODY PRIOR TO ANY CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE FOR ANY PERMITS REQUIRED FOR
WORK WITHIN STREAMS.
7. ALL EXCAVATION BACKFILL SHALL BE COMPACTED TO MIN 95% STANDARD
PROCTOR DENSITY TO PREVENT SETTLEMENT.
8. ANY DISTURBED AREAS NOT SPECIFICALLY DESIGNATED TO BE GRADED
SHALL BE RESTORED TO EQUAL OR BETTER CONDITION AND SHALL BE
GRADED TO DRAIN AS APPROVED BY THE ENGINEER.
ABBREV DESCRIPTION
ABDN ABANDON
ALUM ALUMINUM SULFATE
APPROX APPROXIMATE
ASPH ASPHALT
ASSY ASSEMBLY
BLDG BUILDING
BLK BLOCK
BM BENCHMARK
B, BOT BOTTOM
CI CAST IRON
CIP CAST IRON PIPE
CJ CONSTRUCTION JOINT
CONC CONCRETE
CONN CONNECTION
CP CONTROL POINT
DI DUCTILE IRON
DIP DUCTILE IRON PIPE
EFF EFFLUENT
EQ
STATION
EX EXISTING
EXP EXPANSION
FCJ FLOOR CONSTRUCTION
FES FLARED END SECTION
FH FIRE HYDRANT
FG, FIN GR FINISH GRADE
FL FLOWLINE
FRP FIBERGLASS REINFORCED PIPE
FTG FOOTING
GL GAS LINE
GR GRADE
GV GATE VALVE
HWY HIGHWAY
IN INCHES
INF INFLUENT
INV INVERT
JT JOINT
LEN LENGTH
LG LONG
LIN LINEAL, LINEAR
LOC LOCATION
LT LEFT
MANUF MANUFACTURER
MGD MILLION GALLONS PER DAY
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
N NORTH
NO,# NUMBER
NWSL NORMAL WATER SURFACE LEVEL
EOP END/EDGE OF PAVEMENT
BC BACK OF CURB
G GUTTER
FLG FLANGED
NE NORTHEAST
NW NORTHWEST
MH MANHOLE
ABOVE FINISHED FLOORAFF
CL CENTERLINE, CLASS
CMU CONCRETE MASONRY UNIT
CONT CONTINUOUS
DIA DIAMETER
EA EACH
ELEVATIONEL, ELEV
ELEC ELECTRICAL
FFE FINISHED FLOOR ELEVATION
FT FEET, FOOT
HORIZ HORIZONTAL
ID INSIDE DIAMETER
LF LINEAR FEET
MAX MAXIMUM
MIN MINIMUM
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
PE PLAIN END
PI POINT OF INTERSECTION
PL, PLS PLATE, PLACES
PO PUSH ON
PP POWER POLE
R, RAD RADIUS
RCP REINFORCED CONCRETE PIPE
RED REDUCER
RJ RESTRAINED JOINT
ROW, R/W RIGHT-OF-WAY
RS RESILIENT SEAT
RT RIGHT
S SOUTH, SLUDGE
SCH SCHEDULE
SECT SECTION
SPEC SPECIFICATIONS
TBM TEMPORARY BENCHMARK
TEMP TEMPORARY, TEMPERED
THK THICKNESS
TC TIME CLOCK, TOP OF CURB
VT VENTILATOR
W/O WITHOUT
WTM WATER TRANSMISSION MAIN
WWF WELDED WIRE FABRIC
X BY
SW SIDEWALK, SOUTHWEST
PC POINT OF CURVE
PRC POINT OF REVERSE CURVE
PT POINT OF TANGENT, POINT
SE SOUTHEAST
RP RADIUS POINT
SDMH STORM DRAIN MANHOLE
SD STORM DRAIN
OD OUTSIDE DIAMETER
PD PROCESS DRAIN
PSI POUNDS PER SQUARE INCH
REINF REINFORCEMENT
REQD REQUIRED
SF SQUARE FEET, SILT FENCE
SHT SHEET
SQ SQUARE
SS SANITARY SEWER
STA STATION
STD STANDARD
T&B TOP AND BOTTOM
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
V VOLT, VALVE
VERT VERTICAL
W WIDTH, WATER
WL WATER LINE
W/ WITH
WS WATERSTOP
PVC POLYVINYL CHLORIDE
TS TOP OF SIDEWALK
OVF OVERFLOW
C CONDUIT
PROP PROPOSED
ESMT EASEMENT
TW TOP OF WALL
BOP BEGINNING OF PAVEMENT
VPI VERTICAL POINT OF INTERSECTION
PVI POINT OF VERTICAL INTERSECTION
NG NATURAL GAS
EVCS END OF VERTICAL CURVE
BVCS
VC VERTICAL CURVE
EW EACH WAY
SPC STANDARD PROCTOR DENSITY
HMA HOT MIX ASPHALT
DA DRAINAGE AREA
AC ACRE
PDMH PROCESS DRAIN MANHOLE
CSL
SL SAMPLE LINE
CPB CHEMICAL PULL BOX
HDWL HEADWALL
SSMH SANITARY SEWER MANHOLE
EPB ELECTRICAL PULLBOX
SSL SANITARY SEWER SERVICE LINE
WSL WATER SERVICE LINE
BEGINNING OF VERTICAL
CURVE STATION
CHEMICAL SAMPLE LINE,
CHLORINE SOLUTION
ABBREV DESCRIPTION
EC EDGE OF CONCRETE
EG EDGE OF GRAVEL
SURV LOC SURVEY LOCATED
Fi le
: L :\2
5\
W
-2
R os en be rg
W W
TP
A C la rif ie r 1
R eh ab \D ra w in gs
\R
LS
R -0
2- G
2.
dw g
L as t S av e:
/1 2/
:5
PM
L as t s av ed b y:
A
R M ac m an us
La st p lo tte d by : M ac m an us
, A le c R
. P lo t S ty le
P lo t S ca le
: 1 :2
.5
Pl ot D at e:
/1
4/
:5
AM
P lo tte r u se d:
N on e
GENERAL MECHANICAL NOTES:
1. REFER TO SPECIFICATIONS AND PROJECT MANUAL FOR
ADDITIONAL INFORMATION AND REQUIREMENTS.
2. REFER TO ALL PROJECT DRAWINGS FOR DETAILS OF
CONSTRUCTION AND INSTALLATION REQUIREMENTS.
3. REFER TO GENERAL CONDITIONS AND SUPPLEMENTARY
GENERAL CONDITIONS FOR THE CONTRACT. THE GENERAL
CONTRACTOR IS RESPONSIBLE FOR FULL COORDINATION OF
PROJECT INCLUDING THE EQUIPMENT AND INSTALLATION OF
THE MECHANICAL WORK.
4. CONTRACTOR SHALL BECOME, PRIOR TO BID, THOROUGHLY
FAMILIAR WITH THE REQUIREMENTS OF THESE NOTES AS
WELL AS OTHER REQUIREMENTS SHOWN ON THE CONTRACT
DOCUMENTS.
5. ALL DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE
GENERAL ARRANGEMENTS OR GEOMETRICAL RELATIONSHIPS
OF EQUIPMENT AND SERVICES. THEY ARE NOT INTENDED TO
SPECIFY OR SHOW EVERY OFFSET, SEQUENCE, DEVICE,
OPTION, FITTING, OR COMPONENT.
ABBREV DESCRIPTION
EQUAL
JOINT
CIVIL ABBREVIATIONS
ABBREV DESCRIPTION
6. INFORMATION AND COMPONENTS SHOWN ON RISER
DIAGRAMS OR DETAILS, BUT NOT SHOWN ON PLANS, AND
VICE VERSA, SHALL BE PROVIDED AS IF EXPRESSLY
REQUIRED BY BOTH.
7. CONTRACTOR SHALL NOT SCALE DRAWINGS. DRAWINGS
SPECIFIC TO THIS DISCIPLINE DO NOT LIMIT THE
RESPONSIBILITY OF WORK REQUIRED BY THE CONTRACT
DOCUMENTS.
8. UNLESS NOTED OTHERWISE, THE INDICATION AND/OR
DESCRIPTION OF ANY ITEM, IN THE DRAWINGS OR
SPECIFICATIONS CARRIES WITH IT THE INSTRUCTION TO
FURNISH AND INSTALL THE ITEM.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING ALL WORK WITH THAT OF OTHER TRADES.
REFER TO DRAWINGS FOR COMPLETE INFORMATION
PRIOR TO BID.
10. REPLACE ALL FEATURES REMOVED OR DAMAGED
DURING THE COURSE OF THE WORK.
11. ALL WORK MUST COMPLY WITH THE REQUIREMENTS OF
LOCAL CODES AND ORDINANCES. WHERE INSPECTIONS
ARE REQUIRED BY AUTHORITIES HAVING JURISDICTION,
WORK MUST NOT BE CONCEALED UNTIL INSPECTIONS
AND TESTING ARE COMPLETED AND ACCEPTED.
12. ALL WIRING INSTALLED FOR CONTROLS, POWER,
INTERLOCKS, ETC. WHICH ARE TO BE INSTALLED IN
OCCUPIED SPACES OR IN RETURN AIR PLENUMS MUST BE
PLENUM RATED OR INSTALLED IN CONDUIT UNLESS
OTHERWISE INDICATED. ALL SUCH INSTALLATIONS MUST
MEET NFPA AND NEC REQUIREMENTS AND LOCAL CODES.
13. CONDUIT RUNS INDICATED ON THE PLAN SHEETS ARE
INTENDED TO BE SCHEMATIC . THE CONTRACTOR SHALL
BE RESPONSIBLE FOR FIELD ROUTING ALL CONDUIT RUNS
AND SHALL COORDINATE ANY DEVIATION FROM ROUTING
AS INDICATED HEREIN WITH THE ENGINEER. ALL CONDUIT
SHALL BE INSTALLED IN SUCH A MANNER AS TO PREVENT
CONFLICTS WITH EQUIPMENT. EXPOSED CONDUIT SHALL
BE INSTALLED PARALLEL OR PERPENDICULAR TO BEAMS
OR STRUCTURAL CONDITIONS.
14. ALL RACEWAYS AND EQUIPMENT SHALL BE INSTALLED
AND GROUNDED IN ACCORDANCE WITH THE LATEST
EDITION OF THE NATIONAL ELECTRICAL CODE AND
APPLICABLE LOCAL CODES.
15. THE APPROXIMATE LOCATION OF EXISTING UTILITIES,
PLANT PIPING, AND STRUCTURES ARE GIVEN FOR
REFERENCE ONLY. BEFORE COMMENCING THE WORK ON
THIS CONTRACT, THE CONTRACTOR SHALL VERIFY BY
FIELD INVESTIGATION THE ACTUAL LOCATIONS OF ALL
UTILITY FACILITIES WITHIN AND ADJACENT TO THE LIMITS
OF THE WORK THAT MAY BE AFFECTED BY THE WORK.
CONFLICTS WHICH RESULT DUE TO THE NEGLIGENCE BY
THE CONTRACTOR TO LOCATE, HORIZONTALLY AND
VERTICALLY, EXISTING UTILITIES WHICH ARE SHOWN ON
THE CONSTRUCTION DRAWINGS, OR WHICH THE
CONTRACTOR HAS BEEN GIVEN NOTICE OR HAS
KNOWLEDGE OF, SHALL BE THE SOLE RESPONSIBILITY OF
THE CONTRACTOR. THE COST OF REMEDIAL WORK,
REMOVAL OF PORTIONS OF THE WORK OR EXTENSIVE
DESIGN CHANGES OCCASIONED BY THE FAILURE OF THE
CONTRACTOR TO VERIFY THE LOCATION OF EXISTING
UTILITIES AS DESCRIBED ABOVE SHALL BE BORNE BY THE
CONTRACTOR.
16. CONTRACTOR SHALL NOTIFY ENGINEER OF AND BE
PRESENT FOR THE START-UP OF ALL NEW EQUIPMENT
AND SHALL BE RESPONSIBLE FOR PROPER START-UP
PROCEDURES AS RECOMMENDED BY THE
MANUFACTURER. A MANUFACTURER REPRESENTATIVE
SHALL BE PRESENT FOR START-UP OR PRE-START-UP
INSPECTION AS REQUIRED BY THE SPECIFICATIONS AND
RECOMMENDED BY THE MANUFACTURER OF EACH
EQUIPMENT ITEM. NO EQUIPMENT WILL QUALIFY FOR
SUBSTANTIAL COMPLETION UNTIL CONTRACTOR SUBMITS
SIGNED START-UP REPORTS TO THE ENGINEER.
CITY OF ROSENBERG, TEXAS
DESIGN DRAWN DATE SHEET
REVISIONS
REV NO. DATE DESCRIPTION
CITY BID NO.: 2027-02BSD&C PID:
FILE NUMBER
SEPT.
WWTP NO. 1A CLARIFIER NO. 1
REHABILITATION PROJECT
12141 WICKCHESTER LANE SUITE 200
HOUSTON, TX 77079
(713) 491-8333
TEXAS REGISTRATION NUMBER: F-5713
100% DESIGN -
NOT FOR CONSTRUCTION
THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM
REVIEW UNDER THE AUTHORITY OF ALEC MACMANUS, P.E., #
154827 ON AUGUST 2026. IT IS NOT TO BE USED FOR
CONSTRUCTION, BIDDING, OR PERMITTING PURPOSES.
ARM ARM 01-G002
GENERAL & CIVIL NOTES
ALEC R. MACMANUS
154827 L I C E N S E D
PR O F E S S I O N A L E NG I N
EER
S T A T E O F T E X A S
DIGITALLY
REVISIONS
REV NO. DATE DESCRIPTION
CITY BID NO.: 2027-02BSD&C PID:
FILE NUMBER
SEPT.
WWTP NO. 1A CLARIFIER NO. 1
REHABILITATION PROJECT
12141 WICKCHESTER LANE SUITE 200
HOUSTON, TX 77079
(713) 491-8333
TEXAS REGISTRATION NUMBER: F-5713
Fi le
: L :\2
5\
W
-2
R os en be rg
W W
TP
A C la rif ie r 1
R eh ab \D ra w in gs
\R
LS
R -0
1- G
3.
dw g
L as t S av e:
/2 6/
:0
PM
L as t s av ed b y:
A
R M ac m an us
La st p lo tte d by : M ac m an us
, A le c R
. P lo t S ty le : G
VR
M on o x2
2- W
IP
EO
U T
FI
X.
ct b
Pl ot
S ca le : 1
:1 P lo t D at e:
/2
8/
:4
AM
P lo tte r u se d:
D
W G
T o
PD
F.
pc
ARM ARM 0301-G003
SITE & STAGING PLAN
CLARIFIER 1 TO BE
REHABILITATED INCLUDING
DEMOLITION AND
REPLACEMENT OF EQUIPMENT.
STAGING AREA
SITE ACCESS GATEAVENUE A
N
APPROXIMATE LOCATION OF
EXISTING MCC. CONTRACTOR
SHALL REPLACE CONDUCTOR
FROM THE CLARIFIER STUB
OUT TO THE EXISTING MCC.
APPROXIMATE LOCATION OF EXISTING
3/4" CONDUIT. CONTRACTOR TO FIELD
VERIFY. CONTRACTOR SHALL REPLACE
CONDUCTOR IN EXISTING CONDUIT.
BID ALTERNATE: INSTALL DIRECT BURY
CONDUIT AND CONDUCTOR ALONG
APPROXIMATE ROUTE. INDOOR
CONDUIT ROUTING SHALL MATCH THE
NPW SYSTEM CONDUIT ROUTING AND
BE ALONG WALLS AND CEILINGS.
NOTES:
1. CONTRACTOR SHALL SIZE CONDUCTOR PER NEC
REQUIREMENTS. MINIMUM SIZE OF #12 SHALL BE
PROVIDED FOR CURRENT CARRYING CONDUCTOR.
APPROXIMATE LOCATION OF
EXISTING PULLBOXES, TYP. ALEC R. MACMANUS
154827 L I C E N S E D
PR O F E S S I O N A L E NG I N
EER
S T A T E O F T E X A S
DIGITALLY
REVISIONS
REV NO. DATE DESCRIPTION
CITY BID NO.: 2027-02BSD&C PID:
FILE NUMBER
SEPT.
WWTP NO. 1A CLARIFIER NO. 1
REHABILITATION PROJECT
12141 WICKCHESTER LANE SUITE 200
HOUSTON, TX 77079
(713) 491-8333
TEXAS REGISTRATION NUMBER: F-5713
Fi le
: L :\2
5\
W
-2
R os en be rg
W W
TP
A C la rif ie r 1
R eh ab \D ra w in gs
\R
LS
R -0
3-
X1
.d w g L as t S av e:
/1
8/
:2
PM
L as t s av ed b y:
A R
M ac m an us La st p lo tte d by
: M ac m an us , A le c
R . P lo t S ty le
: G
VR
M on o x2 2-
W
IP
EO
U
T
FI
X.
ct b Pl ot S ca le
: 1 :1
P lo t D at e:
/2 8/
:5
AM
P lo tte r u se d:
D W
G T o
PD
F.
pc
ARM ARM 0410-X101
CLARIFIER DEMOLITION PLAN
NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR RETURNING AND RELOCATING ALL SALVAGE
MATERIAL TO THE CITY'S DESIGNATED SCRAP PILE ON SITE. ANY MATERIAL THE CITY DOES
NOT WISH TO KEEP SHALL BE REMOVED BY THE CONTRACTOR.
2. THE CITY WILL DEWATER AND REMOVE SLUDGE FROM THE CLARIFIER AT THE START OF
THE PROJECT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE CITY
FOR DEWATERING AND SLUDGE REMOVAL. THE CONTRACTOR IS RESPONSIBLE FOR ANY
ADDITIONAL DEWATERING AND SHALL POWER-WASH THE CLARIFIER SURFACE IN A
NON-DESTRUCTIVE MANNER.
3. CONTRACTOR TO REMOVE EXISTING GROUT TO THE FINISHED FLOOR OF THE TANK.
CONTRACTOR SHALL CHECK THE GROUT DEPTH DURING BIDDING. GROUT THICKNESS IS
UNKNOWN AND IS ASSUMED TO BE BETWEEN TWO AND EIGHT INCHES. CONTRACTOR SHALL
MAKE ANY MODIFICATIONS TO THE CLARIFIER BOTTOM REQUIRED FOR INSTALLATION OF
THE SELECTED CLARIFIER EQUIPMENT.
4. CONTRACTOR TO REPAIR ANY MINOR BREAKS OR MISSING EDGE TO THE EFFLUENT
LAUNDER EDGE TO PROVIDE A UNIFORM ELEVATION.
5. CONTRACTOR TO REMOVE SCUM PIPE SPOOL PIECE AND COORDINATE LOCATION AND
ELEVATION WITH CLARIFIER MECHANISM SUPPLIER FOR CONNECTION TO THE EQUIPMENT.
DISPOSE OF EXISTING
WALKWAY AND ASSOCIATED
COMPONENTS
DEMOLISH CLARIFIER MECHANISM,
RAKE ARMS, AND MOTOR.
DEMOLISH SCUM BOX
DEMOLISH SCUM
BAFFLE AND WEIRS
DEMOLITION 1 DEMOLITION 2
DEMOLISH SCUM
SKIMMER ARM
DEMOLITION 3
DEMOLISH SCUM
BAFFLE AND WEIRS
DEMOLISH CLARIFIER MECHANISM,
RAKE ARMS, AND MOTOR.
DEMOLISH SCUM PIPE,
SEE NOTE 5
ALEC R. MACMANUS
154827 L I C E N S E D
PR O F E S S I O N A L E NG I N
EER
S T A T E O F T E X A S
DIGITALLY
PLAN
CHAIN DRIVE
W/ OSHA APPROVED GUARD
(8'-0" SQ.) DRIVE PLATFORM
W/ 1.25" ALUMINUM I-BAR GRATING
SEE NOTE 5.
4" SCUM PIPE
(FIELD VERIFY)
(3'-6" WIDE) WALKWAY
W/ 1 1/4" ALUMINUM
I-BAR GRATING
(13'-0" INSIDE DIA.)
FEEDWELL, 3/16" PLATE
W/ SCUM PORTS & BAFFLES
(8'-0") SCUM COLLECTION BOX
CONNECT PROPOSED SCUM BOX
TO EXISTING 4" SCUM PIPE.
SEE NOTE 6.
SCUM BOX SUPPORT
(TYP. 2 PLACES)
FEEDWELL SUPPORT
(TYP. PER MANUFACTURER)
(3'-10" SQ.) RAKE ARM
W/ COUNTERWEIGHT
(ONE SIDE ONLY)
SKIMMER BLADE
CL MECHANISM
DIRECTION OF
ROTATION
EXISTING CONCRETE BASIN
DRIVE UNIT
DRIVE CONTROL
W/ LOAD INDICATOR
SKIMMER ARM
W/ SKIMMER MECHANISM
(3'-10" SQ.) RAKE ARM
W/ TAPERED SUCTION HEADER
W/ NEOPRENE SQUEEGEES
& BACK-UP BAR
W/ 316 SS FASTENERS
(ONE SIDE ONLY)
EXISTING INTERNAL LAUNDER
PROPOSED WEIRS AND BAFFLES
(FRP)
8" SLUDGE PIPE
(FIELD VERIFY)
30" INFLUENT PIPE
(FIELD VERIFY)
EXISTING NPW CONNECTION
(FIELD VERIFY)
EXISTING CONDUIT STUB OUT
(FIELD VERIFY)
PROPOSED CONDUIT
PROPOSED CONTROL PANEL
W/ DISCONNECT. CONTROL
PANEL SHALL FEED DRIVE.
6" SLUDGE PIPE
(FIELD VERIFY)
PROPOSED 1.5" NPW HEADER
SPRAY NOZZLES, TYP.
W/ ADJUSTABLE HEADS
WALKWAY SHALL EXTEND TO
THE EDGE OF THE TANK
CONNECTED AT THE RAS AND
INFLUENT PIT. GRATING AND
PIT ACCESS SHALL NOT BE
OBSTRUCTED.
PROPOSED 3/4"
HOSE BIB FOR NPW
BID ALTERNATE: DEMOLISH AND
REPLACE EXISTING AIRDROP.
CONDUIT SHALL BE
ROUTED UNDERNEATH
PLATFORM.
CITY OF ROSENBERG, TEXAS
DESIGN DRAWN DATE SHEET
REVISIONS
REV NO. DATE DESCRIPTION
CITY BID NO.: 2027-02BSD&C PID:
FILE NUMBER
SEPT.
WWTP NO. 1A CLARIFIER NO. 1
REHABILITATION PROJECT
12141 WICKCHESTER LANE SUITE 200
HOUSTON, TX 77079
(713) 491-8333
TEXAS REGISTRATION NUMBER: F-5713
Fi le
: L :\2
5\
W
-2
R os en be rg
W W
TP
A C la rif ie r 1
R eh ab \D ra w in gs
\R
LS
R -0
4-
P1
.d w g L as t S av e:
/2
8/
0:
A M
L as t s av ed b y:
A
R M ac m an us
La st p lo tte d by : M ac m an us
, A le c R
. P lo t S ty le : G
VR
M on o x2
2- W
IP
EO
U T
FI
X.
ct b
Pl ot
S ca le : 1
:1 P lo t D at e:
/2
8/
0:
A M
P lo tte r u se d:
D W
G T o
PD
F.
pc
ARM ARM 0510-P101
CLARIFIER PROCESS PLAN VIEW
N
NOTES:
1. CONTRACTOR TO FIELD VERIFY LOCATION, DIMENSIONS, AND ELEVATIONS. CONTRACT DOCUMENTS
SHOW APPROXIMATE VALUES.
2. SCUM BOX SHALL BE LOCATED AS CLOSE TO THE WALKWAY AS POSSIBLE WHILE MAINTAINING A
MINIMUM OF 5% SLOPE TO EXISTING SCUM DRAIN.
3. CONCRETE REPAIRS SHALL BE DETERMINED BY ENGINEER INSPECTION FOLLOWING CLEANING AND
GROUT REMOVAL. REPAIRS SHALL BE COMPLETED PER SPECIFICATION DIVISION 03 AND PROTECTIVE
COATING APPLIED PER SPECIFICATION DIVISION 09 96 00.
4. SCUM SPRAY NOZZLES SHALL BE CONNECTED TO THE EXISTING NON-POTABLE WATER SYSTEM WITH A 1-1/2" PVC LINE EXTENDED FOR THE SPRAY SYSTEM AND LANDING HOSE BIB INSULATED AND
MARKED PURPLE WITH PAINT OR BANDS.
5. GRATING SHALL BE REMOVABLE FOR MAINTENANCE AND REPAIR ACCESS OF CLARIFIER DRIVE AND
EQUIPMENT. CONDUIT SHALL BE UNDER DRIVE PLATFORM.
6. THREE SCUM BOX FLUSH SPRAY NOZZLES SHALL BE MOUNTED FROM THE EXTERIOR WALL OF THE CLARIFIER ABOVE THE INLET OF THE SCUM BOX. APPROPRIATE SPACE SHALL BE PROVIDED TO ALLOW FOR THE SKIMMER BLADE TO PASS BETWEEN THE NOZZLES AND SCUM BOX. NPW SHALL BE
FIELD ROUTED TO THE FLUSH SPRAY NOZZLES.
7. PROPOSED CONDUIT AND NPW PIPING SHALL BE SECURED ONTO STRUCTURE USING 316 STAINLESS
STEEL UNISTRUT, HARDWARE, AND STRAPS.
8. THIS IS A CLASS 1 DIVISION 2 AREA AND ALL EQUIPMENT SHALL BE RATED TO MEET THE CRITERIA.
9. EQUIPMENT, INCLUDING CONTROL PANELS OR LIGHTING, SHALL NOT BE SUPPORTED FROM
HANDRAILS.
NOT TO
SCALE
KEY NOTES:
CONTRACTOR SHALL MATCH CONDUIT SIZE TO EXISTING BELOW GRADE
CONDUIT. CONDUCTORS FROM THE EXISTING CONDUIT STUB UP TO THE
MCC SHALL BE PULLED AND REPLACED BY #12 CONDUCTOR.
2 ALL ABOVE GROUND CONDUITS SHALL BE A MINIMUM OF 3/4"
PVC COATED RIGID GALVANIZED STEEL.
ALEC R. MACMANUS
154827 L I C E N S E D
PR O F E S S I O N A L E NG I N
EER
S T A T E O F T E X A S
DIGITALLY
ILLUSTRATIVE ELEVATION
COUNTER WEIGHT
FOR BALANCING ARM
31'2" (q OF MECHANISM TO END OF WALKWAY)
CL MECHANISM
WEIR BOTTOM OF V-NOTCH
ELEVATION: 104.76
INTERNAL LAUNDER
(REF.)
(3'-10") SQ. RAKE ARM
(TYP. BOTH SIDES)
SKIMMER BLADE
(30" DIA.) INFLUENT COLUMN
W/ 1/4" PL.
(6'-0" DIA.) SLUDGE
MANIFOLD
(3'-0" SQ.) CENTER CAGE
FEEDWELL
SUPPORTS
TAPERED SUCTION HEADER
W/ NEOPRENE SQUEEGEES & BACK-UP BAR
W/ 316 SS FASTENERS
(ONE SIDE ONLY)
FLUSHING MECHANISM
W/ ACTUATOR VALVE
SCUM BOX SUPPORT, OFFSET
FROM EXISTING SCUM BOX
ANCHORS
4" SCUM PIPE
(FIELD VERIFY)
TRUSS WALKWAY
(TRUSS TOP MEMBER
ACTS AS HANDRAIL)
DRIVE PLATFORM
W/ 2-RAIL HANDRAIL-MECHANICAL
1 1/2" DIA. ALUMINUM SUPPLIED
W/SUB ASSEMBLED POSTS AND
W/ 4" EXTRUDED TOE BOARD
(6'-0" DIA.) EDI, 3/16" PL.
W/ OUTLET SCOOPS
WEIRS AND BAFFLES
(FRP)
9'
1.
5"
(S
ID
E W
AT
ER
D
EP
TH
8" SLUDGE PIPE
(FIELD VERIFY)
30" INFLUENT PIPE
(FIELD VERIFY)
DRAIN SUMPPROPOSED GROUT SHALL BE A MINIMUM
OF 2". GROUT DEPTH SHALL BE DICTATED
BY SELECTED MANUFACTURER.
(13'-0" DIA.) FEEDWELL, 3/16" PL.
W/ SCUM PORTS AND BAFFLES
60'-0"INSIDE TANK DIAMETER = 316 SS ANCHOR BOLTS
(TYP.)
BOTTOM OF CLARIFIER
ELEVATION: 94.80
TOP OF WALL ELEVATION: 106.80
GROUT TO BE EVEN ACROSS CLARIFIER.
SPRAY SYSTEM SHALL
BE SUPPORTED FROM
WALKWAY
26'1" (q OF MECHANISM TO SCUM BAFFLE)
26'10" (q OF MECHANISM TO EFFLUENT WEIR)
PROTECTIVE COATING TO BE
APPLIED. (SEE NOTE 4.)
CONNECT AND
EXTEND SCUM DRAIN
CITY OF ROSENBERG, TEXAS
DESIGN DRAWN DATE SHEET
REVISIONS
REV NO. DATE DESCRIPTION
CITY BID NO.: 2027-02BSD&C PID:
FILE NUMBER
SEPT.
WWTP NO. 1A CLARIFIER NO. 1
REHABILITATION PROJECT
12141 WICKCHESTER LANE SUITE 200
HOUSTON, TX 77079
(713) 491-8333
TEXAS REGISTRATION NUMBER: F-5713
Fi le
: L :\2
5\
W
-2
R os en be rg
W W
TP
A C la rif ie r 1
R eh ab \D ra w in gs
\R
LS
R -0
5-
P3
.d w g L as t S av e:
/2
8/
0:
A M
L as t s av ed b y:
A
R M ac m an us
La st p lo tte d by : M ac m an us
, A le c R
. P lo t S ty le : G
VR
M on o x2
2- W
IP
EO
U T
FI
X.
ct b
Pl ot
S ca le : 1
:1 P lo t D at e:
/2
8/
0:
A M
P lo tte r u se d:
D W
G T o
PD
F.
pc
ARM ARM 0610-P301
CLARIFIER PROCESS SECTION VIEW
NOTES:
1. CONTRACTOR TO FIELD VERIFY LOCATIONS, DIMENSIONS, AND
ELEVATIONS. CONTRACT DOCUMENTS SHOW APPROXIMATE VALUES.
2. SCUM BOX SHALL BE LOCATED AS CLOSE TO THE WALKWAY AS POSSIBLE
WHILE MAINTAINING A MINIMUM OF 5% SLOPE TO EXISTING SCUM DRAIN.
3. CONCRETE REPAIRS SHALL BE DETERMINED BY ENGINEER INSPECTION
FOLLOWING CLEANING AND GROUT REMOVAL. REPAIRS SHALL BE
COMPLETED PER SPECIFICATION DIVISION 03 AND PROTECTIVE COATING
APPLIED PER SPECIFICATION DIVISION 09 96 00.
4. SIDE WALLS OF THE LAUNDER SHALL BE RECOATED INCLUDING THE
BOTTOM OF THE LAUNDER AND FROM THE BOTTOM OF THE LAUNDER TO
18 INCHES ABOVE THE BOTTOM OF THE LAUNDER. THE EXTERIOR OF THE
LAUNDER FACING THE CENTER OF THE CLARIFIER SHALL BE RECOATED
FROM THE TOP DOWN 6 INCHES. PROTECTIVE COATING TO BE APPLIED
PER SPECIFICATION DIVISION 09 96 00.
5. SUCTION HEADER SHALL BE INSTALLED FLAT ON THE CLARIFIER BASIN
SURFACE.
ALEC R. MACMANUS
154827 L I C E N S E D
PR O F E S S I O N A L E NG I N
EER
S T A T E O F T E X A S
DIGITALLY
REVISIONS
REV NO. DATE DESCRIPTION
CITY BID NO.: 2027-02BSD&C PID:
FILE NUMBER
SEPT.
WWTP NO. 1A CLARIFIER NO. 1
REHABILITATION PROJECT
12141 WICKCHESTER LANE SUITE 200
HOUSTON, TX 77079
(713) 491-8333
TEXAS REGISTRATION NUMBER: F-5713
100% DESIGN -
NOT FOR CONSTRUCTION
THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM
REVIEW UNDER THE AUTHORITY OF ALEC MACMANUS, P.E., #
154827 ON AUGUST 2026. IT IS NOT TO BE USED FOR
CONSTRUCTION, BIDDING, OR PERMITTING PURPOSES.
Fi le
: L :\2
5\
W
-2
R os en be rg
W W
TP
A C la rif ie r 1
R eh ab \D ra w in gs
\R
LS
R -0
6-
P0 1.
dw g
L as t S av e:
/2 0/
:3
PM
L as t s av ed b y:
A
R M ac m an us
La st p lo tte d by : M ac m an us
, A le c R
. P lo t S ty le : G
VR
M on o x2
2- W
IP
EO
U T
FI
X.
ct b
Pl ot
S ca le : 1
:1 P lo t D at e:
/2
0/
:5
PM
P lo tte r u se d:
D
W G
T o
PD
F.
pc
ARM ARM 0799-P101
DETAILS
8-FOOT SCUM BEACH*
(NOT INCLUDED)
1.5" Sch 80 PVC Pipe
NOT TO SCALE
(BID ALTERNATE)
(BID ALTERNATE)
NOT TO SCALE
ALEC R. MACMANUS
154827 L I C E N S E D
PR O F E S S I O N A L E NG I N
EER
S T A T E O F T E X A S
DIGITALLY
| 01 - 01-G001 COVER SHEET |
| 02 - 01-G002 GENERAL & CIVIL NOTES |
| 03 - 01-G003 SITE & STAGING PLAN |
| 04 - 10-X101 CLARIFIER DEMOLITION PLAN |
| 05 - 10-P101 CLARIFIER PROCESS PLAN VIEW |
| 06 - 10-P301 CLARIFIER PROCESS SECTION VIEW |
| 07 - 99-P101 DETAILS |
File details come from the government source that posted it. Updated .