TECHNICAL SPECIFICATIONS ARFQ DEP24-54 Spencer Allen Well Plugging Project.pdf

PDF 2 MB Posted

Attached to
SPENCER ALLEN WELL PLUGGING PROJECT API# 47-017-00154
Solicitation number
ARFQ 0313 DEP2400000054 2
Issued by
Fayette County, West Virginia

About this file

This technical specifications document is issued by the West Virginia Department of Environmental Protection (DEP), Office of Oil and Gas, for the Spencer Allen Well Plugging Project (API# 47-017-00154) located in Doddridge County near West Union, West Virginia. The project requires a contractor to provide all equipment, materials, labor, and professional services for plugging an abandoned oil and natural gas well and reclaiming the disturbed site in accordance with West Virginia Code 22-6-23 and 22-6-24. The well, located at 1463 Rock Run Road, has a total depth of 2,882 feet with 1,803 feet of 6 5/8" casing remaining. The scope includes site preparation (clearing, grubbing, road construction), well plugging operations involving multiple cement plugs at specified depths, and complete site reclamation. The work must be performed Monday through Friday during standard business hours (maximum 10 hours per day), with the rig operator and crew notification to the DEP Project Coordinator within 24 hours of plugging commencement.

The contract encompasses 37 distinct line items covering equipment, materials, and services including rig operation (bid per hour), mobilization and demobilization, site preparation and reclamation (lump sum), vacuum truck services, heavy equipment rental, specialized well tools (power tongs, casing knives, fishing tools), casing and tubing purchases and rentals, drilling bits, pumps, water storage, waste disposal, cement and gel, gravel, mud pits, monuments, welding services, absorbent supplies, and various specialty items. Payment terms specify 50 percent of mobilization costs upon completion and the remainder with final invoice; site preparation and reclamation are bid as lump sums; hourly labor items are compensated only for on-site work; and material disposal requires scale tickets and manifests from approved facilities. The DEP will obtain and pay for all necessary local, state, and federal permits, with permit conditions becoming mandatory contract inclusions. The contractor is responsible for daily time and material tracking, with DEP confirmation of expenditures at the conclusion of each workday.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPENCER ALLEN WELL PLUGGING PROJECT API# 47-017-00154

WEST VIRGINIA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

OFFICE OF OIL AND GAS

COUNTY

OF

DODDRIDGE

SPENCER / ALLEN WELL PLUGGING PROJECT

API# 47-017-00154

TECHNICAL SPECIFICATIONS

Table of Contents

Table of Contents

I. PROJECT DESCRIPTION

1.0 Location/Site Description

1.1 API# 47-017-00154

2.0 Directions to site:

II. SCOPE OF WORK

III. GENERAL CONDITIONS

1.0 Administrative

2.0 Permitting

3.0 Work

IV. PROJECT DESCRIPTION

1.0 Site-based considerations:

2.0 Well-specific considerations:

V. PROJECT WORK PLAN

Site Preparation Plan

Proposed Plugging Work Plan:

Site Reclamation Plan

VI. TECHNICAL SPECIFICATIONS

1.0 Rig and Crew -Three (3) Man Crew (minimum)

2.0 Mobilization & Demobilization

3.0 Site Preparation

4.0 Vacuum Water Truck

5.0 Heavy Equipment

6.0 Power Tongs

7.0 Casing Knife/Ripper

8.0 Casing and Tubing Purchase

9.0 Casing, Tubing, and Pipe Rentals

10.0 Tri-Cone Drill Bit

11.0 Trash Pump

12.0 On-Site Water Storage Container(s)

13.0 Disposal of Gel

14.0 Disposal of Liquid Waste

15.0 Disposal of Solid Waste

16.0 Aqua Gel

17.0 Cement

18.0 Gravel

19.0 Steel Mud Pit

20.0 Site Reclamation

21.0 Silt Fence

22.0 Monument

23.0 Welder/Cutting Torch

24.0 Oil Absorbent Supplies

25.0 Sand Pump

26.0 Cherry Picker

27.0 Casing/Tubing Spear

28.0 Overshot

29.0 Impression Block

30.0 Subs

31.0 Power Swivel

32.0 Concave Mill

33.0 Mud/mixing pump

34.0 Logging, Bond with CCL

34.5 Wireline Shot/Perforation, Collar Buster

35.0 Tie Mats

36.0 Topsoil

37.0 Culvert

VII. APPENDIX A – WELL RECORDS

1.1 API# 47-017-00154

I. PROJECT DESCRIPTION

This project involves the plugging and/or remediation of abandoned oil and/or natural gas well and site at the location described below.

1.0 Location/Site Description

1.1 API# 47-017-00154

Physical Address: 1463 Rock Run Road

West Union, WV 26456

Parcel Description: Friend, Roger & Lora

ID: 09-08-0008-0017-0000

DESCRIPTION: 26 ½ ACRES

Well Location: 39.31710 °N, -80.74937 °W

Note: DEP strongly advises using only the provided turn-by-turn directions listed below to navigate to the pre-bid meeting site and not the GPS coordinates of the well site itself. Failure to arrive at the determined pre-bid location due to navigation errors will not warrant rescheduling another meeting.

2.0 Directions to site:

Directions from the Charleston Area:

Take I-79 North to Exit 119 turn left at the end of the exit onto Route 50 West. Proceed approximately 29 miles turn right onto Route 18 North at West Union. Go approximately

5/10 mile proceed to the right crossing the bridge over Middle Island Creek at the end of the bridge turn right on Smithton Road Route 50/30. Go 1 mile turn left on Rock Run Road

Route 5. Follow Rock Run 1.4 miles to 1463 Rock Run Road, turn left park in front of the barn.

Directions from the Morgantown Area:

Take I-79 South to Exit 119 bare right onto US Route 50 West proceed approximately

28.2 miles turn right onto Route 18 North at West Union. Go approximately 5/10 mile proceed to the right crossing the bridge over Middle Island Creek. At the end of the bridge turn right on Smithton Road Route 50/30. Go 1 mile turn left on Rock Run Road

Route 5. Follow Rock Run 1.4 miles to 1463 Rock Run Road, turn left parking will be in front of the barn.

Directions from the Parkersburg Area:

From the junction of I-77 and US Route 50 proceed East on US 50 East approximately

43.4 miles turn left onto Route 18 North at West Union. Go approximately 5/10 mile proceed to the right crossing the bridge over Middle Island Creek. At the end of the bridge turn right on Smithton Road Route 50/30. Go 1 mile turn left on Rock Run Road

Route 5. Follow Rock Run 1.4 miles to 1463 Rock Run Road, turn left parking will be in front of the barn.

II. SCOPE OF WORK

The Contractor, the Contractor’s agents, representatives, and subcontractors (“Contractor”) shall provide all equipment, materials, labor, and professional services for the plugging of the oil and/or natural gas well(s) identified herein, and the reclaiming of all land disturbed in association with those plugging operations in accordance with West Virginia Code §§ 22-6-23, 22-6-24, and all rules promulgated thereunder.

This project is defined by, and subject to, the following documents attached hereto or included as part of supplemental documentation made available as part of the solicitation request (“Contract”):

I. Project Description

II. Scope of Work

III. General Conditions

IV. Well Description

V. Remediation and Plugging Work Plan

VI. Technical Specifications

VII. Appendix A – Well Records

III. GENERAL CONDITIONS

In addition to the Standard Terms & Conditions for Construction and Reclamation, the following conditions govern this Contract:

1.0 Administrative

A. The Contract shall be overseen by DEP by an inspector specialist/project coordinator from the Abandoned Well Plugging Program. DEP may, situationally, assign alternate or assistant coordinators as staffing needs vary.

B. The Project Coordinator for the contract will be designated at the time of the issuance of the Notice to Proceed.

C. The Project Coordinator shall serve as the first point of contact for the Contractor in all matters related to the Contract.

D. The Contractor shall notify the Project Coordinator of any work stoppages or changes to planned operators as soon as practically possible.

E. All change order requests shall be submitted to the Project Coordinator for approval prior to the initiation of any work related to that change order request.

2.0 Permitting

A. Upon award of the Contract to the successful bidder, the Department shall transfer the well to and issue the plugging permit under the responsible party name, UNKNOWN

- DEP PAID PLUGGING CONTRACT.

B. The plugging portion of the Remediation and Plugging Work Plan included herein

(Section V) shall be incorporated as part of the plugging permit. This plan is developed based on best available information. Should field observations during plugging operations necessitate deviations from this plan, the Department and Contractor shall cooperate to develop alternate plans in full compliance with all applicable rules and regulations.

C. All work performed under the Contract must be completed in accordance with the most current version of the Erosion and Sediment Control Field Manual.

D. Unless otherwise specified in the Technical Specifications and/or Bid Sheet, the

Department will obtain and pay for all Local, State, and Federal permits necessary for the completion of the Contract. Any permit conditions contained within said permits shall become mandatory inclusions in the Contract.

3.0 Work

A. Contractor shall perform Contract work (i.e., site preparation and permitted well work) during the days of Monday through Friday. Work will not be conducted on weekends or state/national holidays except with Department approval or during emergency situations. A workday is defined as a maximum of ten (10) hours; however, additional hours may be worked with Department approval or during emergency situations.

B. Contractor is responsible for tracking daily time and material utilization for the purpose of invoicing. The Department shall confirm daily expenditures at the conclusion of each workday. Any disputes related to time and/or material usage determinations should be made in writing to the Project Coordinator.

C. All in-stream work required in association with the project shall be performed in accordance with all applicable local, state, and federal requirements.

D. Toilet facilities will be provided by the vendor but will not be a separate line item in the contract.

IV. PROJECT DESCRIPTION

1.0 Site-based considerations:

This well is currently covered with tin to keep the landowner’s grandchildren from falling in the well. The 6 5/8” casing is rotted off at the surface and has a jagged edge. This well has been known to discharge oil in the past. The site is located along a drainage behind a residence. A section of the original lease road is intact and will be upgraded to access the site.

2.0 Well-specific considerations:

The Office of Oil and Gas does have a well record for the subject well API# 47-017-00154. The record well shows total depth (TD) is 2882’. The well record indicates that the well has 1803’ of

6 5/8” casing left in well. Cemented casing locations are unknown. The record shows freshwater at 30’, saltwater at 1265’, gas at 1897-1909’ and no mention of coal. The well was shot @ 2585’, 2578’, 1912’ and 1898’.

V. PROJECT WORK PLAN

Contract work may require site remediation of the well site prior to the commencement of plugging operations.

Project will commence, generally, as follows:

1. Pre-mobilization site remediation, if necessary,

2. Site preparation,

3. Connect rig to well,

4. Clean out well to total depth,

5. Set prescribed plugs and monument,

6. Reclaim site including removal of stream crossings, and

7. Submit invoice to DEP.

Site Preparation Plan

Two hundred (200) feet of silt fence will be installed along the road to the site to isolate the disturbed area. The area around the well (50’ x 100’) shall be cleared of all brush and trees and will be leveled and smoothed. All trees and brush can be stacked and left on location. The existing lease road will need to be widened and stoned to accommodate plugging equipment. Culvert and stone will likely be needed to ready the site to accommodate the rig and equipment. A minimum

24” cellar shall be installed around the well head.

Proposed Plugging Work Plan:

1. Notify Project Coordinator and District Oil & Gas Inspector within 24 hours of plugging commencement.

2. Move in and rig up to existing 6 5/8” casing.

3. Measure in hole to check TD.

4. If TD cannot be reached, begin cleaning out well bore to TD.

5. TIH to TD with tubing, and spot 6% gel and set a minimum of 100’ cement plug from

2882’-2782’. Trip out hole (TOH), wait on cement (WOC).

6. Tag top of plug. Add cement if needed.

7. TIH with tubing, and spot 6% gel from 2782’ to 2635’ set a minimum 100’ cement plug from 2635’ to 2528’. TOH, WOC.

8. Run bond log to find free point and cut 6 5/8” casing prior to setting plug across 6 5/8” casing seat. If free point was found to be shallower, and the entire casing string will not pull. Perforate all additional plugging locations as determined by bond log.

9. ***Note*** Casing free point will determine whether the casing is perforated and cemented at all plugging locations, an additional plug may be required across casing cut achieved.

10. Tag top of plug. Add cement if needed.

11. TIH with tubing, spot 6% gel from 2528’ to 1962’.

12. Set cement plug from 1962’ to 1753’ to cover where well bore was shot and cover casing seat. TOH, WOC.

13. Tag top of plug. Add cement if needed.

14. TIH to estimated 1753’set 6% gel spacer from 1753’to 1315’. Pull tubing to 1315’ and set a minimum of 100’ cement plug from 1315’ to 1215’ covering saltwater zone TOH, WOC.

15. Tag top of plug add cement as needed.

16. TIH with tubing, spot gel from 1215’ to 1026’ set a minimum 100’ cement plug from 1026’ to 926’.

17. Tag to of cement plug. Add cement if needed.

18. TIH with tubing set 6% gel spacer from 926’ to 420’ set a minimum 100’ cement plug from

450’ to 350’.

19. Tag plug add cement as needed.

20. TIH set 6% Gel spacer from 350’ to 100’ set a minimum of 100’ cement plug to surface.

21. Install monument with API attached.

22. Rig down move rig and equipment off site.

23. Reclaim site.

NOTE.. Any casing found in the well without cement in the annulus that cannot be retrieved must be perforated and cemented at all saltwater, freshwater, coal, oil, gas, casing shoe and elevation points.

Site Reclamation Plan

All plugging equipment will be removed from the site. Culverts will be removed and disposed of.

All slopes will be reestablished as near original grade as possible. The well site and road will be limed, fertilized, seeded and mulched in accordance with the terms of the permit and Reclamation

Manual.

VI. TECHNICAL SPECIFICATIONS

1.0 Rig and Crew -Three (3) Man Crew (minimum)

Description:

The rig is a mobile platform from which well work is performed. The rig crew are the persons needed to adequately operate the rig.

Functional/performance requirements:

The rig must be a mobile rig, capable of pulling 150 percent of the heaviest hook load anticipated. The rig crew will consist of, at a minimum, three persons – a rig operator, two hands, and a pickup truck.

Measurement and Payment:

Item is bid per hour of operation. Hours charged will be for on-site work only. Daily transportation to and from the job site is not included and will not otherwise be charged separately. At no time may an individual worker’s hours be billed simultaneously for work completed under this item and any other labor-based item allowing for hourly rate payments (e.g., ‘Heavy Equipment.’)

Hours for Rig and Crew are payable only after the point in time in which the rig has been set up and connected to the well. Rig set up prior to well connection is considered under the line item for “Site Preparation.”

2.0 Mobilization & Demobilization

Mobilization and demobilization, collectively, encompasses the labor and equipment necessary to transport all contract equipment, tools, and materials to and from the project site. Mobilization and demobilization pricing includes all equipment on the contract at the time of the bid. Transportation costs for any other unanticipated equipment needs that may arise will be resolved through the Change Order process, if necessary.

Functional requirements:

All necessary trucking must include operator with a valid Commercial Driver’s License

(CDL).

Item is bid as a service, with half the total bid amount payable after mobilization has occurred (50.0%), and the remainder payable with the final invoice.

3.0 Site Preparation

Site preparation is the process of readying the well site location for plugging activities.

Site preparation may include clearing and grubbing, tree-cutting, construction, installation of erosion and sediment controls, tie-mat installation, cellar installation, and roadbuilding and maintenance thereof. Site preparation includes all setup up and staging of well plugging equipment to the point that the rig is connected to the well and plugging operations are ready to commence.

Any heavy equipment used during site preparation must meet the functional requirements identified in Item 5. Heavy Equipment.

Performance Requirements:

Any construction activities conducted during site preparation shall be completed in accordance with the provisions described in the West Virginia Erosion and Sediment

Control Field Manual – May 2012. Note that Section A of this manual establishes relevant criteria for road construction.

https://dep.wv.gov/oil-and-gas/Documents/Erosion%20Manual%2004.pdf.

Measurement and payment:

https://dep.wv.gov/oil-and-gas/Documents/Erosion%20Manual%2004.pdf

This item is bid as a lump sum per well for all labor, equipment, and tools needed to complete site preparation, as described in the ‘Site Preparation’ project description in

Section V. Any materials needed will be bid separately under their respective line items.

(e.g., stone, silt fence, tie mats, culverts).

4.0 Vacuum Water Truck

A vacuum truck is a tank truck that has a pump and a tank designed to pneumatically suck liquids, sludges, slurries, or similar fluids into the tank of the truck for the purposes of transporting that material to another location. In this contract, the vacuum water truck will be used to deliver water to site, dispose of plugging fluids and may assist in controlling fluid returns from the well bore site.

Vacuum water truck must include all hoses and connections needed as well as operator.

This item is bid per hour of operation and includes operator. At no time may an individual worker’s hours be billed simultaneously for work completed under this item and any other labor-based item allowing for hourly rate payments (e.g., ‘Rig and Crew’ or ‘Heavy

Equipment.’)

5.0 Heavy Equipment

In addition to site preparation, heavy equipment may be used during well plugging operations for purposes including the movement of tools and equipment. The use of heavy equipment requires a qualified operator.

Bulldozer must have winches and tilt blades and will be used for grading and the spotting of equipment. Excavator must be a tracked machine. Note: horsepower and weight will be verified by reviewing the specifications of the model(s) selected by the vendor.

1. Bulldozer (minimum 85 horsepower and minimum weight 16,000 pounds.)

2. Excavator (minimum 85 horsepower and minimum weight 25,000 pounds.)

3. Skid Steer (minimum 24 HP, 700# rated capacity or equivalent.)

This item is bid per hour of operation and includes labor by a qualified operator. At no time may an individual worker’s hours be billed simultaneously for work completed under this item and any other labor-based item allowing for hourly rate payments (e.g., ‘Rig and

Crew).

6.0 Power Tongs

Power tongs are large-capacity self-locking wrenches used to grip drill string components and apply torque. Power tongs are used to assemble and disassemble tubulars and casings.

The following sizes may be needed for this project.

1. Up to 4 ½ inches

2. Over 4 ½ inches up to 8 ⅝ inches

3. Over 8 ⅝ inches up to 10 ¾ inches

This item is bid per day of use.

7.0 Casing Knife/Ripper

A casing knife/ripper is a cable tool used in association with jars to affect the separation or severance of tubing or casing found in the well bore.

Knife block assembly size will be determined by the well bore. All assembly components will be provided by the contractor.

The following sizes may be required:

1. Up to 3 ½”

2. Up to 8 ⅝”

This item is bid per knife per day.

8.0 Casing and Tubing Purchase

Casing and tubing are pipes of a specified diameter lowered into the borehole to serve as a conduit for fluids or to provide borehole structural stability. The casing and tubing purchase is necessary when casing and tubing must be left in the well bore, and when casings need to be lengthened to nipple up for physical connection to the rig. Slips and elevators will be provided by the contractor.

The following sizes may be needed:

1. 24” Casing

2. 6 ⅝” Casing

This item is bid per foot.

9.0 Casing, Tubing, and Pipe Rentals

Casing and tubing are pipes of a specified diameter lowered into the borehole to serve as a conduit for fluids or to provide borehole structural stability. The casing, tubing, drill pipe, and drill collar rentals are needed when tubing and casings may be used in the well bore and recovered in such instances.

This will include various sizes that will be determined by the well bore. Slips and elevators will be provided by the contractor.

1. Tubing: 1 ½ inches to 2 ⅜ inches

2. Drill Collar: 2 ⅞ inches

3. Drill Pipe: PAC 50 or equivalent

This item is bid per foot.

10.0 Tri-Cone Drill Bit

The drill bit is the tool used to cut or crush rock during well drilling. A Tri-cone bit will be used to drill out fill-up found in the well bore.

Tri-cone bit include bit sub and a float.

1. 2 ¾ inches up to 4 ¾ inches

2. 4 ¾ inches up to 6 ¼ inches

Drill bit shall be in used condition.

This item is bid per bit.

11.0 Trash Pump

The trash pump is used to transfer water and other plugging fluids between locations.

Functional and Performance requirements:

The trash pump must be a minimum three (3) inches and shall be of industrial grade with all hoses and fittings included.

This item is bid per hour of use.

12.0 On-Site Water Storage Container(s)

The water storage container(s) must hold at a minimum one hundred (100) barrels and will be used for the storage of fresh water for use in the plugging operation.

This item is bid per container.

13.0 Disposal of Gel

There are instances where gel fluids from the plugging operations may need to be disposed of, in which case they shall be hauled to an approved solid waste facility.

This item is bid per barrel and does not include trucking cost. Copies of scale tickets from an approved solid waste facility shall be provided to the Department.

14.0 Disposal of Liquid Waste

There are instances where saltwater or other Class II fluids are returned to the surface due to the plugging operations and must be disposed of at an Underground Injection Control

(UIC) well. The contactor will transport the saltwater or other Class II fluids to a UIC well for disposal.

This item is bid per barrel and does not include trucking cost. Manifest and invoice from an approved disposal facility shall be provided to the Department.

15.0 Disposal of Solid Waste

Solid waste, including contaminated soil, disposal will be the responsibility of the contractor.

This item is bid per ton and does include trucking cost. Copies of scale tickets from an approved solid waste facility shall be provided to the Department.

16.0 Aqua Gel

Gel is a mixture of water and bentonite clay mixed to desired weight. Aqua gel will have dual use, it will be used to increase the viscosity of the drill fluid and as spacers between the cement plugs.

This item is bid per fifty (50) pound sack delivered to site. Pricing is to include mixing and pumping. Larger unit sizes of aqua gel may be used on-site (i.e., “Super Sacks”), but bid prices and payment shall be standardized to the fifty-pound sack equivalent. The use of any heavy equipment to assist in the mixing and pumping of aqua gel (i.e., excavator to lift a super sack) shall be considered in this line item.

17.0 Cement

Portland Class A Cement shall be used to cement casings and tubulars in the well bore and for cement plugs. Class L cement may be used in place of Class A if explicitly allowed by permit.

Performance requirements:

Cement will be a Portland Class A or L cement, as identified in the permit, with no other additives.

This item is bid per standard ninety-four (94) pound sack delivered to site. Pricing is to include mixing and pumping. Larger unit sizes of cement may be used on-site (i.e., “Super

Sacks”), but bid prices and payment shall be standardized to the ninety-four-pound sack equivalent. The use of any heavy equipment to assist in the mixing and pumping of cement

(i.e., excavator to lift a super sack) shall be considered in this line item.

18.0 Gravel

Gravel is used for a variety of applications including roadbuilding and site stabilization.

Functional requirement:

Gravel will be limestone and size will be determined by the application for which it is being used.

This item is bid per ton delivered to site. This price will include trucking to site.

19.0 Steel Mud Pit

The mud pit is a large tank that contains drilling fluids on-site. Mud pits may also be used to store plugging fluids from the well.

Functional requirement:

The mud pit shall be constructed of steel and have a divider to expedite the settling of cuttings and debris flushed from the well bore.

This item is bid per mud pit.

20.0 Site Reclamation

Site reclamation is the process of restoring the well site area back to original condition.

Site reclamation generally requires earth work and seeding of grass utilizing a combination of lime, fertilizer, seed, and mulch, as appropriate. The minimum quantities of these materials are specified in the reclamation plan. Site reclamation also includes the removal of any well production equipment, installed erosion and sediment controls, and tie mats.

20.1 Site Reclamation – API# 47-017-00154

Any heavy equipment used during site preparation must meet the functional requirements identified in Item 5. Heavy Equipment.

Performance Requirements:

Site reclamation shall be completed in accordance with the provisions described in the

West Virginia Erosion and Sediment Control Field Manual – May 2012. Note that Section

III of this manual establishes minimum quantities for reclamation materials including lime, fertilizer, seed, and mulch based on site acreage. Site reclamation performance will be evaluated against these parameters.

https://dep.wv.gov/oil-and-gas/Documents/Erosion%20Manual%2004.pdf.

This item is bid as a lump sum per well for all labor, equipment, tools, and materials including lime, fertilizer, seed, and mulch needed to complete site reclamation of the well site (including the soil borrow area, if necessary), as described in the ‘Site Reclamation’ project description in Section V. Topsoil, where necessary, shall be bid separately;

however, all labor associated with that soil will be considered in this bid item. Site reclamation shall also include the removal of all production equipment, installed erosion and sediment controls, and tie mats.

21.0 Silt Fence

A silt fence is a temporary sediment control device used on construction sites to protect water quality in nearby streams, rivers, lakes, and seas from sediment in stormwater runoff.

https://dep.wv.gov/oil-and-gas/Documents/Erosion%20Manual%2004.pdf

Silt fence shall be supplied with stakes pre-attached and will be installed during site preparation. Silt fence will also be removed at the completion of reclamation.

This item is bid per foot. Installation and removal of silt fence shall be included in the site preparation and reclamation line items, respectively.

22.0 Monument

The monument is the permanent marker indicating the location of the plugged well.

Monument and its installation will meet all the requirements in 35 CSR 4 – 5.5.b, including:

● The monument will be a minimum of six (6) inches in outside diameter.

● The monument will extend minimum of thirty (30) inches above final grade and not less than ten (10) feet below the surface.

● The monument will have the well’s API Number permanently attached.

http://apps.sos.wv.gov/adlaw/csr/readfile.aspx?DocId=16899&Format=PDF.

This item is bid per monument installed.

23.0 Welder/Cutting Torch

A welder/cutting torch is necessary for the fusing or cutting of metal components.

This item is bid per hour of use and includes operator. At no time may an individual worker’s hours be billed simultaneously for work completed under this item and any other labor-based item allowing for hourly rate payments (e.g., ‘Heavy Equipment.’)

24.0 Oil Absorbent Supplies

Oil Absorbent Supplies are used to absorb and contain oil as directed by the DEP.

1. Booms will be bid per boom and must be a minimum of ten (10) feet in length.

2. Absorbent pads will be bid by the bundle; pads must be a minimum of two

(2) feet by two (2) feet.

3. Peat sorb will be bid per fifty (50) pond bag.

4. Plastic roll – (100 feet by 50 feet), twenty (20) mil (0.02 inch) minimum thickness, bid per roll.

Items are bid as described above, and shall include installation or deployment costs.

25.0 Sand Pump

A sand pump is a syringe-type cable tool typically between four (4) and six (6) inches in diameter used to pump sand and cuttings from the well bore.

The well bore size will determine the size of the sand pump used.

Item is bid per pump.

26.0 Cherry Picker

A cherry picker is a tool used to retrieve items from the well bore and drill out wooden plugs. This tool is run on the stem and is used in conjunction with jars.

The cherry picker will be a four (4) to eight (8) in diameter tubular four (4) feet in length with a tapered hole and slot. The well bore diameter will determine the precise size of cherry picker.

Item is bid per cherry picker.

27.0 Casing/Tubing Spear

Casing/Tubing Spear is a grapple tool that will go inside of tubing that is inside of the well bore.

Size will be determined by tubing encountered.

1. Tubing Spear 1 inch to 3 ½ inches

2. Casing Spear up to 10 ¾ inches

Item is bid per spear.

28.0 Overshot

Overshot is a grapple tool used to retrieve tubular pipe and casing by going over the outside of item being fished.

Size to be determined by the size of the fish. All grapples and working components must be included.

1. 1 inch to 3 ½ inches

2. Up to 8 ⅝ inches

Item is bid per tool.

29.0 Impression Block

The impression block is a wax block affixed to the bottom of fishing tools to allow for the creation of an impression of hole contents to assist in fishing operations.

Item is bid per impression block.

30.0 Subs

A sub is a short, threaded piece of pipe used to adapt parts of the drilling string that cannot otherwise be screwed together because of differences in thread size or design. Subs may be needed to change over to drill pipe or to retrieve casing from the well bore.

This item is bid per sub.

31.0 Power Swivel

The power swivel is a mechanical device that suspends the weight of the drill string. It is designed to allow rotation of the drill string beneath it, conveying high volumes of high-pressure drilling mud between the rig's circulation system and the drill string.

The power swivel must be a minimum of a twenty-five (25) ton hydraulic unit. The Power

Swivel must include the Power Unit with hoses and connections, also includes two Saver

Subs (one for Drill Pipe and one for Drill Collars).

This item is bid per hour of use.

32.0 Concave Mill

A mill is a tool that grinds metal downhole, typically to remove junk or parts of a casing string.

Mills will include subs needed.

1. 4 ¾ inch mill

Item is bid per mill.

33.0 Mud/mixing pump

A mud pump is a reciprocating piston/plunger pump designed to circulate drilling fluid under high pressure down the drill string and back up the annulus.

This pump must have a minimum of five (5) inch diameter with a seven (7) inch stroke length or larger, and able to supply volumes and pressure as needed. It will include hoses and connections capable of handling the pump output.

Item is bid per hour of use.

34.0 Logging, Bond with CCL

Description

Logging includes all labor, equipment, and material necessary to determine various characteristics of the well and using probative tools suspended from a wire line. Bond logs with casing collar locator (CCL) allows for a determination of the cement bond quality behind the casing and identify the free point of any casing strings present in the well.

Logging includes all labor, equipment, and materials required to complete logging run.

Item is bid per log.

34.5 Wireline Shot/Perforation, Collar Buster

The perforation, severance, or separation of pipe by wireline tools equipped with explosive shots (i.e., collar busters, perf balls) or other wireline mechanical means (i.e., jet-cutter), typically in conjunction with a bond log.

Functional Requirements:

The following sizes may be needed:

1. Up to 8 ⅝”

This item is bid per run.

35.0 Tie Mats

Tie mats are portable structures used to support the weight of heavy equipment.

Minimum size 4’ x 12’. Tie mats may be constructed of natural or synthetic materials.

Item is bid per mat for the duration of the project.

36.0 Topsoil

The excavated area may need to be backfilled with topsoil. The quantity of topsoil will be based on the quantity of soil disposed minus the amount of gravel that is placed along the well.

Item is bid per ton and includes excavation from the borrow area, if applicable, transportation to the site and equipment and labor to level the site. At no time may an individual worker’s hours be billed simultaneously for work completed under this item and any other labor-based item allowing for hourly rate payments (e.g., ‘Rig and Crew’ or ‘Heavy Equipment.’)

37.0 Culvert

A culvert is a pipe intended to channel water.

It is anticipated that culverts of the following size will be needed (diameter x length):

1. 36” x 20’ (thirty-six inches by twenty feet)

2. 24” x 20’ (twenty-four inches by twenty feet)

3. 16” x 20’ (sixteen inches by twenty feet)

Culvert may be metal or HDPE.

Item is bid for each culvert.

VII. APPENDIX A – WELL RECORDS

1.1 API# 47-017-00154