Technical_Specifications-2025-35_Replacement_Well_No_5_&_Control_Building_(IFB).pdf
PDF 24 MB Posted
- Attached to
- Replacement Well No. 5 & Control Building
- Solicitation number
- 2025-35
- Issued by
- Harris County, Corpus Christi City, Texas
About this file
This is a technical specifications document for the Replacement Well No. 5 & Control Building Invitation for Bid (IFB) issued by a Texas state or local water utility. The project involves the design and construction of a replacement water well with an associated control building to replace an existing well facility. The engineering estimated budget for this project is $6,900,000.00. The specifications establish comprehensive technical requirements for well drilling, installation, and construction activities, including materials, equipment, workmanship standards, and performance criteria that bidders must meet or exceed in their proposals.
The document outlines detailed specifications for groundwater extraction infrastructure, control systems, and ancillary structures necessary for the project's completion. Technical requirements address well construction standards, pump and motor specifications, electrical systems, instrumentation, SCADA integration, building construction materials and methods, and compliance with applicable codes and regulations. The specifications serve as the binding technical standard for all bids submitted in response to the IFB, ensuring that all competing contractors understand the exact scope of work, quality expectations, and performance metrics required for project execution and acceptance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .