This document is a Statement of Work (SOW) for a federal contract opportunity to replace and upgrade microwave communications equipment for the U.S. Customs and Border Protection's Remote Video Surveillance System Northern Border (RVSS-NB) in the Buffalo, NY area.
The SOW requires the contractor to provide technical services to replace existing ODU300 radios with ODU600v2 radios, update firmware on associated microwave equipment, and replace an INU shelf and associated cards at one of the four tower sites (BUN-010, BUN-011, BUN-012, and BUN-013). The contractor will be responsible for all labor, travel, tools, materials, and subcontracting services to complete the upgrade. The work must meet Federal Aviation Administration (FAA) lightning grounding and bonding shielding specifications. The government estimates the required equipment for the upgrade, but the contractor is ultimately responsible for providing all necessary equipment and materials.
The related federal contract opportunity is a pre-solicitation announcement seeking sources for the technical services described in the SOW. The FAA intends to award a single Firm Fixed Price contract using a Lowest Price Technically Acceptable evaluation process. Interested vendors are requested to provide a statement of interest, project-specific information, and a rough order of magnitude cost estimate by October 4, 2024. The FAA may set aside the contract for small business, 8(a), service-disabled veteran-owned, or woman-owned small business concerns based on the responses received.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
AJW-L4000 / Customs and Border Protection Remote Video Surveillance System Northern Border (RVSS-NB) Technical Services Microwave Communications Update September 23, 2024
Background & Purpose Customs and Border Protection (CBP) has a requirement for procuring technical services. This procurement will be integrated into CBP’s Remote Video Surveillance System Northern Border (RVSS-NB) which is an essential element of the broader CBP strategy to rapidly overhaul surveillance technology to enhance border enforcement efforts.
Scope of Work The contractor will provide technical services (Set-Up, Mobilization, Demobilization, Materials, and Equipment) with the following specifications. The scope of this effort is to replace existing ODU300 radios of the microwave communications technology on a total of 4 RVSS-NB towers in Buffalo Sector, specifically BUN-010, BUN-011, BUN-012, and BUN-013, update firmware of associated microwave equipment, and replacing an INU shelf and associated cards at BUN-011.
Requirements for Installation & Support Requested for the Project The contractor will provide all necessary; labor, travel, tools, materials, and sub-contracting services to successfully complete the tasks specified in Section 2 to meet the objectives and deliverables described in this statement of work (SOW). The contractor will provide the Federal Aviation Aeronautical Logistics Center (FAALC) with cost estimates and schedule for all tasks to be accomplished under this contract prior to starting any work.
Level of work to be performed:
1. All necessary labor of appropriate skill to accomplish all tasks including tower climbing.
2. Travel as necessary to accomplish all tasks.
3. Contractor is responsible to provide all equipment and incidental materials.
4. All contractor and sub-contractor personnel working on this project are required to submit and clear a law enforcement clearance through the local DHS/CBP sector office.
5. Coordinate with FAA and CBP Sector before taking system down each day.
6. Provide services for the installation of the ODU600v2 radio at each tower site.
7. Provide services for updating firmware on associated microwave equipment at each site.
8. Provide services for the installation of the replacement INU shelf and associated cards at BUN-011.
9. Contractor installed equipment will be required to meet FAA lightning grounding and bonding shielding (LGBS) specification FAA-STD-019e.
Facility Services Work will include the contractor providing technical services to install new ODU600v2 at each site and replacing INU shelf and associated cards only at BUN-011.
Field Services The contractor will perform field services where the current towers are located.
Technical services will be required for set-up, mobilization, demobilization, materials, and equipment at the RVSS-NB towers and/or CBP facilities.
The contractor will participate in any required telecom meetings pertaining to the deployment of field services pertaining to set-up, mobilization, demobilization, materials, and equipment at the RVSS-NB towers and/or CBP facilities.
Site Location Buffalo, NY (sites BUN-010, BUN-011, BUN-012, and BUN-013)
| Location |
| Latitude |
| Longitude |
| Tower Type/Height |
| BUN-010 |
| 42° 52’ 34.20’’ N |
| 78° 53’ 23.30’’ W |
| Monopole 80 ft |
| BUN-011 |
| 42° 41’ 36.40’’ N |
| 79° 02’ 17.60’’ W |
| Self-support lattice 180 ft |
| BUN-012 |
| 42° 28’ 12.30’’ N |
| 79° 22’ 21.40’’ W |
| Self-support lattice 180 ft |
| BUN-013 |
| 42° 16’ 54.90’’ N |
| 79° 43’ 14.40’’ W |
| Self-support lattice 180 ft |
Microwave Paths
| Link |
| Main |
Antenna
| Diversity Antenna |
| Main |
Antenna Diversity Antenna
| BUN-010 – BUN-011 |
| BUN-010 |
55 ft
BUN-010
25 ft
BUN-011
160 ft
BUN-011
130 ft
| BUN-011 – BUN-012 |
| BUN-011 |
170 ft
BUN-011
140 ft
BUN-012
160 ft
BUN-012
130 ft
| BUN-012 – BUN-013 |
| BUN-012 |
165 ft
BUN-012
135 ft
BUN-013
160 ft
BUN-013
125 ft
Equipment Requirements The following is the FAA’s estimated list of equipment needed for this upgrade. This equipment list is an estimate only. Contractor is ultimately responsible to provide all equipment and incidental materials needed to complete the upgrade.
| EQUIPMENT LIST DESCRIPTION |
| PRODUCT CODE |
| SYSTEM |
| PART NUMBER |
| QTY |
Section 1
Eclipse ODU600 Radio Products
| ODU 600v2, 05 GHZ, PLANNING PART NUMBER |
| M-ECH-05 |
| 12 |
| ODU/INU Level 2 Terminal Assy & RF Link Test Service |
| VAS-ODUINU-002 |
| 12 |
Eclipse INUe Products
| ECLIPSE, INTELLIGENT NODE UNIT 2RU, INC IDCE, FAN, NCCV3, HIGH OUTPUT |
| EXX-000-205 |
| 1 |
| KIT BRACKET 2RU |
| 179-530064-001 |
| 1 |
| NODE PROTECTION CARD, HIGH OUTPUT |
| EXS-002 |
| 1 |
| RAC 60E, QPSK-256 QAM, High Gain, No XPIC, ACM and SYNC-E |
| EXR-660-002 |
| 4 |
| DAC GE3 GIGABIT ETHERNET SWITCH CARD |
| EXD-181-002 |
| 2 |
| AUX, ALARM I/O CARD |
| EXA-001 |
| 1 |
| CABLE PROT / BRIDGEING GE3, DIRECT FIT, 500mm |
| 037-579461-500 |
| 1 |
| NODE SW LICENSE, 200 Mbps TOTAL RADIO PAYLOAD CAPACITY |
| EZE-08004 |
| 1 |
| SECURE MANGEMENT, INU, inc SNMPV3 NODAL |
| EZF-03 |
| 1 |
| PAYLOAD ENCRYPTION NODAL RAC70/7X/60/6X/60E/6XE |
| EZF-04 |
| 1 |
| RADIUS CLIENT, NODAL CENTRALIZED USER ACCT MGMT |
| EZF-06 |
| 1 |
| GIG ETH SFP, OPT MMF 850nm LC 1000BASE-SX, <550M |
| 079-422662-001 |
| 2 |
Eclipse spares
| ECLIPSE COUPLER 5GHZ UNEQL 6DB N TYPE CONN (840EC0501B) |
| 086-523221-615 |
| 1 |
ODU 600v2, 05 GHZ, PLANNING PART NUMBER
M-ECH-05
Accessories
| ADAPTOR KIT, DIE CAST, ODU600v2 TO ODU600V1, 5GHz |
| 179-530512-005 |
| 12 |
1M JUMPER, 1/2IN, N MALE TO 7/16 DIN MALE
086-523245-001
| CABLE,ODU WITH CONN.GROUND KIT, 75M 0.4INCH 50OHM COAX |
| 037-579311-075 |
| CONNECTOR KIT N TYPE M&F 400 TYPE CABLE |
| 179-530057-001 |
| 8 |
| TYPE N MALE CRIMP CONNECTORS |
| 840-600202-001 |
| 8 |
| LIGHTNING ARRESTOR KIT, UNIVERSAL, 50 OHM, TYPE N, MALE TO FEMALE |
| 179-530062-002 |
| 4 |
| KIT, FLANGE TO BULKHEAD TYPE N ADAPTER (BFN) |
| LOC-BFN |
| 4 |
| WEATHERPROOFING KIT |
| 011-390001-001 |
| 4 |
| HOISTING GRIP, FOR 3/8 INCH CNT-400 COAXIAL CABLE |
| AND-C2SGRIP |
| 2 |
| CABLE, N MALE TO N MALE FOR LMR-600, 1.5M |
| 037-579589-001 |
| 3 |
6.0 COMPLETION OF WORK
Prior to physical completion of this statement of work, Contractor will deliver all replaced equipment to onsite FAA representative for disposition.
This project will be considered physically complete upon completion of all work described herein, successful testing of the updated system configurations for all towers and returning the microwave systems back to normal operations defined by the comparison of snapshots of transmit (TX) power, Received Signal Level (RSL), and link throughput parameters prior to conducting work with post work TX power, RSL, and link throughput parameter readings and within +/- 1dB for TX power, +/- 3dB for RSL and +/- 2% for throughput.
7.0 PERIOD OF PERFORMANCE
The period of performance for the completion of the work defined in this statement of work is 180 days after contract award.