Technical_Questionnaire_PDF.pdf

PDF 182 KB Posted

Attached to
APIS Dock Rehab Federal contract opportunity
Solicitation number
140P6422R0002
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document contains a technical questionnaire and related federal contract opportunity notice for a dock rehabilitation project at Apostle Islands National Lakeshore. The technical questionnaire requests responses to four subfactors: technical approach, project experience, proposed schedule, and management approach. It provides evaluation criteria and notes responses will be critical to selection. The related federal contract opportunity notice provides additional details on the scope of work to remove and replace decking, joists and other dock components. Interested parties are encouraged to attend an organized site visit by June 30th, with proposals due by July 22nd and contract award expected in summer 2022. The project is set aside for total small businesses and has a magnitude between $500,000-$5,000,000 depending on inclusion of an optional line item. The contract will be firm-fixed price and subject to Construction Wage Rate Requirements for Bayfield County, WI.

View the file

Other files for this federal contract opportunity

Other files attached to APIS Dock Rehab, newest first.
File Type Posted
Questions_and_Answers_0002.pdf PDF
Sol_140P6422R0002_Amd_0002.pdf PDF
Site_Visit_Sign-In_Sheet_0002.pdf PDF
Sol_140P6422R0002_Amd_0001.pdf PDF
Project_Specifications.pdf PDF
Bid_Schedule.xlsx XLSX spreadsheet
Sol_140P6422R0002.pdf PDF
Wage_Determination.pdf PDF
Limitations_on_Subcontracting_Worksheet.pdf PDF
Attachment_-_Drawings.pdf PDF
Vaccination_Certification_Notification_Template.pdf PDF
Technical_Questionnaire.docx DOCX document
Past_Performance_Questionnaire.doc DOC document
Attachment_-_Submittal_List.pdf PDF
Past_Performance_Questionnaire_PDF.pdf PDF
Bid_Schedule.pdf PDF
Certification_of_Vaccination_Form.pdf PDF
Attachment_-_Addendum_to_Specifications.pdf PDF
Notice_to_Contractors.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL QUESTIONNAIRE

Dock Rehabilitation

Apostle Islands National Lakeshore

OFFEROR:

SOLICITATION #:

140P6422R0002

DATE:

PLEASE NOTE: IN ADDITION TO PRICING PROVIDED ON THE BID SCHEDULE, RESPONSES ON

THIS TECHNICAL QUESTIONNAIRE (AND RESPONSES ON THE PAST PERFORMANCE

QUESTONNAIRE) ARE CRITICAL TO THE SELECTION OFFICIAL WHEN EVALUATING A PROPOSAL

FOR AWARD. INADEQUATE OR VAGUE RESPONSES MAY RESULT IN A LOWER RATING (SEE

SECTION M OF THE SOLICITATION FOR EVALUATION INFORMATION). YOU MAY USE AS MUCH

SPACE FOR YOUR RESPONSES AS NEEDED.

SUBFACTOR #1 – Technical Approach

Technical approach is your means and methods to complete the technical aspect of required work in dock rehabilitation as described in the project specifications. Submit a written narrative describing your technical approach to the specific aspects listed below.

• Approach to Critical Contract Requirements: Describe your approach to successfully accomplish dock rehabilitation in accordance with requirements outlined in the project specifications within proposed contract performance period and budget.

• Proposed Materials/Products: Please explain and list the materials/products your company will be installing per the specifications (if quoting an “or equal” product, must submit with quote all supporting documentation/specifications for those items).

• Staging Plan: Due to limited space on and off the job site, what is your plan for staging of materials?

Technical approaches that comply with applicable contract requirements; are realistic, appropriate, efficient; and demonstrate clear logic and scope understanding present lower levels of risk and will be more favorably rated. Approaches not demonstrating these attributes present higher levels of risk and will be less favorably rated.

SUBFACTOR #2 – Project Experience

Submit "Project Experience" addressing specific experience working in dock rehabilitation, preferably a minimum of 3 and/or a maximum of 5, relevant projects completed in the last 7 years.

Project experience demonstrating (1) capability to successfully complete relevant projects of similar scope and magnitude to this solicitation; (2) strong technical knowledge and skill required for this solicitation; and (3) effective management, problem solving, communication, coordination, and organization present lower levels of risk and will be more favorably rated. Those not demonstrating these attributes present higher levels of risk and will be less favorably rated.

NOTE: The same projects evaluated for experience under this factor shall also be evaluated for Past Performance. Projects determined more relevant under this factor will be given more weight in the Past Performance evaluation.

SUBFACTOR #3 – Schedule

Submit your proposed construction schedule for THIS SPECIFIC PROJECT showing completion within the required period of performance contained in this solicitation with accompanying schedule narrative. Submit your schedule so that it is clear and concise, addressing the following: major milestones, explain schedule logic, critical path activities, procurement lead-times and key considerations and constraints.

Construction schedules and narrative descriptions documenting (1) clear and efficient critical path and logical sequencing; (2) account for procurement lead-time, subcontractor/trade coordination, resource and time constraints; and (3) demonstrate successful completion within the required period of performance present lower levels of risk and will be more favorably rated. Schedules which do not demonstrate these attributes present higher levels of risk and will be less favorably rated.

SUBFACTOR #4 – Management Approach

Management approach is the is the organizational structure, equipment/assets, and business processes to manage, control, and oversee your firm's operations. Please describe your management approach to the specific aspects listed below.

• Please describe how you will institute quality workmanship for a project of this nature and magnitude.

• Assets/Equipment/Facilities: Please describe in detail your company’s assets and/or technical equipment/facilities that may be utilized for a project of this nature and magnitude. Barges, tugs, boats, equipment?

Management approaches demonstrating (1) sound management practices and business processes; (2) effective cost and quality control; and (3) clear corporate and project team commitment, hierarchy and lines of communication, roles, responsibilities, and relationships present lower levels of risk and will be more favorably rated. Plans not demonstrating these attributes present higher levels of risk and will be less favorably rated.