Technical Questionnaire.pdf
PDF 140 KB Posted
- Attached to
- Boardwalk Replacement Federal contract opportunity
- Solicitation number
- 140P6421R0013
About this file
This document provides details for a solicitation seeking proposals for a boardwalk replacement project at Indiana Dunes National Park. The National Park Service Midwest Region is soliciting proposals to remove an existing boardwalk and install a new floating boardwalk in accordance with provided specifications. Proposals are due by April/May 2021, with an anticipated award date in April/May 2021 and work to begin in May 2021. The project value is estimated between $250,000 to $500,000. The contract type will be firm-fixed price. Evaluation criteria are technical approach, past performance, and price. The NAICS code is 237990 for specialty trade contractors and the size standard is $39.5 million. The project is set aside 100% for small businesses. A pre-bid site visit is available and registrations in SAM.gov and ORCA are required to be eligible for award. The point of contact is the listed contracting officer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers - COR responses_0002.pdf | ||
| Sol_140P6421R0013_Amd_0002.pdf | ||
| Sol_140P6421R0013_Amd_0001.pdf | ||
| Questions and Answers_0001.pdf | ||
| Revised Drawings_0001.pdf | ||
| Revised Specifications - Boardwalk Replacement_0001.pdf | ||
| Revised Bid Schedule - Boardwalk Replacement_0001.xlsx | XLSX spreadsheet | |
| Site Visit Attendee List_0001.pdf | ||
| Specifications - Boardwalk Replacement.pdf | ||
| Pictures.pdf | ||
| Sol_140P6421R0013.pdf | ||
| Bid Schedule - Boardwalk Replacement.pdf | ||
| Wage Determination.pdf | ||
| Technical Questionnaire.docx | DOCX document | |
| Past Performance Questionnaire.docx | DOCX document | |
| Drawings.pdf | ||
| Notice to Contractors.pdf | ||
| COVID-19 Mask Policy.pdf | ||
| Bid Schedule - Boardwalk Replacement.xlsx | XLSX spreadsheet | |
| Past Performance Questionnaire.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL QUESTIONNAIRE
Boardwalk Replacement
Indiana Dunes National Park
OFFEROR:
SOLICITATION #:
DATE:
PLEASE NOTE: IN ADDITION TO PRICING PROVIDED ON THE BID SCHEDULE, YOUR
RESPONSES ON THIS QUESTIONNAIRE (AND YOUR RESPONSES ON THE PAST PERFORMANCE
QUESTIONNAIRE) ARE CRITICAL TO THE SELECTION OFFICIAL WHEN EVALUATING A
PROPOSAL FOR AWARD. INADEQUATE OR VAGUE RESPONSES MAY RESULT IN A LOWER
RATING. YOU MAY USE ADDITIONAL PAGES FOR YOUR RESPONSES, IF NEEDED.
Question #1
Please describe in detail how you plan to complete this project while adhering to the statement of work and period of performance and keeping costs in line with the bid schedule pricing provided in your proposal (Explain in detail your company’s experience installing floating boardwalk.)
Question #2
Please provide a Project Management Plan and describe how you will institute quality workmanship for a project of this nature and magnitude (Please explain in detail your company’s experience with warehouse management. Provide examples of procedures on how to handle and classify stored materials. Even explain how you intend to protect the materials that shall be used for this project. Indicate staging and delivery).
Question #3
Please describe in detail your company’s assets and/or technical equipment/facilities that may be utilized for a project of this nature and magnitude (Explain type of equipment that you plan to utilize for demolition/installation/material handling, including weights of equipment – while protecting the environment and installing new boardwalk).
Question #4
Please explain and list the materials/products your company will be installing per the Statement of Work/Specifications details. (IF QUOTING AN “OR EQUAL” PRODUCT, MUST SUBMIT WITH QUOTE
ALL SUPPORTING DOCUMENTS/SPECIFICATIONS FOR THOSE ITEMS).
Question #5
Please describe how you will address safety on the project, in an area open to the public, while maintaining safety to both the public, park staff and contractor’s forces.
Question #6
Please explain in detail your company’s experience with demolition and restoration of a boardwalk in an environmentally sensitive area.