Technical Questionnaire.pdf

PDF 140 KB Posted

Attached to
Boardwalk Replacement Federal contract opportunity
Solicitation number
140P6421R0013
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document provides details for a solicitation seeking proposals for a boardwalk replacement project at Indiana Dunes National Park. The National Park Service Midwest Region is soliciting proposals to remove an existing boardwalk and install a new floating boardwalk in accordance with provided specifications. Proposals are due by April/May 2021, with an anticipated award date in April/May 2021 and work to begin in May 2021. The project value is estimated between $250,000 to $500,000. The contract type will be firm-fixed price. Evaluation criteria are technical approach, past performance, and price. The NAICS code is 237990 for specialty trade contractors and the size standard is $39.5 million. The project is set aside 100% for small businesses. A pre-bid site visit is available and registrations in SAM.gov and ORCA are required to be eligible for award. The point of contact is the listed contracting officer.

View the file

Other files for this federal contract opportunity

Other files attached to Boardwalk Replacement, newest first.
File Type Posted
Questions and Answers - COR responses_0002.pdf PDF
Sol_140P6421R0013_Amd_0002.pdf PDF
Sol_140P6421R0013_Amd_0001.pdf PDF
Questions and Answers_0001.pdf PDF
Revised Drawings_0001.pdf PDF
Revised Specifications - Boardwalk Replacement_0001.pdf PDF
Revised Bid Schedule - Boardwalk Replacement_0001.xlsx XLSX spreadsheet
Site Visit Attendee List_0001.pdf PDF
Specifications - Boardwalk Replacement.pdf PDF
Pictures.pdf PDF
Sol_140P6421R0013.pdf PDF
Bid Schedule - Boardwalk Replacement.pdf PDF
Wage Determination.pdf PDF
Technical Questionnaire.docx DOCX document
Past Performance Questionnaire.docx DOCX document
Drawings.pdf PDF
Notice to Contractors.pdf PDF
COVID-19 Mask Policy.pdf PDF
Bid Schedule - Boardwalk Replacement.xlsx XLSX spreadsheet
Past Performance Questionnaire.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL QUESTIONNAIRE

Boardwalk Replacement

Indiana Dunes National Park

OFFEROR:

SOLICITATION #:

DATE:

PLEASE NOTE: IN ADDITION TO PRICING PROVIDED ON THE BID SCHEDULE, YOUR

RESPONSES ON THIS QUESTIONNAIRE (AND YOUR RESPONSES ON THE PAST PERFORMANCE

QUESTIONNAIRE) ARE CRITICAL TO THE SELECTION OFFICIAL WHEN EVALUATING A

PROPOSAL FOR AWARD. INADEQUATE OR VAGUE RESPONSES MAY RESULT IN A LOWER

RATING. YOU MAY USE ADDITIONAL PAGES FOR YOUR RESPONSES, IF NEEDED.

Question #1

Please describe in detail how you plan to complete this project while adhering to the statement of work and period of performance and keeping costs in line with the bid schedule pricing provided in your proposal (Explain in detail your company’s experience installing floating boardwalk.)

Question #2

Please provide a Project Management Plan and describe how you will institute quality workmanship for a project of this nature and magnitude (Please explain in detail your company’s experience with warehouse management. Provide examples of procedures on how to handle and classify stored materials. Even explain how you intend to protect the materials that shall be used for this project. Indicate staging and delivery).

Question #3

Please describe in detail your company’s assets and/or technical equipment/facilities that may be utilized for a project of this nature and magnitude (Explain type of equipment that you plan to utilize for demolition/installation/material handling, including weights of equipment – while protecting the environment and installing new boardwalk).

Question #4

Please explain and list the materials/products your company will be installing per the Statement of Work/Specifications details. (IF QUOTING AN “OR EQUAL” PRODUCT, MUST SUBMIT WITH QUOTE

ALL SUPPORTING DOCUMENTS/SPECIFICATIONS FOR THOSE ITEMS).

Question #5

Please describe how you will address safety on the project, in an area open to the public, while maintaining safety to both the public, park staff and contractor’s forces.

Question #6

Please explain in detail your company’s experience with demolition and restoration of a boardwalk in an environmentally sensitive area.

File details come from the government source that posted it. Updated .