Questions and Answers - COR responses_0002.pdf
PDF 88 KB Posted
- Attached to
- Boardwalk Replacement Federal contract opportunity
- Solicitation number
- 140P6421R0013
About this file
This document contains details regarding a federal contract solicitation for boardwalk replacement services. The National Park Service, through its Ohio Major Acquisition Buying Office, is seeking to award a firm-fixed price contract between $250,000 to $500,000 for work to remove an existing floating boardwalk, dispose of removed materials, and install a new floating boardwalk at Indiana Dunes National Park. The contract is expected to be awarded in April/May 2021 with performance beginning in May 2021. Evaluation criteria are technical approach, past performance, and price. The project is set aside 100% for small businesses under NAICS code 237990 for specialty trade contractors with a size standard of $39.5 million. Offerors must register in SAM and complete ORCA by the solicitation close date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6421R0013_Amd_0002.pdf | ||
| Revised Specifications - Boardwalk Replacement_0001.pdf | ||
| Revised Bid Schedule - Boardwalk Replacement_0001.xlsx | XLSX spreadsheet | |
| Site Visit Attendee List_0001.pdf | ||
| Sol_140P6421R0013_Amd_0001.pdf | ||
| Questions and Answers_0001.pdf | ||
| Revised Drawings_0001.pdf | ||
| Notice to Contractors.pdf | ||
| COVID-19 Mask Policy.pdf | ||
| Bid Schedule - Boardwalk Replacement.xlsx | XLSX spreadsheet | |
| Technical Questionnaire.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Specifications - Boardwalk Replacement.pdf | ||
| Pictures.pdf | ||
| Sol_140P6421R0013.pdf | ||
| Bid Schedule - Boardwalk Replacement.pdf | ||
| Wage Determination.pdf | ||
| Technical Questionnaire.docx | DOCX document | |
| Past Performance Questionnaire.docx | DOCX document | |
| Drawings.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Boardwalk Replacement – INDU Questions and Answers #2 listed below:
QUESTIONS:
Question
Question Answer/Response
1.
I am writing to request clarification on Plan Sheet C04, Note 1 it states that “No tracking or storage within the wetlands will be allowed.”
For bidding purposes, is the contractor to interpret this as materials must be hand carried into the site? For example, would a skid steer or similar equipment, not be permitted to transport new or demoed boardwalk materials in and out of the proposed boardwalk site and within the construction limits?
Only vehicles which are 4.5' wide will be allowed. It is imperative to emphasize that due to the high volume of protective species in this area, the contractors need to be extremely cautious to stay within the delineated limit of construction.
The existing and proposed materials are made out of plastic which is very light that two persons can lift and put in a small cart and pushover. Only a small section of the existing boardwalk is made out of wood and will be replaced with a plastic boardwalk.
Another suggestion could be to start the project from the end and do demolition and installation simultaneously.
2.
Could you confirm the bid date time to be 12:00 PM EST or 1:00 PM EDT? The amendment states 12:00 PM EDT but it says 1:00 PM EDT on the website.
I know the amendment is what we are supposed to go by, but I’m just looking for confirmation
It is 12PM ET – not sure why the site states otherwise.
There were issues with this getting posted to beta.SAM and maybe this didn’t transfer over correctly.