Technical Exhibit Package.pdf
PDF 842 KB Posted
- Solicitation number
- W912PB25RA020
About this file
This Technical Exhibit Package details comprehensive refuse collection and recycling services for U.S. Army facilities in Tower Barracks-Grafenwoehr and Rose Barracks-Vilseck, Germany. The exhibits specify precise container management requirements across multiple waste streams including refuse, mixed papers, plastics, glass, and specialized materials like yard waste and electronic waste. The contractor must provide and manage a wide range of containers (240L to 36 cubic meter sizes) with specific color-coding, labeling, and positioning requirements, and maintain strict pickup schedules for over 200 buildings across main camps, field camps, and ranges.
The technical exhibits outline detailed performance standards, including container placement, emptying frequencies, reporting obligations, and operational constraints. Key requirements include maintaining container cleanliness, providing containers for various events and locations, submitting monthly summary reports, responding to deficiency reports within specified timeframes, and operating recycling yards with defined opening hours. The contractor must also handle container replacements, special collections, and emergency work requests, with specific response times ranging from one hour for urgent matters to two workdays for routine adjustments. The contract includes provisions for container rental, special event support, and handling of misused or improperly sorted containers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W912PB25RA0200002 SF 30.pdf | ||
| ELIN Sheet blank.xlsx | XLSX spreadsheet | |
| Solicitation Amendment W912PB25RA0200001 SF 30.pdf | ||
| Vendor Questions and Government Answers.docx | DOCX document | |
| Attachment B - Common Levels of Support (CLS).pdf | ||
| ELIN Sheet blank.xlsx | XLSX spreadsheet | |
| Attachment A- Performance Work Statement (PWS).pdf | ||
| IRS Form W-14 - Sample.pdf | ||
| IRS Form W-14.pdf | ||
| Attachment Package.pdf | ||
| Solicitation - W912PB25RA020.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT A - Performance Requirements Summary
TE A - PRS
PERFORMANCE
OBJECTIVE
STANDARD PERFORMANCE
THRESHOLD
ACCEPTABLE QUALITY
LEVELS (AQLs)
PRS#1 - CLS para 2.2.1 The Contractor shall empty recycle/refuse containers, compacters, and roll-offs as scheduled (TE C, D, K) Not more than one missed emptying cycle per month.
Not more than 5 customer complaints in total per month.
PRS#2 - CLS para 2.2.3 The Contractor shall perform additional container emptying services on demand or as needed
The Contractor shall provide pick-up within the time limit
IAW TE K.
95% Compliance within time limit.
PRS#3 - CLS para 5.3.1 The Contractor shall provide containers for rent.
The Contractor shall provide service for rental and pick up of the containers within the time limit IAW TE K.
95% Compliance within time
PRS#4 - CLS para 5.4 The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to operate a Recycling Yard(s) at defined Opening Hours (TE J)
100% Compliance.
PRS#5 - CLS para 2.8.1 The Contractor shall submit to the COR a monthly summary report of the total tonnage of recyclable and non-recyclable material collected within the time limit IAW TE
K / TE B
100% Compliance within time
Technical Exhibit B - Deliverables TE B - Deliverables
Deliverable Time Limit (days = calendar days) Frequency # of Copies Medium/Format Distribution
A.001 (PWS, para. 2.5.2.1) iWATCH Training
1. NLT thirty (30) days after contract award date
2. NLT thirty (30) days after new employees commencing performance annually 1 Electronic Copy Email KO or designated Government representative/COR
A.002 (PWS, para. 2.5.2.2) Anti-Terrorism (AT) Level I Training
1. NLT thirty (30) days after contract award date
2. NLT thirty (30) days after new employees commencing performance annually 1 Electronic Copy Email KO or designated Government representative/COR
A.003 (PWS, para. 2.5.2.3) Operational Security (OPSEC) Awareness Training
1. NLT thirty (30) days after contract award date
2. NLT thirty (30) days after new employees commencing performance annually 1 Electronic Copy Email KO or designated Government representative/COR
A.004 (PWS, para. 2.5.2.3.1) Cybersecurity Awareness Training ico network access
1. NLT thirty (30) days after contract award date
2. NLT thirty (30) days after new employees commencing performance annually 1 Electronic Copy Email KO or designated Government representative/COR
A.005 (PWS, para. 2.1.11.1.1) certified experience of Project Manager (PM)
NLT thirty (30) days after contract award date or change of PM N/A 1 Electronic Copy Email
KO or designated Government representative/COR
A.006 (PWS, para. 2.1.11.1.6) Certification Qualification Standards for Contractor
1. With proposal
2. NLT thirty (30) days after new contract option year starts annually 1 Electronic Copy Email KO or designated Government representative/COR
A.007 (PWS, para. 2.5.4.1) Certification Requirements for Contractor and/or Subcontractor personnel
1. With proposal
2. NLT thirty (30) days after new personnel starts performance under contract
N/A 1 Electronic Copy Email KO or designated Government representative/COR
A.008 (PWS, para. 2.5.3.1) Safety Plan
1. NLT fourteen (14) days prior to contract performance start date
2. NLT fourteen (14) days before changes shall take effect
N/A 1 Electronic Copy Email KO
A.009 (PWS, para. 2.5.5.4) Spill Plan
1. NLT fourteen (14) days after contract performance start date
2. NLT fourteen (14) days before changes shall take effect
N/A 1 Electronic Copy Email KO
A.010 (CLS, para. 2.8.2) Work Control, Records, and Reports Plan
(WCRRP)
1. NLT fourteen (14) days after contract performance start date
2. NLT fourteen (14) days after new contract option year starts
3. NLT fourteen (14) days before changes shall take effect annually 1 Electronic Copy Email KO
B.001 (CLS, para 2.2.1) Recycle / Refuse Collection Schedule
1. NLT fourteen (14) days prior to contract performance start date
2. NLT fourteen (14) days before changes shall take effect
N/A 1 Electronic Copy Email KO or designated Government representative/COR
B.002 (PWS, para. 2.1.9 / 3.3) Quality Control Plan
(QCP)
1. NLT fourteen (14) days prior to contract performance start date
2. NLT fourteen (14) days before changes shall take effect
N/A 1 Electronic Copy Email KO or designated Government representative/COR
Deliverable Time Limit (days = calendar days) Frequency # of Copies Medium/Format Distribution
B.003 (PWS, para. 3.4) Quality Control Files
1. NLT thirty (30) days after contract Task Order ends N/A 1 Electronic Copy Email designated Government representative/COR
B.004 (PWS, para. 2.5.1.3) Identification of Contractor Vehicles and Trailers
Prior to the contract performance date and prior to any changes N/A 1 Electronic Copy
(on demand) Contractor’s property designated Government representative/COR
B.005 (PWS, para. 2.5.1.4) physical security of GFP
1. NLT thirty (30) days after contract performance start date
2. NLT thirty (30) days after new contract option year starts annually 1 Electronic Copy Email KO or designated Government representative/COR
B.006 (PWS, para. 2.1.11.1) Key Personnel List
1. NLT thirty (30) days after contract performance start date
2. NLT thirty (30) days after new contract option year starts
3. NLT thirty (30) days before changes shall take effect annually 1 Electronic Copy Email KO or designated Government representative/COR
B.007 (PWS, para. 2.5.1.3.2.e) Installation Pass List
1. NLT thirty (30) days after contract performance start date
2. NLT thirty (30) days after new contract option year starts
3. NLT thirty (30) days before changes shall take effect annually 1 Electronic Copy Email KO or designated Government representative/COR
B.008 (PWS, para. 2.5.1.6) Employee Termination Checklist
NLT three (3) days after termination or departure of employee N/A 1 Electronic Copy
(on demand) Contractor’s property designated Government representative/COR
B.009 (PWS, para. 2.5.1.8) Key Control List
1. NLT thirty (30) days after contract performance start date
2. NLT thirty (30) days after new contract option year starts
3. NLT two (2) days after changes took effect annually 1 Electronic Copy Email KO or designated Government representative/COR
B.010 (CLS, para. 2.2.2 / 2.4.13) monitoring the container lists and propose changes
1. NLT thirty (30) days after contract performance start date
2. NLT thirty (30) days after new contract option year starts
3. NLT thirty (30) days before changes shall take effect annually 1 Electronic Copy Email designated Government representative/COR
B.011 (CLS, para 2.4.8 / 2.8.3) report container condition
15. April - 15. July -
15. October - 15. January quarterly 1 Electronic Copy Email designated Government representative/COR
B.012 (CLS, para. 2.4.12) Container Cleaning List
15. April - 15. July -
15. October - 15. January quarterly 1 Electronic Copy Email designated Government representative/COR
B.013 (CLS, para. 2.8.1) Summary Report
NLT 10th of following month (together with invoice) monthly 1 Electronic Copy Email designated Government representative/COR
B.014 (PWS, para. 7.1.1.106) Monthly Invoice
WAWF allows Government vendors to submit and track invoices and receipt or acceptance documents over the web allowing Government personnel to process those invoices in a real-time, paperless environment.
monthly 1 Electronic Copy WAWF designated Government
Deliverable Time Limit (days = calendar days) Frequency # of Copies Medium/Format Distribution
B.015
(CLS 3.4.1 / 5.1.6)
Weight tickets
Together with monthly invoice. monthly 1 Electronic Copy Email designated Government representative/COR
C.001 (PWS, para. 2.1.6.1) Emergency Medical Treatment
1. NLT two (2) hours after incident
2. NLT two (2) days after incident N/A 1. N/A
2. 1 Electronic Copy
1. verbal report on phone and/or in person
2. Email
Supervisor of the Contractor, Fire Department, KO through
COR
C.002 (PWS, para. 2.1.6.2) Accident Reporting
1. NLT two (2) hours after incident
2. NLT two (2) days after incident N/A 1. N/A
2. 1 Electronic Copy
1. verbal report on phone and/or in person
2. Email
KO or designated Government representative/COR
C.003 (PWS, para. 7.5.4) Report Damages caused by contractor
1. NLT two (2) hours after incident
2. NLT two (2) days after incident N/A 1. N/A
2. 1 Electronic Copy
1. verbal report on phone and/or in person
2. Email
KO or designated Government representative/COR
C.004 (PWS, para. 2.5.1.3.2.c /
2.5.1.6 / 2.5.1.7) Return Installation Pass
1.NLT three (3) days after termination or departure of employee
2. NLT three (3) days after end of contract
N/A N/A in person KO or designated Government representative/COR
C.005 (PWS , para. 2.5.1.8) Reporting of Loss of keys
1. NLT two (2) hours after incident
2. NLT two (2) days after incident
1. N/A
2. 1 Electronic Copy
1. verbal report on phone and/or in person
2. Email designated Government representative/COR
C.006 (PWS, para. 2.1.12) Corrective Action Plan
NLT five (5) days after issue had been identified N/A 1 Electronic Copy Email designated Government representative/COR
C.007 (PWS, para. 2.5.5.3) Environmental Compliance and Hazardous Material Records
NLT three (3) days after request of COR N/A Make records available Email designated Government representative/COR
C.008 (PWS, para. 2.5.5.4) Reports on Spills and/or Releases of any hazardous substances
1. NLT two (2) hours after incident
2. NLT two (2) days after incident
1. N/A
2. 1 Electronic Copy
1. verbal report on phone and/or in person
2. Email designated Government representative/COR
C.009 (CLS, para. 2.8.7) Operational logs on Recycling Yard(s)
NLT three (3) days after request of COR N/A Make records available Email designated Government representative/COR
C.010 (CLS, para. 2.8.8) miscellaneous Reports
NLT three (3) days after request of COR N/A Make records available Email designated Government
Technical Exhibit C ‐ Pickup schedule Tower Barracks Grafenwoehr TE C ‐ Pickup Schedule TB
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY
Refuse Main Camp (ALL Buildings)
Refuse Main Camp (AAFES Food Mall)
Refuse Main Camp (AAFES Food Mall)
Refuse Main Camp (ALL Buildings)
Refuse Main Camp (AAFES Food Mall)
Refuse Field Camps Refuse Field Camps Refuse Field Camps
Refuse TB Recycling Yard Refuse TB Recycling Yard Refuse TB Recycling Yard Refuse TB Recycling Yard Refuse TB Recycling Yard
Refuse Ranges Refuse Ranges
Mixed Paper Main Camp
(ALL Buildings)
Mixed Paper Main Camp
(ALL Buildings, but without administrative Buildings)
Mixed Paper Field Camps
Mixed Paper Field Camps
Mixed Paper Field Camps
Mixed Paper TB Recycling Yard &
Centralized Recycling Center
Mixed Paper TB Recycling Yard &
Centralized Recycling Center
Mixed Paper TB Recycling Yard &
Centralized Recycling Center
Mixed Paper TB Recycling Yard &
Centralized Recycling Center
Mixed Paper TB Recycling Yard &
Centralized Recycling Center
Plastic incl. metal cans Main Camp (All Buildings)
Plastic incl. metal cans Main Camp
(All Buildings, but without administrative buildings)
Plastic incl. metal cans Field Camps
Plastic incl. metal cans Field Camps
Plastic incl. metal cans Field Camps
Plastic incl. metal cans TB Recycling Yard &
Centralized Recycling Center
Plastic incl. metal cans TB Recycling Yard &
Centralized Recycling Center
Plastic incl. metal cans TB Recycling Yard &
Centralized Recycling Center
Plastic incl. metal cans TB Recycling Yard &
Centralized Recycling Center
Plastic incl. metal cans TB Recycling Yard &
Centralized Recycling Center
Technical Exhibit D ‐ Pickup schedule Rose Barracks Vilseck TE D ‐ Pickup Schedule RB
Pickup Schedule for RB Vilseck is part of Container List RB Vilseck (TE F).
Please refer to TE F.
Technical Exhibit E - Container List Tower Barracks Grafenwoehr TE E - Container List TB
Tower Barracks Grafenwöhr sc ra p m et al
C& D
W as te
Fl at
G la ss
Ya rd w as te
El ec tr on ic w as te in cl . A
Cs , F rid ge s re m ar ks
Bu lk
T ra sh
Pi ck up p oi nt container size in cbm 5.0 1.1 240 ltr
36 20 5.0 1.1 240 ltr
20 10 5.0 2.5 1.1 240 ltr
3.2 1.6 240 ltr
15 10 36 15 36 15 10 10 10 10 36 5.0 1.1 240 ltr
5.0 1.1 240 ltr
Main Camp 95 119 59 0 2 64 67 57 2 0 2 7 115 68 11 55 1 1 1 5 2 0 2 16 2 1 2 1 43 13 4 0 82 114 59 Field Camps 108 37 1 1 0 106 31 0 0 1 14 4 109 1 4 8 0 1 1 6 0 4 0 13 3 0 0 2 0 0 59 7 0 49 30 1 Ranges 25 25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 25 25 0 0 0 0 total TB 228 181 60 1 2 170 98 57 2 1 16 11 224 69 15 63 1 2 2 11 2 4 2 29 8 1 2 3 43 97 36 0 131 144 60
240 ltr 60 57 69 1 187 240 ltr
1.1 181 98 224 503 1.1
2.5 11 11 2.5
5.0 228 170 16 414 5 10 1 2 29 8 1 2 43 10 15 2 2 2 6 15 20 2 2 4 20 36 1 11 4 3 19 36
1.6 63 63 1.6
3.2 15 15 3.2
Total by
Cl ea ni ng sh ed ul e
4/ ye ar re fu se m ay c on ta fo od
Cl ea ni ng sh ed ul e
1/ ye ar re fu se m ay n ot c on
Re fu se sc ra p w oo d
Bu lk tr as h
Ti re s w ith o r w ith ou t R im s
M ix ed P ap er
Pl as tic in cl m et al ca ns
Gl s
Main Camp sc ra p m et al
C& D
W as te
Fl at
G la ss
Ya rd w as te
El ec tr on ic w
. A
Cs , F rid ge s re m ar ks
Bu lk
T up p oi nt container size in cbm 5.0 1.1 240 ltr
36 20 Pres
5.0 1.1 240 ltr
Pre
10 5.0 2.5 1.1 240 ltr
3.2 1.6 240 ltr
15 10 36 15 36 15 10 10 10 10 36 5.0 1.1 240 ltr
5.0 1.1 240 ltr
101 - Main DFAC 4 4 4 1 4 110 - General 2 1 1 1 2
111 - FH 1 1 1 1 1
112 - FH 1 1 1 1
113 - FH 1 1 1 X 1
114 - FH 1 1 1 X 1
115 - FH 1 1 1 X 1
116 - FH 1 1 1 X 1
117 - FH 1 1 1 X 1
119 - FH 1 1 1 X 1
123 - JMTC HQ 3 1 1 3
124 - Bank+ Chapel 2 1 1 2 134 1 1 1 1
141 - Post Office 1 1 1 1
1.1 Mixed papers
must be lockable 1
148 - Bookstore(Trafo) 1 1 149 - A. Rec.Ctr 1 1 1 1 1
124/150 - USO 2 1 1 1 2
202 - FH 2 1 1 2
209 - Community Club 2 1 1 1 2 211 - AAFES (Trafo) 1 1 219 - Billeting Office 3 1 1 1 X 3
222 - FH 2 1 1 1 X 2
228/229 - Billeting 2 1 1 1 X 2
231 - FH 1 1 1 1 1
232 - FH CSM 1 1 1 1
234 - Rec. Ctr 2 1 1 1 2
236 - FH CSM 1 1 1 1
244 - Community Admin Ctr. 2 1 1 1 2 258 - Gate #3 1 1
271/272 - FH 5 3 2 1 X 5
274 - CSM 1 1 1 1
275 - FH 2 1 1 1 X 2
276 - FH 2 1 1 1 X 2
277 - FH 2 1 1 1 X 2
279 - FH 2 1 1 1 X 2
281 - FH 2 1 1 1 X 2
282 - FH 2 1 1 1 X 2
283 - FH 3 1 1 1 X 2
284 - FH 2 1 1 1 X 2
286 - FH DogPark 1 1
287 - FH 2 1 1 1 X 2
288 - FH 2 1 1 1 X 2
Cl ea ni ng sh ed ul e
1/ ye ar re fu se m ay n ot c on
Bu lk tr as h
Pl as tic m al c an s
M ix ed P ap er
Re fu se
G la ss sc ra p w oo d
Ti re s w ith o r w ith ou t R im s
Cl ea ni ng sh ed ul e
4/ ye ar re fu se m ay c on
Main Camp sc ra p m et al
C& D
W as te
Fl at
G la ss
Ya rd w as te
El ec tr on ic w
. A
Cs , F rid ge s re m ar ks
Bu lk
T up p oi nt container size in cbm 5.0 1.1 240 ltr
36 20 Pres
5.0 1.1 240 ltr
Pre
10 5.0 2.5 1.1 240 ltr
3.2 1.6 240 ltr
15 10 36 15 36 15 10 10 10 10 36 5.0 1.1 240 ltr
5.0 1.1 240 ltr
Cl ea ni ng sh ed ul e
1/ ye ar re fu se m ay n ot c on
Bu lk tr as h
Pl as tic al c an s
M ix ed P ap er
Re fu se
G la ss sc ra p w oo d
Ti re s w ith o r w ith ou t R im s
Cl ea ni ng sh ed ul e
4/ ye ar re fu se m ay c on
289 - FH 2 1 1 1 X 2
290 - FH 2 1 1 1 X 2
295 - TISA 1 1 3 1 1
301 - DOL 3 3 1 3
308/310 - 1 2 1 1 313 - Signal 1 1 1 1
314 - FH 2 1 1 2
316 - POL Yard 1 1 2 1 319 - 2 1 1 2 322 - Gas Station 2 2 2 1 2 329 - DPW Front side 1 1 1 1 329 - DPW Rear side 2 1 2 2 335A - DPW Mechanic Shop 1 1 342 - DPW Mason Shop 1 2 1 351B - DOL Carpenter 1 1 392 - TMP Wash Rack 1 1 394 - Troop Billeting 1 1 1 1 401 MP/Kennels 1 1 413 - AAFES Repair Shop 1 1
433 - DPW DRM SCMB 2 1 1 2
441 - TB Recycling Yard 4 2 2 8 1 2 2 1 4 442/443 - Car Care Center 1 1 1 1 445 1 1 1 453 - MP#33 East 1 1 1 1 1 453 - MP#33 West 1 1 1 1 1 476 - Health&Dental Clinic 2 1 2 2
481 - IFMS/TMP 1 1 1 1
503/507/508 - Thrift Shop/ Boyscouts
3 1 1 X 3
505 - Recycling Center 3 2 1 1 3
515 - MP#7 1 1 1 1 1
521 - Fire Department 1 1 1 1 528 - Auto Skill Center 1 1 1 1 1 532 - Recycling Center 2 2 1 1 2 534 - Military Clothing 1 2 2 1 540 - parking lot across road 2 541/542 - Rec. Ctr 3 2 1 1 3 556 - Laundry (Trafo) 1 1
585 - MP#6 1 1 1 1 1
602 - MP#3 1 1 2 1 1
604 - MP#32 1 1 1 1 1
607 - Library 1 1 1 1 612 - Burger King 2 1 2 1 1 2
Main Camp sc ra p m et al
C& D
W as te
Fl at
G la ss
Ya rd w as te
El ec tr on ic w
. A
Cs , F rid ge s re m ar ks
Bu lk
T up p oi nt container size in cbm 5.0 1.1 240 ltr
36 20 Pres
5.0 1.1 240 ltr
Pre
10 5.0 2.5 1.1 240 ltr
3.2 1.6 240 ltr
15 10 36 15 36 15 10 10 10 10 36 5.0 1.1 240 ltr
5.0 1.1 240 ltr
Cl ea ni ng sh ed ul e
1/ ye ar re fu se m ay n ot c on
Bu lk tr as h
Pl as tic al c an s
M ix ed P ap er
Re fu se
G la ss sc ra p w oo d
Ti re s w ith o r w ith ou t R im s
Cl ea ni ng sh ed ul e
4/ ye ar re fu se m ay c on
619 - Army Lodge 2 1 1 1 2 620 - Tower Theater 4 1 4 621/622/641 1 1 1 1 X 1 623/624/625 1 1 1 1 X 1 632/633/634 1 1 1 1 X 1 626/627/628/638 1 1 1 1 X 1 635/636/637 1 1 1 1 X 1 642/696 2 1 1 1 2 683 Haid Pond 1 1 1 1 695 - AAFES Shop./Gasstation 1 4 2 1 700 West - Commissary 2 1 2 2 700 South - AAFES PX 2 1 2 2 700 East - AAFES Food Court 5 2 2 1 1 1 5 2 715 - 2 1 1 1 X 2 720 - 2 1 1 1 X 2 725 - 2 1 1 1 X 2 730 - 2 1 1 1 X 2 735 - 2 1 1 1 X 2 740 - 2 1 1 1 X 2 745 - 2 1 1 1 X 2 750 - 2 1 1 1 X 2 760 - 2 1 1 1 X 2 765 - 2 1 1 1 X 2 770 - 2 1 1 1 X 2 775 - 2 1 1 1 X 2 780 - 2 1 1 1 X 2 785 - 2 1 1 1 X 2 790 - 2 1 1 1 X 2 800/801/810/811/805 1 1 2 1 1 820/821/830/831/825 2 1 2 1 1 2 840/841/850/851/855 1 1 1 1 1 901/902/903/904/905 East 3 2 2 1 3 901/902/903/904/905 West 1 1 2 1 1 910/911/912/913/915 1 1 2 1 1 920/921/925 1 1 2 1 1 1 930/931/923/924/935 1 1 1 1 2 2 1 1 1 945 - 1 1 1 1 1 Main Railhead 3 3 DPW Railhead 2 2 Gate 20 (to Netzaberg) 1 1 Netzaberg Middle School 2 1 2 1 2 Netzaberg Elementary School 2 1 2 1 2 Netzaberg Child Dev. Center 2 1 2 1 2
Main Camp sc ra p m et al
C& D
W as te
Fl at
G la ss
Ya rd w as te
El ec tr on ic w
. A
Cs , F rid ge s re m ar ks
Bu lk
T up p oi nt container size in cbm 5.0 1.1 240 ltr
36 20 Pres
5.0 1.1 240 ltr
Pre
10 5.0 2.5 1.1 240 ltr
3.2 1.6 240 ltr
15 10 36 15 36 15 10 10 10 10 36 5.0 1.1 240 ltr
5.0 1.1 240 ltr
Cl ea ni ng sh ed ul e
1/ ye ar re fu se m ay n ot c on
Bu lk tr as h
Pl as tic al c an s
M ix ed P ap er
Re fu se
G la ss sc ra p w oo d
Ti re s w ith o r w ith ou t R im s
Cl ea ni ng sh ed ul e
4/ ye ar re fu se m ay c on
Netzaberg Chapel 2 1 2 1 2 Netzaberg Teen Center 2 1 2 1 2 Netzaberg Shopette 1 2 1 1 Netzaberg Gate 1 1 Town House 41A 1 1 1 1 Town House 41B 1 1 1 1 Town House 42A 1 1 1 1 Town House 42B 1 1 1 1 Town House 43A 1 1 1 1 Town House 43B 1 1 1 1 Town House 44A 1 1 1 1 Town House 44B 1 1 1 1 Town House 45A 1 1 1 1 Town House 45B 1 1 1 1 Town House 46A 1 1 1 1 Town House 46B 1 1 1 1 Town House 47A 1 1 1 1 Town House 47B 1 1 1 1 Town House 48A 1 1 1 1 Town House 48B 1 1 1 1 Town House 49A 1 1 1 1 Town House 49B 1 1 1 1 Town House 50A 1 1 1 1 Town House 50B 1 1 1 1 Town House 51A 1 1 1 1 Town House 51B 1 1 1 1 Town House 52A 1 1 1 1 Town House 52B 1 1 1 1 Town House 53A 1 1 1 1 Town House 53B 1 1 1 1 Town House 54A 1 1 1 1 Town House 54B 1 1 1 1 Town House 55A 1 1 1 1 Town House 55B 1 1 1 1 Town House 56A 1 1 1 1 Town House 56B 1 1 1 1 Town House 57A 1 1 1 1 Town House 57B 1 1 1 1 Town House 58A 1 1 1 1 Town House 58B 1 1 1 1 Town House 59A 1 1 1 1 Town House 59B 1 1 1 1 Town House 60A 1 1 1 1
Main Camp sc ra p m et al
C& D
W as te
Fl at
G la ss
Ya rd w as te
El ec tr on ic w
. A
Cs , F rid ge s re m ar ks
Bu lk
T up p oi nt container size in cbm 5.0 1.1 240 ltr
36 20 Pres
5.0 1.1 240 ltr
Pre
10 5.0 2.5 1.1 240 ltr
3.2 1.6 240 ltr
15 10 36 15 36 15 10 10 10 10 36 5.0 1.1 240 ltr
5.0 1.1 240 ltr
Cl ea ni ng sh ed ul e
1/ ye ar re fu se m ay n ot c on
Bu lk tr as h
Pl as tic al c an s
M ix ed P ap er
Re fu se
G la ss sc ra p w oo d
Ti re s w ith o r w ith ou t R im s
Cl ea ni ng sh ed ul e
4/ ye ar re fu se m ay c on
Town House 60B 1 1 1 1 Town House 61A 1 1 1 1 Town House 61B 1 1 1 1 Town House 62A 1 1 1 1 Town House 62B 1 1 1 1 Town House 63A 1 1 1 1 Town House 63B 1 1 1 1 Town House 64A 1 1 1 1 Town House 64B 1 1 1 1 Town House 65A 1 1 1 1 Town House 65B 1 1 1 1 Town House 66A 1 1 1 1 Town House 66B 1 1 1 1 Total Main Camp TB 95 119 59 0 2 64 67 57 2 0 2 7 115 68 11 55 1 1 1 5 2 0 2 16 2 1 2 1 43 13 4 0 82 114 59
Field Camps sc ra p m et al
C& D
W as te
Fl at
G la ss
Ya rd w as te
El ec tr on ic w
. A
Cs , F rid ge s re m ar ks
Bu lk
T up p oi nt container size in cbm 5.0 1.1 240 ltr
36 20 5.0 1.1 240 ltr
20 10 5.0 2.5 1.1 240 ltr
3.2 1.6 240 ltr
15 10 36 15 36 15 10 10 10 10 36 5.0 1.1 240 ltr
5.0 1.1 240 ltr
1005 CMC (EUD/BCT Constr. Office) 1 1 1 1 1
1024, DPW (MT/MP/TP 7) 1 1 1 1
1025, (MT/MP/TP 18) 2 2 1 1 2
1026/1034/1048 Rec.Point 1 1 1 1 1
1030/1060, JMTC (MT/MP/TP 1) 1 1 1 1
1040 HazMat, (MT/MP/TP 12) 2 2 1 2
1040, (MT/MP/TP 12) 2 2 1 1 2
1054, (MT/MP/TP 11) 1 1 1 1
1070 VMS 1 1 1 1 1
1075 CFMO 1 1 1 1 2 1 1
1104 - 1 1 1 1
1145 (USO) 2 1 1 2
1180 Bus Stop 1 1 1184 Messhall 2 2 2 2 1204 Messhall 2 2 2 2 1224 Messhall 2 2 2 2 1244 Messhall 2 2 2 2 1264 Messhall 2 2 2 2 1284 Messhall 2 2 2 2 1304 Messhall 2 2 2 2 1324 Messhall 2 2 2 2 1344 Messhall 2 2 2 2 1364/1384 LAN 5 Rec. Point 1 1 2 1 1
1424 LAN 5 (SIMCTR) 1 1 1 1
1464/1484 (JMSC) 1 1 1 1
2001 ATM 1 1
2001 Food Trucks 3 3 2001 Rec. Point (AAFES) 1 4 2 1 1 2001 Snack Bar ( AAFES) 2 1 1 2
2005 (AAFES) 1 1 1 1
2020, (MT/MP/TP 21) 2 2 1 1 2
2030, (MT/MP/TP 22) 2 2 1 1 2
2040, (MT/MP/TP 24) 1 1 2 1 1
2046/2095, (MT/MP/TP 25) 1 1 1 1 1
2070 East, TSAE (MT/MP/TP 4) 1 1 1 1 2070 West, TSAE (MT/MP/TP 4) 1 1 1 1
2070B (MT/MP/TP 4) 1 1 1 1
2072, (MT/MP/TP 20) 2 2 1 1 2
2073, (MT/MP/TP 23) 2 2 1 1 2
2074, JMSC Whse (MT/MP/TP 14A) 1 1 1 1 2080 West, EAS (MT/MP/TP 4) 1 1 1 1
2080, MWR (MT/MP/TP 4) 1 1 1 1
2090, (MT/MP/TP 26) 2 2 1 1 2
2104 Messhall 2 2 2 2 2124 Messhall 2 2 2 2 2144 Messhall 2 2 2 2 2164 Messhall 2 2 2 2
Re fu se
Gl as s sc ra p w oo d
Cl ea ni ng sh ed ul e
4/ ye ar re fu se m ay c on
Cl ea ni ng sh ed ul e
1/ ye ar re fu se m ay n ot co nt ai n fo od
Bu lk tr as h
Ti re s w ith o r w ith ou t R im s
M ix ed P ap er
Pl as tic al c an
Field Camps sc ra p m et al
C& D
W as te
Fl at
G la ss
Ya rd w as te
El ec tr on ic w
. A
Cs , F rid ge s re m ar ks
Bu lk
T up p oi nt container size in cbm 5.0 1.1 240 ltr
36 20 5.0 1.1 240 ltr
20 10 5.0 2.5 1.1 240 ltr
3.2 1.6 240 ltr
15 10 36 15 36 15 10 10 10 10 36 5.0 1.1 240 ltr
5.0 1.1 240 ltr
Re fu se
Gl as s sc ra p w oo d
Cl ea ni ng sh ed ul e
4/ ye ar re fu se m ay c on
Cl ea ni ng sh ed ul e
1/ ye ar re fu se m ay ai n fo od
Bu lk tr as h
Ti re s w ith o r w ith ou t R im s
M ix ed P ap er
Pl as tic al c an s
2184 Messhall 2 2 2 2 2204 Messhall 2 2 2 2 2224 Messhall 2 2 2 2 2264 Messhall 2 2 2 2 2284 Messhall 2 2 2 2 2304 Backside (for 2300 - 2303) 1 1 1 1 2325 Backside (for 2320 - 2323) 1 1 1 1 2344 Backside (for 2340 - 2343) 1 1 1 1 2364 Backside (for 2360 - 2363) 1 1 1 1 2384 Backside (for 2380 - 2383) 1 1 1 1 2404 Messhall 2 2 2 2 2424 Messhall 2 2 2 2
2440/2441 (MWR) 1 1 2 1 1
2441 Bus Stop Laundry 1 1 2443 Laundry 2 1 1 2 2444 Messhall 2 2 2 2
2465 (JMSC) 1 1 1 1
3000 TSC 2 2 4 2
3001 (EOD) 1 1 1 1
3011 (TSAE) 1 1 1 1
3015 Front (Trafo)(Range Control) 1 1 3015 Rear (Range Control) 1 1 1 1 1
3020 (MT/MP/TP 2) 2 1 2
3052, JMTC/TSAE PBO (MT/MP/TP 30 1 1 1 1
3060 TAPC (Range Whse) 1 1 1 1 1 3060 TMS (Range Whse) 1 1 1 1
3070/3071/3072 (MT/MP/TP 2) 3 3 3 1 3
3104/3124 1 1 1 1 3120/3140 1 1 1 1 3144 CATC (digital training facility) 1 1 1 1
3305 - DFAC 2 2 3 1 2
3344 - NCOA 1 1 1 1
3464 - NCOA 1 1 1 1
4020, AAFES Whse (MT/MP/TP 35C) 1 1 1 1
4029/4060 - EAS 1 1 2 1
4030 - DRMO 1 1 1 1
4080, Class II Whse (MT/MP/TP 35A) 2 1 1 2 4114 Messhall 2 2 2 2 4124 Messhall 2 2 2 2 4214 Messhall 2 2 2 2 4224 Messhall 2 2 2 2 485, Wash Rack 10 3 1 3 Airfield 1 1 1 1 1 Compost Yard (DPW) 1 1
CRC
Centralized Recycling Center 11 1 2 1 1 1 3 3 3
10 cbm plastics for plastic targets 10 cbm tires for chain rubber pads
Gate 4 1 1
Field Camps sc ra p m et al
C& D
W as te
Fl at
G la ss
Ya rd w as te
El ec tr on ic w
. A
Cs , F rid ge s re m ar ks
Bu lk
T up p oi nt container size in cbm 5.0 1.1 240 ltr
36 20 5.0 1.1 240 ltr
20 10 5.0 2.5 1.1 240 ltr
3.2 1.6 240 ltr
15 10 36 15 36 15 10 10 10 10 36 5.0 1.1 240 ltr
5.0 1.1 240 ltr
Re fu se
Gl as s sc ra p w oo d
Cl ea ni ng sh ed ul e
4/ ye ar re fu se m ay c on
Cl ea ni ng sh ed ul e
1/ ye ar re fu se m ay ai n fo od
Bu lk tr as h
Ti re s w ith o r w ith ou t R im s
M ix ed P ap er
Pl as tic al c an s
Gate 6 1 1 Gate 9 1 1
RC 603 (outdoor rec) 1 1 2 1
RC 605A (Cabins) 2 2 2 1 2
RC 608 (Washrooms) 3 1 2 1 3Refuse: 1x standard + 2x Charcoal ( Container made by metal) 1 2
Total Field Camps 108 37 1 1 0 106 31 0 0 1 14 4 109 1 4 8 0 1 1 6 0 4 0 13 3 0 0 2 0 59 7 0 49 30 1
Ranges sc ra p m et al
C& D
W as te
Fl at
G la ss
Ya rd w as te
El ec tr on ic w
. A
Cs , F rid ge s re m ar ks
Bu lk
T up p oi nt container size in cbm 5.0 1.1 240 ltr
36 20 5.0 1.1 240 ltr
20 10 5.0 2.5 1.1 240 ltr
3.2 1.6 240 ltr
15 10 36 15 36 15 10 10 10 10 36 5.0 1.1 240 ltr
5.0 1.1 240 ltr
Decon Site Vilseck Bldg 83 2 2
Range 101 1 1
Range 102 1 1
Range 109 1 1
Range 112 1 1
Range 112 Tower 2 2
Range 117 Tower 1 1
Range 117 New Tower 1 1
Range 117 Maintenance 1 1
Range 117 / Bld. 4415 1 1
Range 117 Calibration 1 1
Range 118 1 1
Range 118 Tower 1 1 1 1
Range 130 3 Range 132 1 1
Range 201 2 2
Range 201 Tower 2 2
Range 204 1 1
Range 206 1 1
Range 206 Tower 1 1
Range 211 1 1
Range 211 Tower 1 1
Range 213 2 2
Range 301 3 3
Range 301 Maint. Bldg. 1 1
Range 301 Tower (next to WC) 1 1
Range 301 Operation 2 2
Range 305 1 1
Range 305 AWSS 1 1
Range 307 1 1
Range 309 1 1
Range 312 2 2
Tactical Site # 17 2 2
Rock Quarry 2 2
NAHA 2 2
SAHA 2 2
Bone Yard 1 1
Total Ranges 25 25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 25 25 0 0 0 0
Bu lk tr as h
Cl ea ni ng sh ed ul e
4/ ye ar re fu se m ay c on
Cl ea ni ng sh ed ul e
1/ ye ar re fu se m ay ai n fo od
Re fu se
M ix ed P ap er
Pl as tic al c an s
G la ss
Ti re s w ith o r w ith ou t R im s sc ra p w oo d
Technical Exhibit F - Container List Rose Barracks Vilseck TE F - Container List RB list of contractor furnished containers at Rose Barracks Vilseck Size: 240 L
Pickup Day(s) Every 2nd Tue Every 2nd Thur Every 2nd Tue
Bu ild in g
Re fu se
M ix ed P ap er s
Ca rd bo ar d
Pl as tic
M al C an s
Cont Size L 240 240 240
# services/week Service every 2 weeks Service every 2 weeks Service every 2 weeks 1110 8 8 8 1115 8 8 8 1120 8 8 8 1125 8 8 8 1130 4 4 4 1135 8 8 8 1140 8 8 8 1145 8 8 8 1150 8 8 8 1155 8 8 8 1160 8 8 8 1165 8 8 8 1170 8 8 8 1200 4 4 4 1205 4 4 4 1210 4 4 4 1215 4 4 4 1220 6 6 6 1225 4 4 4 1230 6 6 6 1235 4 4 4 1240 4 4 4 1245 4 4 4 1250 4 4 4 1255 4 4 4 1260 4 4 4 1265 4 4 4 1270 4 4 4 1275 4 4 4 1280 6 6 6 1285 4 4 4 1290 6 6 6 1300 6 6 6 1305 2 2 2 1310 6 6 6 1315 4 4 4 1320 4 4 4 1325 4 4 4 1330 4 4 4 1335 4 4 4 list of contractor furnished containers at Rose Barracks Vilseck Size: 240 L
Pickup Day(s) Every 2nd Tue Every 2nd Thur Every 2nd Tue
Bu ild in g
Re fu se
M ix ed P ap er s
Ca rd bo ar d
Pl as tic al C an s
Cont Size L 240 240 240
# services/week Service every 2 weeks Service every 2 weeks Service every 2 weeks 1340 6 6 6 1345 4 4 4 1350 1 1 1 1355 4 4 4 1360 4 4 4 1365 6 6 6 1370 4 4 4 1375 4 4 4 1380 4 4 4 1410 4 4 4 1415 4 4 4 1420 4 4 4 1425 6 6 6 1430 4 4 4 1435 4 4 4 1500 6 6 6 1505 4 4 4 1510 4 4 4 1515 4 4 4 1520 4 4 4 1525 4 4 4 1530 4 4 4 1535 6 6 6 1540 2 2 2 1545 6 6 6 1550 2 2 2 1555 4 4 4 1560 2 2 2 1565 4 4 4 1570 1 1 1 1600 4 4 4 1605 4 4 4 1610 4 4 4 1615 2 2 2 1620 6 6 6 1625 2 2 2 1630 8 8 8 1635 2 2 2 1640 8 8 8 1645 6 6 6 list of contractor furnished containers at Rose Barracks Vilseck Size: 240 L
Pickup Day(s) Every 2nd Tue Every 2nd Thur Every 2nd Tue
Bu ild in g
Re fu se
M ix ed P ap er s
Ca rd bo ar d
Pl as tic al C an s
Cont Size L 240 240 240
# services/week Service every 2 weeks Service every 2 weeks Service every 2 weeks 1650 6 6 6 1655 2 2 2 1660 6 6 6 1665 2 2 2 1670 2 2 2 1675 8 8 8 1680 4 4 4 1685 4 4 4 1710 6 6 6 1715 4 4 4 1720 6 6 6 1725 4 4 4 1730 6 6 6 1735 4 4 4 1740 8 8 8 1745 6 6 6 1750 4 4 4 1755 4 4 4 1760 4 4 4 1765 2 2 2 1770 2 2 2 1775 4 4 4 1780 2 2 2 1785 4 4 4 2010 8 8 8 2015 4 4 4 2020 4 4 4 2025 4 4 4 2030 2 2 2 2035 2 2 2 2040 2 2 2 2045 2 2 2 2050 2 2 2 2055 2 2 2 2060 2 2 2 2065 4 4 4 2070 4 4 4 2075 4 4 4 2080 4 4 4 2085 4 4 4 list of contractor furnished containers at Rose Barracks Vilseck Size: 240 L
Pickup Day(s) Every 2nd Tue Every 2nd Thur Every 2nd Tue
Bu ild in g
Re fu se
M ix ed P ap er s
Ca rd bo ar d
Pl as tic al C an s
Cont Size L 240 240 240
# services/week Service every 2 weeks Service every 2 weeks Service every 2 weeks 2090 4 4 4 2095 4 4 4 2110 4 4 4 2115 4 4 4 2120 4 4 4 2125 4 4 4 2130 4 4 4 2135 4 4 4 2140 2 2 2 2145 2 2 2 2150 2 2 2 2155 2 2 2 2160 2 2 2 2170 4 4 4 2175 1 1 1 2180 1 1 1 2185 1 1 1 2190 1 1 1 2215 2 2 2 2220 2 2 2 2305 2 2 2 2310 2 2 2 2315 2 2 2 2320 2 2 2 2325 2 2 2 2330 2 2 2 2335 2 2 2 2340 2 2 2 2345 2 2 2 2350 2 2 2 2355 2 2 2 2360 2 2 2 2365 2 2 2 2370 2 2 2 2375 2 2 2 2380 2 2 2 2405 2 2 2 2410 2 2 2 2415 2 2 2 2420 2 2 2 list of contractor furnished containers at Rose Barracks Vilseck Size: 240 L
Pickup Day(s) Every 2nd Tue Every 2nd Thur Every 2nd Tue
Bu ild in g
Re fu se
M ix ed P ap er s
Ca rd bo ar d
Pl as tic al C an s
Cont Size L 240 240 240
# services/week Service every 2 weeks Service every 2 weeks Service every 2 weeks 2425 2 2 2 2440 2 2 2 2445 2 2 2 2450 2 2 2 2455 2 2 2 2460 2 2 2 2465 3 3 3 2470 2 2 2 2475 2 2 2 2480 2 2 2 2485 2 2 2 2505 4 4 4 2510 4 4 4 2515 4 4 4 2520 4 4 4 2525 4 4 4 2530 4 4 4 2535 4 4 4 2540 4 4 4 2545 4 4 4 2550 4 4 4 2555 4 4 4 2605 2 2 2 2610 2 2 2 2615 2 2 2 2620 2 2 2 2625 2 2 2 2630 2 2 2 2635 2 2 2 2640 2 2 2 2645 2 2 2 2650 4 4 4 2655 4 4 4 2660 4 4 4 2705 4 4 4 2710 4 4 4 2715 4 4 4 2720 4 4 4 2725 4 4 4 2730 4 4 4 list of contractor furnished containers at Rose Barracks Vilseck Size: 240 L
Pickup Day(s) Every 2nd Tue Every 2nd Thur Every 2nd Tue
Bu ild in g
Re fu se
M ix ed P ap er s
Ca rd bo ar d
Pl as tic al C an s
Cont Size L 240 240 240
# services/week Service every 2 weeks Service every 2 weeks Service every 2 weeks 2735 4 4 4 2740 4 4 4 2745 4 4 4 2750 4 4 4 2755 4 4 4 2760 4 4 4 2765 6 6 6 2770 6 6 6 2775 4 4 4 2780 4 4 4 2785 4 4 4 2805 4 4 4 2810 4 4 4 2815 4 4 4 2820 4 4 4 2825 4 4 4 2830 4 4 4 2835 4 4 4 2905 3 3 3 2910 4 4 4 2915 4 4 4 2920 4 4 4 2925 4 4 4 2930 8 8 8 2935 4 4 4 2940 4 4 4 2945 8 8 8 2950 4 4 4 2955 4 4 4 2960 4 4 4 2965 4 4 4 2970 4 4 4 2975 4 4 4 3000 2 2 2 3005 2 2 2 3010 2 2 2 3015 2 2 2 3020 2 2 2 3025 2 2 2 3030 2 2 2 list of contractor furnished containers at Rose Barracks Vilseck Size: 240 L
Pickup Day(s) Every 2nd Tue Every 2nd Thur Every 2nd Tue
Bu ild in g
Re fu se
M ix ed P ap er s
Ca rd bo ar d
Pl as tic al C an s
Cont Size L 240 240 240
# services/week Service every 2 weeks Service every 2 weeks Service every 2 weeks 3035 2 2 2 3040 2 2 2 3050 2 2 2 3100 2 2 2 3105 2 2 2 3110 2 2 2 3115 2 2 2 3120 2 2 2 3125 2 2 2 3130 2 2 2 3140 1 1 1 3145 2 2 2 3150 2 2 2 3155 2 2 2 3160 2 2 2 3165 2 2 2 3170 2 2 2 3175 2 2 2
Total: 949 949 949 list of contractor furnished containers at Rose Barracks Vilseck Size: 1 cbm and larger
Bu ild in g
Cl ea r G la ss
Br ow n G la ss
G re en G la ss
Ti re s
Ti re s
Bu lk
T ra sh sc ra p m et al
C& D w as te
Fl at g la ss re m ar ks
Bu lk
T ra sh P ic ku p po in t
Cont Size cbm 1.1 1.1 5 1.1 2.5 5 1.1 2.5 5 1.1 2.5 5 2.5 5 1.1 20 Press 1.5 1.5 1.5 10 15 15 36 15 10 10 10 1.1 2.5 5 1.1 2.5 5 # services/week 1 1 1 3 3 3 5 5 5 1 1 1 3 3 1 On Call
Pickup Day(s) Thu Fri Thu Mo Wed Fri Tue On Call
Bldg.#
102 1 1 2 1 104 1 1 2 (1 davon bei Gruengut) 1 107 3 3 1 2 1 1 1 2 2 2 3
112-122 5 1 6 1 5 115 1 1 1 1 116 1 1 1 118 1 1 1 1
132 / 134 back 1 1 1 1 134 front 1 1
140 1 1 1 1 141 1 2 2 1 1 142 1 1 158 1 1 1 1 167 1 1 1 1 175 1 1 201 1 1 215 1 1 1 1 217 1 1 1 1 220 1 1 1 1
221 Thrift Shop 1 1 223 / 224 1 1 1
226 1 1 2 1 227/231/232 1 1 2 1 1 1 1
233 / 234 1 1 1 1 241 / 242 1 1 1 1 243 / 244 1 1 2 1 1 1 1
245 1 1 2 1 250 1 1 2 1 254 1 1 255 1 1 1 1 256 1 1 1 1
275 /252-53 1 1 2 1 301 / 354 1 1 1
Cl ea ni ng sh ed ul e
1/ ye ar re fu se m ay ai n fo od
Mo - Wed - Fri Mo - Wed - Fri Every 4th Tue On Call
Refuse Mixed Papers / Cardboard Plastics &
Metal Cans
Sc ra p W oo d
On Call
Cl ea ni ng sh ed ul e
4/ ye ar re fu se m ay c on
Service every 4 weeks
Mo - Tue - Wed - Thu - F list of contractor furnished containers at Rose Barracks Vilseck Size: 1 cbm and larger
Bu ild in g
Cl ea r G la ss
Br ow n G la ss
G re en G la ss
Ti re s
Ti re s
Bu lk
T ra sh sc ra p m et al
C& D w as te
Fl at g la ss re m ar ks
Bu lk
T ra sh P ic ku p po in t
Cont Size cbm 1.1 1.1 5 1.1 2.5 5 1.1 2.5 5 1.1 2.5 5 2.5 5 1.1 20 Press 1.5 1.5 1.5 10 15 15 36 15 10 10 10 1.1 2.5 5 1.1 2.5 5 # services/week 1 1 1 3 3 3 5 5 5 1 1 1 3 3 1 On Call
Pickup Day(s) Thu Fri Thu Mo Wed Fri Tue On Call
Bldg.#
Cl ea ni ng sh ed ul e
1/ ye ar re fu se m ay ai n fo od
Mo - Wed - Fri Mo - Wed - Fri Every 4th Tue On Call
Refuse Mixed Papers / Cardboard Plastics &
Metal Cans
Sc ra p W oo d
On Call
Cl ea ni ng sh ed ul e
4/ ye ar re fu se m ay c on
Service every 4 weeks
Mo - Tue - Wed - Thu - F
305 1 1 1 1
308 - MAV 3 1 1 2 1 3
312 1 1 314 1 1 2 1 1 1 1 317 1 1 2 1 1 1 1 330 1 1 1 1 333 1 1 1 1 338 1 1 1 340 1 1 2 1 341 1 1 1 1 349 1 1 1 1 350 1 1
352 / 353 1 1 1 1 375* 1 1 377 1 1 1 1
400 / 401 2 1 2 1 1 1 2 402 1 1 1 1 1 1 1 404 2 1 1 1 1 1 2 405 1 1 1 1 1 1 1 408 1 1 1 1 1 1 1 502 1 1 1 509 1 1 1 553 1 1 562 5 1 1 5 600 1 1 1 1 602 2 1 1 1 1 1 2 603 2 2 3 2 606 3 1 3 2 2 2 3 612 2 3 3 2 613 3 1 3 1 1 1 3 618 3 1 2 1 1 1 3 622 1 1
630 - (MT/MP/TP) 1 1 1 1 1
list of contractor furnished containers at Rose Barracks Vilseck Size: 1 cbm and larger
Bu ild in g
Cl ea r G la ss
Br ow n G la ss
G re en G la ss
Ti re s
Ti re s
Bu lk
T ra sh sc ra p m et al
C& D w as te
Fl at g la ss re m ar ks
Bu lk
T ra sh P ic ku p po in t
Cont Size cbm 1.1 1.1 5 1.1 2.5 5 1.1 2.5 5 1.1 2.5 5 2.5 5 1.1 20 Press 1.5 1.5 1.5 10 15 15 36 15 10 10 10 1.1 2.5 5 1.1 2.5 5 # services/week 1 1 1 3 3 3 5 5 5 1 1 1 3 3 1 On Call
Pickup Day(s) Thu Fri Thu Mo Wed Fri Tue On Call
Bldg.#
Cl ea ni ng sh ed ul e
1/ ye ar re fu se m ay ai n fo od
Mo - Wed - Fri Mo - Wed - Fri Every 4th Tue On Call
Refuse Mixed Papers / Cardboard Plastics &
Metal Cans
Sc ra p W oo d
On Call
Cl ea ni ng sh ed ul e
4/ ye ar re fu se m ay c on
Service every 4 weeks
Mo - Tue - Wed - Thu - F
640 - (MT/MP/TP) 1 1 1 1 1
641 1 1 1 1
650 - (MT/MP/TP) 1 1 1 1 1
660 - (MT/MP/TP) 1 1 1 1 1
670/672 - (MT/MP/TP) 1 1 1 1 1
680 2 1 2 1 1 1 2
681 / 682 3 1 2 3 683 3 1 2 1 1 1 3 685 1 1 695 1 1 1 1
697-699 1 1 1 1 700 1 1 1 1 701 1 1 1 1 710 1 1 1 1 711 1 1 1 1 1 712 1 1 1 1 718 no permananent containers - just on request
720 1 1 1 1
721 - (MT/MP/TP) 1 1 1 1 1
724 / 726 - (MT/MP/TP) 1 1 1 1 1
728 - (MT/MP/TP) 1 1 4 1 1
741 - Gate 2 1 1 1000 1 1 1002 no permananent containers - just on request
1103* 1 1 1108* 1 1 1296 1 1 1400 1 1 1 2 2 1 1 1405 1 1 2 1 1690 1 1 2 1 1695 1 1 2 1 1706 1 1 1 1803 1 1 3 1 list of contractor furnished containers at Rose Barracks Vilseck Size: 1 cbm and larger
Bu ild in g
Cl ea r G la ss
Br ow n G la ss
G re en G la ss
Ti re s
Ti re s
Bu lk
T ra sh sc ra p m et al
C& D w as te
Fl at g la ss re m ar ks
Bu lk
T ra sh P ic ku p po in t
Cont Size cbm 1.1 1.1 5 1.1 2.5 5 1.1 2.5 5 1.1 2.5 5 2.5 5 1.1 20 Press 1.5 1.5 1.5 10 15 15 36 15 10 10 10 1.1 2.5 5 1.1 2.5 5 # services/week 1 1 1 3 3 3 5 5 5 1 1 1 3 3 1 On Call
Pickup Day(s) Thu Fri Thu Mo Wed Fri Tue On Call
Bldg.#
Cl ea ni ng sh ed ul e
1/ ye ar re fu se m ay ai n fo od
Mo - Wed - Fri Mo - Wed - Fri Every 4th Tue On Call
Refuse Mixed Papers / Cardboard Plastics &
Metal Cans
Sc ra p W oo d
On Call
Cl ea ni ng sh ed ul e
4/ ye ar re fu se m ay c on
Service every 4 weeks
Mo - Tue - Wed - Thu - F
1811 no permananent containers - just on request
1820 1 1 1 1 1825 1 1 1 2 2 1 1 1830 1 1 1 1 1835 1 1 1 1 1840 1 1 1 1 1845 1 1 1 1 1850 1 1 1 1 2099 1 1 1 1 2201 2 1 2 1 1 1 2 2203 3 3 5 3 2204 1 1 1 1 1 1 1 2207 1 2 3 1 2208 1 1 3 1 1 1 1 2231 1 1 3 1 2234 1 1 2 1 2236 1 1 1 1 2237 1 1 1 2 2 1 1
2791* 1 1 2793 / 2794 1 1
2795* 1 1 5000 1 1 1 1
9911/9914 Airfield 1 1 1 Total by Type, Size & Services per week:
4 26 5 34 21 43 1 2 15 31 12 13 4 45 138 1 26 25 22 1 1 2 5 2 9 4 1 5 0 9 61 23 53
Total by Services/week: 138 1
Total by Type & Size: 1.1 1.1
2.5 2.5
5 5
35 98 18 7331 4
ELIN B001BB
ELIN B001BC
ELIN B001BD
ELIN
B001AC
ELIN
B001AD
ELIN
B001AB
list of contractor furnished containers at Rose Barracks Vilseck Size: 1 cbm and larger
Bu ild in g
Cl ea r G la ss
Br ow n G la ss
G re en G la ss
Ti re s
Ti re s
Bu lk
T ra sh sc ra p m et al
C& D w as te
Fl at g la ss re m ar ks
Bu lk
T ra sh P ic ku p po in t
Cont Size cbm 1.1 1.1 5 1.1 2.5 5 1.1 2.5 5 1.1 2.5 5 2.5 5 1.1 20 Press 1.5 1.5 1.5 10 15 15 36 15 10 10 10 1.1 2.5 5 1.1 2.5 5 # services/week 1 1 1 3 3 3 5 5 5 1 1 1 3 3 1 On Call
Pickup Day(s) Thu Fri Thu Mo Wed Fri Tue On Call
Bldg.#
Cl ea ni ng sh ed ul e
1/ ye ar re fu se m ay ai n fo od
Mo - Wed - Fri Mo - Wed - Fri Every 4th Tue On Call
Refuse Mixed Papers / Cardboard Plastics &
Metal Cans
Sc ra p W oo d
On Call
Cl ea ni ng sh ed ul e
4/ ye ar re fu se m ay c on
Service every 4 weeks
Mo - Tue - Wed - Thu - F
Bu ild in g
Re fu se
Re fu se
Re fu se
Re fu se Cont Size cbm
Total by Cont Size
Cont Size cbm 1.1 1.1 5 1.1 240 L 2847 # services/week 1 1 1 3 1.1 234
375 Sports 1 2.5 39 1103 Outdoor Rec 1 5 121 1108 Sports 1 10 15 2791 Outdoor Rec 1 15 5 2795 Sports 1 20 0
36 5
* Placement only 01 March - 31 October
105Mixed PapersRefuse 151
Technical Exhibit G - Specification of containers
Types of Containers
Size Type Material Accessories 240 L Umleerbehaelter rear lift waste container Kunststoff plastics
Deckel, Raeder lid, wheels
1.1 cbm Umleerbehaelter rear lift waste container
Kunststoff plastics
Deckel, Raeder lid, wheels
1.1 cbm charcoal
Umleerbehaelter rear lift waste container
Stahl, verzinkt hot dip zinc
Deckel, Raeder lid, wheels
2.5 cbm Umleerbehaelter rear lift waste container
Stahl, verzinkt oder lackiert hot dip zinc or painted
Deckel, Raeder lid, wheels
5.0 cbm Umleerbehaelter rear lift waste container
Stahl, verzinkt oder lackiert hot dip zinc or painted
Deckel, Raeder lid, wheels
10 cbm Absetzcontainer skip container
Stahl, verzinkt oder lackiert hot dip zinc or painted
Deckel lid
15 cbm Abrollcontainer hook lift roller dumpster
Stahl, verzinkt oder lackiert hot dip zinc or painted offen
36-40 cbm Abrollcontainer hook lift roller dumpster
Stahl, verzinkt oder lackiert hot dip zinc or painted offen oder geschlossen, mit/ohne seitl. Tueren open and/or closed with or w/o rear doors
1.6 cbm Igloo Glas Container Igloo glass container
Kunststoff plastics round openings, min.Ø 260mm, w/o sharp edges
3.2 cbm Igloo Glas Container Igloo glass container
Kunststoff plastics round openings, min.Ø 260mm, w/o sharp edges
Colors
Type of waste specified color refuse black refuse (charcoal) silver mixed papers green mixed plastics incl. metal tins yellow all other materials not specified
Der Behaelter muss die dieser Muellart zugeordnete Farbe repraesentieren. Dies kann der ganze Container, aber mindestens der Deckel sein.
The Containers has to present the for this type specified color. This can be the whole container but at least the lid.
Technical Exhibit H - Container Labeling Schedule TE H - Container Labeling Schedule
Size of Container in cbm
Size of Label (Format) always 60x40 cm
Position
Refuse 1.1 portrait front wall
2.5 portrait front wall 5 landscape front and rear wall
Mixed Papers 1.1 portrait front wall
2.5 portrait front wall 5 landscape front and rear wall
Mixed Plastics 1.1 portrait front wall
2.5 portrait front wall 5 landscape front and rear wall
Glass 1.6 cbm portrait front and rear wall
3.2 cbm portrait front and rear wall
Labels must be positioned at all opening side(s) Refer to Attachments No 4 ‐ Container Labels for exact wording requirements
Technical Exhibit J - Duty Hours, Opening Hours TE J - Duty Hours, Opening Hours
Monday to Friday 7:30-12:00 12:30-16:00
New Year’s Day 1st day of January Martin Luther King Jr.'s Birthday 3rd Monday of January Presidents Day 3rd Monday of February Memorial Day Last Monday of May Juneteenth 19th day of June Independence Day 4th day of July Labor Day 1st Monday of September Columbus Day 2nd Monday of October Veterans Day 11th day of November Thanksgiving Day 4th Thursday of November Christmas Day 25th day of December
Opening Hours
CRC = Central Recycling Center RY = Recycling Yard
CRC
Haderbuehl
RY Grafenwoehr Bldg.# 441
RY Vilseck Bldg.# 107
Monday 8:00-12:00 12:30-15:30 11:30-18:00 11:30-18:00
Tuesday 8:00-12:00 12:30-15:30 11:30-18:00 11:30-18:00
Wednesday 8:00-12:00 afternoon closed 11:30-18:00 11:30-18:00
Thursday 8:00-12:00 12:30-15:30 11:30-18:00 11:30-18:00
Friday 8:00-12:00 12:30-15:30 11:30-18:00 11:30-18:00
Saturday closed 8:30-14:00 8:30-14:00 Sunday closed closed closed German Holidays closed see weekday schedule see weekday schedule US Holidays see weekday schedule see weekday schedule see weekday schedule closed on Dec. 25th and Jan. 01st closed on Dec. 25th and Jan. 01st
Governments Normal Duty Hours exept on US Federal Holidays
Technical Exhibit K ‐ Timetable Re‐/Actions, Readiness
TE K ‐ Timetable Re‐/Actions, Readiness
PWS/CLS Subject Request Government Time to (re)act
Reports
CLS 2.1.1 explosives, ammunation, weapons report all potentially explosive items or materials to the COR/ACOR and the Provost Marshal’s Office (or Military Police)
Verbal (phone): one (1) hour and Written (email): two (2) workdays
CLS 2.1.2
2.4.4
HAZMAT report all hazardous items or materials to the
COR/ACOR
Written (email): two (2) workdays
CLS 2.1.3 Scavenging report structural defencies of recycling points to the
COR/ACOR
Written (email): two (2) workdays
CLS 2.8.1 Monthly Summary Report submit report Written (email): NLT 10th of following month (together with invoice)
CLS 2.8.4 Deficiency Report report deficiencies for scheduled emptying Written (email): same day report deficiencies for unscheduled emptying Verbal (phone) or Written (email): one
(1) hour CLS 3.0 GFP/GFE/GFM inform COR/ACOR about damages to GFP/GFE/GFM Verbal (phone): one (1) hour and
Written (email): two (2) workdays
Container handling
CLS 2.2.3
2.6.2
Additional/ Special Collection provide pick‐up one (1) workday
CLS 2.2.4
2.6.2
Miscellaneous MSW Collection and Disposal Services provide pick‐up and disposal two (2) workdays
CLS 2.3.1.11 Yard Waste Items / Garden Debris provide pick‐up and disposal two (2) workdays
CLS 2.3.1.12 Green Waste from DPW provide container pick‐up and disposal two (2) workdays same day
CLS 2.3.1.13 Road Rubbish provide container pick‐up and disposal two (2) workdays same day
CLS 2.4.9
2.6.2
Container Replacements provide pick‐up and replacement of containers two (2) workdays
CLS 5.3.1.2 Rental of Containers for temporary facilities provide container pick‐up and disposal two (2) workdays same day
CLS 5.3.1.3 Rental of Containers for defined locations by Rotating Units provide container pick‐up and disposal two (2) workdays same day
CLS 5.3.1.4
2.6.2
Rental of Containers for Special Events provide container pick‐up and disposal two (2) workdays same day
CLS 5.3.6 Interaction of misused container transport misused container(s) to the CRC, empty, manually sort and properly dispose two (2) workdays
Miscellaneous tasks
CLS 2.7.6 Emergency Work respond immediately to emergency work requests Verbal (phone) or Written (email): one
(1) hour start emergency work (during normal duty hours) two (2) hours start emergency work (outside normal duty hours) eight (8) hours
CLS 2.4.11 Complaints correct unsanitary conditions due to Contractor negligence same day
CLS 2.4.13 Container Capacity Implementation of gov. Adjustments of the Containerlist (increase, decrease, relocation) two (2) workdays to start and up to 20 containers per workday
CLS 2.7.4 Unscheduled Clean‐Ups remove materials on the ground at collection sites and clean‐up unauthorized (illegal) dump sites one (1) workday
CLS 2.5.2 Unserviceable Vehicles unserviceablevehicles shall be repaired or replaced two (2) workdays
Every missed service shall be catched up one (1) workday CLS 4.3.2.2 Hoist/Haul Vehicles respond to Government requesting hoist‐and‐haul vehicle(s) Written (email): same day
| TE B - Deliverables 20250508.pdf |
| Sheet1 |
| TE package.pdf |
| TE package.pdf |
| TE A - PRS |
| TE package |
| TE C - Pickup Schedule TB |
| TE D - Pickup Schedule RB |
| TE E - Containerlisten TB |
| Container Anzahl Gesamt |
| Main Camp |
| Field Camp |
| Ranges |
| TE F - Containerlisten RB |
| RB 240L |
| RB 1.1<38 |
| TE G - Container Specs |
| Sheet1 |
| TE H - Container Labeling Schedule |
| Table 1 |
| TE J - Duty and Opening Hours CRC RYs |
| Sheet1 |
TE K - Timetable Re-Actions
| TE B - Deliverables.pdf |
| Sheet1 |
File details come from the government source that posted it. Updated .