Attachment A- Performance Work Statement (PWS).pdf
PDF 588 KB Posted
- Solicitation number
- W912PB25RA020
About this file
This Performance Work Statement (PWS) details solid waste management services for the U.S. Army Garrison (USAG) Bavaria, specifically covering Tower Barracks in Grafenwoehr and Rose Barracks in Vilseck, Germany. The contract requires comprehensive refuse collection and disposal services, including collection and management of various waste streams such as mixed paper, cardboard, metal cans, glass, scrap metal, used tires, mixed plastics, electronics, bulk trash, styrofoam, wood, compound materials, garden waste, and used refrigerators.
The contract period spans five years, with one base year from 01 November 2025 to 31 October 2026 and four consecutive one-year option periods extending through 31 October 2030. The contractor will be responsible for operating two recycling yards, managing waste collection, and ensuring compliance with applicable Federal, State, and Local environmental regulations. The scope of work includes providing all necessary personnel, equipment, facilities, and services to perform refuse collection and recycling operations, with a focus on innovation and commercial best practices in solid waste management.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W912PB25RA0200002 SF 30.pdf | ||
| ELIN Sheet blank.xlsx | XLSX spreadsheet | |
| Vendor Questions and Government Answers.docx | DOCX document | |
| Solicitation Amendment W912PB25RA0200001 SF 30.pdf | ||
| Attachment B - Common Levels of Support (CLS).pdf | ||
| IRS Form W-14 - Sample.pdf | ||
| Technical Exhibit Package.pdf | ||
| ELIN Sheet blank.xlsx | XLSX spreadsheet | |
| IRS Form W-14.pdf | ||
| Solicitation - W912PB25RA020.pdf | ||
| Attachment Package.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A (Refuse Collection PWS) to OPORD 24-XXX IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)
Attachment-A Performance Work Statement (PWS)
Base Operations
Solid Waste Services Collection and Disposal of
Refuse and Recyclable Materials
United States Army Garrison (USAG) Bavaria Tower Barracks (Grafenwoehr) and
Rose Barracks (Vilseck)
PoP:
Basic Year 01 Nov 2025 – 31 Oct 2026
1st Option Year 01 Nov 2026 – 31 Oct 2027 2nd Option Year 01 Nov 2027 – 31 Oct 2028 3rd Option Year 01 Nov 2028 – 31 Oct 2029 4th Option Year 01 Nov 2029 – 31 Oct 2030
Oct 2024
W912PB-25-D-XXXX
Attachment A (Refuse Collection PWS): IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)
Table of Contents
1.0 INTRODUCTION
1.1 Background
1.2 Objectives
1.3 Climatic Conditions
1.4 Facility Access
1.5 Traffic Flow
1.6 Drainage
1.7 Restoration of Landscape Damage
1.8 Dust Suppression
1.9 Utility Location
1.10 Excavation Permits
1.11 Work Clearance
2.0 REQUIREMENTS
2.1 Description of Services
2.1.2 General Information
2.1.3 Place of Performance and Hours of Operation
2.1.4 Federal Holidays
2.1.5 Travel/Temporary Duty
2.1.6 Emergency Services
2.1.7 Contract Administration and Management
2.1.8 COR Functions
2.1.9 Quality Control (QC)
2.1.10 Subcontract Management
2.1.11 Contractor Employees
2.1.12 Business Relations
2.2 Work Management
2.2.1 Coordination
2.3 As-Builts and Geospatial Information System (GIS)
2.3.1 Maintain As-Builts
2.3.2 Real Property Records Updates
(BASOPS) Performance Work Statement (PWS) Templates (U)
2.3.3 GIS
2.3.4 GIS Support Services
2.3.5 GIS Files
2.3.6 Other Documents
2.4 Historic Property or Archaeological Site
2.4.1 Repair and Replacement
2.5 Special Requirements
2.5.1 Security
2.5.2 Security Training
2.5.3 Safety
2.5.4 Training, Physical Requirements, or other Expertise Required
2.5.5 Environmental Requirements
2.5.6 Contingency Plans. N/A
3.0 PERFORMANCE REQUIREMENTS AND STANDARDS
3.1 Performance Task Requirements, Standards and Acceptable Quality Levels (AQLs). 20
3.2 Quality Assurance
4.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS) MATRIX. REFERENCE TE A
5.0 COMMON LEVELS OF SERVICE (SERVICE)
6.0 DELIVERABLES. REFERENCE TE B
7.0 RELATED DOCUMENTS
7.1 Definitions and Acronyms
7.1.1 Definitions
7.2 Acronyms
7.3 Applicable Directives, Publications
7.3 46
7.4 Government-Furnished Material (GFM)/Property (GFP)/Equipment (GFE)
7.4.1 Utilities
7.5 Contractor-Furnished Material (CFM)/Property (CFP)/Equipment (CFE
7.5.1 Contractor-Furnished Material and Responsibilities
7.5.2 Contractor-Furnished Items
7.5.3. Contractor Facilities
7.6 U.S. Department of Labor (DOL) Wage Determination (WD)
(BASOPS) Performance Work Statement (PWS) Templates (U)
1.0 Introduction. This is a non-personal services contract to provide Solid Waste Services for Collection and Disposal of Refuse and Recyclable Materials. The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this Performance Work Statement (PWS). Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this PWS. The Contractor is responsible for providing all parts required for Preventive Maintenance Orders (PMOs) and all repair parts required for Demand Maintenance Orders (DMOs).
1.1 Background. USAG Bavaria is located in Germany, Bavaria, Grafenwoehr and Vilseck. It resembles a small town with residential, commercial and recreational areas.
1.2 Objectives. The Contractor shall ensure all work accomplished in the performance of this PWS meets all applicable Federal, State, and Local Laws, Regulations, and Directives to include, but not limited to, the publications in Section 7, Related Documents
1.2.1 The Contractor shall compile historical data, prepare required reports, and submit all information as specified by the Deliverables presented in the contract. The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the PWS of this contract.
The intent is to establish work requirements that are performance-based and results-oriented. The Contractor shall determine the best and most cost-effective ways to fulfill Solid Waste Services and their component needs, emphasizing innovation and commercial best practices.
1.3 Climatic Conditions. N/A
1.4 Facility Access. The Contractor shall ensure access to all fire detection and suppression systems in case of emergencies or for other Fire Department purposes.
The Contractor shall inform the Directorate of Emergency Services (DES), Bldg.# 2099 in Vilseck, phone +49 (0)9641-70-599-4611 or +49 (0)9641-70-599-4612), prior to outages that will impact the function of the system, special problems or circumstances, which require Fire Department inspection. The Fire Department will reset alarm systems to operational status.
1.5 Traffic Flow. N/A
(BASOPS) Performance Work Statement (PWS) Templates (U)
1.6 Drainage. Maintenance work performed under this contract shall not impede drainage.
1.7 Restoration of Landscape Damage. Trees or other landscape features damaged by the Contractor’s operations shall be restored to the original state at no additional cost to the Government.
1.8 Dust Suppression. N/A
1.9 Utility Location. N/A
1.10 Excavation Permits. N/A
1.11 Work Clearance. N/A
(BASOPS) Performance Work Statement (PWS) Templates (U)
2.0 Requirements.
2.1 Description of Services. The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the Common Levels of Support (CLS) functions of the Base Operations specified below. This shall be done IAW PWS and all the terms, conditions, general and special provisions, specifications, drawings, attachments, and exhibits contained herein or incorporated by reference.
The contract is specifically tailored to the specific needs of the training rotations held at Tower Barracks Grafenwoehr and Rose Barracks Vilseck. The Contractor shall provide refuse collection as well as operation of 2 Recycling Yards, disposal services, collection and disposal of recyclable items, e.g. mixed paper, cardboard, metal cans, glass, scrap metal, used tires, mixed plastic, mixed electronics, bulk trash, styrofoam, wood, compound materials, garden waste, as well as acceptance of used refrigerators.
2.1.1 Non-Personal Services. The personnel rendering the services are not subject;
either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.
2.1.2 General Information.
2.1.2.1 Transition (Phase In). There is no Phase In planned. Therefore, on the initial day of performance, the Contractor shall provide a work force which is fully qualified and capable of performing all work required under this contract.
2.1.2.1.1 Transition (Phase In/Phase Out for Incumbent Contractor). There is no Transition phase planned. Therefore, on the initial day of performance, the Contractor shall provide a work force which is fully qualified and capable of performing all work required under this contract.
2.1.2.2 Transition (Phase-Out). There is no Phase Out planned. The Contractor shall fully support a smooth and orderly transfer of performance responsibility to a potential successor, e.g. inventories and transfer of Government furnished items; Removal of Contractor property; Data and information transfer; deletion of password access to Government systems, installation clearance actions including turn-in of windshield decals and controlled access cards (CAC), cleanup of Contractor work areas and any other actions required to ensure continuity of operations. The Contractor shall correct any damage to Government-Owned items caused by employee negligence or mistake, intentional or otherwise. The Contractor shall not defer any needed repairs or
Attachment A (Refuse Collection PWS): IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U) maintenance for the purpose of transferring responsibility to the successor Contractor.
The Contractor shall fully cooperate with the successor Contractor and the Government so as not to interfere with their work or duties.
2.1.3 Place of Performance and Hours of Operation.
2.1.3.1 Place of Performance. The work to be performed under this contract will be performed at the USAG Bavaria, only at following parts: Tower Barracks Grafenwoehr (TB) incl. Community Circle at Netzaberg Housing Area, Grafenwoehr Training Area (GTA) and Rose Barracks Vilseck. Maps of these locations are provided at TE I.a, I.b, I.c.
2.1.3.2 Hours of Operation. The Government's regular (normal) hours are from 0730 – 1200 and 1230-1600 hours, excluding Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
2.1.4 U.S. Federal Holidays. The Contractor shall perform work on the Federal public holidays listed below. Holidays occurring on weekends will be observed as directed by the Federal calendar (5 United States Code (U.S.C) § 6103, Government Organization and Employees, Holidays).
New Year’s Day 1st day of January Martin Luther King Jr.'s Birthday 3rd Monday of January Presidents Day 3rd Monday of February Memorial Day Last Monday of May Juneteenth 19th day of June Independence Day 4th day of July Labor Day 1st Monday of September Columbus Day 2nd Monday of October Veterans Day 11th day of November Thanksgiving Day 4th Thursday of November Christmas Day 25th day of December
NOTE: When a holiday falls on a Sunday, the following Monday will be observed as a holiday, and, when a holiday falls on a Saturday, the preceding Friday is observed as a holiday by U.S. Government Agencies. Federal holidays also include any Presidential or Congressionally designated days off other than the holidays listed above.
2.1.4.1 Host Nation Holidays. Work shall not be performed on local Host Nation holidays occurring during the normal workweek unless otherwise directed by the
Attachment A (Refuse Collection PWS): IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)
Contracting Officer. The Contractor is responsible to inform itself about local Host Nation Holidays of the Area/Country the work will be performed.
2.1.4.2 Installation Closures. When an unforeseen Installation closure occurs on a regularly scheduled day of work, the Contractor shall reschedule the work to be performed the next business day following the closure unless the following day is a Saturday, Sunday, a recognized Federal Holiday, and when routine work is not scheduled for that day.
2.1.4.3 Inclement Weather Delay. If the Contractor determines unsafe weather conditions for continued operations, then the Contractor shall request approval from the KO to suspend services. The Contractor shall suspend collection and disposal operations because of inclement weather only after receiving approval from the KO. The Contractor shall resume operations with KO approval.
2.1.4.4 Curtailment of Operations. When operations are curtailed due to manmade or natural conditions on a working day, it may be necessary for the KO/COR to interrupt that day’s work under this contract. The Contractor shall reschedule the work on any day acceptable to the Government. If the KO agrees, the Contractor may continue the work as scheduled. The KO will provide verbal announcements of immediate curtailment of operations to the Contractor.
2.1.4.5 Days of No Scheduled Activities (DONSA). The Installation has historically granted Military personnel (Enlisted and Officers) DONSA, for example, the Friday after Thanksgiving, in addition to the listed Federal Holidays above.
• DONSA are not considered a day of excused absence for the Government civilian work force or Contractor employees.
• If a DONSA affects scheduled contract work or access to facilities, the work in affected facilities may be rescheduled to compensate for the DONSA.
• However, announced DONSA or exodus of Military personnel may provide the Contractor with an opportunity for unrestricted access to facilities and areas or uninterrupted performance of work (i.e., training facility and area maintenance and supply inventories).
The Contractor shall vary work schedules to take full advantage of such opportunities by planning maintenance that is better accomplished when personnel are not using facilities during those times.
2.1.5 Travel/Temporary Duty. N/A
2.1.6 Emergency Services.
(BASOPS) Performance Work Statement (PWS) Templates (U)
2.1.6.1 Emergency Medical Treatment. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO or COR within the time limit IAW TE B Deliverables. The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel.
2.1.6.2 Accident Reporting. The Contractor shall comply with Operational Safety and Health Administration (OSHA) for record keeping and reporting of all accidents resulting in death, injury, occupational disease, or adverse environmental impact. A completed typed original plus one (1) copy of ENG FORM 3394 United States Army Corps of Engineers Accident Investigation Report shall be delivered to the KO within the time limit IAW TE B Deliverables, whenever an accident involving personal injury or government owned property occurs.
2.1.7 Contract Administration and Management.
2.1.7.1 Post Award Conference/Performance Evaluation Meetings. The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW FAR Subpart 42.5, Post-award Orientation. The KO and COR will meet on demand with the Contractor to review the Contractor's performance.
Written minutes of meetings will be recorded by the Government and signed by both the Project Manager and the KO. The written minutes shall be distributed within five (5) calendar days after the meeting. If the Contractor does not concur with any portion of the minutes, recorded by the Government, the non-concurrence shall be provided in writing to the KO within two (2) calendar days following receipt of the minutes.
2.1.7.2 Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.
2.1.7.3 The following provides the roles and their respective authority during the performance of the contract:
2.1.7.3.1 Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO. In the event the Contractor makes any change at the direction of any person other than the KO, the change shall be considered to have been made without authority and solely at the risk of the Contractor. All contract administration will be affected by the KO. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this
PWS.
2.1.7.3.2 Contracting Officer’s Representative (COR). The KO will appoint a COR during the performance of this contract. Additional Government personnel may be
(BASOPS) Performance Work Statement (PWS) Templates (U) assigned to assist in contract oversight IAW AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR or Alternate Contracting Officer’s Representative (ACOR), and shall be trained and appointed IAW DoDI 5000.72, DoD Standard for Contracting Officer’s Representative (COR) Certification and DFARS 201.602-2. The Alternate Contracting Officer Representative (ACOR) will serve as on-site representatives of the COR in performance of actual contract surveillance, if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR. The COR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR will perform IAW the responsibilities and duties identified in the appointment letter.
2.1.7.3.2.1 COR Authority. A letter of designation will be issued to the COR by the KO.
A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR, especially with regard to changes in cost, price estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.
2.1.7.3.3. The Contractor shall not in any way represent the United States (U.S.)
Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).
2.1.8 COR Functions. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract;
perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Property, and coordinate site entry of Contractor personnel.
2.1.9 Quality Control (QC). (ref. para. 3.3) Quality Control is the responsibility of the Contractor. The Contractor shall provide a Quality Control Plan (QCP) within the time limit IAW TE B Deliverables. The Contractor shall provide and maintain a QCP that is acceptable to the KO. Changes to the Contractor’s QCP shall be submitted to the KO for review and approval within the time limit IAW TE B Deliverables.
2.1.10 Subcontract Management. N/A
2.1.11 Contractor Employees.
2.1.11.1 Key Personnel. (Att. 8)
(BASOPS) Performance Work Statement (PWS) Templates (U)
The Contractor shall provide a list reflecting Contractor’s Key Personnel, like the Project Manager (PM), the dispatchers or the staff at the recycling yards. The list shall at least contain the names, the position, responsibility and contact data of all personnel the COR or KO might to have act directly with. The list shall be provided within the time limit IAW TE B Deliverables.
2.1.11.1.1 Project Manager (PM). The Contractor shall provide a PM who is responsible for the performance of the work. The PM shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. IAW TE B Deliverables the PM shall have three (3) years of experience within the last ten (10) years in base support management or a contract similar in scope and breadth to this solicitation. The name of the PM shall be provided by the Contractor to the KO within the time limit IAW TE B Deliverables. In the circumstances when the PM is not available, the Contractor shall designate an alternate who can perform the same duties during the absence of the Project Manager. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the contracting officer at the start of the contract. The PM shall be available between 0700 - 1600 hours, Monday through Friday except Host Nation Holidays or when the Government facility is closed for administrative reasons. The PM and any individuals designated as key personnel (Att. 8) shall be able to understand, speak, read, and write the English language.
2.1.11.1.2 GFEBS PM Coordinator Lead. N/A
2.1.11.1.3 GFEBS Certification. N/A
2.1.11.1.4 Common Access Card (CAC). N/A
2.1.11.1.5 U.S. Residency. N/A
2.1.11.1.6 Qualification Standards. The Contractor shall be an accredited waste management company for collection, transportation, storage, handling, recycling and disposal of waste material according to the Circular Economy Act. A valid certificate “Entsorgungsfachbetrieb” (Special Waste Management Company) must be provided within the time limit IAW TE B Deliverables.
2.1.11.1.7 Contractor Identification. The Contractor shall ensure all personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees. The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.
2.1.11.1.8 Standards of Conduct. Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government Installation. The
(BASOPS) Performance Work Statement (PWS) Templates (U)
Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the Installation. The removal of such a person shall not relieve the Contractor of the requirement to provide personnel to perform adequate and timely service.
2.1.11.1.9 Contractor Hiring Restrictions. The Contractor shall not hire or sub-contract with off duty or former Government employees whose employment would result in a conflict with Joint Ethics Regulation (JER) DoD 5500.07-R.
2.1.12 Business Relations. The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the COR corrective action plans, timely identification of issues, and effective management of Subcontractors at a mutually agreed upon date within the time limit IAW TE B Deliverables. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.
2.1.13 Manual Operations. N/A
2.2 Work Management.
2.2.1 Coordination. The Contractor shall schedule and coordinate with the COR to minimize disruptions to the facility mission. All correspondence shall be submitted within the established suspense dates. All extensions, releases, or other relief of suspense requirements shall be obtained from the originating office by the Contractor.
2.2.2 General Fund Enterprise Business System (GFEBS). N/A
2.2.2.1 Army Maintenance Application (ArMA). N/A
2.2.2.1.1 Contingency Plan. N/A
2.2.2.1.2 Transition (Phase-in) Plan. N/A
2.2.2.1.3 ArMA and GFEBS. N/A
2.2.2.1.4 Duplicate Orders. N/A
Attachment A (Refuse Collection PWS): IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)
2.2.3 Demand Maintenance Orders (DMOs). N/A
2.2.3.1 DMO Desk. N/A
2.2.3.2 DMO Call Receipt and Entry. N/A
2.2.3.3 GFEBS and/or ArMA Case Number. N/A
2.2.3.4 Completed Work. N/A
2.2.4 Preventive Maintenance Orders (PMOs). N/A
2.2.4.1 PMO Program. N/A
2.2.4.2 PMO Schedules. N/A
2.2.4.3 Approved PM Schedule. N/A
2.2.4.4 PMO Stickers/Log. N/A
2.2.4.5 Warranty Program. N/A
2.2.4.6 Operation and Maintenance (O&M) Manual Digital Library. N/A
2.2.5 Operations Work Orders (OWOs). N/A
2.2.6 Project Work Orders (PWOs). N/A
2.2.6.1 DA Form 4283, Facilities Engineering Work Requests. N/A
2.2.6.1.1 Conversion of DMO to PWO. N/A
2.2.6.1.2 Conversion during Execution. N/A
2.2.6.1.3 Conversion Prior to Execution. N/A
2.2.6.2 Cost Estimates for PWOs. N/A
2.2.6.3 Preparation of Detailed Estimates. N/A
2.2.6.4 Subcontract Work. N/A
2.2.6.5 Specialty Subcontracting Work. N/A
Attachment A (Refuse Collection PWS): IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)
2.2.6.6 Execution of PWO Work. N/A
2.2.6.7 Wage Rates for PWOs. N/A
2.2.6.8 PWO Bi-weekly Meetings. N/A .
2.2.6.9 PWO Records. N/A
2.2.6.10 PWO Reporting Requirements. N/A
2.2.7 Warranty Program. N/A
2.2.7.1 Warranty Enforcement Manager. N/A
2.2.7.2 Warranty Management. N/A
2.2.7.3 Routing of Warranty DMOs. N/A
2.2.7.4 Warranty Records. N/A
2.2.7.5 Exceptions. N/A
2.2.7.6 Technical Document Library Operation. N/A
2.3 As-Builts and Geospatial Information System (GIS). N/A
2.3.1 Maintain As-Builts. N/A
2.3.1.1 Support. N/A
2.3.1.2 GIS Software. N/A
2.3.2 Real Property Records Updates. N/A
2.3.3 GIS. N/A
2.3.4 GIS Support Services. N/A
2.3.5 GIS Files. N/A
2.3.6 Other Documents. N/A
2.4 Historic Property or Archaeological Site. N/A
Attachment A (Refuse Collection PWS): IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)
2.4.1 Repair and Replacement. N/A
2.4.2 Salvage. N/A
2.5 Special Requirements.
2.5.1 Security.
2.5.1.1 Access and General Protection/Security Policy and Procedures. The Contractor and all associated Subcontractors’ employees shall comply with applicable Installation, facility, and local security policies and procedures. The Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by Department of Defense (DoD), Headquarters Department of the Army (HQDA), and local policy. The COR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or Installation changes.
2.5.1.2 Motor Vehicle Operators. Contractor’s personnel, whose tasks require operation of any vehicles, shall possess a valid driver’s license, certificates, and permits applicable for the type and class of vehicle being operated.
2.5.1.3 Contractor Vehicle Registration. Currently there is no requirement to register Contractor owned vehicles with the Provost Marshal or DES. However, all vehicles must be registered IAW current state requirements. In addition, the Contractor shall maintain a list of all Contractor-owned or operated vehicles and trailers operating on the Installation at all times. The list may be provided within the time limit IAW TE B Deliverables and used in case of emergency and/or another contingency. Evidence of vehicle ownership and vehicle liability insurance must be presented upon request.
2.5.1.3.1 Contractor and Vendor Access. All privately-owned vehicles or motorcycles or Contractor or vendor-furnished vehicles and equipment must enter the Installation through the designated secure access control points (ACP). Under the present Installation FPCON, vehicle and equipment operators and passengers must possess identification documents as required by Fort Belvoir DES to access the Installation.
Vehicle and equipment operators must also possess and be ready to show a valid state and/or commercial driver's license, current vehicle registration, and proof of state required minimum liability insurance. As determined by the Installation FPCON, an elevated FPCON may require additional security screening and/or limited Installation access. All vehicles must be registered IAW current state requirements in which they are registered.
2.5.1.3.2 All Contractor personnel, not possessing a Common Access Card (CAC).
(BASOPS) Performance Work Statement (PWS) Templates (U)
a. Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances in accordance with AE Regulation 190-16, Installation Access Control, will be grounds for denying access to U.S. installations and controlled areas. The Contractor is responsible to ensure that any Subcontractor used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any Subcontractor utilized by the contractor, are made aware of and comply with these requirements.
b. The Contractor is responsible for being aware of and complying with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control (IAC) processing requirements.
c. The Contractor is responsible for returning installation passes to the issuing Installation Access Control Office (IACO) when the contract is completed or when a contractor employee no longer requires access within the time limit IAW TE B Deliverables.
d. AE Regulation 190-16 (and AE Regulation 190-16-G German translation) can be found on the following website: https://www.aepubs.eur.army.mil/AE-Regulations/
e. The Contractor shall create and maintain an always up-to-date personnel list. The list shall at least contain the names, the position, responsibility, Installation Pass expiration date and special access data (e.g. access to ammunition storage area) of all personnel.
The list shall be provided within the time limit IAW TE B Deliverables.
2.5.1.4 Physical Security. The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use IAW AR 190-13, The Army Physical Security Program. The Contractor shall maintain a physical security checklist or log (e.g., Standard Form (SF) 701, Activity Security Checklist), which will be forwarded to the KO and COR, within the time limit IAW TE B Deliverables. The Contractor shall secure Government facilities, equipment, and materials at the close of each work period. The Contractor will be provided Government furnished on-site staging area for necessary equipment and materials. The Contractor shall secure the area at the close of each work period. The Contractor shall be solely responsible for any loss or damage of equipment and material. The Contractor shall ensure debris of any type will be disposed of according to local policies and directives.
2.5.1.5 Secure Area Access. N/A
2.5.1.6 Employee Terminations. When an employee is terminated from employment on the contract for any reason, the Contractor shall have an out-processing checklist that identifies the Government issued CAC card and Installation Access Badge/Pass https://www.aepubs.eur.army.mil/AE-Regulations/
Attachment A (Refuse Collection PWS): IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U) has been turned in to the COR within the time limit IAW TE B Deliverables and property items accounted for and back in proper custody. A signature shall be required on the checklist from the appropriate person acknowledging receipt of the items within the time limit IAW TE B Deliverables. Checklists shall be retained for the duration of the contract.
2.5.1.7 Departing Employees. The Contractor shall ensure Contractor employees return security photographic identification cards, permits, CAC, GFP, keys, photo passes, range passes, sensor access (slide) cards and that access to the LAN email has been canceled. All out-processing Contractor employee CACs must be returned to the COR within the time limit IAW TE B Deliverables. A formal termination or departing memo must be submitted to the COR and security office with the requested items stating they have been collected.
2.5.1.8 Key Control. The Contractor shall establish a control system to ensure no keys issued to the Contractor by the Government are lost, misplaced, or used by unauthorized persons. Government keys shall not be duplicated by the Contractor without the COR's/ACOR’s authorization. Lost keys shall be reported within the time limit IAW TE B Deliverables. The Contractor shall implement a Key Control List within the time limit IAW TE B Deliverables. Procedures developed to control Government keys shall be included in the Contractor's QCP. The Contractor shall comply with AR 190-13 The Army Physical Security Program and AR 190-51 Security of Unclassified Army Property (Sensitive and Non-sensitive, applicable to key and lock).
2.5.2 Security Training. Further information and links about necessary Contractor Training is available at https://www.mepcom.army.mil/Home/Contractors/ The Contractor shall complete all the trainings and submit evidence of completion within the time limit IAW TE B Deliverables.
2.5.2.1 iWATCH Training. The Contractor shall brief the local iWATCH program (training standards provided by the RA’s Anti-Terrorism Officer (ATO)) to all of the Contractor’s employees and associated Subcontractors. This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the USAG Bavaria, Police Department and the COR. The Contractor shall complete the training within the time limit IAW TE B Deliverables.
Documentation to be used to satisfy this requirement can be found at:
https://home.army.mil/bavaria/application/files/1715/7857/7112/iWatch_Trifold_English.
pdf.
2.5.2.2 Anti-Terrorism (AT) Level 1 Awareness Training. All Contractor employees, to include Subcontractor employees, requiring access to USAG Bavaria’s Installation, facilities and controlled access areas shall complete AT Level I awareness training within the time limit IAW TE B Deliverables. AT level I awareness training is available at the following website: https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf https://www.mepcom.army.mil/Home/Contractors/ https://home.army.mil/bavaria/application/files/1715/7857/7112/iWatch_Trifold_English.pdf https://home.army.mil/bavaria/application/files/1715/7857/7112/iWatch_Trifold_English.pdf https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf
(BASOPS) Performance Work Statement (PWS) Templates (U)
2.5.2.3 Operational Security (OPSEC) Awareness Training. IAW AR 530-1, Operations Security, Contractor employees shall complete Level I OPSEC Awareness training within the time limit IAW TE B Deliverables. All Contractor personnel shall complete Level I OPSEC Awareness training annually. Level I OPSEC training is available at the following website: https://securityawareness.usalearning.gov/opsec/index.htm
2.5.2.3.1 All Contractor employees must complete the DoD Cybersecurity Awareness Training before issuance of network access and annually thereafter (TE B Deliverables).
Upon completion of training, the Contractor shall submit training certificates within the time limit IAW TE B Deliverables to the COR.
2.5.3 Safety. The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The Contractor shall comply with AR 385-10, The Army Safety Program. All Contractor employees shall wear a reflective vest or suitable substitute while working during darkness hours. Contractor shall be responsible for any injury to any Contractor’s representative, or others, as well as for any damage to any personal or public property that occurs during the performance of this contract that is caused by the Contractor’s fault or negligence.
2.5.3.1 Safety Plan. The Contractor shall develop and implement a safety program for its employees. The Contractor shall submit the Safety Plan to the KO for review and acceptance within the time limit IAW TE B Deliverables. Revisions shall be submitted within the time limit IAW TE B Deliverables prior to the effective date of change.
2.5.3.2 Occupational Safety and Health Administration (OSHA). The Contractor shall comply with the OSHA standards. The Contractor shall comply with all applicable Federal, State, and Local Laws, Regulations, and Directives. If the Contractor fails or refuses to comply promptly with safety requirements, the Government may issue an order stopping all or part of the work until satisfactory corrective action has been taken.
No part of the time lost due to any such order shall be made the subject of claim for extension of time or for excess costs or damages to/by the Contractor. The Contractor shall be responsible for enforcement of all safety requirements by the Contractor and his Subcontractors/teaming partners and/or joint venture partners.
2.5.3.3 Hot Work Permit. A Hot Work Permit is required any time heat producing devices are used and shall be issued by the garrison Fire Department prior to ANY work being started.
• Example, welding, grinding, cutting, brazing, etc.
• Hot Work Permits will be closed by the Fire Department, after hot-work is completed, and before personnel responsible for the work clears the job site.
2.5.4 Training, Physical Requirements, or other Expertise Required.
2.5.4.1 C2.5.4.1 Certification and Licensure. The Contractor shall ensure all Contractor’s employees and associated Subcontractors are certified or licensed in the specific areas required by Germany, State Bavaria.
https://securityawareness.usalearning.gov/opsec/index.htm
Attachment A (Refuse Collection PWS): IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)
The Contractor shall ensure employees are certified or licensed with Germany’s central environmental authority (UBA). Certificate as a certified waste management Company together with Quality Management Certificate ISO 9001 for the collection, transportation, storage, treatment, disposal, recycling municipal and commercial waste as well as supplementary waste disposal services, shall be mandatory.
The Contractor shall ensure all required documentation of certification or licensure for Contractor personnel are filed with the COR within the time limit IAW TE B Deliverables.
2.5.5 Environmental Requirements.
2.5.5.1 Green Procurement. N/A.
2.5.5.2 N/A.
2.5.5.3 Environmental Compliance. The Contractor shall comply with all Federal, State, Local, and Installation Environmental Laws, Rules, Plans, and Policies. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the Installation IAW with Industry Standards, Local, State and Federal Laws. The Contractor shall be financially responsible for all fines and associated costs for hazardous waste management, transportation, and disposal of waste due to the Contractor's non-compliance. The Contractor shall provide upon request from the COR all required data to meet environmental-mandated reporting requirements (e.g., air emission data, hazardous material storage/usage, herbicide/pesticide usage, solid/hazardous waste generation). The Contractor shall provide data to meet reporting deadlines and during compliance inspections upon request from the COR within the time limit IAW TE B Deliverables.
2.5.5.4 Spill Plan. The Contractor shall notify the COR within the time limit IAW TE B Deliverables, if the Contractor spills or releases any hazardous substances, i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification.
The Contractor shall submit a Spill Plan to the KO for approval within the time limit IAW TE B Deliverables IAW Spill Prevention Control and Countermeasure Plan.
2.5.6 Contingency Plans. N/A
2.5.6.1 General. N/A
2.5.6.2 Mobilization Contingency Plan. N/A
2.5.6.3 Disaster Contingency Plan. N/A
2.5.6.4 Labor Dispute Contingency Plan. N/A
2.5.6.5 Plan Updates. N/A.
(BASOPS) Performance Work Statement (PWS) Templates (U)
3.0 Performance Requirements and Standards.
3.1 Performance Task Requirements, Standards and Acceptable Quality Levels (AQLs).
3.2 Quality Assurance (QA). The Government will evaluate the Contractor’s performance under the contract IAW the Government’s Quality Assurance Surveillance Plan (QASP). QASPs are considered to be "living documents," dynamic, adaptable, and subject to modification based on Contractor performance surveillance results. The QASP is not part of the PWS and will not be issued with the solicitation. The QASP focuses on the procedures and processes the Government will implement to assure the Contractor is performing IAW the performance standards within the PWS. The Government plan defines the criteria of how the Contractor’s performance will be evaluated, the frequency of surveillance, and the items to be inspected. Although the Government will develop a QASP, Government surveillance of Contractor performance is not limited to the QASP, or the performance objectives, outlined in the Performance Requirements Summary (PRS). The Government retains the right to evaluate all services required by the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work. If any of the services performed do not conform to contract requirements, the Contractor shall perform the services again at no additional cost to the Government.
3.3 Quality Control Plan (QCP). Quality control is the responsibility of the Contractor.
The Contractor shall develop, implement, and maintain an effective quality control program which shall be documented in a QCP to ensure services are performed IAW this PWS. The Contractor shall develop and implement procedures to identify and prevent the recurrence of defective services. The Contractor’s QCP is the means by which they assure themselves that the work conforms to contract requirements. The basic principle of the plan is that the Contractor is responsible for quality control. The QCP shall be constructed in such a manner that each SERVICE can be extracted and used for that function only and not contain extraneous information. The Contractor's QCP shall include a separate section, which addresses the Contractor's method of managing quality of work. The QCP shall include a description of the inspection system to address services listed in this PWS, and a description of the methods to be used for identifying and preventing defects in the quality of services performed. The plan shall include a description of the Contractor’s inspection system to include specifics as to areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the Contractor’s inspectors. No lead person or first line supervisor shall be considered a Quality Control Inspector. The Contractor shall develop, maintain, and submit a QCP to the KO for acceptance within the time limit IAW TE B Deliverables. The Contractor shall submit any proposed changes in the QCP to the KO within the time limit IAW TE B Deliverables.
3.4 Quality Control Files. The Contractor shall maintain files of all inspections or tests conducted by the Contractor, to include any corrective actions taken. These files shall
Attachment A (Refuse Collection PWS): IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U) be subject to Government review at the COR’s discretion during the contract term, to include any extensions of contract term. The Contractor shall send these files to the COR within the time limit IAW TE B Deliverables. The Quality Control Files will be the property of the Government and shall be turned over to the Government upon completion or termination of the contract.
3.5 Customer Feedback Program. The Contractor shall establish and operate a customer feedback program as part of the QCP.
Attachment A (Refuse Collection PWS): IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)
4.0 Performance Requirements Summary (PRS) Matrix. Reference TE A
Attachment A (Refuse Collection PWS): IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)
5.0 Common Levels of Service (SERVICE). The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the SERVICE functions of the Base Operations specified below. This shall be done IAW all the Terms, Conditions, General and Special Provisions, Specifications, Drawings, Attachments, and Exhibits contained herein or incorporated by reference.
The Contractor shall ensure that all work meets or exceeds the specifications for the listed SERVICE.
SERVICE Service Title Attachment No.
403 Solid Waste Management Attachment E
Attachment A (Refuse Collection PWS): IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)
6.0 Deliverables. Reference TE B
(BASOPS) Performance Work Statement (PWS) Templates (U)
7.0 Related Documents.
7.1 Definitions and Acronyms7.1.1 Definitions.
7.1.1.1 Acceptable Quality Level (AQL). The AQL is the maximum percent defective (or the number of defects per hundred units) for the purposes of sampling inspection can be considered satisfactory.
7.1.1.2 Alternate Contracting Officer’s Representative (ACOR). An employee of the U.S. Government provided by the RA and appointed by the KO to provide support to CORs in monitoring and documenting the Contractor’s performance. These alternate surveillance support personnel will serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR.
7.1.1.3 Ashes. The residue from burned wood, coal, coke, and other combustible material.
7.1.1.4 Bulk Waste. Large items of solid waste such as household appliances, furniture, auto parts, pallets, shelving, piping, stone, concrete rubble, brick, lumber, toys, and other wastes; the size or weight of which, precludes or complicates the handling by normal collection, processing, or disposal methods.
7.1.1.5 Bulky Waste. The waste placed at the collection point or curbside that doesn't fit or is too heavy to be placed in the routine collection container. These wastes include but are not limited to: lumber, scrap metals, bricks, blocks, concrete rubble, stones, toys, furniture, appliances, logs, limbs, televisions, cabinets, automotive components, power equipment, crates, wheels, de-rimmed tires, electronics and their components, etc.
7.1.1.6 Cannibalize. Remove parts from Government property for use or for Installation on other Government property.
7.1.1.7 Carpet Care. Cleaning and maintenance to keep carpet reasonably free of all stains, soil, and dirt. Methods used for carpet care are vacuum cleaners and carpet shampooers.
7.1.1.8 Child, Youth and School Services (CYS). Overarching naming convention for Child Development Center (CDC), Youth Activity Center, and School Age Services (SAS). CYS is used when referencing all programs.
7.1.1.9 Cleaning. Removing stains, soil, and dirt; accomplished by chemical or mechanical means.
Attachment A (Refuse Collection PWS): IMCOM Enterprise Base Operations (BASOPS) Performance Work Statement (PWS) Templates (U)
7.1.1.10 Collection. The pickup of accumulated recyclable material, solid waste, including bulky waste, from any collection point, regardless of quantity.
7.1.1.11 Collection Frequency. The number of times collection is performed during a specific time frame.
7.1.1.12 Collection Point. The location designated on the drawings or maps or described in this performance work statement where solid waste, including bulky materials, will be temporarily stored for collection by the Contractor.
7.1.1.13 Commercial Solid Waste. All types of solid waste generated by stores, offices, restaurants, warehouses, and other non-manufacturing activities, excluding residential and industrial waste.
7.1.1.14 Construction and Demolition (C&D) Waste. The waste building materials, packaging and rubble resulting from construction, remolding, repair, and demolition operation on pavement, housing, commercial buildings, and other structures.
7.1.1.15 Contract Administrator (CA). The official Government representative delegated authority by the KO to administer a contract. This individual, normally working in an appropriate contracting or procurement career field, advises on all technical contractual matters.
7.1.1.16 Contract Discrepancy. A failure of the Contractor to perform IAW contract requirements and specifications, e.g., a failure of the Contractor to provide, or provide on time, the required contract products, or services; or it may result because delivered products or services do not meet specific contract requirements.
7.1.1.17 Contract Discrepancy Report (CDR). A report used to document other than satisfactory Contractor performance. The CDR requires the Contractor to explain, in writing, why performance is other than satisfactory; how performance shall be returned to satisfactory levels; and how recurrence of the problem shall be prevented in the future.
7.1.1.18 Contractor.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .