Technical Exhibit B - Submittal Register Form.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- Fort Campbell Construction Services Multiple Award Task Order Contract (MATOC) Federal contract opportunity
- Solicitation number
- W91248-23-R-0001
About this file
This document contains a submittal register form and details for a federal construction services contract opportunity. The form outlines 27 potential submittals from the contractor such as construction site plans, health and safety plans, permits, manuals, schedules, and other submittals. It includes columns for the contractor to note initial submittal dates, approval dates, receipt dates, review dates, and government action codes.
The related federal contract opportunity is a solicitation for a Construction Services Multiple Award Task Order Contract at Fort Campbell, Kentucky. The MATOC will be used over its period of performance to execute a variety of maintenance, repair, and construction projects through the issuance of task order proposals. Required services include tasks in trades such as carpentry, roofing, electrical, HVAC, plumbing, and general construction. The selected contractors will compete for projects valued at an total estimated ceiling and be accountable to the Army Materiel Command Mission and Installation Contracting Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachement 03 W91248-23-R-0001 - Questions and Answers_10 May 2023.xlsx | XLSX spreadsheet | |
| Attachement 03 W91248-23-R-0001 - Questions and Answers_05 May 2023.xlsx | XLSX spreadsheet | |
| W91248-23-R-0001 Amendment0001.pdf | ||
| Attachment 01 - FTCKY HAZMAT Inventory Form.pdf | ||
| W91248-23-R-0001.pdf | ||
| Technical Exhibit A - CDRLs A001 - A011 03Apr2023.pdf | ||
| Attachment 02 - Performance Assessment Questionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DPW-EDB FORM 4288-R1 (2)
| Technical Exhibit B - SUBMITTAL REGISTER | CONTRACTOR: | |||||||
| TITLE AND LOCATION: | CONTRACT NO: | |||||||
| Trans. No. | SOW Refer. | Paragraph No. | Description | Type of Submittal | ||||
| (Check all that apply) | Initial Contractor Submittal Date |
(DD-MMM-YY) Approval Needed By
(DD-MMM-YY) EDB Received Date
| (DD-MMM-YY) | Date Reviewed Submittal Sent to MICC | ||||||||||||
| (DD-MMM-YY) | DPW ENGR. | ||||||||||||
| Data | Drawings | Instructions | Schedules | Statements | Reports | Certificates | Samples | Records | O&M Manuals | Infor. Only | Date Reviewed Submittal Rec. By Contractor | ||
| (DD-MMM-YY) | Gov't Action Code |
| Re-sub. Req. (Y/N) |
| Remarks |
| 1 | Project Construction Site Plan | X | |||||||
| 2 | Project APP and AHA's | X | |||||||
| 3 | Project Quality Control Plan | X | |||||||
| 4 | Erosion Control Measures | X | |||||||
| 5 | Erosion Control Records | X | |||||||
| 6 | Dig / Excavation Permit | X | |||||||
| 7 | Haul / Borrow Permit | X | |||||||
| 8 | Electrical Permit | X | |||||||
| 9 | Hazmat Inventory Form | X | |||||||
| 10 | General Conformity Report | X | |||||||
| 11 | Waste Management Report | X | |||||||
| 12 | O & M Manuals | X | |||||||
| 13 | Form 1354 | X | |||||||
| 14 | As-Built Drawings | X | |||||||
| 15 | Project Work Schedule - MPP files | X | |||||||
| 16 | Warranty Documents | X | |||||||
| 17 | TN / KY Const. Permits (If Required) | X | |||||||
| 18 | Water/Waste Water Req.(If required) | X | |||||||
| 19 | Natural Gas Request (If required) | X | |||||||
| 20 | Confined Space Plan (If Required) | X | |||||||
| 21 | Color Samples (If required) | X | |||||||
| 22 | Power Outage Request (If required) | X | |||||||
| 23 | Landfill Access Permit (If required) | X | |||||||
| 24 | (Add tech. submittals as required) | ||||||||
| 25 | (Add tech. submittals as required) | ||||||||
| 26 | (Add tech. submittals as required) | ||||||||
| 27 | (Add tech. submittals as required) |
Government Action Codes
A Approved as Submitted
B Approved, except as noted on drawings. Resubmission not required.
C Approved, except as noted on drawings. Refer to attached comments. Resubmission Required
D Will be returned by separate correspondence.
E Disapproved. Refer to attached comments.
F Receipt acknowledged.
X Receipt acknowledged, does not comply with contract requirements, as noted.
G Other action required. (Specify)
K Government concurs with intermediate design. (For D-B contracts)
R Design submittal is acceptable for release for construction. (For D-B contracts)
DPW-EDB FORM 4288-R1 MARCH 2017
Page &P of &N
Working-DPW-EDB FORM 4288-R1
| SUBMITTAL REGISTER | CONTRACTOR: | |||||||
| TITLE AND LOCATION: ( a ) | CONTRACT NO: ( b ) | ( c ) | ||||||
| Trans. No. | SOW Refer. | Paragraph No. | Description | Type of Submittal | ||||
| (Check all that apply) | Initial Contractor Submittal Date |
(DD-MMM-YY) Approval Needed By
(DD-MMM-YY) EDB Received Date
| (DD-MMM-YY) | Date Reviewed Submittal Sent to MICC | |||||||||||||
| (DD-MMM-YY) | DPW ENGR. | ( d ) | ||||||||||||
| Data | Drawings | Instructions | Schedules | Statements | Reports | Certificates | Samples | Records | O&M Manuals | Infor. Only | Date Reviewed Submittal Rec. By Contractor | |||
| (DD-MMM-YY) | Gov't Action Code |
| Re-sub. Req. (Y/N) | ||||||||||||||||||||
| Remarks | ||||||||||||||||||||
| ( e ) | ( f ) | ( g ) | ( h ) | (i) | ( j ) | ( k ) | ( l ) | ( m ) | ( n ) | ( o ) | ( p ) | ( q ) | ||||||||
| 1 | Project Construction Site Plan | X | ||||||||||||||||||
| 2 | Project APP and AHA's | X | ||||||||||||||||||
| 3 | Project Quality Control Plan | X | ||||||||||||||||||
| 4 | Erosion Control Measures | X | ||||||||||||||||||
| 5 | Erosion Control Records | X | ||||||||||||||||||
| 6 | Dig / Excavation Permit | X | ||||||||||||||||||
| 7 | Haul / Borrow Permit | X | ||||||||||||||||||
| 8 | Electrical Permit | X | ||||||||||||||||||
| 9 | Hazmat Inventory Form | X | ||||||||||||||||||
| 10 | General Conformity Report | X | ||||||||||||||||||
| 11 | Waste Management Report | X | ||||||||||||||||||
| 12 | O & M Manuals | X | ||||||||||||||||||
| 13 | Form 1354 | X | ||||||||||||||||||
| 14 | As-Built Drawings | X | ||||||||||||||||||
| 15 | Project Work Schedule - MPP files | X | ||||||||||||||||||
| 16 | Warranty Documents | X | ||||||||||||||||||
| 17 | TN / KY Const. Permits (If Required) | X | ||||||||||||||||||
| 18 | Water/Waste Water Req.(If required) | X | ||||||||||||||||||
| 19 | Natural Gas Request (If required) | X | ||||||||||||||||||
| 20 | Confined Space Plan (If Required) | X | ||||||||||||||||||
| 21 | Color Samples (If required) | X | ||||||||||||||||||
| 22 | Power Outage Request (If required) | X | ||||||||||||||||||
| 23 | Landfill Access Permit (If required) | X | ||||||||||||||||||
| 24 | (Add tech. submittals as required) | |||||||||||||||||||
| 25 | (Add tech. submittals as required) | |||||||||||||||||||
| 26 | (Add tech. submittals as required) | |||||||||||||||||||
| 27 | (Add tech. submittals as required) |
Government Action Codes
A Approved as Submitted
B Approved, except as noted on drawings. Resubmission not required.
C Approved, except as noted on drawings. Refer to attached comments. Resubmission Required
D Will be returned by separate correspondence.
E Disapproved. Refer to attached comments.
F Receipt acknowledged.
X Receipt acknowledged, does not comply with contract requirements, as noted.
G Other action required. (Specify)
K Government concurs with intermediate design. (For D-B contracts)
R Design submittal is acceptable for release for construction. (For D-B contracts)
DPW-EDB FORM 4288-R1 MARCH 2017