About this file

This document contains a submittal register form and details for a federal construction services contract opportunity. The form outlines 27 potential submittals from the contractor such as construction site plans, health and safety plans, permits, manuals, schedules, and other submittals. It includes columns for the contractor to note initial submittal dates, approval dates, receipt dates, review dates, and government action codes.

The related federal contract opportunity is a solicitation for a Construction Services Multiple Award Task Order Contract at Fort Campbell, Kentucky. The MATOC will be used over its period of performance to execute a variety of maintenance, repair, and construction projects through the issuance of task order proposals. Required services include tasks in trades such as carpentry, roofing, electrical, HVAC, plumbing, and general construction. The selected contractors will compete for projects valued at an total estimated ceiling and be accountable to the Army Materiel Command Mission and Installation Contracting Command.

View the file

Other files for this federal contract opportunity

Other files attached to Fort Campbell Construction Services Multiple Award Task Order Contract (MATOC), newest first.
File Type Posted
Attachement 03 W91248-23-R-0001 - Questions and Answers_10 May 2023.xlsx XLSX spreadsheet
Attachement 03 W91248-23-R-0001 - Questions and Answers_05 May 2023.xlsx XLSX spreadsheet
W91248-23-R-0001 Amendment0001.pdf PDF
Attachment 01 - FTCKY HAZMAT Inventory Form.pdf PDF
W91248-23-R-0001.pdf PDF
Technical Exhibit A - CDRLs A001 - A011 03Apr2023.pdf PDF
Attachment 02 - Performance Assessment Questionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DPW-EDB FORM 4288-R1 (2)

Technical Exhibit B - SUBMITTAL REGISTERCONTRACTOR:
TITLE AND LOCATION:CONTRACT NO:
Trans. No.SOW Refer.Paragraph No.DescriptionType of Submittal
(Check all that apply)Initial Contractor Submittal Date

(DD-MMM-YY) Approval Needed By

(DD-MMM-YY) EDB Received Date

(DD-MMM-YY)Date Reviewed Submittal Sent to MICC
(DD-MMM-YY)DPW ENGR.
DataDrawingsInstructionsSchedulesStatementsReportsCertificatesSamplesRecordsO&M ManualsInfor. OnlyDate Reviewed Submittal Rec. By Contractor
(DD-MMM-YY)Gov't Action Code
Re-sub. Req. (Y/N)
Remarks
1Project Construction Site PlanX
2Project APP and AHA'sX
3Project Quality Control PlanX
4Erosion Control MeasuresX
5Erosion Control RecordsX
6Dig / Excavation PermitX
7Haul / Borrow PermitX
8Electrical PermitX
9Hazmat Inventory FormX
10General Conformity ReportX
11Waste Management ReportX
12O & M ManualsX
13Form 1354X
14As-Built DrawingsX
15Project Work Schedule - MPP filesX
16Warranty DocumentsX
17TN / KY Const. Permits (If Required)X
18Water/Waste Water Req.(If required)X
19Natural Gas Request (If required)X
20Confined Space Plan (If Required)X
21Color Samples (If required)X
22Power Outage Request (If required)X
23Landfill Access Permit (If required)X
24(Add tech. submittals as required)
25(Add tech. submittals as required)
26(Add tech. submittals as required)
27(Add tech. submittals as required)

Government Action Codes

A Approved as Submitted

B Approved, except as noted on drawings. Resubmission not required.

C Approved, except as noted on drawings. Refer to attached comments. Resubmission Required

D Will be returned by separate correspondence.

E Disapproved. Refer to attached comments.

F Receipt acknowledged.

X Receipt acknowledged, does not comply with contract requirements, as noted.

G Other action required. (Specify)

K Government concurs with intermediate design. (For D-B contracts)

R Design submittal is acceptable for release for construction. (For D-B contracts)

DPW-EDB FORM 4288-R1 MARCH 2017

Page &P of &N

Working-DPW-EDB FORM 4288-R1

SUBMITTAL REGISTERCONTRACTOR:
TITLE AND LOCATION: ( a )CONTRACT NO: ( b )( c )
Trans. No.SOW Refer.Paragraph No.DescriptionType of Submittal
(Check all that apply)Initial Contractor Submittal Date

(DD-MMM-YY) Approval Needed By

(DD-MMM-YY) EDB Received Date

(DD-MMM-YY)Date Reviewed Submittal Sent to MICC
(DD-MMM-YY)DPW ENGR.( d )
DataDrawingsInstructionsSchedulesStatementsReportsCertificatesSamplesRecordsO&M ManualsInfor. OnlyDate Reviewed Submittal Rec. By Contractor
(DD-MMM-YY)Gov't Action Code
Re-sub. Req. (Y/N)
Remarks
( e )( f )( g )( h )(i)( j )( k )( l )( m )( n )( o )( p )( q )
1Project Construction Site PlanX
2Project APP and AHA'sX
3Project Quality Control PlanX
4Erosion Control MeasuresX
5Erosion Control RecordsX
6Dig / Excavation PermitX
7Haul / Borrow PermitX
8Electrical PermitX
9Hazmat Inventory FormX
10General Conformity ReportX
11Waste Management ReportX
12O & M ManualsX
13Form 1354X
14As-Built DrawingsX
15Project Work Schedule - MPP filesX
16Warranty DocumentsX
17TN / KY Const. Permits (If Required)X
18Water/Waste Water Req.(If required)X
19Natural Gas Request (If required)X
20Confined Space Plan (If Required)X
21Color Samples (If required)X
22Power Outage Request (If required)X
23Landfill Access Permit (If required)X
24(Add tech. submittals as required)
25(Add tech. submittals as required)
26(Add tech. submittals as required)
27(Add tech. submittals as required)

Government Action Codes

A Approved as Submitted

B Approved, except as noted on drawings. Resubmission not required.

C Approved, except as noted on drawings. Refer to attached comments. Resubmission Required

D Will be returned by separate correspondence.

E Disapproved. Refer to attached comments.

F Receipt acknowledged.

X Receipt acknowledged, does not comply with contract requirements, as noted.

G Other action required. (Specify)

K Government concurs with intermediate design. (For D-B contracts)

R Design submittal is acceptable for release for construction. (For D-B contracts)

DPW-EDB FORM 4288-R1 MARCH 2017