TAWS_2_CDRL_Pacakge.pdf
PDF 441 KB Posted
- Solicitation number
- FA8526-20-R-0020
About this file
This amendment to a solicitation seeks proposals for a 10-year contract to sustain the C-17 Terrain Awareness and Warning System tool and annual database. Required services include maintenance and support of existing software products and database outputs. Offerors must demonstrate experience developing and maintaining aviation mission planning tools. Proposals are due within 45 days of publication of the solicitation. The award recipient will provide software maintenance, help desk support, database updates, and configuration management for the life of the contract. The Department of the Air Force Materiel Command Lifecycle Management Center at Robins Air Force Base will oversee contract performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA8526-20-R-0020-0001.pdf | ||
| Q and A Attachment.xlsx | XLSX spreadsheet | |
| FA8526-20-R-0020.pdf | ||
| 21_30024_PWS_20200811.docx | DOCX document | |
| RFP_Attachment_E_Transmittal_Letter.doc | DOC document | |
| RFP_Attachment_B_TAWS_FACTS_Sheet_ACE.docx | DOCX document | |
| RFP_Attachment_C_TAWS_Present_and_Past_Performance_Questionnaire_ACE.doc | DOC document | |
| RFP_Attachment_D_TAWS_Subcontractor_and_Teaming_Member_Consent_Form_ACE.docx | DOCX document | |
| RFP_Attachment_A_TAWS_Client_Authorization_Letter_ACE.docx | DOCX document | |
| FA8526-20-R-0020 Official.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Exhibit A
For the
C-17 Terrain Awareness and Warning System (TAWS) Tool and Annual Database (DB) Sustainment
CONTRACT: TBD
29 April 2020
PREPARED BY THE
C-17 Program Branch, AFLCMC/WLME
AIR FORCE LIFE CYCLE MANAGEMENT CENTER
ROBINS AIR FORCE BASE, GA 31098-2428
TABLE OF CONTENTS
Contents
CONTRACT DATA REQUIREMENTS LIST (CDRL)
TABLE OF CONTENTS
CDRL GENERAL INSTRUCTIONS
ACRONYMS AND ABBREVIATIONS LIST
C-17 DISTRIBUTION MATRIX
PAPER COPY DELIVERY ADDRESSES
ITEMIZED CDRL List A001 – A010
CDRL GENERAL INSTRUCTIONS
1. SCOPE: This Contract Data Requirements List (CDRL) establishes the data to be delivered by the Contractor and the submittal, approval and distribution requirements of all the CDRL data items herein.
2. GENERAL: The Data Item Descriptions (DIDs) (DD Form 1664) specified in Block 4 of the corresponding CDRLs are all “active” at time of contract award and were extracted (or as found
in) the Acquisition Streamlining and Standardization Information System (ASSIST) and the latest version of the DoD 5010.12-L Volume II, Acquisition Management System and Data Requirements Control List (AMSDL).
3. TAILORED DATA ITEMS: A slash (/) and the letter “T” (e.g. DI-MGMT-80368/T) added to the end of the DID number in Block 4 of the DD Form 1423-1 denotes that the DID has been tailored to comply with specific system/program requirements. Thereafter, the unique tailoring instructions will be identified in Block 16 of each affected DD Form 1423-1.
4. MODIFICATIONS OF DATA REQUIREMENTS:
4.1. From time to time during the performance of this contract, the US Government (USG) Procuring Contracting Officer (PCO) unilaterally may change the place of delivery and the technical office for any line item of contract Exhibits (DD Form 1423-1) hereto, at no change in contract price, notwithstanding the provision of the “Changes” clause of the TAWS contract. If there is a change in the place of delivery, the Contractor and the PCO may mutually agree to an extension of the data submittal requirement date (refer to paragraph 5.1.2 for extension requests).
4.2. From time to time during the performance of this contract, being that the majority of data will be delivered electronically to the USG, the PCO unilaterally may increase or decrease the number of addresses and/or number of copies specified for any data item of the CDRL hereto, at no change in price provided that either the increase in the total number of copies for an individual line item of data shall not be greater than one hundred-fifty percent (150%) of the total number of copies initially specified in the CDRL or that (in the case of a decrease in delivery requirements) the decrease in the total number of copies for an individual item of data be greater than fifty percent (50%) of the total number of copies initially specified in the CDRL. In the event of an increase greater than such 150% or of a decrease greater than fifty percent (50%), the parties will negotiate any equitable adjustments.
4.3. Unilateral actions pursuant to paragraphs 4.1 and 4.2 above shall be by the issuance of a USG Procuring Contracting Officer’s Letter (PCOL) followed by a Supplemental Agreement to this contract which will reference the appropriate paragraph 4.1 or 4.2 above of these CDRL General Notes as its authority. Any action directed by this clause shall be put into effect by the Contractor beginning with the first submission of the particular data item or items immediately following receipt of the USG PCO’s direction by the Contractor.
4.4. Any other/subsequent changes to this CDRL package and not specifically pertaining to changes identified in paragraphs (a) and (b) above shall be proposed utilizing Proposed Contract
Document Change Notices (PCDCNs) and submitted to the USG as an attachment to a Contract Change Proposal (CCP). Upon approval of the CCP (and the corresponding PCDCNs) by the USG, the PCDCNs shall be converted to approved CDCNs and be incorporated into the contract as part of the corresponding contract modification.
5. DATA SUBMITTALS AND SUBMITTAL APPROVALS:
5.1. The following processes apply to all CDRLs, except for those submitted through Wide Area Workflow (WAWF)
5.1.1. The USG will formally respond to the Contractor within forty-five (45) days after receipt for any data determined by the USG as being deficient and/or technically disapproved. Data submittal requirements shall not be considered met until the procuring agency has determined that all contractual requirements have been satisfactorily met regarding the identified data.
5.1.2. Formal CDRL delivery and Data Management functions will be at Robins AFB. If the contractor cannot submit by the due date and desires an extension, the C-17 WLMA Data Management Office (DMO) shall be notified at least 10 days prior to the required delivery date, in writing with supporting rationale. If an extension is not granted or agreed to before the original contractual due date passes, the original due date shall remain in effect. It may be necessary for the C-17 WLM to coordinate the extension with the C-17 WLMA, since Configuration Management (CM) Operation Safety, Suitability, and Effectiveness (OSS&E) and Engineering responsibility is located at the C-17 WLM.
5.1.3. If there are discrepancies noted upon receipt of the data, the C-17 WLMA Data Manager has the right to disapprove the document via the Procurement Contracting Officer (PCO) letter or e-mail and request a resubmittal (DFAR Clause 252.246 - 7001).
5.2. The use of an “A” in Block 8 indicates that government approval of the identified document is required to assure that the Contractor is sufficiently prepared to proceed to the next phase of the contract in addition to verifying compliance with the DID and CDRL requirements. The USG Office of Primary Responsibility (OPR) designated in Block 6 of the DD Form 1423-1 will be responsible for consolidating the evaluations performed by the data recipients with his own evaluation and respond through the PCO to the Contractor within forty-five (45) days after receipt of the data submittal unless specified otherwise within the CDRL.
5.3. If Block 8 is left blank or there is an “N” (or an “N/A”) in this block then these data items are considered “Non-approval”; however, this does not relieve the Contractor of the responsibility of compliance with the applicable regulations, standards, procedures, etc. All data submissions are subject to USG review and approval by the procuring agency for departure of said compliance.
5.4. When a scheduled deliverable has no changes since the last scheduled submittal, the contractor delivery letter, paragraph one (1), will state “Negative Report, there have been no changes/updates since the last scheduled submittal.”
5.5. When referring to numbers of days for frequency, submittals, and subsequent submittals all days are recognized as“calendar” days unless otherwise stated elsewhere on the DD Form 1423-1.
5.6. Any reference to delivery requirements tied to SRR, SSR, PDR, and/or CDR refer to program level reviews only.
6. REVISIONS TO DATA SUBMITTALS AND RESUBMITTALS OF DATA:
6.1. Unless otherwise specified, data submittals that are disapproved by the USG, shall be revised and resubmitted by the Contractor within forty-five (45) days after receipt of the official USG PCO letter. If the Contractor determines that they cannot resubmit within the initial forty-five (45) days, then the USG shall be notified in writing before the initial time has expired and a new suspense date will be established.
6.2. Unless otherwise specified, data submittals that are approved contingent upon revision shall be revised and distributed within forty-five (45) days after receipt of the official USG PCO letter or as negotiated by the Contracting Officers. If the Contractor determines that they cannot resubmit within the initial forty-five (45) days, then the USG shall be notified in writing before the initial time has expired and a new suspense date will be established. If the resubmittal requirements identified in Block 16 of the DD Form 1423-1 are different than stated here, then the DD Form 1423-1 instructions shall take precedence.
6.3. When “R/ASR” OR “ASREQ” appears in Block 13 of the DD Form 1423-1 with no explanatory remarks in Block 16, then all revisions to the data will be resubmitted as necessary/required to maintain the data’s currency and accuracy.
7. DATA PREPARATION:
7.1. Data submitted by the Contractor shall conform to the quality requirements specified on the CDRL for each data item. If the data preparation instructions contained in Block 16 of the DD Form 1423-1 are different from the instructions contained in Block 10 of the DID, the DD Form 1423-1 instructions shall take precedence.
7.2. Data shall be delivered by one of the following methods unless otherwise specified on the DD Form 1423-1.
The order of preference is:
Electronic Notification/On-line Access Magnetic Media (i.e. floppy disks/CD-ROM/Magnetic tapes) Hard Copy/Paper
7.3. Digital/Magnetic media preparation
In order to simplify the entry remarks in the CDRLs Block 16, the following notes pertain to CDRL deliverables on digital/magnetic media and electronic delivery. This note is intended to apply to all CDRL deliverables, including Computer Program Configuration Item (CPCIs)/Computer Software Configuration Item (CSCIs) and their source code. When employed, Block 16 may further clarify requirements on the use of digital/magnetic media as it applies to a specific DID.
a. CPCI/CSCIs executables (and Source Code) will be delivered in digital/magnetic media format (e.g.
DVD, CD), based on Air Mobility Command (AMC) derived user requirements. Source code shall be in standard ASCII characters.
b. All digital media deliveries shall be complete. Partial submittals of CSPIs/CSCIs (i.e., the equivalent of change pages) are not permitted.
c. If source files (source, documentation, etc.) are compressed for delivery, they shall be extractable by WinZip and readable in a decompressed state using a commercially available or public domain word-processing application (e.g. Microsoft Word).
d. Many CDRL deliverables readily lend themselves to electronic delivery (e.g., source listings, PDL, automated test plans/procedures/results and documentation, etc.). In general, only (complete) textural type documents should be considered for electronic delivery; however, specific CDRLs may limit the applicability of electronic delivery. C-17 WLMA concurrence to submit particular portions of this data for specific CPCIs shall be provided once for an identified CDRL and will not require individual approval for subsequent submittals.
e. All software (CSCI/CPCI/Image Disks) deliveries to the C-17 WLMA Equipment Specialist (ES) will be delivered on appropriate digital/magnetic media (e.g. DVD, CD). Electronic delivery by the Contractor will require C-17 WLMA Software Manager’s, and CM’s concurrence, on a case-by-case basis.
f. Approval for deviations from delivery requirements shall be requested in writing from the C-17 WLMA DMO. The contractor shall include the following information in the request for approval:
(1) Identification of the specific portions of the DID, by paragraph or content, to be submitted on digital/magnetic media.
(2) Which form of physical media, from the specified options, will be used. An estimate of the on-line storage required for the digital/magnetic media data, for both compressed and uncompressed form, shall be provided.
(3) The C-17 WLMA DMO will respond in a timely manner, with a goal of eight (8) days after receipt of any request has been established (e-mail response is acceptable).
8. DOCUMENT MARKING:
8.1. Distribution Statements
8.1.1. Air Force Instruction AFI 61-201, titled “Management of Scientific and Technical Information (STINFO)” specifies that certain distribution statements be assigned on each technical document to control distribution by Government agencies such as the Defense Technical Information Center (DTIC). Documents must be marked on the cover page with an appropriate corresponding distribution statement prior to submittal. Block 9 of the DD Form 1423-1 annotates the relevant distribution statement applicable to the data to be submitted.
8.1.2. As annotated in Block 9 of the DD Form 1423-1, the following distribution and warning statements will apply to all data acquired under this contract:
8.1.3. “DISTRIBUTION STATEMENT C” – Distribution authorized to U.S. Government Agencies and their contractors. (reason) (date of determination). Other request for this document shall be referred to C-17 System Program Office, AFLCMC/WLM, 660 Eleventh Street, Robins AFB, GA 31098-2428.
8.1.4. “DISTRIBUTION STATEMENT D” – Distribution authorized to the Department of
Defense (DoD) and U.S. DoD Contractors only; (justification); (date of determination). All other requests for this documentation shall be referred to the C-17 System Program Office, AFLCMC/WLM, 660 Eleventh Street, Robins AFB, GA 31098-2428.
8.1.5. If an export warning is deemed required by USG then include the following statement on the document:
8.1.6. “WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50 U.S.C., App. 2401, et seq. Violation of these export-control laws is subject to severe criminal penalties. Dissemination of this document is controlled under DoD Directive 5230.25 and AFI 61-201. If space does not permit use of the full statement, the following may be used: WARNING- EXPORT CONTROLLED.
8.1.7. The Contractor is not authorized to provide copies of any data acquired under a CDRL to activities who are not specifically identified in the distribution block of the CDRL without written Government approval from the C-17 System Program Office, AFLCMC/WLM, 660 Eleventh Street, Robins AFB, GA 31098-2428.
8.1.8. Destruction Notices for Limited-Release STINFO and Classified STINFO are as follows:
8.1.9. Limited-Release STINFO (Distribution Statement other than A): “DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
8.1.10. Classified STINFO: “DESTRUCTION NOTICE: Follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5- 705, or DoD 5200.1-R, Information Security Program, Chapter VI”.
9. METHOD OF TRANSMITTAL:
9.1. In addition to DD 250 requirements (where applicable), all data transmittal requirements shall be listed in Block 7 of the DD Form 1423-1; regardless of the physical method of data submission (i.e., on-line access, magnetic media, paper copy, etc). The requirement for “LT” may be satisfied by delivery of an electronic message and shall convey all contractually required information, including signature (or recognized symbol). The letter of transmittal and/or notification shall include as a minimum: reference to the contract number, program name, data item number, title, CDRL sequence number, revision level, and any Contractor’s control number assigned to that data.
The data itself shall also contain the above information. For electronic message notifications, the Contractor shall include in that notification a list of all the applicable required recipients (as identified in Block 14 of the DD Forms 1423-1).
9.2. Delivery Process
9.3.1 Electronic CDRL Delivery notifications made prior to 1600 EST will credited for same day delivery. Notification received after 1600 EST will be credited with delivery on the next working day. Time delays in web server functions in email transmissions will not affect receipt of credit for electronic CDRL delivery.
9.3.2 Deliverable components are: Contract Letter, Contract Letter Attachments and Enclosures.
9.3.2. Subject of e-mail notification shall contain the letter number, CDRL number, contract number, and subject title
9.3.2.1. E-mail notifications shall contain:
• Delivery date
• CDRL Number
• CDRL Title/Subtitle
• Contract Letter Number and Date
• Uniform Resource Locator (URL)
• Warning Notification
• Destruction Notice
9.3.4 If any server that impacts CDRL delivery is down 48 consecutive business-day hours (not to include weekends or holidays), regardless of whether it is a C-17 WLMA or Contractor problem, Contractor shall:
• make hard copy deliveries and send overnight (i.e., FedEx, UPS, etc.) to all C-17 WLMA DMO
• send an e-mail (or Fax) to the C-17 WLMA DMO and affected Government agencies stating that the system is down with the expected restoral time
• send an e-mail (or Fax) advising the availability of the data in Documentum.
9.4. Contract Letters
9.4.1. All original signed contract letters and attachments/enclosures will be retained by the Contractor.
Upon completion of the contract, the Procuring Contracting Officer may direct the contractor to forward all original letters to the Government.
9.4.2. Contract letter(s) for software deliveries will reference the TCTO number announcing the release of the software and the expected TCTO release date.
9.5. Archiving
Contractor shall maintain documentation of contractual CDRL submittals in electronic form within Contractor computing systems, for the duration of the contract(s). Contractor may transfer electronic documents/data to other computer digital media (e.g. CD, DVD, etc.) format as the need is determined.
Inactive data/documents will be made available to the Government (within a reasonable time after request, normally one (1) working day, but no later than two (2) working days). All contract documents/data hard-copy/original paper and electronic CDRL documentation will be retained in accordance with established DoD/Government regulations.
9.6. The transmittal letter of all submittals shall be forwarded electronically. In some cases, due to size of media package, the software may be delivered via a C-17 WLMA SW POC and /C-17 WLMA CM agreed upon physical media, vice CCS – either file transfer protocol (FTP), mutually accessible hard drive, CD/DVD overnight, etc.
9.7. Unless otherwise specified in Block 16 of the DD Form 1423-1, data submittal date is interpreted as the date of letter of transmittal. If the scheduled delivery date of any data item falls on a weekend (Saturday or Sunday), or legal holiday, the next scheduled delivery date for the data item and tracking record shall reflect the following day after the weekend or legal holiday.
9.8. For each data item in the CDRL, the Contractor shall clearly state in the final transmittal letter that this is the last submittal being made and that all contractual requirements concerning that data item have hereby been fulfilled.
9.9. Classified data shall be submitted in accordance with the Department of Defense (DoD) 5220.22-M, National Industrial Security Program Operating Manual (NISPOM).
9.10. Defense Technical Information Center (DTIC) applicable data shall be delivered and marked in accordance with the DID and CDRL requirements.
9.11. When the same documentation is required on multiple contracts, only one submittal per addressee will be made IAW Block 14 of the applicable DD Forms 1423-1. When updates are required on one contract and not any other, then all addressees will receive the updates to the documentation IAW the Block 14 distribution requirements spelled out for that affected contract CDRL; with that contract absorbing any cost of the damage.
9.12. The USG C-17 Procuring Agency Configuration Management Office (AFLCMC/WLE (CM/DM), Robins AFB, GA 31098-2428) and the assigned DCMA shall be notified of all CDRL submittals.
ACRONYMS AND ABBREVIATIONS LIST
1TIME One Time
ACA After Contract Award
ACL Access Control List
ACO Administrative Contracting Officer
ACPINS Automated Computer Program Identification Number System
AMC Air Mobility Command
AMSDL Acquisition Management Systems and Data Requirements Control Lists
ANNLY Annually
AOD As of Date
ASAP As Soon As Possible
ASREQ As Required
BLK 16 Refer to Block 16
CAIG Cost Analysis Improvement Group
CDR Critical Design Review
CDAS Contract Data Accounting System
CDRL Contract Data Requirements List
CPR Contract Performance Report
DAC Days after Contract Award
DAL Data Accession List
DAOD Days after As-of-Date
DCDR Days after Critical Design Review
DI Data Item
DID Data Item Description
DMO Data Management Office
ECMS Electronic Contract Management System
ECP Engineering Change Proposal
EOM End of Month
ES Equipment Specialist
FCA Functional Configuration Audit
FQ Fiscal Quarter
FY Fiscal Year http Hyper Text Transport Protocol https Hyper Text Transport Protocol Secure
IAW In Accordance With
IPT Integrated Product Team
LOC Life of Contract, contract life shall be deemed to end upon date of delivery to the Government of the last item delivered hereunder.
LT Letter of Transmittal
MAC Months after Contract Award
MEARS Multi-user ECP Automated Review System
MIP Material Improvement Program
MTHLY Monthly
N/A Not Applicable
NLT Not Later Than
OEM Original Equipment Manufacturer
ONE/R One Time - With Revisions
PCA Physical Configuration Audit
PDR Preliminary Design Review
PCO Procuring Contracting Officer
POC Point of Contact
PWS Performance Work Statement
QRTLY Quarterly
SCN Specification Change Notice
SOW Statement of Work
SRD System Requirements Document
STR Status Report
USAF United States Air Force
WEKLY Weekly
TRR Test Readiness Review
C-17 DISTRIBUTION MATRIX
DISTRIBUTION
ADDRESS
EMAIL ADDRESS
POC
CDRL
AFLCMC/WLMA CDRL
DMO
wralc.lth.cdrldmcm@us.af.mil
Amanda Martin Dixie Duncan
All CDRLs
AFLCMC/WLMA CDRL PM
564acss.cdrl.pm@us.af.mil
Daniel Segno Dorica Smith Charles Keown Patricia Boehm Willi J
AFLCMC/WLMA CDRL EN
wralc.lth.cdrleng@us.af.mil
Anthony Brantley William Brown James Davis David Doran David Gries David Lunsford Hans Hinners Stephen Kiser
A002
AFLCMC/WLMA CDRL
CPINS
wralc.lth.cdrlcpin@us.af.mil
Anthony Jones Dixie Duncan John Logan Raymond Rangel Ronnie Kennedy
A001
PAPER COPY DELIVERY ADDRESSES for Contingency
DISTRIBUTION
ADDRESS
PHYSICAL ADDRESS
POC
CDRL
AFLCMC/WLE, C-17
AFLCMC/WLMA
660 Eleventh Street Robins AFB, GA 31098-2428
Controlling DoD Office mailto:wralc.lth.cdrldmcm@us.af.mil mailto:564acss.cdrl.pm@us.af.mil
ITEMIZED CDRL List A001 – A007
Data Item Requiring Office Authority/Title/Subtitle PWS Paragraph
A001
AFLCMC/WLMC
DI-AVCS-80700A/T
Computer Software Product End Items
4.1
A002
DI-SESS-80639D/T
Engineering Change Proposal (ECP)
4.2
A003
DI-SESS-80640E/T
Request for Variance (RFV)
4.2
A004
DI-IPSC-81433A/T
Software Requirements Specification (SRS)
4.3
A005 AFLCMC/WLMC DI-MISC-80508B/T
Technical Report - Study/Services 4.3 4.5
A006 AFLCMC/WLMC DI-IPSC-81442A/T
Software Version Description (SVD) 4.3
A007 AFLCMC/WLMC DI-IPSC-81440A/T
Software Test Report (STR)
4.4
A008
AFLCMC/WLMC DI-IPSC-81443A/T
Software User Manuals (SUM)
4.3
A009
AFLCMC/WLMC DI-MGMT-82135
Risk Management Framework (RMF) Security Authorization
4.8.1 4.8.4
A010
AFLCMC/WLMC DI-MISC-80508B/T
Monthly Status Report
4.11
CDRLs A001 – A010 (Following This Page)
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER AVCS
D. SYSTEM/ITEM
C-17 Terrain Awareness and Warning System (TAWS) Tool and C-17 Terrain
E. CONTRACT/PR NO.
FD2060-21-30024
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Computer Software Product End Items
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-AVCS-80700A/T
5. CONTRACT REFERENCE
PWS Para 4.1
6. REQUIRING OFFICE
AFLCMC/WLMC
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor format is acceptable as long as the content, intent, and data required by DI-AVCS-80700A/T is satisfied. Military Standards and Specifications are for guidance only. The contractor shall maintain the latest software releases at a Government designated location. To allow for the installation, building, and testing of the software, the Contractor shall deliver all of the following items for Interim (a.k.a. FQT) and Final releases.
1. Source code, including Interface definitions (e.g., IDL, WSDL, interops, etc)
2. For components with public interfaces to be used by other developers:
a. Programmers reference manual with examples for public interfaces
b. Class diagrams where applicable
c. XML Schema and Schematron files
d. Database schema definitions
e. Unified Modeling Language (UML) source as available
f. Dependency diagrams as available
3. Distribution package and source code of public domain tools used in the software
4. List of all software components with the following information:
a. Purpose and function
b. Interfaces provided
c. Language/version for each module
5. Items required to build the software, at a minimum:
a. List of commercial, public domain, and open source software (including code quality scanning tools(s), such as HP Fortify)required to create the build environment and the recommended order of installing these on the build machine
b. Products and source from list described in “5a.” not restricted by licensing
c. Build scripts (to include scripts related to code quality scanning tools)
d. Procedures to build from this source delivery (including recommended order of installing products to create the build environment)
e. Detailed instruction on setting up of build environment (e.g.
visual studio options, system path, code quality scanning tool(s) options, etc)
f. A snapshot of all the file directories required to build the software on a second machine (just prior to executing the script to compile and build the software, use common compression tools, e.g.
zip, rar, to create)
6. Items required to install the software, at a minimum:
a. Installation scripts and procedures
MEARS 1 1 1
AFLCMC/WLMA
CDRL DMO 1 1 1
AFLCMC/WLMA
CDRL CPINS 1 1
15. TOTAL 3 3 3
G. PREPARED BY
AFLCMC/WLME, C-17 Data Manager
H. DATE I. APPROVED BY
AFLCMC/WLMC, C-17 Logistics
J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 3 Pages
17. PRICE GROUP
12 AUG 20 8/12/2020
MARTIN.AMAND
A.J.1106780893
Digitally signed by
MARTIN.AMANDA.J.1106780893
Date: 2020.08.12 14:49:02 -04'00'
GELTER.DANIE
L.L.1073034945
Digitally signed by
GELTER.DANIEL.L.1073034945
Date: 2020.08.12 12:51:22 -04'00'
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER AVCS
D. SYSTEM/ITEM
C-17 Terrain Awareness and Warning System (TAWS) Tool and C-17 Terrain Awareness an
E. CONTRACT/PR NO.
FD2060-21-30024
F. CONTRACTOR
TBD
16. REMARKS (Continued)
b. Products and data required to install and run the application(s)
c. One version with debug “On” and one version with debug “Off.”
7. Items used to test the software and required to repeat the tests, at a minimum:
a. Description of unit tests which indicate the modules under test and the functional requirements tested (the test report/results should also be included)
b. Unit testing tools / drivers, their source code, build instructions and descriptions of how to install and use them and interpret results
c. Automated unit tests and associated items to run the tests (e.g. source code, data, stubs / drivers, templates)
d. Integration testing tools / drivers, their source code, build instructions and descriptions of how to install and use them and interpret results
e. List of code quality scanning tools used by the developer. Include the drivers, data files, tool settings, and installation instructions for the code quality scanning tools.
8. Items that comprise Software Developer’s Kit (SDK) type material, at a minimum:
a. Interface Design Description (IDD)
b. Software Programmer’s Guide
c. Security stubs or guidance to developers related to flexibility required to create new JMPS products that integrate with this product
d. Items created by the contractor during period of performance which help other developers simplify integration to this JMPS product
9. Items to facilitate maintenance
a. Source file history (the history of changes to the source code)
1. For Engineering releases, with DR fixes, the contractor shall deliver the products listed under 1, 5, 6 (debug version not required), and 8 (extensions to existing products).
2. Item 9 above shall be delivered with the final release only.
Block 7: The contractor shall submit a Provisional DD250 (Material Inspection and Receiving Report) with the interim release submittal and a Final DD250 with the Final release.
Block 8: The Government shall provide a notice of acceptability or unacceptability within 30 days of the submission. The Government shall not provide a notice of acceptability for Engineering or Beta releases.
Acceptance clause in Section E of the Delivery Order.
Block 9: Documentation will be marked with Distribution Statement C and Destruction Notice, unless otherwise directed by the program manager.
Distribution Statement C: Distribution authorized to U.S. Government Agencies and their contractors;
Administrative/Operational Use; 06 April 2020. Other requests for this document shall refer to the C-17 AFLCMC/WLMBA, 235 Byron Street Suite 19A, Robins AFB, GA 31098.
Block 12 and 13: Engineering releases, Interim (a.k.a. FQT) and Final releases shall be delivered in accordance with the Government approved IMS with the following guidance:
a. Engineering and Final releases should be scheduled to allow for defect verification and feedback to the developer prior to the final release.
b. Interim releases shall be delivered within 30 days of completion of FQT
c. Final releases shall be submitted to the Government for acceptance upon satisfactory completion of software performance in MPE Operational Testing (OT). The full delivery shall include all updates which occurred between the interim delivery along with a description of all changes
Block 14: Submissions shall be via electronic media in a format acceptable to the Government.
No hardcopies of source code are required for submission
Interim release SW shall be delivered to the WR-ALC/WLMBA, CPIN Manager, 235 Byron St, Suite 19A, RAFB, GA 31098
Final versions to be sent to WR-ALC/WLMC. One copy of the final compiled annual database shall be sent to The Boeing Company, Attn: Configuration Management, 4060 N Lakewood Blvd, Long Beach, CA 90808-1700
DD FORM 1423-1, FEB 2001 Page 2 of 3 Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER AVCS
D. SYSTEM/ITEM
C-17 Terrain Awareness and Warning System (TAWS) Tool and C-17 Terrain Awareness an
E. CONTRACT/PR NO.
FD2060-21-30024
F. CONTRACTOR
TBD
16. REMARKS (Continued) WARNING- This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50 U.S.C., App.
2401, et seq. Violation of these export-control laws is subject to severe criminal penalties. Dissemination of this document is controlled under DoD Directive 5230.25 and AFI 61-201. If space does not permit use of the full statement, the following may be used: WARNING- EXPORT CONTROLLED
DESTRUCTION NOTICE- For classified documents follow the procedures in DoD 5220.22-M, National industrial Security Program Operating Manual (NISPOM), section 5-705,or DoD 5200.1-R, information Security Program, Chapter VI. For unclassified limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
DD FORM 1423-1, FEB 2001 Page 3 of 3 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
C-17 Terrain Awareness and Warning System (TAWS) Tool and C-17 Terrain
E. CONTRACT/PR NO.
FD2060-21-30024
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Engineering Change Proposal (ECP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80639D/T
5. CONTRACT REFERENCE
PWS Para 4.2
6. REQUIRING OFFICE
AFLCMC/WLMC
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor format is acceptable. Military Standards and Military Specification are for guidance only.
Block 9: Distribution Statement C: Distribution authorized to U.S.
Government Agencies and their contractors; Administrative/Operational Use; 06 April 2020. Other requests for this document shall refer to the C-17 AFLCMC/WLMBA, 235 Byron Street Suite 19A, Robins AFB, GA 31098.
Blocks 10, 12, & 13: Contractor shall submit ECP 30 days after the event has occurred. USG shall provide approval 30 days after submission.
Block 14: Submissions shall be via electronic media in a format acceptable to the government.
WARNING- This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50 U.S.C., App. 2401, et seq. Violation of these export-control laws is subject to severe criminal penalties. Dissemination of this document is controlled under DoD Directive 5230.25 and AFI 61-201. If space does not permit use of the full statement, the following may be used:
WARNING- EXPORT CONTROLLED
DESTRUCTION NOTICE- For classified documents follow the procedures in DoD 5220.22-M, National industrial Security Program Operating Manual (NISPOM), section 5-705,or DoD 5200.1-R, information Security Program, Chapter VI. For unclassified limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
MEARS 1
AFLCMC/WLMA
CDRL DMO 1
15. TOTAL 0 2 0
G. PREPARED BY
AFLCMC/WLME, C-17 Data Manager
H. DATE I. APPROVED BY
AFLCMC/WLMC, C-17 Logistics
J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
17. PRICE GROUP
MARTIN.AMAND
A.J.1106780893
Digitally signed by
MARTIN.AMANDA.J.1106780893
Date: 2020.04.29 11:10:42 -04'00' 29 APRIL 2020 28 APRIL 2020
GELTER.DANIEL.
L.1073034945
Digitally signed by
Date: 2020.04.28 10:17:24 -04'00'
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER SESS
D. SYSTEM/ITEM
C-17 Terrain Awareness and Warning System (TAWS) Tool and C-17 Terrain
E. CONTRACT/PR NO.
FD2060-21-30024
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Request for Variance (RFV)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80640E/T
5. CONTRACT REFERENCE
PWS Para 4.2
6. REQUIRING OFFICE
AFLCMC/WLMC
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor format is acceptable. Military Standards and Military Specification are for guidance only.
Block 9: Distribution Statement C: Distribution authorized to U.S.
Government Agencies and their contractors; Administrative/Operational Use; 06 April 2020. Other requests for this document shall refer to the C-17 AFLCMC/WLMBA, 235 Byron Street Suite 19A, Robins AFB, GA 31098.
Block 10, 11, & 13: Contractor shall submit draft due 15 days prior to formal submission of a Request for Deviation/Waiver.
Block 14: Submissions shall be via electronic media in a format acceptable to the Government.
WARNING- This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50 U.S.C., App. 2401, et seq. Violation of these export-control laws is subject to severe criminal penalties. Dissemination of this document is controlled under DoD Directive 5230.25 and AFI 61-201. If space does not permit use of the full statement, the following may be used:
WARNING- EXPORT CONTROLLED
DESTRUCTION NOTICE- For classified documents follow the procedures in DoD 5220.22-M, National industrial Security Program Operating Manual (NISPOM), section 5-705,or DoD 5200.1-R, information Security Program, Chapter VI. For unclassified limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
MEARS 1 1
AFLCMC/WLMA
CDRL DMO 1 1
15. TOTAL 2 2 0
G. PREPARED BY
AFLCMC/WLME, C-17 Data Manager
H. DATE I. APPROVED BY
AFLCMC/WLMC, C-17 Logistics
J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
17. PRICE GROUP
MARTIN.AMANDA.
J.1106780893
Digitally signed by
MARTIN.AMANDA.J.1106780893
Date: 2020.04.29 11:19:19 -04'00'
GELTER.DANIEL.L
.1073034945
Digitally signed by
Date: 2020.04.28 10:18:17 -04'00'29 APRIL 2020 28 APRIL 2020
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER IPSC
D. SYSTEM/ITEM
C-17 Terrain Awareness and Warning System (TAWS) Tool and C-17 Terrain
E. CONTRACT/PR NO.
FD2060-21-30024
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Software Requirements Specification (SRS)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81433A/T
5. CONTRACT REFERENCE
PWS Para 4.3
6. REQUIRING OFFICE
AFLCMC/WLMC
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Block 4: Use format of current SRS for submittal. No other format will be acceptable without prior Government approval.
Block 8: The Government shall provide a notice of acceptability, or a notice of unacceptability with specific comments, not more than 30 days after receipt of each submission.
Block 9: Distribution Statement C: Distribution authorized to U.S.
Government Agencies and their contractors; Administrative/Operational Use; 06 April 2020. Other requests for this document shall refer to the C-17 AFLCMC/WLMBA, 235 Byron Street Suite 19A, Robins AFB, GA 31098.
Block 10 & 12: Contactor shall submit draft SRS 30 days prior to SRR and a final SRS shall be submitted 30 days prior to CDR.
Block 14: Submissions shall be via electronic media in a format acceptable to the Government.
WARNING- This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50 U.S.C., App. 2401, et seq. Violation of these export-control laws is subject to severe criminal penalties. Dissemination of this document is controlled under DoD Directive 5230.25 and AFI 61-201. If space does not permit use of the full statement, the following may be used:
WARNING- EXPORT CONTROLLED
DESTRUCTION NOTICE- For classified documents follow the procedures in DoD 5220.22-M, National industrial Security Program Operating Manual (NISPOM), section 5-705,or DoD 5200.1-R, information Security Program, Chapter VI. For unclassified limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
MEARS 1 1
AFLCMC/WLMA
CDRL DMO 1 1
15. TOTAL 2 2 0
G. PREPARED BY
AFLCMC/WLME, C-17 Data Manager
H. DATE I. APPROVED BY
AFLCMC/WLMC, Logistics Manager
J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
17. PRICE GROUP
MARTIN.AMANDA.J.
1106780893
Digitally signed by
MARTIN.AMANDA.J.1106780893
Date: 2020.04.29 11:27:14 -04'00' 29 APRIL 2020 28 APRIL 2020
GELTER.DANIE
L.L.1073034945
Digitally signed by
Date: 2020.04.28 10:19:22 -04'00'
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
C-17 Terrain Awareness and Warning System (TAWS) Tool and C-17 Terrain
E. CONTRACT/PR NO.
FD2060-21-30024
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B/T
5. CONTRACT REFERENCE
PWS Para 4.3, 4.5
6. REQUIRING OFFICE
AFLCMC/WLMC
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor format is acceptable. Military Standards and Military Specifications are for guidance only. Studies to be directed by the government.
Block 8: The contractor shall provide the first draft 30 days after the study/services is complete. The USG will provide a notice of acceptability, or a notice of unacceptability with specific comments, not more than 30 days after receipt of submission.
Block 9: Distribution Statement C: Distribution authorized to U.S.
Government Agencies and their contractors; Administrative/Operational Use; 06 April 2020. Other requests for this document shall refer to the C-17 AFLCMC/WLMBA, 235 Byron Street Suite 19A, Robins AFB, GA 31098.
Block 10 - 13: Whitepapers outlining unique capabilities or improvements may be submitted at any time throughout the period of performance. Whitepapers shall be evaluated and notification of acceptability or unacceptability not more than 30 days after receipt of each submission. Unacceptable drafts shall require a final report incorporating USG comments 30 days after receipt. Accepted drafts shall be considered final.
Block 14: Submissions shall be via electronic media in a format acceptable to the Government.
WARNING- This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50 U.S.C., App. 2401, et seq. Violation of these export-control laws is subject to severe criminal penalties. Dissemination of this document is controlled under DoD Directive 5230.25 and AFI 61-201. If space does not permit use of the full statement, the following may be used:
WARNING- EXPORT CONTROLLED
DESTRUCTION NOTICE- For classified documents follow the procedures in DoD 5220.22-M, National industrial Security Program Operating Manual (NISPOM), section 5-705,or DoD 5200.1-R, information Security Program, Chapter VI. For unclassified limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
MEARS 1 1
AFLCMC/WLMA
CDRL DMO 1 1
15. TOTAL 2 2 0
G. PREPARED BY
AFLCMC/WLME, C-17 Data Manager
H. DATE I. APPROVED BY
AFLCMC/WLMC, C-17 Logistics
J. DATE
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
17. PRICE GROUP
MARTIN.AMANDA.J.
1106780893
Digitally signed by
MARTIN.AMANDA.J.1106780893
Date: 2020.04.29 11:32:36 -04'00' 29 APRIL 2020 28 APRIL 2020
GELTER.DANIEL
.L.1073034945
Digitally signed by
Date: 2020.04.28 10:20:32 -04'00'
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER IPSC
D. SYSTEM/ITEM
C-17 Terrain Awareness and Warning System (TAWS) Tool and C-17 Terrain
E. CONTRACT/PR NO.
FD2060-21-30024
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Software Version Description (SVD)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81442A/T
5. CONTRACT REFERENCE
PWS Para 4.3
6. REQUIRING OFFICE
AFLCMC/WLMC
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor format is acceptable so long as the content, intent and the data required is met. Military Standards and Military Specification are for guidance only.
Block 9: Distribution Statement C: Distribution authorized to U.S.
Government Agencies and their contractors; Administrative/Operational Use; 06 April 2020. Other requests for this document shall refer to the C-17 AFLCMC/WLMBA, 235 Byron Street Suite 19A, Robins AFB, GA 31098.
Block 10, 12, & 13: The Software Version Description shall be delivered with each Release (Engineering, Beta, Interim and Final).
For each Interim and Final Release, DRAFT update shall be due 30 days prior to FQT, and FINAL update shall be submitted 14 days after FQT.
Block 14: Submissions shall be via electronic media in a format acceptable to the Government
WARNING- This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50 U.S.C., App. 2401, et seq. Violation of these export-control laws is subject to severe criminal penalties. Dissemination of this document is controlled under DoD Directive 5230.25 and AFI 61-201. If space does not permit use of the full statement, the following may be used:
WARNING- EXPORT CONTROLLED
DESTRUCTION NOTICE- For…