Tank Plan and ST Locations .pdf
PDF 139 KB Posted
- Attached to
- TVKP EMERGENCY DRYDOCK Federal contract opportunity
- Solicitation number
- 6933A225Q000017
About this file
These are technical schematics for the Training Vessel Kings Pointer, depicting detailed tank and sounding tube locations across three deck levels: Tank Plan, Sounding Tube Locations, Main Deck, Lower Deck, and Forecastle Deck.
The Tank Plan diagram shows multiple tank classifications including Ballast Tanks (No. 3, No. 4, No. 6), DSL Oil Tanks, Lube Oil Tanks, Day Tanks, Gear Oil Tanks, Sewage Tanks, and Potable Water Tanks. The Sounding Tube Locations diagram meticulously maps 1½" and 1¼" sounding tubes throughout the vessel, indicating precise measurement points for various tank types across Port and Starboard sides, including Day Tanks, Ballast Tanks, Sewage Tanks, Diesel Tanks, Washwater Tanks, and Peak Tanks. The technical drawings provide comprehensive spatial and functional details of the vessel's internal tank and tubing infrastructure.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sole Source Justification TVKP REDACTED.pdf | ||
| 6933A225Q000017 Combined Synopsis Solicitation REv1.pdf | ||
| IMG_1222-2025-2-6-17-14-38-435 with proposed doubler.pdf | ||
| TV KINGS POINTER Docking Calculations (3).pdf | ||
| 1316-901 Kings Pointer Docking Plan (4).pdf | ||
| 1547-1420 Docking Plan (5).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .