Tank Plan and ST Locations .pdf

PDF 139 KB Posted

Attached to
TVKP EMERGENCY DRYDOCK Federal contract opportunity
Solicitation number
6933A225Q000017
Issued by
Department of Transportation Maritime Administration

About this file

These are technical schematics for the Training Vessel Kings Pointer, depicting detailed tank and sounding tube locations across three deck levels: Tank Plan, Sounding Tube Locations, Main Deck, Lower Deck, and Forecastle Deck.

The Tank Plan diagram shows multiple tank classifications including Ballast Tanks (No. 3, No. 4, No. 6), DSL Oil Tanks, Lube Oil Tanks, Day Tanks, Gear Oil Tanks, Sewage Tanks, and Potable Water Tanks. The Sounding Tube Locations diagram meticulously maps 1½" and 1¼" sounding tubes throughout the vessel, indicating precise measurement points for various tank types across Port and Starboard sides, including Day Tanks, Ballast Tanks, Sewage Tanks, Diesel Tanks, Washwater Tanks, and Peak Tanks. The technical drawings provide comprehensive spatial and functional details of the vessel's internal tank and tubing infrastructure.

View the file

Other files for this federal contract opportunity

Other files attached to TVKP EMERGENCY DRYDOCK, newest first.
File Type Posted
Sole Source Justification TVKP REDACTED.pdf PDF
6933A225Q000017 Combined Synopsis Solicitation REv1.pdf PDF
IMG_1222-2025-2-6-17-14-38-435 with proposed doubler.pdf PDF
TV KINGS POINTER Docking Calculations (3).pdf PDF
1316-901 Kings Pointer Docking Plan (4).pdf PDF
1547-1420 Docking Plan (5).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .