The document is a Stormwater Management Plan (SWMP) for The Aurora Highlands Sunset Park, prepared by Matrix Design Group for Aurora Highlands, LLC in the City of Aurora, Adams County, Colorado. The plan, approved on March 25, 2025, details erosion control strategies and site development for a park within the larger Aurora Highlands master-planned community. The documents include multiple sheets covering general notes, erosion control index, and initial and final phase erosion control plans, with specific focus on managing stormwater runoff, sediment control, and landscape stabilization during construction.
The project site encompasses multiple tracts within the development, with a total area of approximately 59,087 square feet (1.36 acres). The stormwater management strategy includes a temporary sediment basin (SB-1) with a required volume of 25,416 cubic feet and a provided volume of 38,702 cubic feet, featuring diversion ditches, check dams, and erosion control best management practices (BMPs). The plan outlines phased construction approaches, including initial grading and utility work through final landscaping and park amenities such as playground areas, fitness zones, pickleball courts, and walking paths. The design incorporates slope management, surface roughening, silt fencing, and revegetation techniques to minimize environmental impact and comply with City of Aurora erosion control specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
AI
N S
TR
EE
T
E-
38TH PARKWAY
26TH AVENUE
RIVER FRONT DRIVE
1 2 3 4 5 6 7 8 9 10 11 12 13
14 15 16 17 18 19 20
16 15 14 13 12 11 10 9 8
1 2 3 4 5 6 7
654321
181716151413121110
7 6 5
1 12
13 11
10 12
TR
AC
T F
TRACT A
TRACT B
TR
AC
T G
TRACT H
TRACT C
TRACT D TRACT E
TRACT A
TRACT A TRACT B
12 14
7 8
TRACT A
32,206 SF
31,034
SF
TRACT H
91,771 SF
TR
AC
T F
TR
AC
T F
TR
AC
T K
TRACT F
1 1
TRACT B
TR
AC
T D
TRACT J
TH
E
AU
R
O R
A H
IG
H
LA
N
D S
FI
LI
N G
N O
. 3 T
R
AC
T F
6,974 SF
6, SF
33,932 SF
4, SF
18,348 SF
,3
S
F
10,173 SF
TRACT I
91,771 SF
TRACT I
91,771 SF
TRACT I
4,125 SF
2 3 4 5 6 7 8 9 10 11 12 13 14
65202122232425262728293031
654321
10 9 8 7
8 9
6 11
4 13
3 14
1 16 1
8 9
1 2
1 2 3 4 5 6 7 10 11 12
1 2 3
23 24 25 26
151413121110
54321
8 9 10 11 12
3 8
1 10
TRACT E
TRACT C
TR
AC
T G
S F
8,747
SF
TRACT ZZ
2 3
15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
29282726252423222120191817
2 3
414243444546474849
2 3 4
8 7
43 44
6 5
S F
0.
A C
TRACT A
59,087 SF
1.36 AC
59,087 SF
1.36 AC
TRACT A
59,087 SF
1.36 AC
TRACT C
7405 SF
0.17 AC
TR
AC
T B
TRACT A
S F
0.
A C
TR
AC
T D
59,087 SF
1.36 AC
TRACT A
15 16 17 18 19 20
9 10 11 12 13 14 15 16 17 18
1 2 3 4 5 6
91011121314
19 20 21 22 23 24 25 26 27 28
3130292827262524232221
121121
20 19
11,390 SF
0.26 AC
,9
S
F 1.
A
C
,7
S
F 0.
A
C
TRACT E
TR
AC
T F
TRACT D
TR
AC
T F
TR
AC
T A
TR
AC
T H
TRACT B
16 16
40,532 SF
0.93 AC
37,203 SF
0.85 AC
TRACT D
37,203 SF
0.85 AC
,9
S
F 1.
A
C
,9
S
F 1.
A
C
TR
AC
T F
2, SF
0.
A C
TRACT G
66,777 SF
1.53 AC
3, SF
0.
A C
TR
AC
T C
46,958 SF
1.08 AC
TRACT F
TRACT G
66,777 SF
1.53 AC
TRACT D
TR
AC
T J
- P A
TRACT P - PA 40
TRACT C
PA 46
0.92 ac.
40,394 sf.
PROJECT
LOCATIONS
E-
D
EN
AL
I B
LV
D
FU
LT
O N
D
AL
E
AV
E
M
AI
N S
TR
EE
T
48TH AVENUE
THE AURORA
HIGHLANDS PARKWAY
E. WARM SPRINGS AVE.
N. HIGHLANDS CREEK PARKWAY
N R
ES
ER
VE
B
LV
D
42ND AVENUE
RESERVE ST
M
AI
N S
TR
EE
T
MATRIX DESIGN GROUP
707 17TH STREET, SUITE 3150
DENVER, CO. 80202
PH: 303-572-0200
CONTACT: JEFF KILLION, P.E.
JEFF_KILLION@MATRIXDESIGNGROUP.COM
CIVIL ENGINEER
BENCHMARK:
CITY OF AURORA BENCHMARK 3S6636NE003 BEING A 3" DIAM. BRASS CAP (COA BM,
19-020B, E-090A) ATOP THE S. WALL @ THE S.E. COR. OF THE E. 26TH AVE. BRIDGE
CROSSING OVER E-470. BRASS CAP AT LOWER STEP ON WALL WHERE THE RAILING ENDS
ON THE E. END. AKA 19-020B.
ELEVATION = 5521.54 (NAVD88)
MATRIX DESIGN GROUP
707 17TH STREET, SUITE 3150
DENVER, CO. 80202
PH: 303-572-0200
CONTACT: THOMAS KOPF, PLA, ASLA
THOMAS.KOPF@MATRIXDESIGNGROUP.COM
LANDSCAPE ARCHITECT
AURORA HIGHLANDS, LLC
CARLO FERREIRA
250 S PILOT ROAD
LAS VEGAS, NV 89119
DEVELOPER
AURORA HIGHLANDS, LLC
CARLO FERREIRA
250 S PILOT ROAD
LAS VEGAS, NV 89119
PROJECT APPLICANT
INDEX OF SHEETS
SHEET NUMBERDESCRIPTION
TITLE SHEET
GENERAL NOTES
EROSION CONTROL INDEX PLAN
EROSION CONTROL PLANS INITIAL
EROSION CONTROL PLANS FINAL
5 - 6
7 - 8
APPROVED ONE YEAR FROM THIS DATE
AURORA WATER - UTILITIES DIVISION
CITY ENGINEER
DATE
DATE
PLAN PREPARER SIGNATURE BLOCK
I ACKNOWLEDGE MY RESPONSIBILITY FOR THE PREPARTION
OF THE STORMWATER MANAGEMENT PLAN.
JEFF KILLION, P.E.
FOR AND ON BEHALF OF MATRIX DESIGN
GROUP, INC.
DATE
PROJECT OWNER/DEVELOPER
SIGNATURE BLOCK
MATT HOPPER, AACM DISTRICT DATE
I HAVE REVIEWED THE INFORMATION CONTAINED WITHIN
THE STORMWATER MANAGEMENT PLAN AND ACCEPT
RESPONSIBILITY FOR THE REQUIREMENTS SET FORTH.
THE AURORA HIGHLANDS SUNSET PARK
STORMWATER MANAGEMENT PLANS
MARCH 2025
1. CITY OF AURORA PLAN REVIEW IS ONLY FOR GENERAL
CONFORMANCE WITH CITY OF AURORA DESIGN CRITERIA AND THE
CITY CODE. THE CITY IS NOT RESPONSIBLE FOR THE ACCURACY AND
ADEQUACY OF THE DESIGN, DIMENSIONS, AND ELEVATIONS WHICH
SHALL BE CONFIRMED AND CORRELATED AT THE JOB SITE. THE CITY
OF AURORA, THROUGH THE APPROVAL OF THIS DOCUMENT, ASSUMES
NO RESPONSIBILITY FOR THE COMPLETENESS AND/OR ACCURACY OF
THIS DOCUMENT.
2. ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO
INSPECTION BY THE CITY. THE CITY RESERVES THE RIGHT TO ACCEPT
OR REJECT ANY MATERIALS AND WORKMANSHIP THAT DOES NOT
CONFORM TO THE CITY STANDARDS AND SPECIFICATIONS.
3. THE CONTRACTOR SHALL NOTIFY THE CITY PUBLIC IMROVEMENT
INSPECTIONS DIVISION, 303-739-7420, 24 HOURS PRIOR TO THE
BEGINNING OF CONSTRUCTION.
4. LOCATION OF EXISTING UTILITIES SHALL BE VERIFIED BY THE
CONTRACTOR PRIOR TO ACTUAL CONSTRUCTION. FOR INFORMATION,
CONTACT UTILITY NOTIFICATION CENTER OF COLORADO,
1-800-922-1987 OR 811.
5. THE CONTRACTOR SHALL HAVE ONE SIGNED COPY OF THE PLANS
(APPROVED BY THE CITY OF AURORA), ONE COPY OF THE
APPROPRIATE STANDARDS AND SPECIFICATIONS AT THE JOB SITE AT
ALL TIMES, AND A COPY OF ANY PERMITS AND EXTENSION
AGREEMENTS NEEDED AT THE JOB SITE AT ALL TIMES.
6. IT IS THE CONSULTANT'S RESPONSIBILITY TO ACCURATELY SHOW
EXISTING CONDITIONS, BOTH ON-SITE, AND OFF-SITE, ON THE
CONSTRUCTION PLANS. ANY MODIFICATIONS NEEDED DUE TO
CONFLICTS, OMISSIONS, OR CHANGED CONDITIONS EITHER ON-SITE
OR OFF-SITE, WHICH ARISE IN THE FIELD, WILL BE ENTIRELY THE
DEVELOPER'S RESPONSIBILITY. THE COST TO RECTIFY ANY ADVERSE
SITUATION TO MEET THE CITY STANDARDS AND SPECIFICATIONS AND
THE CITY CODE SHALL BE BORNE SOLELY BY THE DEVELOPER.
7. THE OWNER/DEVELOPER MUST OBTAIN THE WRITTEN PERMISSION OF
THE ADJACENT PROPERTY OWNER(S) PRIOR TO ANY OFF-SITE
GRADING OR CONSTRUCTION.
8. THE OWNER/CONTRACTOR MUST OBTAIN A C.D.P.S. STORM WATER
DISCHARGE PERMIT FROM THE COLORADO DEPARTMENT OF PUBLIC
HEALTH AND ENVIRONMENT, IF REQUIRED.
9. PROJECT SHALL COMPLY WITH UTILITY ENGINEERING INVESTIGATING
AND DOCUMENTING REQUIREMENTS PER CRS 9-1.5-101 ET SEQ., AS
AMENDED, WHEN THE PROJECT INCLUDES EXCAVATION. BY
STAMPING THE PLAN THE ENGINEER OF RECORD IS CERTIFYING THE
PLAN MEETS THE STANDARDS ESTABLISHED BY THE AMERICAN
SOCIETY OF CIVIL ENGINEERS' ASCE 38 STANDARD, LATEST
PUBLICATION, FOR DEFINING THE ACCURACY OF A FACILITY OR
UTILITY.
10. PROJECT SHALL COMPLY WITH AURORA WATER STANDARDS AND
SPECIFICATIONS, LATEST EDITION, WHEN THE PROJECT INCLUDES
EXCAVATION, INCLUDING BUT NOT LIMITED TO INSTALLATION OF
ELECTRONICALLY TRACEABLE MARKERS OR BEING TRACEABLE BY
APPROVED ELECTRONIC METHODS FOR ALL SUBSURFACE UTILITIES.
11. PAVING OF PUBLIC STREETS SHALL NOT START UNTIL A SOIL REPORT
AND PAVEMENT DESIGN IS APPROVED BY THE CITY ENGINEER, PROOF
ROLLING, AND SUBGRADE AND TRENCH COMPACTION TESTS TAKEN
BY THE DEVELOPER’S GEOTECH ARE APPROVED BY PUBLIC
IMPROVEMENTS INSPECTIONS/MATERIALS LAB.
12. STANDARD CITY OF AURORA CURB RAMPS SHALL BE CONSTRUCTED
AT ALL CURB RETURNS, AT ALL "T" INTERSECTIONS AND AT ALL
CURBSIDE KIOSKS OR CLUSTERS, UNLESS OTHERWISE MODIFIED BY
THESE PLANS.
13. ALL STATIONING IS BASED ON CENTERLINE OF ROADWAYS UNLESS
OTHERWISE NOTED.
14. ALL ELEVATIONS ARE (INDICATE TOP OF CURB OR FLOW LINE) UNLESS
OTHERWISE NOTED.
15. THE CITY OF AURORA SHALL NOT BE LIABLE FOR THE MAINTENANCE
OF . (INSERT NAME OF SPECIFIC PRIVATE IMPROVEMENT(S), OR ‘ANY
PRIVATE IMPROVEMENTS’ IF UNKNOWN.) THESE FACILITIES MAY NOT
MEET CITY STANDARDS AND SHALL REMAIN IN PRIVATE MAINTENANCE
BY _________________ (INSERT NAME OF ENTITY TO BE RESPONSIBLE
FOR THE MAINTENANCE) IN PERPETUITY. THESE PRIVATE FACILITIES
INCLUDE, IF PROVIDED, THE PRIVATE UNDERDRAIN SYSTEM PLACED
WITHIN THE PUBLIC RIGHT-OF-WAY.
16. THE CONTRACTOR/DEVELOPER IS RESPONSIBLE FOR CONTACTING
CDOT TO ENSURE ALL WORK ON OR ADJACENT TO STATE HIGHWAYS
OR CDOT R.O.W. MEETS CDOT REQUIREMENTS.
17. THE PUBLIC STREETLIGHT OR PEDESTRIAN LIGHT INSTALLATION
WITHIN THE PUBLIC RIGHT-OFWAY SHALL BE DESIGNED, FUNDED, AND
CONSTRUCTED BY THE DEVELOPER/OWNER. OWNERSHIP AND
MAINTENANCE OF THE PUBLIC STREET/PEDESTRIAN LIGHTS SHALL BE
THE RESPONSIBILITY OF THE CITY OF AURORA ONCE THEY HAVE
BEEN ACCEPTED. STREETLIGHT AND/OR PEDESTRIAN PHOTOMETRICS
PLANS SHALL BE PREPARED AND SUBMITTED TO THE CITY FOR
REVIEW AND APPROVAL AND SHALL BECOME A PART OF THE
APPROVED CIVIL CONSTRUCTION PLANS FOR THE PROJECT. AN
ELECTRICAL PLAN SHOWING SITE LOCATION OF LIGHTS, ELECTRICAL
ONE LINE AND GROUNDING DETAILS SHALL BE SUBMITTING TO THE
PERMIT CENTER FOR REVIEW BY THE BUILDING DEPARTMENT. THE
OWNER IS RESPONSIBLE FOR OBTAINING AN ADDRESS FOR THE
METER(S) FROM THE PLANNING DEPARTMENT. A BUILDING PERMIT
FOR THE METER AND A PUBLIC INSPECTIONS PERMIT FOR THE
STREET LIGHTS ARE REQUIRED. IT IS THE DEVELOPER’S/OWNER’S
RESPONSIBILITY TO CONTACT XCEL ENERGY TO INITIATE AND OBTAIN
ELECTRICAL SERVICE FOR ANY NEW DEVELOPMENT/REDEVELOPMENT
DURING THE PLAN REVIEW PROCESS. SUBMITTAL REQUIREMENTS
AND PROCEDURES 2-15 2023
18. THE OWNER/CONTRACTOR MUST OBTAIN A C.D.P.S. STORM WATER
DISCHARGE PERMIT FROM THE COLORADO DEPARTMENT OF PUBLIC
HEALTH AND ENVIRONMENT, IF REQUIRED.
19. THE OWNER/CONTRACTOR IS RESPONSIBLE FOR COORDINATING
WITH THE ARMY CORP OF ENGINEERS FOR WETLAND MITIGATION OR
WORK WITHIN THE WATERS OF THE U.S., IF REQUIRED. IT IS THE
RESPONSIBILITY OF THE OWNER/CONTRACTOR TO PROVIDE A COPY
OF THE ARMY CORP OF ENGINEER’S REQUIREMENTS TO THE CITY OF
AURORA. IF THERE ARE NO REQUIREMENTS BY THE ARMY CORP OF
ENGINEERS, THEN A WRITTEN NOTIFICATION FROM THE ARMY CORP
OF ENGINEERS SHALL BE SUBMITTED TO THE CITY OF AURORA
STATING SUCH. CITY APPROVAL OF THE CONSTRUCTION PLANS IS
SUBJECT TO THE OWNER/CONTRACTOR OBTAINING A 404 PERMIT, IF
APPLICABLE. A COPY OF THIS PERMIT SHALL BE SUBMITTED TO THE
CITY OF AURORA PRIOR TO ANY PERMITS BEING ISSUED.
20. ALL SIGNAGE AND STRIPING SHALL BE IN ACCORDANCE WITH THE
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, UNLESS
OTHERWISE NOTED BY THE CITY OF AURORA.
PRIVATE UNDERDRAIN SYSTEMS FOR GROUNDWATER DISCHARGES
FROM FOUNDATION DRAINS SHALL BE OWNED AND MAINTAINED BY
THE HOA/METRO DISTRICT (SELECT ONE).
21. PROJECT SHALL COMPLY WITH UTILITY ENGINEERING INVESTIGATION
AND DOCUMENTING REQUIREMENTS PER CRS 9-1.5-101 ET SEQ., AS
AMENDED, WHEN THE PROJECT INCLUDES EXCAVATION. BY
STAMPING THE PLAN THE ENGINEER OF RECORD IS CERTIFYING THE
PLAN MEETS THE STANDARDS ESTABLISHED BY THE AMERICAN
SOCIETY OF CIVIL ENGINEERS’ ASCE 38 STANDARD, LATEST
PUBLICATION, FOR DEFINING THE ACCURACY OF A FACILITY OR
UTILITY. PROJECT SHALL COMPLY WITH AURORA WATER STANDARDS
AND SPECIFICATIONS, LATEST EDITION, WHEN THE PROJECT
INCLUDES EXCAVATION, INCLUDING BUT NOT LIMITED TO
INSTALLATION OF ELECTRONICALLY TRACEABLE MARKERS OR BEING
TRACEABLE BY APPROVED ELECTRONIC METHODS FOR ALL
SUBSURFACE UTILITIES
22. IN LOCATIONS WHERE UTILITY EASEMENTS OVERLAP DRAINAGE
EASEMENTS, ONLY SUBSURFACE UTILITIES SHALL BE PERMITTED
WITHIN THE PORTION OF THE UTILITY EASEMENT THAT OVERLAPS THE
DRAINAGE EASEMENT. INSTALLATION OF ABOVE GROUND UTILITIES
WITHIN A DRAINAGE EASEMENT REQUIRES PRIOR WRITTEN
APPROVAL BY THE AURORA WATER ENGINEERING SERVICES
MANAGER, OR DESIGNEE.
23. PROPOSED PROJECT PHASING SHALL BE INCLUDED IN THE CIVIL
PLANS. THE PHASING PLAN SHALL INCLUDE A DESCRIPTIVE
NARRATIVE FOR EACH PHASE ALONG WITH PLAN VIEW. SUBMITTAL
REQUIREMENTS AND PROCEDURES 2-16 2023.
24. CRITICAL TRAFFIC CONTROL AREAS, AS IDENTIFIED BY THE TRAFFIC
MANAGER DURING CIVIL PLAN REVIEW, ARE CIRCUMSTANCES THAT
DEVELOP RESULTING FROM TEMPORARY MODIFICATIONS TO THE
ROADWAY NETWORK. CRITICAL TRAFFIC CONTROL AREAS CAN
INCLUDE, BUT ARE NOT LIMITED TO:
· LANE CLOSURES RESULTING IN REDUCTION IN VEHICLES
CAPACITY GREATER THAN 50%,
· PROXIMITY TO INTERSECTIONS, ACCESS DRIVES, RAIL LINES,
· LOCATIONS WITH HIGHER MULTIMODAL MOVEMENTS, OR
· OTHER SPECIAL CIRCUMSTANCES
WHEN IDENTIFIED, THE CONTRACTOR SHALL SUBMIT TRAFFIC
CONTROL PLANS (TCPS) TO THE CITY THROUGH THE PUBLIC
IMPROVEMENT PERMIT APPLICATION PROCESS FOR THE CITY’S
REVIEW AS SOON AS POSSIBLE OR A MINIMUM OF FOUR WEEKS IN
ADVANCE OF CONSTRUCTION. IN ADDITION, AS PART OF THE PUBLIC
IMPROVEMENT PERMIT AND TCP, THE CONTRACTOR MAY BE
REQUIRED TO PROVIDE ADVANCE NOTICE (MINIMUM TWO WEEKS) TO
NEARBY IMPACTED USERS. NOTIFICATIONS BY THE CONTRACTOR MAY
BE REQUIRED TO NEIGHBORING RESIDENCES, BUSINESSES, OR
IMPACTED OPERATIONS OF EMERGENCY RESPONSE ENTITIES (LAW
ENFORCEMENT, FIRE, AND MEDICAL), TRANSIT, DELIVERY COMPANIES,
ETC., AS DETERMINED BY THE TRAFFIC MANAGER AT TIME OF THE TCP
REVIEW
26. THE CIVIL PLANS FOR THE ASSOCIATED INFRASTRUCTURE (ROADWAY
AS SHOWN IN THE INFRASTRUCTURE SITE PLANS) MUST BE
APPROVED PRIOR TO ISSUANCE OF ADJACENT BUILDING PERMITS.
CONSTRUCTION SHOWN ON CIVIL PLANS FOR THE ASSOCIATED
INFRASTRUCTURE MUST BE INITIALLY ACCEPTED BY THE CITY PRIOR
TO ISSUANCE OF TEMPORARY CERTIFICATE OF
OCCUPANCY/CERTIFICATE OF OCCUPANCY (TCO/CO) PER THE PUBLIC
IMPROVEMENT PLAN (PIP).
27. ENSURE THAT THE PROVISIONS OF CRS 37-92-602, AS AMENDED BY
SENATE BILL 15-212, REGARDING NOTIFICATION OF DOWNSTREAM
WATER RIGHTS HOLDERS ARE UPHELD.
CITY OF AURORA NOTES
BASIS OF BEARINGS:
BASIS OF BEARINGS BEARING SHOWN HEREON ARE GRID BEARINGS DERIVED FROM GPS
OBSERVATION BASE UPON THE COLORADO COORDINATE SYSTEM OF 1983 CENTRAL
ZONE (NAD83, 2011) REFERENCED TO THE EASTERLY BOUNDARY OF THE AURORA
HIGHLANDS SUBDIVISION FILING NO. 2, TAKEN TO BEAR NORTH 08 32 14 WEST, A
DISTANCE OF 1,017.25 FEET, BEING MONUMENTED BY A FOUND 1-1/4” ORANGE PLASTIC
CAP STAMPED PLS 38668 AT THE NORTHERLY CORNER AND A FOUND 1-1/4” ORANGE
PLASTIC CAP STAMPED PLS NO 38668 AT THE SOUTHERLY CORNER AND MOUNMENTED
AS SHOWN HEREON, WITH ALL BEARINGS CONTAINED HEREIN BEING RELATIVE THERE
TO.
TRACT A, THE AURORA HIGHLANDS SUBDIVISION FILING NO. 32
SITUATED IN THE WEST HALF OF SECTION 30, TOWNSHIP 3 SOUTH, RANGE
65 WEST OF THE SIXTH PRINCIPAL MERIDIAN
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
LOCATION MAP
SCALE: 1" = 2000'
N
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
FILE NAME:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET
Know what's below.
before you dig.Call
R
KEY MAP: 1" = 500'
N
STORMWATER MANAGEMENT
PLANS
March 12, 2025 2:12:05 PM R:\23.1229.025 TAH Park PA-58\500 CADD\504 Plan Sets\Construction Plans\GEC Plan\TS01-.dwg
23.1229.025 02
MARCH 2025
TS01
TITLE SHEET
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
STORMWATER MANAGEMENT PLANS
THE AURORA HIGHLANDS SUNSET PARK
N/A
N/AGA
EG
EJK
APPROVED ON 03/25/2025
SD
03/17/2025
3/24/2025
3/25/2025
3/12/2025 2:12 PM
R:\23.1229.025 TAH Park PA-58\500 CADD\504 Plan Sets\Construction Plans\GEC Plan\GN01.dwg
N/A GN01
MARCH 2025
N/AGR
EG
EJK
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
STORMWATER MANAGEMENT PLANS
THE AURORA HIGHLANDS SUNSET PARK
23.1229.025
GENERAL NOTES
CITY OF AURORA GENERAL EROSION CONTROL NOTES
12" MIN. BURY DEPTH
4" (TYP.)
1"
90° BEND
1.0% MIN SLOPE OF
OUTLET PIPE
SCHEDULE 40 PVC
OR GREATER
HD
EL3
EL2
EL1 (OUTLET)
INVERT ELEVATION AT OUTLET
INVERT ELEVATION AT BEND
LOWEST PERFORATION INVERT
TOP OF RISER PIPE ELEVATION
POND BOTTOM
EL1
EL2
EL3
EL4
EL5
EL4
EL5
SB
TA
(AC)
W
(FT)
L
(FT)
CL
(FT)
HD
(IN)
V
(AC-FT)
NR OD
(IN)
EL3
(FT)
EL4
(FT)
EL1
(FT)
EL2
(FT)SB
EL5
(FT)
1 5484.73 5486.88 5488.55 5489.89 5487.00
SEDIMENT BASIN
TRIBUTARY AREA
BOTTOM WIDTH
BOTTOM LENGTH
SPILLWAY CREST LENGTH
SB
TA
W L
CL
*DRILL HOLES IN FRONT AND BACK OF RISER PIPE AT 4" ON
CENTER TO ACHIEVE TWO COLUMNS
1 7.06 0.8961'X115' 41 3/4"*10 8
VOLUME W/ 1' FREEBOARD
HOLE DIAMETER
NUMBER OF RISER HOLE ROWS
OUTLET PIPE DIAMETER
V
HD
NR
OD
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
FILE NAME:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET
Know what's below.
before you dig.Call
R
KEY MAP: 1" = 500'
N
STORMWATER MANAGEMENT
PLANS
1. CONTRACTOR AND CONSTRUCTION MANAGER SHALL VERIFY EXISTING TOPOGRAPHY AND ESTIMATED EARTHWORK
QUANTITIES PRIOR TO EXECUTING WORK.
2. ADDITIONAL FINE GRADING WILL BE REQUIRED PRIOR TO PAVEMENT CONSTRUCTION. EARTHWORK SEQUENCING AND METHODOLOGY SHALL BE COORDINATED BETWEEN THE CONTRACTOR AND THE CONSTRUCTION MANAGER.
3. UTILITY NOTIFICATION CENTER - CONTRACTOR SHALL CONTACT UTILITY NOTIFICATION CENTER FOR LOCATION OF UNDERGROUND UTILITIES AT LEAST 48 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION. PHONE: 1-800-922-1987.
4. ESTIMATED EARTHWORK QUANTITIES PROVIDED HEREIN DO NOT INCLUDE EARTHWORK FOR FOUNDATION AND
BASEMENT EXCAVATION.
5. ESTIMATED EARTHWORK QUANTITIES ARE TO FINISH GRADE. NO ALLOWANCE HAS BEEN MADE FOR STRIPPING, EXISTING PAVEMENT THICKNESS, FUTURE PAVEMENT THICKNESS, UTILITY SPOILS, NOR SHRINKAGE DUE TO
SCARIFICATION/COMPACTION.
6. NO ALLOWANCE HAS BEEN MADE FOR TOPSOIL IMPORT.
7. THE ENGINEER MAY REQUIRE SILT FENCING OR ROCK SOCKS AS NECESSARY TO RETARD SEDIMENT TRANSPORT ON OR OFF THE PROJECT SITE. SILT FENCE SHALL BE INSTALLED ALONG THE EXISTING BACK OF CURB OR SIDEWALK. SILT FENCE OR ROCK SOCKS SHALL BE REMOVED AND REPLACED AS CONSTRUCTION PHASING PROGRESSES.
8. FINAL LOCATION AND SIZE OF STAGING AREA (SSA) AND SITE ENTRANCE (VTC) MAY BE DETERMINED AT THE SITE BY THE
CONTRACTOR.
9. INLET PROTECTION FOR PROPOSED STORM SEWER SHALL BE INSTALLED UPON CONSTRUCTION OF THE INLET.
CONSTRUCTION PHASING NOTES:
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING REASONABLE AND PRUDENT EROSION AND SEDIMENT CONTROL MEASURES TO PROTECT THE DOWNSTREAM FACILITIES AND WHICH ARE RELEVANT TO THE CURRENT CONSTRUCTION
ACTIVITY. AT A MINIMUM THE FOLLOWING BMPS SHALL BE INSTALLED FOR EACH PHASE:
1. DEMO AND GRADING
a. VEHICLE TRACKING CONTROL
b. STABILIZED STAGING AREA
c. SILT FENCE
d. INLET PROTECTION
e. SURFACE ROUGHENING
f. ROCK SOCKS
2. UTILITY CONSTRUCTION - ALL ABOVE BMPS PLUS
a. ADDITIONAL INLET PROTECTION AT NEW INLETS
b. CONCRETE WASHOUT AREA
3. PAVING AND STABILIZATION
a. SEEDING & MULCHING
b. REMOVE BMPS AS UPSTREAM AREA IS ESTABLISHED
PURSUANT TO SECTIONS 138-440 AND 138-442 OF THE AURORA MUNICIPAL CODE, THE PERMITTEE SHALL LOCATE, INSTALL, AND MAINTAIN ALL BEST MANAGEMENT PRACTICES, INCLUDING, BUT NOT LIMITED TO, EROSION CONTROLS, SEDIMENT CONTROLS, DRAINAGE CONTROLS, AND WATER
QUALITY BMPS AS INDICATED IN THE APPROVED STORMWATER MANAGEMENT PLAN (SWMP).
BMP INSTALLATIONS SHALL BE INSTALLED PER THE COA STANDARD DETAIL IN EFFECT AT THE TIME OF INSTALLATION OR PER THE APPROVED SWMP DESIGN DRAWING, A COA APPROVED VARIANCE, OR A COA APPROVED DESIGN DRAWING PLAN AMENDMENT.
1. THE PERMITTEE SHALL BE RESPONSIBLE FOR REMEDIATION OF ANY ADVERSE IMPACTS TO ADJACENT WATERWAYS, WETLANDS, STORM SEWERS, STORM SEWER APPURTENANCES, OTHER PROPERTIES, ETC., RESULTING FROM WORK DONE AS PART OF THIS PROJECT.
2. ADDITIONAL EROSION AND SEDIMENT CONTROL BMPS MAY BE REQUIRED DURING AND AFTER CONSTRUCTION AND SHALL BE EXECTUED AND COMPLETED BY THE PERMITTEE. THE PERMITTEE SHALL PLAN, INSTALL, AND MAINTAIN ALL EROSION, AND SEDIMENT CONTROL MEASURES, INCLUDING DRAINAGE AND WATER QUALITY BMPS AS INDICATED ON THIS PLAN AND AS NECESSARY TO REDUCE THE DISCHARGE OF POLLUTANTS TO THE MAXIMUM EXTENT PRACTICABLE ADVERSE IMPACTS, EROSION AND SEDIMENT DEPOSITION ONTO PAVED SECTIONS, INTO STORM SEWERS, STORM SEWER APPURTENANCES, RECEIVING WATERS, OR OFF THE PROJECT SITE.
3. THE PERMITTEE SHALL TAKE APPROPRIATE PREVENTIVE MEASURES TO MINIMIZE TO THE MAXIMUM EXTENT PRACTICABLE DIRT AND MUD FROM BEING TRACKED OR DEPOSITED ONTO PAVED SECTIONS VIA MULTIPLE BMPS. SEDIMENT, MUD, AND CONSTRUCTION DEBRIS THAT MAY BE TRACKED, DEPOSITED, OR ACCUMULATED ON PAVED SECTIONS, IN THE FLOW LINES, PRIVATE PROPERTY, AND/OR PUBLIC RIGHTS-OF-WAY
OF THE CITY AS A RESULT OF THIS CONSTRUCTION PROJECT SHALL BE CLEANED UP.
4. AREAS REACHING SUBSTANTIAL COMPLETION OF GRADING AND TOPSOIL PLACEMENT OPERATIONS MUST BE DRILL SEEDED AND CRIMP MULCHED WITHIN 14 DAYS OF SUBSTANTIAL COMPLETION OF GRADING AND TOPSOIL OPERATIONS. IF AN INCOMPLETE AREA IS TO REMAIN INACTIVE FOR LONGER THAN 30 DAYS, IT MUST BE DRILL SEEDED AND CRIMP MULCHED OR OTHERWISE LANDSCAPED WITHIN 14 DAYS FROM
THE SUSPENSION OR COMPLETION OF LAND DISTURBANCE ACTIVITIES.
5. THIS APPROVED SWMP DESIGN DRAWING, THE ASSOCIATED APPROVED SWMP NARRATIVE, A COPY OF THE STORMWATER QUALITY DISCHARGE PERMIT, AND THE RULES AND REGULATIONS REGARDING STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION
ACTIVITIES MANUAL SHALL BE KEPT ON SITE AT ALL TIMES.
6. ACCUMULATED SEDIMENT AND DEBRIS SHALL BE REMOVED FROM A BMP (MAINTENANCE) WHEN THE SEDIMENT LEVEL OR DEBRIS ADVERSELY IMPACTS THE FUNCTIONING OF THE BMP OR AS DEFINED WITHIN THE RULES AND REGULATIONS REGARDING STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES MANUAL, WHICHEVER IS MORE RESTRICTIVE. IF MAINTENANCE OF THE BMP
DOES NOT RESTORE THE INTENDED FUNCTION, THEN THE BMP MUST BE REPLACED.
7. THE DISCHARGING OF CEMENT, CONCRETE, OR MORTAR FROM READY MIX DELIVERY TRUCKS, PUMP TRUCKS, BATCH PLANTS OR SMALL MECHANICAL MIXERS DIRECTLY ONTO PAVED SURFACES OR DISTURBED GROUND HAVING NO CONTAINMENT IS PROHIBITED. THE DISPOSAL OF ANY LIQUID WASTES OR WASH WATER FROM ANY OPERATIONS SUCH AS PAINTING, DRYWALL, OR TILE INSTALLATIONS DIRECTLY ONTO PAVED SURFACES OR THE GROUND WITHOUT CONTAINMENT IS PROHIBITED. THE PERMITTEE SHALL PROTECT ALL CURB FLOW LINES, ADJACENT WATERWAYS, WETLANDS, STORM SEWERS, STORM SEWER APPURTENANCES, OTHER PROPERTIES, ETC., ADJACENT TO ANY LOCATION WHERE PAVEMENT CUTTING OPERATIONS INVOLVING WHEEL CUTTING, SAW CUTTING, OR ABRASIVE WATER JET CUTTING ARE
TAKING PLACE.
8. IT SHALL BE THE RESPONSIBILITY OF THE PERMITTEE TO RESOLVE CONSTRUCTION PROBLEMS DUE TO CHANGING CONDITIONS OR DESIGN ERRORS THEY MAY ENCOUNTER DURING THE PROGRESS OF ANY PORTION OF THE WORK. IF CONDITIONS IN THE FIELD REQUIRE CHANGES AND THE PROPOSED MODIFICATIONS TO THE APPROVED PLANS INVOLVE SIGNIFICANT CHANGES TO THE CHARACTER OF THE WORK OR TO FUTURE CONTIGUOUS PUBLIC OR PRIVATE IMPROVEMENTS, THE CONTRACTOR, THROUGH THE ENGINEER OF RECORD, SHALL BE RESPONSIBLE TO REVISE PLANS AND SUBMIT THEM TO THE CITY OF AURORA FOR APPROVAL PRIOR TO ANY FURTHER CONSTRUCTION RELATED TO THAT PORTION OF THE WORK. ANY CONTROLS, FEATURES OR IMPROVEMENTS NOT CONSTRUCTED IN ACCORDANCE WITH THE APPROVED SWMP, CITY OF AURORA STANDARD DETAIL DESIGNS, CITY OF AURORA APPROVED VARIANCES, OR AN APPROVED DESIGN DRAWING AMENDMENT SHALL BE REMOVED AND THE CONTROLS, FEATURES AND/OR IMPROVEMENTS SHALL BE RECONSTRUCTED.
9. SECONDARY CONTAINMENT FEATURES SHALL BE IN PLACE FOR ANY BULK FUEL STORAGE, MIXERS, GENERATORS, OR ANY OTHER SPILL OR LEAK SOURCE THAT REMAINS ONSITE FOR A PERIOD LONGER THAN 7 CALENDAR DAYS. A RECOVERY OR SALVAGE DRUM SHALL BE KEPT
ON-SITE FOR STORAGE OF CONTAMINATED SOILS.
10. STRAW BALES AND RECYCLED ASPHALT OR CONCRETE ARE NOT ACCEPTABLE FOR THE CONSTRUCTION OF BMPS WITHIN THE CITY OF
AURORA AND MAY NOT BE USED.
1. A CITY OF AURORA STORMWATER QUALITY DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES MUST BE ISSUED BY THE CITY AND EXECUTED BY A COA EROSION CONTROL STAFF PRIOR TO ANY EARTHWORK ACTIVITIES. AN ON-SITE INSPECTION WILL BE CONDUCTED TO VERIFY THE CORRECT INSTALLATION AND ADEQUACY OF INITIAL BMPS FOR THE SITE. NO EARTHWORK, INCLUDING CLEARING AND GRUBBING, OR DEMOLITION ACTIVITIES ARE TO BEGIN UNTIL THE PROJECT SITE HAS PASSED AN INSPECTION AND THE CITY OF AURORA STORMWATER QUALITY DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES HAS BEEN EXECUTED. THE PERMITTEE IS REQUIRED TO PRESENT THE PROJECT'S CDPHE/WQCD STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY PERMIT TO THE INSPECTOR DURING THE INITIAL INSPECTION. THE PERMITTEE SHALL DESIGNATE A STORMWATER MANAGEMENT PLAN (SWMP) ADMINISTRATOR ON THE APPLICATION FOR THE CITY OF AURORA STORMWATER QUALITY DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES. THE SWMP ADMINISTRATOR WILL ACT AS THE PROJECT REPRESENTATIVE FOR ANY CONCERNS OR ISSUES REGARDING
ENVIRONMENTAL CONTROLS AND STORMWATER MANAGEMENT.
2. THESE REQUIREMENTS SHALL BE THE OBLIGATION OF THE PERMITTEE, UNTIL SUCH TIME AS THE PERMIT IS PROPERLY CLOSED, OR OTHERWISE ALLOWED BY THE CITY TO BE VOIDED, MODIFIED, TRANSFERRED, RE-ASSIGNED, OR REPLACED.
3. THIS SWMP NARRATIVE, THE SWMP DESIGN DRAWINGS, AND THE PERMITTEE'S INSPECTION AND MAINTENANCE RECORDS ARE ALL COMPONENTS OF REQUIRED RECORD KEEPING AND SHALL BE KEPT ON SITE AT ALL TIMES AND UPDATED AS REQUIRED. THESE AND ANY
OTHER PERTINENT RECORDS SHALL BE PROVIDED TO THE CITY WHEN REQUESTED.
4. ANY DISCREPANCY BETWEEN THIS SUMP AND ANY OTHER APPROVED STORMWATER MANAGEMENT PLAN FOR THIS SITE SHALL REQUIRE
COMPLIANCE WITH THE MORE RESTRICTIVE VALID, APPROVED PLAN.
5. STREETS SHALL BE CONSTRUCTED WITH ROUGH CUT STREET CONTROL MEASURES, SURFACE ROUGHENED, OR OTHERWISE TEMPORARILY STABILIZED WITH ROUGH CUT STREET CONTROLS WITHIN SEVEN (7) DAYS OF COMPLETION OF GRADING IN THE APPROPRIATE PHASE. IF PAVING IS TO OCCUR WITHIN FOURTEEN (14) DAYS AFTER FINAL GRADING, ROUGH CUT STREET CONTROLS
SHALL BE WAIVED.
6. INSPECTION AND MAINTENANCE OF EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMPS) ARE THE CONTINUOUS OBLIGATION OF THE PERMITTEE. BMPS SHALL BE INSPECTED AT A MINIMUM EVERY SEVEN (7) DAYS AND WITHIN 24 HOURS AFTER THE END OF A PRECIPITATION EVENT THAT PRODUCES RUN-OFF, AND FOLLOWING SNOWMELT EVENTS. IF A SITE IS TEMPORARILY IDLE AND NO CONSTRUCTION ACTIVITIES WILL OCCUR DURING THE 48 HOURS FOLLOWING A STORM EVENT, THE POST-PRECIPITATION EVENT (INCLUDING SNOWMELT) INSPECTION SHALL BE CONDUCTED PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES ON THE SITE, BUT NOT LATER THAN 72 HOURS FOLLOWING THE STORM EVENT. ALL NECESSARY MAINTENANCE AAND REPAIRS SHALL BE INITIATED AND COMPLETED ON AN ON-GOING BASIS, AS FEATURES ARE REQUIRED TO OPERATE CONTINUOUSLY. INSPECTIONS MAY NEED TO BE CONDUCTED AT A GREATER FREQUENCY THAN NOTED ABOVE, TO ENSURE FEATURES AND SYSTEMS ARE OPERATING ADEQUATELY.
EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED AND FUNCTIONAL FOR THE ENTIRE DURATION OF THE PROJECT.
7. INGRESS AND EGRESS VEHICLE ACCESS POINTS ONTO DISTURBED AREAS SHALL BE STABILIZED WITH VEHICLE TRACKING CONTROL PADS (VTC) AND SHALL BE CONSTRUCTED WITH ANGULAR ROCK, 3" TO 6" IN SIZE AND TO A DEPTH OF AT LEAST 9 INCHES. THE USE OF RECYCLED ASPHALT OR CONCRETE IS NOT PERMITTED. THE VTC SHALL BE INSTALLED OVER A LINER OF NON-WOVEN GEOTEXTILE WITH A WEIGHT OF AT LEAST 10 OZ/YD2 AND A GRAB TENSILE STRENGTH OF AT LEAST 250 POUNDS. NO DIRT OR OTHER MATERIALS SHALL BE PLACED ON PAVED SURFACES OR CURB FLOW LINES TO ACT AS CURB RAMPS. ONLY METAL RAMPS OR ROCK WATTLES MAY BE USED IN
THE CURB FLOW LINE.
8. FUGITIVE DUST EMISSIONS RESULTING FROM GRADING ACTIVITIES AND/OR WIND SHALL BE CONTROLLED USING REASONABLY AVAILABLE CONTROL TECHNOLOGY AS DEFINED BY THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT.
9. ALL POTENTIAL POLLUTION SOURCES ON-SITE SHALL BE IDENTIFIED AND CONTROL MEASURES INSTALLED AND PRACTICED TO MINIMIZE THE LIKELIHOOD OF A RELEASE. SPILL PREVENTION CONTROLS SHALL BE DEVELOPED FOR THE SITE WITH BMPS IN PLACE TO RESPOND
TO ANY SPILLS, LEAKS OR OTHER RELEASES.
10. HYDRAULIC MULCHING AS A MEANS TO COVER AND PROTECT SEEDING IS NOT AN ACCEPTABLE MEANS OF APPLYING MULCH IN THE CITY OF AURORA UNLESS A PREVIOUSLY INSTALLED IRRIGATION SYSTEM IS USED TO AID GERMINATION AND GROWTH AND WHERE APPROVED
THROUGH VARIANCE. HYDRAULIC SEEDING IS NOT PERMITTED.
11. FOR ALL POROUS LANDSCAPE DETENTION FACILITIES, IN ORDER TO PREVENT CLOGGING OF FILTER MEDIUM, INSTALLATION OF THE
FILTRATION SYSTEM MUST BE DELAYED UNTIL AFTER THE SITE IS FULLY LANDSCAPED.
12. IF STOCKPILES ARE LOCATED WITHIN 100 FEET OF A DRAINAGE WAY OR A PUBLIC STORM SEWER SYSTEM, ADDITIONAL SEDIMENT CONTROLS SUCH AS TEMPORARY DIVERSION DIKES, SILT FENCE, OR SEDIMENT BASIN SHALL BE REQUIRED
13. PROJECT SHALL COMPLY WITH UTILITY ENGINEERING INVESTIGATION AND DOCUMENTING REQUIREMENTS PRE CRS 9-1.5-101 ET SEQ., AS AMENDED, WHEN THEN PROJECT INCLUDES EXCAVATION. BY STAMPING THE PLAN THE ENGINEER OF RECORD IS CERTIFYING THE PLAN MEETS THE STANDARDS ESTABLISHED BY THE AMERICAN SOCIETY OF CIVIL ENGINEERS' ASCE 38 STANDARD, LATEST PUBLICATION, FOR
DEFINING THE ACCURACY OF A FACILITY OR UTILITY.
14. PROJECT SHALL COMPLY WITH AURORA WATER STANDARDS AND SPECIFICATIONS, LATEST EDITION, WHEN THE PROJECT INCLUDES EXCAVATION, INCLUDING BUT NOT LIMITED TO INSTALLATION OF ELECTRONICALLY TRACEABLE MARKERS OR BEING TRACEABLE BY
APPROVED ELECTRONIC METHODS FOR ALL SUBSURFACE UTILITIES.
APPROVED ON 03/25/2025
S
S
S
8''SS
8''SS 8''SS 8''SS
8''SS 8''SS
8''W
8''SS
8''SS
8''SS
8''SS
8''SS
8''SS
8''SS
8' 'W
8' 'W
8' 'W
8' 'W
8' 'W
8' 'W
8' 'W
8' 'W
8' 'W
8''W 8''W 8''W 8''W
8' 'W
8' 'W
8' 'W
8' 'W
8' 'W
8''SS
8''SS
8''SS
8''SS
8''SS
8''W 8''W
8''SS
8''SS 8''SS 8''SS8''SS 8''SS 8''SS 8''SS 8''SS
8' 'S
S
8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W
EC01,EC03
EC02,EC04
TRACT A
THE AURORA HIGHLANDS
SUBDIVISION FILING NO. 32
THE AURORA
HIGHLANDS ISP #1
CN# 2019-6016-00
THE AURORA HIGHLANDS
SITE PLAN #9
CN# 2020-6029-00
AURORA
HIGHLANDS
SUBDIVISION
FILING #15
EDN# 222118
MAI
N S
TR
EE
T (F
OUR LA
NE
AR
TE
RIA
L)
(P
UBL
IC
R
OW
W
ID
TH
V
AR
IE
S)
REC
. N
O. 2
E. WARM SPRINGS AVENUE
(COLLECTOR THREE LANE)
(78' PUBLIC ROW )
DA-2062-15
REC. NO. 2023000042190
N . C
AT
AW
BA
W
AY
(L
O C
AL
S
TR
EE
T
TY
PE
(P
U
BL
IC
R
O W
W
ID
TH
V
AR
IE
S) D
A -2
2-
R
E C
. N O
. 2
AURORA HIGHLANDS
SUBDIVISION
FILING #15
EDN# 222118
AURORA HIGHLANDS
SUBDIVISION
FILING #15
EDN# 222118
AURORA HIGHLANDS
SUBDIVISION
FILING #15
EDN# 222118
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
FILE NAME:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET
Know what's below.
before you dig.Call
R
KEY MAP: 1" = 500'
N
N
060 12060
SCALE: 1" = 60'
BENCHMARK
CITY OF AURORA BENCHMARK 3S6636NE003 BEING A 3" DIAM.
BRASS CAP (COA BM, 19-020B, E-090A) ATOP THE S. WALL @
THE S.E. COR. OF THE E. 26TH AVE. BRIDGE CROSSING OVER
E-470. BRASS CAP AT LOWER STEP ON WALL WHERE THE
RAILING ENDS ON THE E. END. AKA 19-020B.
ELEVATION = 5521.54 (NAVD88)
March 12, 2025 2:12:38 PM R:\23.1229.025 TAH Park PA-58\500 CADD\504 Plan Sets\Construction Plans\GEC Plan\ECX1.dwg
23.1229.025 04
MARCH 2025
ECX1
EROSION CONTROL INDEX SHEET
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
STORMWATER MANAGEMENT PLANS
THE AURORA HIGHLANDS SUNSET PARK
1"=60'
N/AGA
EG
EJK
APPROVED ON 03/25/2025
8''SS
8''SS
8''SS
8''SS
8''SS
8''SS
8''SS
8''SS
8''SS
8''SS
8''SS
8' 'W
8' 'W
8' 'W
8' 'W
8' 'W
8' 'W
8' 'W
8' 'W
8' 'W
8' 'W
8' 'W
S
THE AURORA HIGHLANDS
ISP #1 CN# 2019-6016-00
TH
E A
URORA H
IG
HLA
NDS
SITE
P
LA
N #9
CN# 2
0-6
9-0
1.
6%
1.6
2.
8%
2.3%
2.0%
9.2%
2.
6%
2.1
1.
9%
2.4%
3.9%
4:1
12" DIP WATER
EDN# 222235
12" PVC
SANITARY SEWER
EDN# 222235
30" RCP
STORM SEWER
EDN# 222118
36" STL WATER
EDN# 219314
24" PVC
SANITARY SEWER
EDN# 219062
M
AI
N
ST
RE
ET
(F
OUR
L
AN
E
AR
TE
RI
AL
(P
UB
LI
C
RO
W
W
ID
TH
V
AR
IE
S)
RE
C.
N O. 2
AURORA HIGHLANDS
SUBDIVISION
FILING #15
EDN# 222118
AURORA HIGHLANDS
SUBDIVISION
FILING #15
EDN# 222118
LOC
LOC
LOC
LOC
CF
CF
CF CF
LOC
LOC
CF
LOC
VTC
CWA
SSA
DD
DD
DD
CD
SB
ECB
ECB
SF
CF
SF
SF
SF SF
SF
SF
E. WARM SPRINGS AVENUE
(COLLECTOR THREE LANE)
(78' PUBLIC ROW )
DA-2062-15
REC. NO. 2023000042190
DISTURBED
DRAINAGE AREA
TO SB-1
DISTURBED
DRAINAGE AREA
TO SB-1
DISTURBED
DRAINAGE AREA
TO SB-1
2.
8%
2.
6%
1.
7%
1.4%
8.
1%
3.
3%
1.8
3.0
1.9
2.0%
2.
7%
1.7
4.
5%
1.4%
2.1
5493.00
DIVERSION DITCH (DD-1A)
LENGTH: 259 LF
SLOPE: 0.77%
CHECK DAM: EVERY 200 LF (1)
TEMPORARY SEDIMENT BASIN 1
TRIB AREA (DISTURBED) = 7.06 ACRES
VREQUIRED = 25,416 CF (0.58 AC-FT)
VPROVIDED = 38,702 CF (0.89 AC-FT)
W = 61' L = 115'
HD = 1.76"
BOT POND ELEV = 5487.00'
CREST ELEV = 5490.87'
TOP OF BERM = 5492.00'
EXISTING STORM
INVERT ELEV: 5484.73'
TEMP. 8" RISER PIPE (PVC)
L= 64 LF
S= 3.35%
SEE ECGN FOR INVERTS
1.
6%
TYPE M RIP-RAP RUNDOWN
12" DEEP
WIDTH=6'
LENGTH=20'
TYPE M RIP-RAP RUNDOWN
12" DEEP
WIDTH=6'
LENGTH=20'
1 12" - 2" CRUSHED ROCK
EMERGENCY SPILLWAY
EL= 5491'
CREST LEGNTH = 10'
N . C
AT
AW
BA
W
AY
(L
O C
AL
S
TR
EE
T
TY
PE
(P
U
BL
IC
R
O W
W
ID
TH
V
AR
IE
S) D
A -2
2-
R
E C
. N O
. 2
EXISTING POND 8540
EDN # 222235
54875488548954915491
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
FILE NAME:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET
Know what's below.
before you dig.Call
R
KEY MAP: 1" = 500'
N
STORMWATER MANAGEMENT
PLANS
March 12, 2025 2:13:14 PM R:\23.1229.025 TAH Park PA-58\500 CADD\504 Plan Sets\Construction Plans\GEC Plan\EC01.dwg
23.1229.025 05
MARCH 2025
EC01
EROSION CONTROL PLAN INITIAL PHASE
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
STORMWATER MANAGEMENT PLANS
THE AURORA HIGHLANDS SUNSET PARK
1"=30'
N/AGA
EG
EJK
MATCHLINE SEE SHEET EC02
BENCHMARK:
CITY OF AURORA BENCHMARK 3S6636NE003 BEING A
3" DIAM. BRASS CAP (COA BM, 19-020B, E-090A) ATOP
THE S. WALL @ THE S.E. COR. OF THE E. 26TH AVE.
BRIDGE CROSSING OVER E-470. BRASS CAP AT
LOWER STEP ON WALL WHERE THE RAILING ENDS ON
THE E. END. AKA 19-020B.
ELEVATION = 5521.54
NOTES:
1. REFER TO THE CITY OF AURORA STANDARD
SPECIFICATIONS FOR EROSION CONTROL DETAILS
AND SPECIFICATIONS.
2. STOCKPILE SHALL HAVE A MAXIMUM OF 3:1 SLOPES
AND BE A MAXIMUM OF 10 FEET IN HEIGHT.
3. FINAL DIMENSIONS AND LOCATIONS OF VTC, SSA
AND STOCKPILES TO BE DETERMINED BY THE
CONTRACTOR.
CD
DC
ECB
SF
SM
SR
SSA
TSC
VTC
LOC
SITE LEGEND
BMP
LEGEND
CF
RCS
SP
DRAINAGE ARROW
5490 EXISTING 5' CONTOUR
EXISTING 1' CONTOUR
1.00%
CWA
IP
PROPOSED 1' CONTOUR
PROPOSED 5' CONTOUR
OFFSITE PROPOSED 5' CONTOUR
(REFER TO PLAN FOR RSN
NUMBERS)
OFFSITE PROPOSED 1' CONTOUR
(REFER TO PLAN FOR RSN
NUMBERS)
N
030 6030
SCALE: 1" = 30'
APPROVED ON 03/25/2025
8''SS
8''SS
8''SS
2.2%
2.7%
3.2%
5:1
5:1 4:1
4:1
4:
5:1
0.40%
0.40%
0.40%
30" RCP
STORM SEWER
EDN# 222235
12" PVC
SANITARY SEWER
EDN# 222235
12" DIP WATER
EDN# 222235
18" RCP
STORM SEWER
EDN# 222118
42" RCP
STORM SEWER
EDN# 222235
72" RCP
STORM SEWER
EDN# 222235
30" RCP
STORM SEWER
EDN# 222118
E. WARM SPRINGS AVENUE
(COLLECTOR THREE LANE)
(78' PUBLIC ROW )
DA-2062-15
REC. NO. 2023000042190
LOC
LOC
CF
IP
IP
LOC
CF
CF
IP
CF
DD
CD
SF
SF
SF
1.8
2.0%
3.3%
5493.00
DIVERSION DITCH (DD-1B)
LENGTH: 390 LF
SLOPE: 0.51%
CHECK DAM: EVERY 200 LF (1)
2.6%
EXISTING POND 8540
EDN # 222235
EXISTING POND 8540
EDN # 219009
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
FILE NAME:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET
Know what's below.
before you dig.Call
R
KEY MAP: 1" = 500'
N
STORMWATER MANAGEMENT
PLANS
March 12, 2025 2:13:23 PM R:\23.1229.025 TAH Park PA-58\500 CADD\504 Plan Sets\Construction Plans\GEC Plan\EC01.dwg
23.1229.025 06
MARCH 2025
EC02
EROSION CONTROL PLAN INITIAL PHASE
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
STORMWATER MANAGEMENT PLANS
THE AURORA HIGHLANDS SUNSET PARK
1"=30'
N/AGA
EG
EJK
MATCHLINE SEE SHEET EC01
N
030 6030
SCALE: 1" = 30'
BENCHMARK:
CITY OF AURORA BENCHMARK 3S6636NE003 BEING A
3" DIAM. BRASS CAP (COA BM, 19-020B, E-090A) ATOP
THE S. WALL @ THE S.E. COR. OF THE E. 26TH AVE.
BRIDGE CROSSING OVER E-470. BRASS CAP AT
LOWER STEP ON WALL WHERE THE RAILING ENDS ON
THE E. END. AKA 19-020B.
ELEVATION = 5521.54
NOTES:
1. REFER TO THE CITY OF AURORA STANDARD
SPECIFICATIONS FOR EROSION CONTROL DETAILS
AND SPECIFICATIONS.
2. STOCKPILE SHALL HAVE A MAXIMUM OF 3:1 SLOPES
AND BE A MAXIMUM OF 10 FEET IN HEIGHT.
3. FINAL DIMENSIONS AND LOCATIONS OF VTC, SSA
AND STOCKPILES TO BE DETERMINED BY THE
CONTRACTOR.
CD
DC
ECB
SF
SM
SR
SSA
TSC
VTC
LOC
SITE LEGEND
BMP
LEGEND
CF
RCS
SP
DRAINAGE ARROW
5490 EXISTING 5' CONTOUR
EXISTING 1' CONTOUR
1.00%
CWA
IP
PROPOSED 1' CONTOUR
PROPOSED 5' CONTOUR
OFFSITE PROPOSED 5' CONTOUR
(REFER TO PLAN FOR RSN
NUMBERS)
OFFSITE PROPOSED 1' CONTOUR
(REFER TO PLAN FOR RSN
NUMBERS)
APPROVED ON 03/25/2025
8''SS
8''SS
8''SS
8''SS
8''SS
8''SS
8''SS
8''SS
8''SS
8''SS
S
2.0
2.
0%
2.0%
2.
0%
2.0%
4.
4%
3.3%
7.
8%
2.1%
4.2%
2.2
1.1%
3.8%
8:1
5.
0%
2.
0%
2.
3%
2.5%
2.1%
BIKE RACK,
TYP.
TRASH
RECEPTACLE,
TYP.
PROP 24"X24"
SUMP INLET
PROP 6" PVC
STORM SEWER
PROP 6" PVC
STORM SEWER
FITNESS
AREA
PICNIC
AREA
BENCH
PICNIC
AREA
FITNESS
AREA
FITNESS
AREA
BOCCE BALL
4' PATH
10' SDWK
10' SDWK
10' SDWK
6' PATH
6' PATH
8' PATH
6' PATH
10' SDWK
10' SDWK
4:1
PLAY AREA
(TURF)
BIKE RACK,
TYP.
IP
IP SR
SM
SR
SR
SR
SR
SR
SM
SR
SM
SM
SM
SM
SM
LOC
LOC
LOC
LOC
CF
CF
CF CF
LOC
LOC
CF
LOC
VTC
CWA
SSA
DD
DD
DD
CD
SB
ECB
ECB
SF
CF
SF
SF
SF SF
SF
SF
12" DIP WATER
EDN# 222235
TRACT A
THE AURORA HIGHLANDS
SUBDIVISION FILING NO. 32
THE AURORA HIGHLANDS
ISP #1 CN# 2019-6016-00
TH
E A
URORA H
IG
HLA
NDS
SITE
P
LA
N #9
CN# 2
0-6
9-0
10' SDWK
PLAYGROUND
(ENGINEERED
WOOD FIBER PLAY
SURFACING)
LANDSCAPE
AREA
4:1
4:
4:1
4:1
4:1
4:1
2:1
6:1
5:1
0.2%
0.4%
1.
0%
0.
8%
0.5%
1.1%
0.0%
0.9%
E. WARM SPRINGS AVENUE
(COLLECTOR THREE LANE)
(78' PUBLIC ROW )
DA-2062-15
REC. NO. 2023000042190
AURORA
HIGHLANDS
SUBDIVISION
FILING #15
EDN# 222118
AURORA
HIGHLANDS
SUBDIVISION
FILING #15
EDN# 222118
EX
IS
TI
N
G S
ID
EW
AL
K
EX
IS
TI
NG S
ID
EW
AL
K
EXISTING SIDEWALK
MAIN
S
TR
EET
(F
OUR LA
NE A
RTE
RIA
L)
(P
UBLIC
R
OW
W
ID
TH
V
ARIE
S)
REC. N
O. 2
N . C
AT
AW
BA
W
AY
(L
O C
AL
S
TR
EE
T
TY
PE
(P
U
BL
IC
R
O W
W
ID
TH
V
AR
IE
S) D
A -2
2-
R
E C
. N O
. 2
EXISTING POND 8540
EDN # 222235
PROP 24"X24"
UNDERDRAIN
C.O.
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
FILE NAME:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET
Know what's below.
before you dig.Call
R
KEY MAP: 1" = 500'
N
STORMWATER MANAGEMENT
PLANS
March 12, 2025 2:13:55 PM R:\23.1229.025 TAH Park PA-58\500 CADD\504 Plan Sets\Construction Plans\GEC Plan\EC02.dwg
23.1229.025 07
MARCH 2025
EC03
EROSION CONTROL PLAN FINAL PHASE
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
STORMWATER MANAGEMENT PLANS
THE AURORA HIGHLANDS SUNSET PARK
1"=30'
N/AGA
EG
EJK
MATCHLINE SEE SHEET EC04
BENCHMARK:
CITY OF AURORA BENCHMARK 3S6636NE003 BEING A
3" DIAM. BRASS CAP (COA BM, 19-020B, E-090A) ATOP
THE S. WALL @ THE S.E. COR. OF THE E. 26TH AVE.
BRIDGE CROSSING OVER E-470. BRASS CAP AT
LOWER STEP ON WALL WHERE THE RAILING ENDS ON
THE E. END. AKA 19-020B.
ELEVATION = 5521.54
NOTES:
1. REFER TO THE CITY OF AURORA STANDARD
SPECIFICATIONS FOR EROSION CONTROL DETAILS
AND SPECIFICATIONS.
2. STOCKPILE SHALL HAVE A MAXIMUM OF 3:1 SLOPES
AND BE A MAXIMUM OF 10 FEET IN HEIGHT.
3. FINAL DIMENSIONS AND LOCATIONS OF VTC, SSA
AND STOCKPILES TO BE DETERMINED BY THE
CONTRACTOR.
CD
DC
ECB
SF
SM
SR
SSA
TSC
VTC
LOC
SITE LEGEND
BMP
LEGEND
CF
RCS
SP
DRAINAGE ARROW
5490 EXISTING 5' CONTOUR
EXISTING 1' CONTOUR
1.00%
CWA
IP
PROPOSED 1' CONTOUR
PROPOSED 5' CONTOUR
OFFSITE PROPOSED 5' CONTOUR
(REFER TO PLAN FOR RSN
NUMBERS)
OFFSITE PROPOSED 1' CONTOUR
(REFER TO PLAN FOR RSN
NUMBERS)
N
030 6030
SCALE: 1" = 30'
APPROVED ON 03/25/2025
8''SS
8''SS
8''SS
4.0%
2.2
3.6%
8.9%
3.6%
FITNESS AREA
PROP 24"X24"
SUMP INLET
PROP 6" PVC
STORM SEWER
FITNESS AREA
FITNESS AREA
PICKLEBALL
COURTS
5:1
5:1
4:1
4:1
4:
5:1
0.40%
0.40%
0.40%
EX 12'
ACCESS
10' SDWK
IP
IP
SM
SR
LOC
LOC
CF
IP
IP
LOC
CF
CF
IP
CF
DD
CD
SF
SF
SF
30" RCP
STORM SEWER
EDN# 222118PROPOSED
JERSEY
BARRIERS
30" RCP
STORM SEWER
EDN# 222235
LANDSCAPE
AREA
4:
4.4%
2.9%
6:
5:1 5:1
0.9%
1.1%
E. WARM SPRINGS AVENUE
(COLLECTOR THREE LANE)
(78' PUBLIC ROW )
DA-2062-15
REC. NO. 2023000042190
EXISTING SIDEWALK
EXISTING POND 8540
EDN # 222235
EXISTING POND 8540
EDN # 219009
54925492
5496 54
98 5499
HORIZ.
VERT.
DESIGNED BY:
DRAWN BY:
CHECKED BY:
SCALE DATE ISSUED: DRAWING No.
SEAL
FOR AND ON BEHALF OF
MATRIX DESIGN GROUP, INC.
PROJECT No.
PREPARED BY:
FILE NAME:
PLOT DATE:
THIS DRAWING IS CURRENT AS OF PLOT DATE AND MAY BE SUBJECT TO CHANGE.
COMPUTER FILE MANAGEMENT
No. DATE DESCRIPTION BY
REVISIONS
SHEET
Know what's below.
before you dig.Call
R
KEY MAP: 1" = 500'
N
STORMWATER MANAGEMENT
PLANS
March 12, 2025 2:14:02 PM R:\23.1229.025 TAH Park PA-58\500 CADD\504 Plan Sets\Construction Plans\GEC Plan\EC02.dwg
23.1229.025 08
MARCH 2025
EC04
EROSION CONTROL PLAN FINAL PHASE
CITY OF AURORA, COUNTY OF ADAMS, STATE OF COLORADO
STORMWATER MANAGEMENT PLANS
THE AURORA HIGHLANDS SUNSET PARK
1"=30'
N/AGA
EG
EJK
MATCHLINE SEE SHEET EC03
N
030 6030
SCALE: 1" = 30'
BENCHMARK:
CITY OF AURORA BENCHMARK 3S6636NE003 BEING A
3" DIAM. BRASS CAP (COA BM, 19-020B, E-090A) ATOP
THE S. WALL @ THE S.E. COR. OF THE E. 26TH AVE.
BRIDGE CROSSING OVER E-470. BRASS CAP AT
LOWER STEP ON WALL WHERE THE RAILING ENDS ON
THE E. END. AKA 19-020B.
ELEVATION = 5521.54
NOTES:
1. REFER TO THE CITY OF AURORA STANDARD
SPECIFICATIONS FOR EROSION CONTROL DETAILS
AND SPECIFICATIONS.
2. STOCKPILE SHALL HAVE A MAXIMUM OF 3:1 SLOPES
AND BE A MAXIMUM OF 10 FEET IN HEIGHT.
3. FINAL DIMENSIONS AND LOCATIONS OF VTC, SSA
AND STOCKPILES TO BE DETERMINED BY THE
CONTRACTOR.
CD
DC
ECB
SF
SM
SR
SSA
TSC
VTC
LOC
SITE LEGEND
BMP
LEGEND
CF
RCS
SP
DRAINAGE ARROW
5490 EXISTING 5' CONTOUR
EXISTING 1' CONTOUR
1.00%
CWA
IP
PROPOSED 1' CONTOUR
PROPOSED 5' CONTOUR
OFFSITE PROPOSED 5' CONTOUR
(REFER TO PLAN FOR RSN
NUMBERS)
OFFSITE PROPOSED 1' CONTOUR
(REFER TO PLAN FOR RSN
NUMBERS)
APPROVED ON 03/25/2025
File details come from the government source that posted it. Updated .