About this file

This is a pre-solicitation notice and bid schedule for a design-bid-build construction project at Travis Air Force Base, California. The solicitation (FA8903-25-B-0002) seeks a contractor to demolish and replace approximately 60,000 square yards of concrete pavement and associated underground drainage utilities at the 400 Aircraft Parking Ramp, covering Phases 5 and 8. The project is a total small business set-aside with a price range of $25M-$100M, using NAICS code 237310 (Highway, Street, and Bridge Construction), and has a size standard of $45M.

Key project details include a site visit scheduled for 03 June 2025, with attendee registration due by 20 May 2025. The solicitation will be posted on SAM.gov on 23 July 2025, with sealed bids due on 25 August 2025 at 11:00 AM Central Time. The contractor will be required to establish an on-site staging area with a batch plant capable of producing 250 cubic yards of concrete per hour. Project completion time is 420 days for the base bid and 510 days if including the Phase 8 option. Contracting points of contact are Mr. David Foote and Ms. Monica Gallegos from the Air Force Installation Contracting Agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CSI Summary

Contractor's Name
Project No.:XDAT06100105 & XDAT06100108
Project Title:Repair 400 Aircraft Parking Ramp Phases 5 & 8
Project Location:TRAVIS AFB, CA
Contracting No.:TBD
Task Order No.:N/A
Date:09 July 2025
CSI SUMMARY

MasterSpec Divisions Total

Division 01 — General Conditions
Division 02 — Existing Conditions
Division 03 — Concrete
Division 04 — Masonry
Division 05 — Metal
Division 06 — Wood, Plastics, and Composites
Division 07 — Thermal and Moisture Protection
Division 08 — Openings
Division 09 — Finishes
Division 10 — Specialties
Division 11 — Equipment
Division 12 — Furnishings
Division 13 — Special Construction
Division 14 — Conveyance
Division 21 — Fire Suppression
Division 22 — Plumbing
Division 23 — Heating Ventilating and Air Conditioning
Division 25 — Cybersecurity
Division 26 — Electrical
Division 27 — Communications
Division 28 — Electronic Safety and Security
Division 31 — Earthwork
Division 32 — Exterior Improvements
Division 33 — Utilities
BASE BID ITEMS
CLIN #CLIN DescriptionUICLIN Price
BASE BID ITEMS
0001Base Bid Item 1 400 Aircraft Parking Ramp Phase VLS
0002Option Item #1 400 Aircraft Parking Ramp Phase VIIILS
Base Bid Items Subtotal$ -
OPTIONS
N/A$ -
Bid Options Subtotal$ -
Grand Total for All CLINs$ -
Project Completion Time (Base Bid Only):420days from Award Date.
Project Completion Time (Base Bid + Option 1):510days from Award Date.

&"-,Bold"&A

&"-,Bold"Page &P of &N

Col C - CSI Subtotal from each Base Bid Item and Bid Option Tabs