Tabulation_Packet_for_201922KW_Att.F.pdf

PDF 1 MB Posted

Attached to
Unit Price Contract (UPC) for Stormwater Pipeline Infrastructure Rehabilitation
Solicitation number
252720FB
Issued by
Sarasota County, Florida

About this file

The document is a bid tabulation packet for Sarasota County's Unit Price Contract (UPC) for Stormwater Pipeline Infrastructure Rehabilitation, solicitation number 201922KW. The invitation for bids covers a comprehensive infrastructure rehabilitation project for stormwater pipelines, with an anticipated initial contract term of 3 years. The bid was open from November 27, 2019, to January 15, 2020, with multiple contractors submitting bids across three distinct categories of pipeline rehabilitation work. The project involves CIPP (Cured-In-Place Pipe) lining for pipes ranging from 12 inches to 84 inches in diameter, including various repair, cleaning, and ancillary services.

Six contractors submitted bids: Granite Inliner, LLC ($16,173,175), Insituform Technologies, LLC ($14,786,189), Miller Pipeline ($2,783,110), Shenandoah General Construction ($11,102,980), Vortex Services, LLC ($13,393,980), and Hinterland Group, Inc. ($7,153,150). Miller Pipeline and Vortex Services only bid on specific categories, with Miller Pipeline focusing solely on Category 1 and Vortex Services not participating in Category 3. The bids included detailed pricing for main lining, repair sleeves, joint repairs, lateral reconnections, cleaning, and various ancillary services, with unit prices varying based on pipe diameter, thickness, and specific rehabilitation requirements. As of the document date, the contract had not yet been awarded.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Tabulation Packet for

Solicitation 201922KW

Unit Price Contract for Stormwater Pipeline Infrastructure Rehabilitation

Bid Designation: Public

Sarasota County

201922KWSarasota County

BidSync1/15/2020 p. 1

Bid #201922KW - Unit Price Contract for Stormwater Pipeline Infrastructure

Rehabilitation

Creation Date Nov 26, 2019 End Date Jan 15, 2020 2:30:00 PM EST

Start Date Nov 27, 2019 1:16:57 PM EST Awarded Date Not Yet Awarded

201922KW-04-01 Letter of Bondabi l i ty: Letter of Bondabi l i ty

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Letter of Bondability Attached

201922KW--01 -01 Category 1: Category 1 - Contractor Qualif ication Form(s)

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Bid Form 1 Reference Attached

201922KW--01 -02 Category 1: Category 1 -Bid Form

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Category 1 Bid Form Attached

201922KW--01 -03 Category 1: Total Bid Price for Category 1

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - $1,423,030.00 1 / each $1,423,030.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - $1,888,350.00 1 / each $1,888,350.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - $2,736,477.60 1 / each $2,736,477.60 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - $2,783,110.00 1 / each $2,783,110.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - $2,898,200.00 1 / each $2,898,200.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - $3,319,780.00 1 / each $3,319,780.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

201922KW--02 -01 Category 2: Category 2 - Contractor Qualif ication Form(s)

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: NOT BIDDING THIS CATEGORY

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Bid Form 2 Reference Attached

201922KW--02 -02 Category 2: Category 2 - Bid Form

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / sheet Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Granite Inliner, LLC First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Category 2 Bid Form Attached

201922KW--02 -03 Category 2: Total Bid Price for Category 2

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Miller Pipeline First Offer - $0.00 1 / sheet $0.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Shenandoah General Construction First Offer - $4,060,990.00 1 / sheet $4,060,990.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - $4,744,769.40 1 / sheet $4,744,769.40 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - $5,264,800.00 1 / sheet $5,264,800.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - $6,042,475.00 1 / sheet $6,042,475.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - $10,074,200.00 1 / sheet $10,074,200.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

201922KW--03 -01 Category 3: Category 3 - Contractor Qualif ication Form(s)

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Bid Form 3 References Attached

201922KW--03 -02 Category 3: Category 3 - Bid Form

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: We will not be bidding this section.

Hinterland Group, Inc. First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Category 3 Bid Form Attached

201922KW--03 -03 Category 3: Total Bid Price for Category 3

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Vortex Services, LLC. First Offer - $0.00 1 / each $0.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - $0.00 1 / each $0.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Shenandoah General Construction First Offer - $5,618,960.00 1 / each $5,618,960.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - $7,232,500.00 1 / each $7,232,500.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - $7,304,942.00 1 / each $7,304,942.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Supplier Totals f Granite Inliner, LLC $16,173,175.00 (10/10 items)

Bid Contact Michael Cannon mike.cannon@gcinc.com

Ph 407 -472 -0014

Address 2531 Jewett Lane

Sanford, FL 32771

Qualifications 2 CFR FL CBE IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PR PUBLIC

ENTITY

Agency Notes: Supplier Notes: Head

Attch:

f Insituform Technologies, LLC $14,786,189.00 (10/10 items)

Bid Contact Chrissy Koller ckoller@aegion.com

Ph 636 -530 -8610

Address 17988 Edison Avenue

Chesterfield, MO 63005

Qualifications 2 CFR FL CBE IMMIGRATION JV LEGAL NAME LOCAL HIRING NO LOBBY PR

PUBLIC ENTITY

Agency Notes: Supplier Notes: Head

Attch:

f Miller Pipeline $2,783,110.00 (10/10 items)

Bid Contact Emy Belich jeff.newman@millerpipeline.com

Ph 317 -653 -5296

Fax 317-293 -8502

Address 8850 Crawfordsville Rd.

Indianapolis, IN 46234

Qualifications IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PUBLIC ENTITY

Bid Notes ONLY BIDDING CATEGORY 1

Agency Notes: Supplier Notes:

ONLY BIDDING CATEGORY 1

Head

Attch:

f Shenandoah General Construction $11,102,980.00 (10/10 items)

Bid Contact Margaret Lary

Margaret.Lary@shenandoahconstruction.com

Ph 954 -975 -0098

Fax 954-975 -9718

Address 1888 NW 22 Street

Pompano Beach, FL

33069

Qualifications 2 CFR IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PR PUBLIC ENTITY

Agency Notes: Supplier Notes: Head

Attch:

f Vortex Services, LLC. $13,393,980.00 (10/10 items)

Bid Contact Wesley Kingery ccorrigan@vortexcompanies.com

Ph 813 -626 -0700

Address 10200 US Hwy 92 E

Tampa, FL 33610

Qualifications FL CBE IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PUBLIC ENTITY

Agency Notes: Supplier Notes: Head

Attch:

Hinterland Group, Inc. $7,153,150.00 (9/10 items)

Bid Contact Daniel Duke III info@hinterlandgroup.com

Ph 321 -633 -7066

Address 5580 S.R. 524

Cocoa, FL 32926

Qualifications 2 CFR FL CBE IMMIGRATION JV LEGAL NAME LOCAL HIRING NO LOBBY PR PUBLIC

ENTITY

Agency Notes: Supplier Notes:

BidSync1/15/2020 p. 2

Bid #201922KW - Unit Price Contract for Stormwater Pipeline Infrastructure

Rehabilitation

Creation Date Nov 26, 2019 End Date Jan 15, 2020 2:30:00 PM EST

Start Date Nov 27, 2019 1:16:57 PM EST Awarded Date Not Yet Awarded

201922KW-04-01 Letter of Bondabi l i ty: Letter of Bondabi l i ty

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Letter of Bondability Attached

201922KW--01 -01 Category 1: Category 1 - Contractor Qualif ication Form(s)

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Bid Form 1 Reference Attached

201922KW--01 -02 Category 1: Category 1 -Bid Form

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Category 1 Bid Form Attached

201922KW--01 -03 Category 1: Total Bid Price for Category 1

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - $1,423,030.00 1 / each $1,423,030.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - $1,888,350.00 1 / each $1,888,350.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - $2,736,477.60 1 / each $2,736,477.60 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - $2,783,110.00 1 / each $2,783,110.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - $2,898,200.00 1 / each $2,898,200.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - $3,319,780.00 1 / each $3,319,780.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

201922KW--02 -01 Category 2: Category 2 - Contractor Qualif ication Form(s)

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: NOT BIDDING THIS CATEGORY

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Bid Form 2 Reference Attached

201922KW--02 -02 Category 2: Category 2 - Bid Form

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / sheet Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Granite Inliner, LLC First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Category 2 Bid Form Attached

201922KW--02 -03 Category 2: Total Bid Price for Category 2

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Miller Pipeline First Offer - $0.00 1 / sheet $0.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Shenandoah General Construction First Offer - $4,060,990.00 1 / sheet $4,060,990.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - $4,744,769.40 1 / sheet $4,744,769.40 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - $5,264,800.00 1 / sheet $5,264,800.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - $6,042,475.00 1 / sheet $6,042,475.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - $10,074,200.00 1 / sheet $10,074,200.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

201922KW--03 -01 Category 3: Category 3 - Contractor Qualif ication Form(s)

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Bid Form 3 References Attached

201922KW--03 -02 Category 3: Category 3 - Bid Form

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: We will not be bidding this section.

Hinterland Group, Inc. First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Category 3 Bid Form Attached

201922KW--03 -03 Category 3: Total Bid Price for Category 3

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Vortex Services, LLC. First Offer - $0.00 1 / each $0.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - $0.00 1 / each $0.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Shenandoah General Construction First Offer - $5,618,960.00 1 / each $5,618,960.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - $7,232,500.00 1 / each $7,232,500.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - $7,304,942.00 1 / each $7,304,942.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Supplier Totals f Granite Inliner, LLC $16,173,175.00 (10/10 items)

Bid Contact Michael Cannon mike.cannon@gcinc.com

Ph 407 -472 -0014

Address 2531 Jewett Lane

Sanford, FL 32771

Qualifications 2 CFR FL CBE IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PR PUBLIC

ENTITY

Agency Notes: Supplier Notes: Head

Attch:

f Insituform Technologies, LLC $14,786,189.00 (10/10 items)

Bid Contact Chrissy Koller ckoller@aegion.com

Ph 636 -530 -8610

Address 17988 Edison Avenue

Chesterfield, MO 63005

Qualifications 2 CFR FL CBE IMMIGRATION JV LEGAL NAME LOCAL HIRING NO LOBBY PR

PUBLIC ENTITY

Agency Notes: Supplier Notes: Head

Attch:

f Miller Pipeline $2,783,110.00 (10/10 items)

Bid Contact Emy Belich jeff.newman@millerpipeline.com

Ph 317 -653 -5296

Fax 317-293 -8502

Address 8850 Crawfordsville Rd.

Indianapolis, IN 46234

Qualifications IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PUBLIC ENTITY

Bid Notes ONLY BIDDING CATEGORY 1

Agency Notes: Supplier Notes:

ONLY BIDDING CATEGORY 1

Head

Attch:

f Shenandoah General Construction $11,102,980.00 (10/10 items)

Bid Contact Margaret Lary

Margaret.Lary@shenandoahconstruction.com

Ph 954 -975 -0098

Fax 954-975 -9718

Address 1888 NW 22 Street

Pompano Beach, FL

33069

Qualifications 2 CFR IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PR PUBLIC ENTITY

Agency Notes: Supplier Notes: Head

Attch:

f Vortex Services, LLC. $13,393,980.00 (10/10 items)

Bid Contact Wesley Kingery ccorrigan@vortexcompanies.com

Ph 813 -626 -0700

Address 10200 US Hwy 92 E

Tampa, FL 33610

Qualifications FL CBE IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PUBLIC ENTITY

Agency Notes: Supplier Notes: Head

Attch:

Hinterland Group, Inc. $7,153,150.00 (9/10 items)

Bid Contact Daniel Duke III info@hinterlandgroup.com

Ph 321 -633 -7066

Address 5580 S.R. 524

Cocoa, FL 32926

Qualifications 2 CFR FL CBE IMMIGRATION JV LEGAL NAME LOCAL HIRING NO LOBBY PR PUBLIC

ENTITY

Agency Notes: Supplier Notes:

BidSync1/15/2020 p. 3

Bid #201922KW - Unit Price Contract for Stormwater Pipeline Infrastructure

Rehabilitation

Creation Date Nov 26, 2019 End Date Jan 15, 2020 2:30:00 PM EST

Start Date Nov 27, 2019 1:16:57 PM EST Awarded Date Not Yet Awarded

201922KW-04-01 Letter of Bondabi l i ty: Letter of Bondabi l i ty

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Letter of Bondability Attached

201922KW--01 -01 Category 1: Category 1 - Contractor Qualif ication Form(s)

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Bid Form 1 Reference Attached

201922KW--01 -02 Category 1: Category 1 -Bid Form

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Category 1 Bid Form Attached

201922KW--01 -03 Category 1: Total Bid Price for Category 1

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - $1,423,030.00 1 / each $1,423,030.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - $1,888,350.00 1 / each $1,888,350.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - $2,736,477.60 1 / each $2,736,477.60 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - $2,783,110.00 1 / each $2,783,110.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - $2,898,200.00 1 / each $2,898,200.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - $3,319,780.00 1 / each $3,319,780.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

201922KW--02 -01 Category 2: Category 2 - Contractor Qualif ication Form(s)

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: NOT BIDDING THIS CATEGORY

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Bid Form 2 Reference Attached

201922KW--02 -02 Category 2: Category 2 - Bid Form

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / sheet Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Granite Inliner, LLC First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Category 2 Bid Form Attached

201922KW--02 -03 Category 2: Total Bid Price for Category 2

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Miller Pipeline First Offer - $0.00 1 / sheet $0.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Shenandoah General Construction First Offer - $4,060,990.00 1 / sheet $4,060,990.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - $4,744,769.40 1 / sheet $4,744,769.40 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - $5,264,800.00 1 / sheet $5,264,800.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - $6,042,475.00 1 / sheet $6,042,475.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - $10,074,200.00 1 / sheet $10,074,200.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

201922KW--03 -01 Category 3: Category 3 - Contractor Qualif ication Form(s)

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Bid Form 3 References Attached

201922KW--03 -02 Category 3: Category 3 - Bid Form

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: We will not be bidding this section.

Hinterland Group, Inc. First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Category 3 Bid Form Attached

201922KW--03 -03 Category 3: Total Bid Price for Category 3

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Vortex Services, LLC. First Offer - $0.00 1 / each $0.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - $0.00 1 / each $0.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Shenandoah General Construction First Offer - $5,618,960.00 1 / each $5,618,960.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - $7,232,500.00 1 / each $7,232,500.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - $7,304,942.00 1 / each $7,304,942.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Supplier Totals f Granite Inliner, LLC $16,173,175.00 (10/10 items)

Bid Contact Michael Cannon mike.cannon@gcinc.com

Ph 407 -472 -0014

Address 2531 Jewett Lane

Sanford, FL 32771

Qualifications 2 CFR FL CBE IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PR PUBLIC

ENTITY

Agency Notes: Supplier Notes: Head

Attch:

f Insituform Technologies, LLC $14,786,189.00 (10/10 items)

Bid Contact Chrissy Koller ckoller@aegion.com

Ph 636 -530 -8610

Address 17988 Edison Avenue

Chesterfield, MO 63005

Qualifications 2 CFR FL CBE IMMIGRATION JV LEGAL NAME LOCAL HIRING NO LOBBY PR

PUBLIC ENTITY

Agency Notes: Supplier Notes: Head

Attch:

f Miller Pipeline $2,783,110.00 (10/10 items)

Bid Contact Emy Belich jeff.newman@millerpipeline.com

Ph 317 -653 -5296

Fax 317-293 -8502

Address 8850 Crawfordsville Rd.

Indianapolis, IN 46234

Qualifications IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PUBLIC ENTITY

Bid Notes ONLY BIDDING CATEGORY 1

Agency Notes: Supplier Notes:

ONLY BIDDING CATEGORY 1

Head

Attch:

f Shenandoah General Construction $11,102,980.00 (10/10 items)

Bid Contact Margaret Lary

Margaret.Lary@shenandoahconstruction.com

Ph 954 -975 -0098

Fax 954-975 -9718

Address 1888 NW 22 Street

Pompano Beach, FL

33069

Qualifications 2 CFR IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PR PUBLIC ENTITY

Agency Notes: Supplier Notes: Head

Attch:

f Vortex Services, LLC. $13,393,980.00 (10/10 items)

Bid Contact Wesley Kingery ccorrigan@vortexcompanies.com

Ph 813 -626 -0700

Address 10200 US Hwy 92 E

Tampa, FL 33610

Qualifications FL CBE IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PUBLIC ENTITY

Agency Notes: Supplier Notes: Head

Attch:

Hinterland Group, Inc. $7,153,150.00 (9/10 items)

Bid Contact Daniel Duke III info@hinterlandgroup.com

Ph 321 -633 -7066

Address 5580 S.R. 524

Cocoa, FL 32926

Qualifications 2 CFR FL CBE IMMIGRATION JV LEGAL NAME LOCAL HIRING NO LOBBY PR PUBLIC

ENTITY

Agency Notes: Supplier Notes:

BidSync1/15/2020 p. 4

Bid #201922KW - Unit Price Contract for Stormwater Pipeline Infrastructure

Rehabilitation

Creation Date Nov 26, 2019 End Date Jan 15, 2020 2:30:00 PM EST

Start Date Nov 27, 2019 1:16:57 PM EST Awarded Date Not Yet Awarded

201922KW-04-01 Letter of Bondabi l i ty: Letter of Bondabi l i ty

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Letter of Bondability Attached

201922KW--01 -01 Category 1: Category 1 - Contractor Qualif ication Form(s)

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Bid Form 1 Reference Attached

201922KW--01 -02 Category 1: Category 1 -Bid Form

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Category 1 Bid Form Attached

201922KW--01 -03 Category 1: Total Bid Price for Category 1

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - $1,423,030.00 1 / each $1,423,030.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - $1,888,350.00 1 / each $1,888,350.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - $2,736,477.60 1 / each $2,736,477.60 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - $2,783,110.00 1 / each $2,783,110.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - $2,898,200.00 1 / each $2,898,200.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - $3,319,780.00 1 / each $3,319,780.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

201922KW--02 -01 Category 2: Category 2 - Contractor Qualif ication Form(s)

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: NOT BIDDING THIS CATEGORY

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Bid Form 2 Reference Attached

201922KW--02 -02 Category 2: Category 2 - Bid Form

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / sheet Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Granite Inliner, LLC First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Category 2 Bid Form Attached

201922KW--02 -03 Category 2: Total Bid Price for Category 2

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Miller Pipeline First Offer - $0.00 1 / sheet $0.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Shenandoah General Construction First Offer - $4,060,990.00 1 / sheet $4,060,990.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - $4,744,769.40 1 / sheet $4,744,769.40 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - $5,264,800.00 1 / sheet $5,264,800.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - $6,042,475.00 1 / sheet $6,042,475.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - $10,074,200.00 1 / sheet $10,074,200.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

201922KW--03 -01 Category 3: Category 3 - Contractor Qualif ication Form(s)

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Bid Form 3 References Attached

201922KW--03 -02 Category 3: Category 3 - Bid Form

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: We will not be bidding this section.

Hinterland Group, Inc. First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Category 3 Bid Form Attached

201922KW--03 -03 Category 3: Total Bid Price for Category 3

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Vortex Services, LLC. First Offer - $0.00 1 / each $0.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - $0.00 1 / each $0.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Shenandoah General Construction First Offer - $5,618,960.00 1 / each $5,618,960.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - $7,232,500.00 1 / each $7,232,500.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - $7,304,942.00 1 / each $7,304,942.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Supplier Totals f Granite Inliner, LLC $16,173,175.00 (10/10 items)

Bid Contact Michael Cannon mike.cannon@gcinc.com

Ph 407 -472 -0014

Address 2531 Jewett Lane

Sanford, FL 32771

Qualifications 2 CFR FL CBE IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PR PUBLIC

ENTITY

Agency Notes: Supplier Notes: Head

Attch:

f Insituform Technologies, LLC $14,786,189.00 (10/10 items)

Bid Contact Chrissy Koller ckoller@aegion.com

Ph 636 -530 -8610

Address 17988 Edison Avenue

Chesterfield, MO 63005

Qualifications 2 CFR FL CBE IMMIGRATION JV LEGAL NAME LOCAL HIRING NO LOBBY PR

PUBLIC ENTITY

Agency Notes: Supplier Notes: Head

Attch:

f Miller Pipeline $2,783,110.00 (10/10 items)

Bid Contact Emy Belich jeff.newman@millerpipeline.com

Ph 317 -653 -5296

Fax 317-293 -8502

Address 8850 Crawfordsville Rd.

Indianapolis, IN 46234

Qualifications IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PUBLIC ENTITY

Bid Notes ONLY BIDDING CATEGORY 1

Agency Notes: Supplier Notes:

ONLY BIDDING CATEGORY 1

Head

Attch:

f Shenandoah General Construction $11,102,980.00 (10/10 items)

Bid Contact Margaret Lary

Margaret.Lary@shenandoahconstruction.com

Ph 954 -975 -0098

Fax 954-975 -9718

Address 1888 NW 22 Street

Pompano Beach, FL

33069

Qualifications 2 CFR IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PR PUBLIC ENTITY

Agency Notes: Supplier Notes: Head

Attch:

f Vortex Services, LLC. $13,393,980.00 (10/10 items)

Bid Contact Wesley Kingery ccorrigan@vortexcompanies.com

Ph 813 -626 -0700

Address 10200 US Hwy 92 E

Tampa, FL 33610

Qualifications FL CBE IMMIGRATION LEGAL NAME LOCAL HIRING NO LOBBY PUBLIC ENTITY

Agency Notes: Supplier Notes: Head

Attch:

Hinterland Group, Inc. $7,153,150.00 (9/10 items)

Bid Contact Daniel Duke III info@hinterlandgroup.com

Ph 321 -633 -7066

Address 5580 S.R. 524

Cocoa, FL 32926

Qualifications 2 CFR FL CBE IMMIGRATION JV LEGAL NAME LOCAL HIRING NO LOBBY PR PUBLIC

ENTITY

Agency Notes: Supplier Notes:

BidSync1/15/2020 p. 5

Bid #201922KW - Unit Price Contract for Stormwater Pipeline Infrastructure

Rehabilitation

Creation Date Nov 26, 2019 End Date Jan 15, 2020 2:30:00 PM EST

Start Date Nov 27, 2019 1:16:57 PM EST Awarded Date Not Yet Awarded

201922KW-04-01 Letter of Bondabi l i ty: Letter of Bondabi l i ty

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Letter of Bondability Attached

201922KW--01 -01 Category 1: Category 1 - Contractor Qualif ication Form(s)

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Bid Form 1 Reference Attached

201922KW--01 -02 Category 1: Category 1 -Bid Form

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Category 1 Bid Form Attached

201922KW--01 -03 Category 1: Total Bid Price for Category 1

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - $1,423,030.00 1 / each $1,423,030.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - $1,888,350.00 1 / each $1,888,350.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - $2,736,477.60 1 / each $2,736,477.60 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - $2,783,110.00 1 / each $2,783,110.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - $2,898,200.00 1 / each $2,898,200.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - $3,319,780.00 1 / each $3,319,780.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

201922KW--02 -01 Category 2: Category 2 - Contractor Qualif ication Form(s)

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: NOT BIDDING THIS CATEGORY

Granite Inliner, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Bid Form 2 Reference Attached

201922KW--02 -02 Category 2: Category 2 - Bid Form

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / sheet Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Granite Inliner, LLC First Offer - 1 / sheet Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes: Category 2 Bid Form Attached

201922KW--02 -03 Category 2: Total Bid Price for Category 2

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Miller Pipeline First Offer - $0.00 1 / sheet $0.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Shenandoah General Construction First Offer - $4,060,990.00 1 / sheet $4,060,990.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Insituform Technologies, LLC First Offer - $4,744,769.40 1 / sheet $4,744,769.40 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - $5,264,800.00 1 / sheet $5,264,800.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - $6,042,475.00 1 / sheet $6,042,475.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - $10,074,200.00 1 / sheet $10,074,200.00 Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

201922KW--03 -01 Category 3: Category 3 - Contractor Qualif ication Form(s)

Supplier Unit Price Qty /Uni t Total Price Attch. Docs

Shenandoah General Construction First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Vortex Services, LLC. First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Hinterland Group, Inc. First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Miller Pipeline First Offer - 1 / each Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

NOT BIDDING THIS CATEGORY

Insituform Technologies, LLC First Offer - 1 / each Y Y

Product Code:

Agency Notes:

Supplier Product Code:

Supplier Notes:

Granite Inliner, LLC First Offer - 1 /…