The technical specifications document is for a Unit Price Contract for Stormwater Pipeline Rehabilitation issued by Sarasota County, Florida, with the project designated as Capital Improvement Project (CIP) #75832. The contract covers comprehensive pipeline rehabilitation services including cleaning, televising, CIPP (Cured-in-Place Pipe) lining, repair sleeves, joint repairs, lateral reconnections, and ancillary services for storm water pipeline infrastructure. The work will involve trenchless rehabilitation techniques for existing pipeline systems, with methods including high-pressure cleaning, root and protrusion removal, pipeline lining, joint sealing, and lateral reconnection, utilizing advanced technologies like robotic cutting and video inspection.
The technical specifications outline detailed requirements for equipment, materials, and execution, with specific provisions for maintaining traffic, environmental controls, and quality assurance. The contract appears to be a unit price contract, meaning payment will be based on actual quantities of work performed at predetermined unit rates across various categories such as pipeline cleaning, CIPP lining, repair sleeves, and joint repairs. The contractor will be responsible for comprehensive site management, including bypass pumping, traffic control, safety protocols, and environmental compliance. The contract includes provisions for emergency mobilization, with requirements for rapid response and 24/7 availability, and mandates detailed documentation, including video inspections and maintenance logs. The anticipated contract term is three years, with specific performance standards and warranty requirements for all rehabilitation work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL
SPECIFICATIONS
Technical Specifications
For
Unit Price Contract for Stormwater Pipeline Rehabilitation
CIP #75832
Page 1 of 1 TOC
TABLE OF CONTENTS
01026 Measurement and Payment
01310 Construction Schedule
01505 Mobilization
01550 Maintenance of Traffic (MOT)
02400 Sod Restoration
02500 Base Courses and Paving
02530 Pipe Lining and Repair - General
02531 CIPP (Cured in Place Pipe) Lining
02536 Repair Sleeve and Joint Repair
02538 Lateral Reconnection and Repair
02539 Pipeline Cleaning and Televising
02540 Ancillary Main Lining and Repair Services
Page 1 of 6 Section 01026
SECTION 01026
MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.01 EXPLANATION AND DEFINITIONS
A. The following explanation of the Measurement and Payment for the pricing table items is made for information and guidance. The omission of reference to any item in this description shall not, however, alter the intent of the pricing table or relieve the Contractor of the necessity of furnishing such as a part of the Contract at no additional cost to the County.
1.02 MEASUREMENT
A. The quantities set forth in the pricing table are approximate and are given to establish a uniform basis for the comparison of bids. The County reserves the right to increase, decrease, or eliminate the quantity of any class or portion of the work during the progress of construction in accordance with the terms of the Contract.
1.03 PAYMENT
A. Payment for each Work Assignment shall be made at the Contract unit or negotiated unit price per item of work on the basis of the work actually performed, completed, and accepted by the County. Such work includes but is not limited to, the furnishing of all necessary plant, labor, materials, appurtenances, equipment, transportation, clean up, restoration of disturbed areas, and all other expenses to complete the construction and placing the work into operation, as described in the Work Assignment and
Technical Specifications, and as directed by the County.
B. Payment for each item includes compensation for cleanup and restoration.
Cleanup and surface restoration will be considered as ten percent (10%) of each pay item in the Work Assignment, and complete payment of each item will not be made until cleanup and restoration have been completed, and the final DVD’s and logs are delivered and approved by the County.
1.04 MEASUREMENT AND PAYMENT OF LUMP SUM ITEMS
A. Measurement and Payment for Lump Sum bid items will be made based on the approved Schedule of Values submitted by the Contractor. Monthly progress payments will be based on a percentage of the work completed, as approved by the County.
Page 2 of 6 Section 01026
PART 2 – PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.01 PAY ITEMS
A. CIPP (Cured in Place Pipe) Lining (Bid Items – Pricing Table A 1-6, Pricing Table B 1-10, Pricing Table C 1-12): Measurement and Payment for furnishing and installing CIPP lining will be made at the Contract unit price per Linear Foot for the various sizes and thicknesses indicated on the Price Schedule of the Pricing Table, of acceptable liner material installed, and shall include all necessary labor, tools, equipment, and materials required for the operation and installation of the CIPP lining. Separate payment shall be made for the removal of roots, lateral protrusion, hard scales (tuberculation), and concrete in the manner specified in the Technical
Specifications and as indicated in the Price Schedule of the Pricing Table.
Measurement of the installed liner shall be to the nearest foot from centerline of structure to centerline of structure for each pipe section lined. Linear footage measurement shall be horizontal.
B. Repair Sleeve and Joint Repair (Bid Items – Pricing Table A 7-26, Pricing Table B 11-48, Pricing Table C 13-21):
Repair Sleeve (Bid Items Pricing Table A 7-24, Pricing Table B 11-40):
Measurement and Payment for furnishing and installing cured in place pipe
(CIPP) Repairs Sleeves will be made at the Contract unit price per Each for the various pipe diameter ranges, thicknesses, and lengths indicated on the Price Schedule of the Pricing Table, of acceptable liner material installed, and shall include all necessary labor, tools, equipment, and materials required for the operation and installation of the repair sleeve.
Joint Repair - Pre-Fabricated Seals (Bid Item Pricing Table A 25, Pricing
Table B 41-45, Pricing Table C 13-18): Measurement and Payment for furnishing and installing Pre-Fabricated Joint Repairs (WEKO-Seal or equal) will be made at the Contract unit price per Each for the specific repair of various pipe diameters indicated on the Price Schedule of the Pricing Table, of acceptable repair material installed, and shall include all necessary labor, tools, equipment, and materials required for the operation and installation of the joint repair.
Joint Repair – Pressure Grout (Bid Item Pricing Table A 26, Pricing Table
B 46 & 47, Pricing Table C 19 & 20): Measurement and Payment for furnishing and installing Pressure Grouting Joint Repairs will be made at the
Contract unit price per Gallon indicated on the Price Schedule of the
Pricing Table, of acceptable repair material installed, and shall include all necessary labor, tools, equipment, and materials required for the operation and installation of the joint repair.
Joint Repair – Resin Based Coating Over Grout (Bid Item Pricing Table B
48, Pricing Table C 21): Measurement and Payment for furnishing and
Page 3 of 6 Section 01026 installing Resin Based Coating over Grouted Repair (Spraywall, Raven 405 or equal) will be made at the Contract unit price per Square Foot for the directed width of the applied coating for various pipe diameters indicated on the Price Schedule of the Pricing Table, of acceptable coating material installed, and shall include all necessary labor, tools, equipment, and materials required for the operation and installation of the coating over the grouted joint repair.
C. Lateral Reconnection and Repair (Bid Items Pricing Table A 27 & 28, Pricing Table B 49-52, Pricing Table C 22-26): Measurement and
Payment for furnishing and installing Lateral Reconnection and Repair, and for re-establishing the laterals will be made at the Contract unit price per
Each for the various categories of lateral repair (pressure grouting/sealing), and reconnection indicated on the Price Schedule of the Pricing Table, of acceptable reconnection and repair (pressure grouting/sealing), and shall include all necessary labor, tools, equipment, and materials required for the operation and installation, as specified in the Technical Specifications and as directed by the County. Price includes the cleaning and televising of the lateral as specified in the Technical Specifications.
D. Cleaning and Televising (Bid Items Pricing Table A 29-38, Pricing
Table B 53-72, and Pricing Table C 27-46): Measurement and Payment for Pipeline Cleaning and Televising the existing main lines directed by the
County for such services will be made at the Contract unit price per Linear
Foot for the various pipe diameters, pipe size ranges, and work classifications indicated on the Price Schedule of the Pricing Table and as defined in the Technical Specifications. Price includes all necessary labor, tools, equipment, and materials required for the Cleaning and Televising
Operations and for the removal and proper disposal of the debris resulting from the Cleaning Operation. Price also includes supplying the County with two (2) copies of the digitized audio-video record in DVD format on USB flash drives, and two (2) copies of the Cleaning and Televising Inspection Log in
PACP format, as specified in the Technical Specifications. Measurements of the cleaning and televising shall each be to the nearest foot from centerline of structure to centerline of structure for each pipe section cleaned and televised by the Contractor, as approved by the County. Measurement for the lateral protrusion removal, root removal, tuberculation removal and concrete removal shall be based on actual work performed and approved, as determined by the pre- and post-televising of the main line. Linear footage measurement shall be horizontal.
E. Ancillary Services (Bid Items Pricing Table A 39-53, Pricing Table B
73-88, Pricing Table C 47-62:
Hauling Curing Water or Bypass Water (Bid Items Pricing Table A 39-
41, Pricing Table B 73-75, Pricing Table C 47-49: Measurement and Payment for Pumper Truck, Vac-Truck and Tanker Truck will be made at the
Contract unit price per Hour the trucks are on the project site for
Page 4 of 6 Section 01026 operations as approved by the County. This price shall include mobilizing and demobilizing, equipment, and hauling storm water bypassing or curing water for the time period the vehicles are required on-site, there will be no compensation for idle time. This price shall also include all necessary labor, equipment, tools, material, fuel, and proper disposal of water as necessary for an approved bypass system for storm water flow around the storm water sections to be repaired and lined or hauling curing water in accordance with the Technical Specifications. The time to mobilize, demobilize and dispose of water will not be paid as an hourly rate. Note these bid items are for bypassing operations and disposing curing water and not for cleaning which would be incidental to that work
Bypass Pumping (Bid Items Pricing Table A 42-44, Pricing Table B
76-78, Pricing Table C 50-52): Measurement and Payment for bypass pumping will be made at the Contract unit price per Day for the various pump sizes indicated on the Price Schedule of the Pricing Table, as approved by the County, and as defined in the Technical Specifications. This price shall include mobilizing and demobilizing the bypass pumping system and providing bypass pumping for the distance pumped over the time period required to line and repair the pipe sections indicated in each Work
Assignment. This price shall also include all necessary labor, equipment, including back-up pumps, tools, material, including pressure rated conduit, and power, including fuel, necessary for furnishing, installing, operating, maintaining, decommissioning and removing an approved bypass pumping system to divert flow around the pipe sections to be lined and repaired, in accordance with the Technical Specifications.
Cofferdams for Piping Entering Ponds/Lakes (Bid Items Pricing
Table A 45, Pricing Table B 79, Pricing Table C 53): Measurement and
Payment for cofferdams will be made at the Contract unit price per Linear
Foot of cofferdam wall installed at locations where pipes enter ponds or lakes as indicated on the Price Schedule of the Pricing Table, as approved by the
County, and as defined in the Technical Specifications. This price shall include mobilizing and demobilizing, costs of design, materials, equipment, labor, dewatering operations, environmental controls, any repair, correction, adjustment or reconstruction of such cofferdam indicated in each Work
Assignment. This price shall also include all decommissioning and removing of all materials installed for the cofferdam and site restoration, in accordance with the Technical Specifications.
Maintenance of Traffic (MOT) Bid Items Pricing Table A 46 & 47, Pricing Table B 80 & 81, Pricing Table C 54 & 55): Measurement and
Payment shall be made at the Contract unit price per Each for the
Maintenance of Traffic (MOT) Plan associated with each Work Assignment.
Work components listed on the Price Schedule of the Pricing Table will be measured and paid as indicated. This price includes preparing a maintenance of traffic plan for each project work site affected by the Contractor’s
Page 5 of 6 Section 01026 operations. The price also includes obtaining construction permits and approvals; construction and maintenance of any necessary detour facilities;
providing of personnel and facilities to guide traffic safely around the work;
providing access to residences and businesses along the project; furnishing, installing and maintaining of traffic control barricades, railings, warning lights, and other safety devices during construction; the control of dust; the immediate clean-up of any spills; and any other special requirements needed for the safe and expeditious movements of traffic as defined in the Technical
Specifications, as directed by the County, and as approved by the agency(s) governing traffic safety in specific work areas. Payment will be made for MOT for arterial and FDOT roadways. These roadway systems are defined as follows:
• Arterial roadways are streets with speed limits higher than 35 mph and up to and including 50 mph. Arterial roadways may be two lane or multilane highways.
• FDOT roadways are streets within FDOT right-of-way or with speed limits above 50 mph.
Maintenance of Traffic for residential streets (speed limits 35 mph or less) shall be considered incidental to other work and shall be included in the provided pay items above. No separate payment will be made for MOT for residential streets.
Structure Top Removal and Replacement Bid Items Pricing Table A
48-50, Pricing Table B 82-84, Pricing Table C 56-58: Measurement and
Payment for removal and replacement of structure top will be made at the
Contract unit price per Each as designated on the Pricing Table for the various surface conditions as indicated on the Price Schedule of the Pricing
Table. The structure top shall be carefully removed to avoid damage to the structure or top and temporarily placed next to the structure to avoid any impacts to vehicular or pedestrian traffic while other rehabilitation work is being performed. When the indicated rehabilitation work has been completed the top shall be carefully placed onto the structure and provide a firm non-rocking fit to the structure. The structure shall be sealed to the vertical walls with butyl rubber or hydraulic cement. This price shall also include all necessary labor, equipment, tools, material, fuel and surface restoration in
Failed Liner Removal Bid Items Pricing Table A 51, Pricing Table B 85
& 86, Pricing Table C 59 & 60: Measurement and Payment for failed liner removal will be made at the Contract unit price per Linear Foot as designated on the Pricing Table for the various pipeline sizes as indicated on the Price Schedule of the Pricing Table. This price shall include all costs of materials, equipment and labor, to complete the failed liner removal and disposal of liner materials as indicated in each Work Assignment in
Page 6 of 6 Section 01026
Pre-Lining Void Filling Bid Items Pricing Table A 52, Pricing Table B
87, Pricing Table C 61: Measurement and Payment for filling voids prior to liner placement will be made at the Contract unit price per Cubic Feet as designated on the Pricing Table. Voids identified in the pipeline wall/joints/floor during the cleaning and televising operations shall be brought to the attention of the County Project Manager. When directed by the County to fill the identified voids, the contractor shall place cementitious grout or aggregates within the void prior to the placement of the pipeline liner. This price shall also include all necessary labor, equipment, tools, material, fuel and cementitious grout or aggregates in accordance with the
Technical Specifications.
Emergency Mobilization Bid Items Pricing Table A 53, Pricing Table
B 88, Pricing Table C 62: Measurement and Payment for Emergency
Mobilization shall be made at the Contract unit price per Each emergency mobilization and demobilization associated with the Work. This price shall be full compensation for all costs incurred for preparatory work and operations including, but not limited to those necessary for the movement of personnel, equipment and supplies to and from the project site; site preparation, cleanup, installation and removal of silt fencing as necessary, soil tracking prevention, sod replacement, and incidentals; temporary facilities; permits;
and all other related work that must be performed in connection with the various items of Work. The Emergency Mobilization Bid Item includes demobilization and will be payable for each Emergency Mobilization required.
Emergency shall be defined as the contractor responding to the County’s communication within 24 hours and begin work within 72 hours or a time beyond as agreed to with the County.
END OF SECTION
Page 1 of 2 Section 01310
SECTION 01310
CONSTRUCTION SCHEDULE
PART I - GENERAL
1.01 DESCRIPTION OF REQUIREMENTS
A. Within ten days of the issuance of the Notice to Proceed for the Work, the Contractor shall prepare and submit to the County for review and approval, a construction progress schedule for the work. This schedule shall be based on calendar days, with sub- schedules of related activities, which are essential to its progress. The project duration shown on the schedule shall not exceed the time indicated on the individual Work Assignment.
B. Contractor shall submit revised progress schedules on a monthly basis. No partial payments shall be approved until there is an approved updated construction progress schedule in hand.
C. The Contractor shall designate an authorized representative of his firm who shall develop and maintain the construction schedule and progress and payment reports. This representative of the Contractor shall be responsible to the Contractor’s Representative, who shall have the authority to act on behalf of the Contractor in fulfilling the commitments of the Construction schedules.
D. The project scheduling software shall be compatible with the latest County software.
E. The progress schedule shall demonstrate compliance with the Contract Document requirements utilizing a Critical Path Method (CPM) precedence method schedule to coordinate, plan, schedule, and perform the work (including the activities of subcontractors and suppliers).
1.02 FORM OF SCHEDULES
A. The Contractor shall prepare schedules in the form acceptable to the County.
1) Provide a separate horizontal bar for each activity of the Work Assignment.
2) Horizontal time scale: In weeks from start of construction and identify the first work day of each month. The schedule shall identify the day, month, and year of starting and finishing each activity.
3) Scale and spacing: To allow space for notations and future revisions.
4) Minimum sheet size: 8 1/2 inches X 11 inches.
5) Maximum sheet size: 11 inches X 17 inches.
B. Format of listings: The chronological order of the start of each item of work for each Work Assignment.
Page 2 of 2 Section 01310
1.03 CONTENT OF SCHEDULES
A. Show the complete sequence of construction by activity including:
1) Activity beginning and ending date
2) Duration
3) Early start date
4) Early finish date
5) Activity float and total float
6) Predecessor
7) Successor
B. Show the dates for the beginning of and completion of each major element of construction in no more than a one-week increment scale.
C. Show projected percentage of completion for each item, as of the first day of each month.
D. The schedule shall clearly identify the project's critical path. Provide a list of all long lead items (equipment, materials, etc.) with anticipated delivery dates to the County.
1.04 PROGRESS REVISIONS
A. Indicate progress of each activity as of the date of revision.
B. Show changes occurring since previous revision of schedule:
1) Major changes in scope.
2) Activities modified since previous revision.
3) Revised projections of progress and completion.
4) Other identifiable changes.
C. Provide a narrative report as needed to define:
1) Problem areas, anticipated delays, and the impact on the schedule.
2) Corrective action recommended and its effect.
3) The effect of changes on schedules of sub-contractor(s) and others.
1.06 DISTRIBUTION
A. Distribute copies of the schedules to:
1) County (two hard copies, one electronic copy)
2) Subcontractors (as needed)
B. Instruct recipients to report promptly to the Contractor, in writing, any problems anticipated by the projections shown in the schedules.
Page 1 of 2 Section 01505
SECTION 01505
MOBILIZATION
1.01 GENERAL
A. Contractor shall mobilize as required for the proper performance and completion of the Work Assignment in accordance with the Contract
Documents.
B. Mobilization shall include, but not be limited to, the following items, as applicable to each Project:
1) Move plant and equipment onto the Project Site necessary for Contractor's operation
2) Install temporary power, wiring, and lighting facilities
3) Establish fire protection system
4) Provide field office complete with furnishings, equipment, and utility services
5) Provide On-Site communication facilities
6) Provide On-Site sanitary facilities and potable water facilities
7) Arrange for storage yard
8) Obtain required permits
9) Post OSHA required notices and establish safety programs
10) Contractor's superintendent shall be on Site full time
11) Obtain Performance and Payment Bond when applicable
12) Obtain Builders Risk Installation Floater when applicable
13) Provide submittals
14) Install/remove silt fencing as necessary in unstabilized areas.
15) Install/remove soil tracking prevention devices per FDOT Index 106 in unstabilized areas.
1.02 PAYMENT FOR MOBILIZATION
A. The costs of bonds, permits, and any additional required insurance over and above the Contractor’s standard insurance as specified in Article V of the
Construction Contract, and any other pre-construction expense necessary for the start of the Project, excluding cost of construction materials, shall also be included in the payment for Mobilization.
B. No separate payment will be made for mobilization. Mobilization is considered incidental to other work to be performed in the Work Assignment and the costs shall be included in those identified bid items as described in
Section 01026 Measurement and Payment.
Page 2 of 2 Section 01505
1.03 PAYMENT FOR EMERGENCY MOBILIZATION
A. The Contractor’s attention is directed to the condition that no payment for mobilization, or any part thereof, will be recommended for payment under the Contract until the applicable mobilization items listed above have been completed.
B. The costs of bonds, permits, and any additional required insurance over and above the Contractor’s standard insurance as specified in Article V of the
Construction Contract, and any other pre-construction expense necessary for the start of the Project, excluding cost of construction materials, shall also be included in the payment for Mobilization.
C. As soon as practicable after receipt of the Notice to Proceed, the Contractor shall submit, as required, a breakdown (Schedule of Values), of the Mobilization items to the County for approval, which shall show the estimated value of each major component of mobilization. Once accepted by the County, this Schedule of Values will be the basis for approving progress payments in which mobilization is included, and where applicable per the General Conditions.
D. Payment for mobilization will be made when the Contractor has completed the required mobilization items and will not exceed 90% of the Item Bid for mobilization.
E. The work involved in the demobilization is included in the Mobilization Bid
Item.
F. Payment for demobilization (10% of the Item Bid for mobilization), will be made at such time that the Contractor has completely demobilized from the site.
G. Emergency shall be defined as the contractor responding to the County’s communication within 24 hours and begin work within 72 hours or a time beyond as agreed to with the County.
Page 1 of 3 Section 01550
SECTION 01550
MAINTENANCE OF TRAFFIC (MOT)
PART 1 – GENERAL
1.01 DESCRIPTION
A. Work under this Section consists of maintaining traffic within the project limits for each work area, including any temporary suspensions of work, and includes all traffic control plans, facilities, devices, and operations as required for the safety and convenience of the public and to minimize public nuisance, as specified herein.
B. The Contractor’s work includes preparing approved traffic control plans;
construction and maintenance of approved detour facilities (where required); providing necessary facilities for access to residences and businesses along the project; furnishing, installing, and maintaining traffic control markings, signs, and safety devices; and any other special requirements for safe and expeditious movement of traffic in the project area and other impacted areas as specified herein.
1.02 STANDARD REQUIREMENTS FOR MAINTENANCE OF TRAFFIC
A. All MOT work shall conform to the latest editions of the Florida Department of Transportation (FDOT) Design Standards, the Manual on Uniform
Control Devices (MUTCD) Part VI, the FDOT Standard Specifications for
Road and Bridge Construction, Section 102, and Sarasota County Mobility
Standards. Regardless of the MOT standards and specific traffic control plan used, it is the Contractor’s responsibility to maintain the work zone in a safe condition.
1.03 SUBMITTALS
A. Traffic Control Plan - Prepare detailed work zone traffic control plans for
County review and approval. The traffic control plan shall apply specifically to each phase of the Contractor’s activities for the Work. The Contractor may not begin work until a traffic control plan is approved by the County.
Except in an emergency, modifications to the traffic control plans require the County’s written approval.
1.04 SPECIFIC REQUIREMENTS
A. The work for MOT may include the following:
1) All roads will be kept open to two-way traffic during construction, except one-way roads and where otherwise approved in the MOT.
Except in approved detoured areas, the Contractor will always
Page 2 of 3 Section 01550 maintain one lane of traffic in each direction (each lane 11-foot wide minimum) by using existing or constructing temporary pavement.
2) Portions of work phases may be worked concurrently with the approval of the County, provided traffic is properly maintained.
3) Temporary pavement will consist of six-inch thick suitable base and one-inch thick asphalt concrete surface; cost is included in MOT.
4) Construction of major side streets can be phased similarly to maintain one lane of traffic in each direction (each lane 11-foot wide minimum) at all times by using existing or constructing temporary pavement.
5) Unless provided for under the Items Bid, all cost of all barricades, signing, flagmen, and temporary pavement marking are included in the cost of MOT. The Contractor will erect and maintain all barricades, warning signs, and delineators.
6) Detouring of traffic to other roads to by-pass the project area must be approved by the Sarasota County Public Works Department before implemented.
7) The Contractor shall remove any existing striping conflicting with the MOT plan during construction and provide adequate signing and/or striping. Advanced "road closed" warning signs shall be placed at side streets at the direction of the Construction Manager.
8) Paved temporary connections shall be provided at intersections as directed by the Construction Manager.
9) Alternate access will be provided to all residences and businesses whenever construction interferes with the existing means of access.
The Contractor is not permitted to isolate residences or businesses.
10) Major intersections shall have through movements maintained at all times during construction except during short periods of time approved by the County.
11) Traffic shall be maintained on paved, dust free surfaces at all times.
12) The resetting of traffic signs on side streets and the resurfacing and/or pavement marking on detour roads and/or side streets before and after construction is completed shall be included in the cost of Maintenance of Traffic.
13) The County shall approve any alteration of approved traffic patterns prior to implementation.
14) The Contractor is responsible for establishing a work schedule so that any location under construction will not be left in a hazardous condition at the completion of the work day.
15) When construction activities require flagmen for traffic control, the Contractor will employ the appropriate number of trained, competent
Page 3 of 3 Section 01550 flagmen, and will provide them with appropriate equipment in good condition.
16) Temporary approaches or crossings and intersections with trails, roads, streets, businesses, residences, and parking lots and parking garages will be provided and maintained in a safe condition by the Contractor. The Contractor shall take precautions to protect the work and the safety of the public.
Page 1 of 3 Section 02400
SECTION 02400
SOD RESTORATION
1.01 DESCRIPTION OF REQUIREMENTS
A. Work under this section consists of furnishing all labor, material and equipment to replace and maintain all grassed areas disturbed during construction of the Work by the furnishing and placing sod, as directed by the County.
1.02 REFERENCE DOCUMENTS
A. Materials used in this work shall conform to the following requirements of
Florida Department of Transportation Standard Specifications for Road and
Bridge Construction, current edition:
1) Sod - Section 981-3
2) Fertilizer - Section 982
3) Water - Section 983
1.03 SUBMITTALS
A. Submit certifications and identification labels for all sod and fertilizer supplied.
PART 2 - PRODUCTS
2.01 SOD
A. Grassed areas disturbed by the Contractor’s operation shall be restored with sod of the same type as the existing lawn grass type.
B. The sod shall be taken up in commercial-size rectangles, preferably 12-inch by 24-inch or larger, except where 6-inch strip sodding is called for.
C. The sod shall be sufficiently thick to secure a dense stand of live grass.
The sod shall be live, fresh and uninjured at the time of planting. It shall have a soil mat of sufficient thickness adhering firmly to the roots to withstand all necessary handling. It shall be reasonably free of weeds and other grasses. It shall be planted as soon as possible after being dug and shall be shaded and kept moist from the time it is dug until it is planted.
D. Sod should be handled in a manner to prevent breaking or other damage. Sod shall not be handled by pitch forks or by dumping from trucks or other vehicles. Care shall be taken at all times to retain the native soil on the roots of each sod roll during stripping and handling. Sod that has
Page 2 of 3 Section 02400 been damaged by handling during delivery, storage or installation will be rejected.
2.02 FERTILIZER
A. Chemical fertilizer shall be supplied in suitable bags with the net weight certification of the shipment. Fertilizer shall be 12-8-8 and comply with
Section 982 of the FDOT Standard Specification for Road and Bridge
Construction
B. The numerical designations for fertilizer indicate the minimum percentages
(respectively) of (1) total nitrogen, (2) available phosphoric acid and (3) water soluble potash, contained in the fertilizer.
C. The chemical designation of the fertilizer shall be 12-8-8, with at least 50 percent of the nitrogen from a non- water soluble organic source. The nitrogen source may be a urea-formaldehyde source provided it is not derived from a waste product of the plastic industry.
2.03 EQUIPMENT
A. The device for spreading fertilizer and seed shall be capable of uniformly distributing the material at the specified rate.
PART 3 - EXECUTION
3.01 SOD BED PREPARATION
A. Areas to be restored shall be cleared of all rough grass, weeds, and debris, and brought to an even grade.
B. The soil shall then be thoroughly tilled to a minimum 6-inch depth.
C. The areas shall then be brought to proper grade, free of sticks, stones, or other foreign matter over ½ inch in diameter or dimension. The surface shall conform to finish grade, less the thickness of the sod, free of water-retaining depressions.
3.02 INSPECTION
A. The County shall verify that soil preparation and related preceding work has been completed.
Work will not begin until conditions are satisfactory.
3.03 SOD HANDLING AND INSTALLATION
A. During delivery, prior to planting, and during the planting of sod areas, the sod panels shall at all times be protected from excessive drying and unnecessary exposure of the roots to the sun. All sod shall be stacked during construction and planting so as not to be damaged by sweating or excessive heat and moisture.
Page 3 of 3 Section 02400
B. After completion of soil conditioning as specified above, sod panels shall be laid tightly together so as to make a solid sodded lawn area. On mounds and other slopes, the long dimension of the sod shall be laid perpendicular to the slope. Immediately following sod laying the lawn areas shall be rolled with a lawn roller customarily used for such purposes, and then thoroughly watered.
C. Sod shall be placed to restore all areas where grass existed prior to construction; on all slopes of 3 horizontal on 1 vertical (3:1) or greater; in all areas where erosion of soils will occur; along edge of roads, driveways, and structures; and as directed by the County. Sod shall be pinned as necessary on sloped areas to maintain the tight placement of sod panels.
3.04 SOD MAINTENANCE
A. The sod shall produce a dense, well established growth. The Contractor shall be responsible for the repair, mowing (6" maximum height) and re-sodding of all eroded or bare spots until project acceptance. Sod repair shall be accomplished as in the original work.
B. Sufficient watering shall be done by the Contractor to maintain adequate moisture for optimum development of the sodded areas. Sodded areas shall receive no less than 1.5 inches of water per week for at least 2 weeks.
Thereafter, the Contractor shall apply water for a minimum of 60 days as needed until the sod takes root and starts to grow or until final acceptance, whichever is latest.
Page 1 of 2 Section 02500
SECTION 02500
BASE COURSES AND PAVING
PART 1 - GENERAL
1.01 DESCRIPTION OF REQUIREMENTS
A. This section provides for repairing street, drives and other asphalt concrete pavements which have been cut, broken or otherwise damaged during construction.
1.02 SUBMITTALS
A. The Contractor shall submit the following:
1) List identifying the types and sources of materials proposed for this work.
2) Laboratory test reports for tests performed in the process of mix design.
3) Material certificates, signed by the material producer and the
Contractor, certifying that each material item complies with, or exceeds, specified requirements.
1.03 REFERENCE STANDARDS
A. Latest editions of Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction and FDOT Roadway and
Traffic Design Standards shall apply to all work done within the FDOT road right-of-way.
B. Latest edition of Sarasota County Land Development Code shall apply to all work done within the Sarasota County road right-of-way.
PART 2 – PRODUCTS
A. Materials provided under this section shall be as specified in the applicable sections of the Reference Standards stated herein.
PART 3 – EXECUTION
3.01 GENERAL
A. Pavement removed as a result of project activities shall be repaired
B. All valve boxes or other utility castings within the area to be surfaced shall be adjusted to the proposed surface elevation by the Contractor. The work shall be accomplished in such a manner as to leave the casting fixed permanently in its correct position.
Page 2 of 2 Section 02500
C. Execution of work under this section shall be in accordance with the applicable sections of the Reference Standards stated herein.
Page 1 of 6 Section 02530
SECTION 02530
PIPE LINING AND REPAIR - GENERAL
PART 1 GENERAL
1.01 DESCRIPTION
A. Work covered by these specifications includes the furnishing of all labor, tools, equipment, and materials, and performing all operations, installations, and ancillary work in connection with the repair, lining and trenchless reconstruction of portions of the County’s storm water systems, as defined by the Work authorized under the Contract.
B. Work includes underground pipe systems located throughout Sarasota
County, Florida.
C. The Contractor shall provide any combination of the following methods and applications in meeting the County’s requirements as stated in these
Technical Specifications.
1.02 SUMMARY OF WORK
A. Lining Method: CIPP (Cured-in-Place-Pipe) requires the lining and trenchless reconstruction of existing storm water pipe by inserting a resin-impregnated flexible felt tube into the existing pipe and cured by the use of hot water or external steam heat source.
B. Repair Sleeve and Joint Repair:
1) Repair Sleeve: Requires the trenchless repair of existing pipe joints and sections by inserting a section of resin-impregnated flexible felt fiberglass tube into the existing pipe at the point(s) of damage and cured by the use of hot water or external steam heat source.
2) Joint Repair: The County may, as an option, require internal pipe joint repairs by means of a pre-fabricated rubber gasket and stainless steel band (Weko Seal, or equal), or with a combination of pressure grouting and sealing of pipe joints with a resin based coating.
C. Lateral Reconnection and Repair: Requires re-establishment of lateral connections, and the trenchless repair of these connections, by pressure grouting connections.
D. Cleaning and Televising includes cleaning of existing storm water lines, including root removal, lateral line protrusion removal, tuberculation removal and concrete removal where required; and televising pipe sections to determine existing pipe conditions and record lateral locations, pipe damage, and infiltration points.
E. Ancillary Services include Hauling Bypass or Curing Water, By-Pass
Pumping, Cofferdams, Maintenance of Traffic, Structure Top Removal and Replacement, Failed Liner Removal, Pre-Lining Void Filling and Emergency
Mobilization.
Page 2 of 6 Section 02530
1.03 REQUIREMENTS
A. The Contractor shall meet the minimum qualifications outlined in the
Instructions, Terms, and Conditions of the Contract Documents.
B. The Contractor and/or responsible employee(s) shall be certified in Confined Space Entry and Traffic Control (MOT), as required in the Work.
C. The Contractor shall provide services that include safety measures for workers and the public, and shall comply with all local, state, and federal laws, rules and regulations. The Contractor shall carry out its operation in accordance with all OSHA and Manufacturer’s safety requirements, with particular attention to those safety requirements involving steam and confined space entry.
D. Television inspection video operator shall comply with the National
Association of Sewer Service Companies (NASSCO). The Contractor shall have television inspection personnel certified in NASSCO’s Pipeline
Assessment and Certification Program (PACP).
E. The Contractor shall be responsible for the control of the environment of the project site. All precautions shall be taken by the Contractor to protect the workers, public and County staff from the exposure of harmful or hazardous substances that may be encountered during the work.
F. The Contractor shall be responsible for the loading, transportation, and disposal of all waste materials generated by its operations, to the nearest approved landfill, meeting all Local, State, and Federal rules and regulations, and as approved by the County.
G. The Contractor shall ensure compliance with the latest editions of Chapter
40 CFR Part 263. “Standards Applicable to Transporter’s of Hazardous Waste” and Chapter 17-730, Part 3 of the Florida Administrative Code (FAC).
H. The Contractor shall mobilize and be on site within ten (10) days following issuance of the Notice to Proceed for each Work Assignment by the County, unless otherwise agreed to by the Contractor and the County. In the case of an emergency, the Contractor shall respond within twenty four (24) hours of the telephone notification by the County, to be followed by the issuance of a written Work Assignment.
I. The Contractor shall inform the County in writing of its planned work schedules and shall afford the County reasonable opportunity to observe and inspect the Contractor’s work in progress. The County will be advised of all scheduling changes. Once work has begun in an area, the Contractor shall complete the work without interruption.
J. The Contractor shall provide the County with a forty-eight (48) hours’ notice prior to the start of work.
K. Each Work Assignment shall include a written cost estimate and the required
Substantial and Final completion time in days.
Page 3 of 6 Section 02530
L. If the Work of an individual Work Assignment is not completed within the specified completion date, liquidated damages will be assessed in accordance with the Construction Contract and Work Assignment.
PART 2 PRODUCTS
A. See individual Technical Specification Sections for acceptable pipe lining and repair materials.
B. Chemical joint, crack, and annular space sealing materials used in the work shall have the following properties:
1) React quickly to form a permanent watertight seal
2) Resultant seal shall be flexible and immune to the effects of wet/dry cycles
3) Non-Biodegradable and immune to the effects of acids, alkalis, and organics
4) Component packaging and mixing compatible with field conditions and worker safety
C. Chemical joint sealing material shall be acrylic resin type and shall be furnished with activators, initiators, inhibitors and any other materials recommended by the manufacturer for a complete sealing system.
D. Sealing grout shall be furnished in liquid form in standard manufacturer’s containers.
PART 3 EXECUTION
3.01 SYSTEM FLOW CONTROL
A. The Contractor shall divert the upstream system flow around the section(s) of pipe being lined, and discharge the intercepted flow to a downstream structure or other suitable outlet. By-pass set- up and operation shall be as specified in the Technical Specifications.
B. If system flow is minimal and repairs and lining can be installed in a timely manner, by-passing may not be required.
C. The Contractor shall be responsible for any system back-up or any damage that may be caused by the Contractor’s operations.
3.02 CLEANING AND TELEVISING
A. The Contractor shall clean and televise the pipeline sections to be repaired and lined. The interior surface of the pipeline shall be cleaned with high pressure water jet equipment prior to receiving a new liner. In-line cutters shall be used by the Contractor to remove waste product build-up, hard scales (tuberculation), roots, debris, grease, lateral projections, and resin slugs before any repair or lining work is performed. All lateral locations and obstructions, such as dropped joints and protruding laterals, pipe damage, and infiltration points shall be noted on the digital video record (DVD) and recorded in the cleaning and television inspection logs. All observations noted
Page 4 of 6 Section 02530 in inspection logs shall be entered in accordance with the NASSCO PACP and MACP format.
B. The Contractor shall notify the County if any severe problems are discovered during televising that would prohibit the repair and installation of the liner. If conditions such as a broken pipe or major blockages are found that will prevent proper cleaning, or where additional damage would occur if cleaning is attempted or continued, the Contractor shall notify the County and request further direction on how to proceed.
C. Any damage caused by the Contractor to any existing pipe or structure will be immediately repaired to a condition equal to or better than its original condition at the Contractor’s expense.
3.03 PROTRUDING LATERAL CONNECTIONS AND ROOTS
A. Existing lateral connections and roots that protrude into the main pipeline shall be removed to within one-quarter (1/4”) inch of the inside wall of the main line pipe by means of robotic and/or mechanical equipment. Lateral connection and root protrusions shall be ground using grinding tools specifically designed for this purpose. The finished product shall be uniform and smooth to accept main line repair and lining products to provide a proper seal.
3.04 LINER INSERTION
A. The Contractor shall obtain all field measurements required to properly size the liner for installation. The proposed liner shall be sized to provide for a tight fit to the inside circumference of the host pipe and extend sufficiently from end to end of the pipe section. The pipe liner shall be installed in strict accordance with the Manufacturer’s recommendations, and the requirements of the ASTM Standards specified. Liner shall be free of irregularities, pinholes, tears, cracks, excessive wrinkling and sealed so as to eliminate the possibility of infiltration in the pipeline run, at lateral connections, and at the end structures.
B. Chemical sealant compatible with liner material shall be injected by the use of standard packer device and equipment if a tight seal is not obtained or leaks occur. Extraneous sealant left inside pipe shall be readily removable;
and shall be compatible with the repair resin utilized.
C. The Contractor shall notify the County in a timely fashion if the lining process is delayed and would continue to cause system interruption affected by the lining operation. In this situation, the Contractor shall be responsible for taking steps necessary to reconnect system components or provide a by-pass operation, satisfactory to the County.
3.05 LATERAL RECONNECTIONS
A. Lateral reconnections shall be completed as soon as possible upon completion of the pipe section lining operation and with the approval of the County.
Page 5 of 6 Section 02530
B. Re-connections shall be accomplished without excavation using robotic cutter. Cuts shall be neat and smooth with the lateral line opened to ninety-five (95%) percent of the inside diameter in order to prevent blockages.
All cuttings and coupons shall be recovered prior to putting the main line back into service.
C. The Contractor shall stop all visible lateral line leaks and seal each connection to the new liner with compatible grouts or other approved compatible sealants.
D. In the event reconnection within the pipe cannot be accomplished or failure occurs during the reconnection process, the Contractor may be required to excavate and reconnect the lateral line to the existing main using approved methods at the Contractors expense.
E. Due to the critical nature of lateral reconnections, the Contractor shall keep back up robotic equipment on site to eliminate any delay to the reactivation of the system.
3.06 TRAFFIC CONTROL AND MAINTENANCE OF TRAFFIC
A. Pipelines to be rehabilitated may be in backyard easements, light traffic subdivision roadways, collector roads, or highways requiring Maintenance of Traffic plans conforming to Florida Department of Transportation and Sarasota County requirements.
3.07 CLEANUP
A. Cleanup is an essential part of the work. As the work progresses and is completed, the Contractor shall clean the various work sites of all excess materials and debris, completely restoring all work areas to the satisfaction of the County. This cleanup shall be done as promptly as practicable and shall not be left until the end of the project. No part of the work is considered complete and no payment will be made until cleanup has been completed and accepted by the County.
3.08 FINAL ACCEPTANCE
A. Inspection of completed lines shall be by television inspection at the Contractor’s expense. The Contractor shall provide the County with two (2) copies of the digitized audio-video record in DVD format (Granite XP or equal), on USB flash drives of the completed repaired and lined mains with data-view and accurate footage displayed as follows:
1) Street name and nearby address
2) Structure numbers
3) Size and material of pipe
4) Lateral connection locations, right or left, with camera head rotated at each location to view into lateral.
5) All distances between structures
Page 6 of 6 Section 02530
3.09 WARRANTY
A. The warranty period shall be as specified in the Contract Documents and each specific section of the Technical Specifications. Any defects in material or workmanship found within this warranty period shall be repaired or replaced by the Contractor at Contractor’s expense.
Page 1 of 5 Section 02531
SECTION 02531
CIPP (CURED IN PLACE PIPE) LINING
PART 1 GENERAL
1.01 SCOPE OF WORK
A. Work under this section includes furnishing all labor, tools, equipment, and materials and performing all operations and installations in connection with lining and trenchless reconstruction of existing storm water lines in the sizes and thickness indicated on the Price Schedule of the Pricing Table, by use of an approved Cured-in-Place Pipe (CIPP) liner system in conformance with the Contract Documents, and as directed by the County.
B. All lining material shall be suitable for use in storm water systems.
C. Pipelines to be rehabilitated may be located in backyard easements; or in light traffic subdivision roadways, collector roads, or highways, which will require Maintenance of Traffic (MOT) plans conforming to Florida Department of Transportation and Sarasota County requirements.
D. It is anticipated that pipelines to be rehabilitated will only need light cleaning, removal of protruding laterals, root removal, and by-pass pumping to successfully install the liner system. The Contractor shall be responsible for all materials removed from the lines and shall properly dispose of materials in accordance with appropriate regulatory agency requirements.
E. The Contractor shall be responsible for any spills during any by-pass operation and pay any and all fines, fees, property damage, environmental damages, and cleanup costs that are associated with the spills.
1.02 QUALITY CONTROL
A. Acceptable products shall have a minimum of 250,000 linear feet of documented acceptable pipe lining installations in the United States.
B. Liner materials shall be as manufactured by Insituform of North America, Inc, or equal.
1.03 REFERENCE SPECIFICATIONS
A. This specification references American Society for Testing and
Materials (ASTM) standard specifications, latest edition, which are made a part hereof by such reference:
F1216 - Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube.