About this file

This is an as-built documentation file for the Kiefer Landfill base liner system maintained by the County of Sacramento, Department of Waste Management & Recycling. The document provides a comprehensive technical summary of liner system components installed across multiple modules and phases of the facility from November 1993 through February 2024. The table details specifications for eleven separate construction projects, including general contractors, liner installers, construction dates, and acreage of coverage for each phase. Key components documented include operations layers, drainage layers, geomembranes, geotextiles, geosynthetic clay liners, and leak detection systems. The liner systems have been installed by various firms including Serrot, Geo Pacific, GSI United Linings, National Seal, C.W. Neal Corp, D&E Construction Inc, Layfield Geosynthetics, and others. Construction activities span from the initial Phase 1 of Module M1L (15.5 acres, November 1993) to the most recent Phase 1 of Module M4 (27 acres, February 2024), with total documented installation area exceeding 168 acres.

The document reflects evolving engineering standards and material specifications over three decades of landfill development. Early phases utilized single-sided textured HDPE geomembranes and basic drainage configurations, while later phases incorporated more sophisticated systems including double-sided textured geomembranes, leak detection system geocomposites, and geosynthetic ballast systems for wind protection. Materials specified include products from manufacturers such as Gundle, CETCO, GSE, Solmax, and Agru America. Low-permeability soil layers consistently feature hydraulic conductivity requirements of K < 1x10-7 cm/s or better, with geosynthetic clay liner components rated at K < 2x10-9 to K < 5x10-9 cm/s. Quality assurance firms listed include Floor Slope Material, EMCON, Shaw Environmental Inc, Golder Associates Inc, and Geo-Logic Associates. This documentation serves as a baseline record for the facility's environmental protection infrastructure and is directly referenced in the related on-call repair services contract solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Abbreviations:

GM Geomembrane LDS Leak Detection System GT Geotextile HDPE High Density Polyethylene

GCL Geosynthetic Clay Liner SST Single-Sided Texturing DST Double-Sided Texturing

General Contractor: VeerKamp Construction Date: Nov. 1993 Liner Installer: Serrot Area: 15.5 acres

CQA Firm:

Floor Slope Material Notes

2 ft Operations Layer 2 ft Operations Layer Slope: 5 ft vertical maximum 8 oz/sy Nonwoven GT Filter -- (Not Identified) 1 ft Drainage Layer -- Pea Gravel Pea Gravel 60 mil SST HDPE GM 60 mil SST HDPE GM Gundle Gundline HDT Textured side down 2 ft Low-Permeability Soil 2 ft Low-Permeability Soil Imported: Van Vleck Ranch K < 1x10-7 cm/s

General Contractor: Ford Construction Date: Nov. 1994 Liner Installer: Geo Pacific Area: 18.1 acres

CQA Firm:

Floor Slope Material Notes

2 ft Soil Operations Layer 2 ft Sand Operations Layer Slope: 1x10-3 cm/s 8 oz/sy Nonwoven GT Filter -- Trevira 1 ft LCRS Drainage Layer -- 60 mil SST HDPE GM 60 mil SST HDPE GM Gundle Gundline HDT Texture side down 1 ft Low-Permeability Soil -- Imported: Van Vleck Ranch K < 1x10-7 cm/s GCL GCL Claymax 50 CSP K < 2x10-9 cm/s

General Contractor: Ford Construction Date: Aug.1995 Liner Installer: Serrot Area: 16.7 acres

CQA Firm:

Floor Slope Material Notes

2 ft Operations Soil 2 ft Operations Sand 7 oz/sy Nonwoven GT Filter -- Amoco Fabrics Style 4553 1 ft LCRS Drainage Layer -- 60 mil SST HDPE GM 60 mil SST HDPE GM Serrot HST S/S Text 60 mil Texture side down GCL GCL CETCO - Bentomat ST

General Contractor: Ford Construction Date: Oct. 1997 Liner Installer: GSI United Linings Area: 6.5 acres

CQA Firm:

Floor Slope Material Notes

2 ft Operations Layer 2 ft Operations Layer 8 oz/sy Nonwoven GT Filter -- Amoco Fabrics Style 4508 1 ft LCRS Drainage Layer -- 60 mil SST HDPE GM 60 mil SST HDPE GM Columbia Geosystems Textured side down GCL GCL Bentofix NW

TABLE 1

LINER SYSTEM COMPONENTS

KIEFER LANDFILL

COUNTY OF SACRAMENTO, DEPT. OF WASTE MANAGEMENT & RECYCLING

Module M1L, Phase 1

Module M1L, Phase 2

Module M1L, Phase 3

Module M1L, Phase 4A

County of Sacramento, DWMR P:\Shared Folders\Engineering\Secured Divisional Folders\KIEFER LANDFILL\As-Builts\Baseliner\KLF Base Liner Summary.xlsx, 9/27/2024 Page 1 of 3

TABLE 1

LINER SYSTEM COMPONENTS

KIEFER LANDFILL

COUNTY OF SACRAMENTO, DEPT. OF WASTE MANAGEMENT & RECYCLING

General Contractor: Yubacon Construction Date: Nov. 1998 Liner Installer: National Seal Area: 8.9 acres

CQA Firm:

Floor Slope Material Notes

2 ft Operations Layer 2 ft Operations Layer 8 oz/sy Nonwoven GT Filter -- Mirafi S800 1 ft LCRS Drainage Layer -- 60 mil SST HDPE GM 60 mil SST HDPE GM NSC/Columbia Geosystems Textured side down GCL GCL CETCO - Bentomat DN

General Contractor: Ford Construction Date: Feb. 2004 Liner Installer: C.W. Neal Corp Area: 18 acres

CQA Firm: EMCON Floor Slope Material Notes

2 ft Soil Operations Layer 2 ft Sand Operations Layer Slope: K > 1x10-3 cm/s 8 oz/sy Nonwoven GT Filter -- SI Geosolutions - Geotex 861 1 ft LCRS Drainage Layer -- 8 oz/sy Nonwoven GT Cushion -- SI Geosolutions - Geotex 861 Primary 60 mil DST HDPE GM Primary 60 mil SST HDPE GM GSE - HD Textured Primary GCL Primary GCL CETCO - Bentomat DN K < 5x10-9 cm/s LDS Geocomposite -- CETCO - TexDrain TD 200 DS6 Secondary 60 mil DST HDPE GM -- GSE - HD Textured Secondary GCL -- CETCO - Bentomat DN K < 5x10-9 cm/s

General Contractor: Ford Construction Date: Oct. 2005 Liner Installer: D&E Construction Inc Area: 13.5 acres

CQA Firm: EMCON Floor Slope Material Notes

2 ft Soil Operations Layer 2 ft Sand Operations Layer Slope: K > 1x10-3 cm/s 8 oz/sy Nonwoven GT Filter -- GSE - NW8 1 ft LCRS Drainage Layer -- 8 oz/sy Nonwoven GT Cushion -- GSE - NW8 Primary 60 mil DST HDPE GM Primary 60 mil SST HDPE GM GSE - HD Black/White Textured Primary GCL Primary GCL CETCO - Bentomat DN K < 5x10-9 cm/s LDS Geocomposite -- GSE - 6 oz DS 200 mil FabriNet Secondary 60 mil DST HDPE GM -- GSE - HD Black/White Textured Secondary GCL -- CETCO - Bentomat DN K < 5x10-9 cm/s

General Contractor: DeSilva Gates Construction Construction Date: Jan. 2009 Liner Installer: D&E Construction Inc Area: 39 acres

CQA Firm: Shaw Environmental Inc Floor Slope Material Notes

2 ft Soil Operations Layer 2 ft Sand Operations Layer 8 oz/sy Nonwoven GT Filter -- GSE - NW8 1 ft LCRS Drainage Layer -- 8 oz/sy Nonwoven GT Cushion -- GSE - NW8 Primary 60 mil DST HDPE GM Primary 60 mil SST HDPE GM GSE - White Textured Primary GCL Primary GCL GSE - Bentofix NWL-35 LDS Geocomposite -- GSE - 6 oz DS 200 mil FabriNet Secondary 60 mil DST HDPE GM -- GSE - White Textured Secondary GCL -- GSE - Bentofix NWL-35

Module M3, Phases 1-2

Module M1L, Phase 4B

Module M2, Phase 1

Module M2, Phase 2

P:\Shared Folders\Engineering\Secured Divisional Folders\KIEFER LANDFILL\As-Builts\Baseliner\KLF Base Liner Summary.xlsx, 9/27/2024 Page 2 of 3

TABLE 1

LINER SYSTEM COMPONENTS

KIEFER LANDFILL

COUNTY OF SACRAMENTO, DEPT. OF WASTE MANAGEMENT & RECYCLING

General Contractor: Wood Brothers Inc Construction Date: Aug. 2012 Liner Installer: D&E Construction Inc Area: 12 acres

CQA Firm: Golder Associates Inc Floor Slope Material Notes

2 ft Soil Operations Layer 2 ft Sand Operations Layer Slope: K > 1x10-3 cm/s 8 oz/sy Nonwoven GT Filter -- GSE - NW8 1 ft LCRS Drainage Layer -- 8 oz/sy Nonwoven GT Cushion -- GSE - NW8 Primary 60 mil DST HDPE GM Primary 60 mil SST HDPE GM GSE - White Textured Primary GCL Primary GCL CETCO - Bentomat DN K < 5x10-9 cm/s LDS Geocomposite -- GSE - FabriNet UF Secondary 60 mil DST HDPE GM -- GSE - White Textured Secondary GCL -- CETCO - Bentomat DN K < 5x10-9 cm/s

General Contractor: ICS, Inc Construction Date: May 2021 Liner Installer: Layfield Geosynthetics Area: 32 acres

CQA Firm: Geo-Logic Associates Floor Slope Material Notes

2 ft Soil Operations Layer 2 ft Sand Operations Layer 8 oz/sy Nonwoven GT Filter -- Tencate - Mirafi S800 1 ft LCRS Drainage Layer --

-- Geosynthetic Ballast System Wind Defender TG 12 oz/sy Nonwoven GT Cushion -- Skaps - GT112 aka: Layfield - LP12E Primary 60 mil DST HDPE GM Primary 60 mil SST HDPE GM Layfield - 60 mil HDPE GM Primary GCL Primary GCL CETCO - Bentomat DN-HS LDS Geocomposite -- Skaps - TN 250-2-6 Secondary 60 mil DST HDPE GM -- Layfield - 60 mil HDPE GM Secondary GCL -- CETCO - Bentomat DN-HS

General Contractor: Ford Construction Co, Inc. Construction Date: Feb-24 Liner Installer: D&E Construction Area: 27 acres

CQA Firm: Geo-Logic Associates Floor Slope Material Notes

2 ft Soil Operations Layer 2 ft Sand Operations Layer 8 oz/sy Nonwoven GT Filter -- Solmax Mirafi S800 8 oz/sy 1 ft LCRS Drainage Layer --

-- Geosynthetic Ballast System Wind Defender TG 12 oz/sy Nonwoven GT Cushion -- Solmax Mirafi S1200 12 oz/sy Primary 60 mil DST HDPE GM Primary 60 mil SST HDPE GM Agru America Microspike Primary GCL Primary GCL Solmax Bentoliner NW 0.75 lb/sf LDS Geocomposite -- Solmax Double-Sided FabriNet 225 mil, 6 oz/sy GT Secondary 60 mil DST HDPE GM -- Agru America Microspike Secondary GCL -- Solmax Bentoliner NW

Module M4, Phase 2

Module M3, Phase 3

Module M4, Phase 1

P:\Shared Folders\Engineering\Secured Divisional Folders\KIEFER LANDFILL\As-Builts\Baseliner\KLF Base Liner Summary.xlsx, 9/27/2024 Page 3 of 3